Filling device and method for controlling sluice pier cracks
By embedding a filling device with stress absorbing material in the gate base plate of the sluice gate pier, the crack problem caused by temperature changes is solved, and the durability of the sluice and the safety of the sluice are improved.
Patent Information
- Application Number
- CN202510072117.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-16
- Publication Date
- 2025-03-18
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
During the construction process, the sluice gate pier is prone to cracking due to excessive tensile stress caused by temperature changes, resulting in durability and safety problems.
A filling device is designed, including an outer box, a deformation frame and a stress absorption assembly, and uses stress absorption materials such as a mixture of acrylic mortar or rubber aggregate and acrylic mortar to be embedded in the bottom plate of the gate to form a stress absorption layer to reduce the stress constraints of the gate pier concrete.
By setting a stress absorption layer between the gate base plate and the gate pier, cracks in the gate pier are effectively reduced, and the durability of the gate pier and the safe operation of the gate pier are improved.
Smart Images

Figure CN119640748A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of magnetic ore dressing equipment for mineral processing engineering, and in particular to a filling device and method for controlling cracks in sluice piers. Background Art
[0002] Cracks in sluice piers are a common phenomenon. Almost all sluices that have been built or are under construction are cracked. Cracks affect the durability and safe operation of sluices. Pier cracks have certain characteristics and regularities. Piers on rock foundations are more likely to crack than those on soft foundations. During construction, the longer the interval between the bottom plate and the pier casting, the easier it is to crack. Pier cracks first occur at the bottom of the pier, and as time goes by, the cracks gradually develop upward. The main reason for cracks in piers is that the tensile stress generated by temperature changes after the concrete solidifies is greater than the ultimate tensile strength of the concrete. The necessary condition for the generation of temperature stress in pier concrete is that the concrete is completely constrained and embedded when the temperature rises and falls.
[0003] Based on the above reasons, the present invention provides a filling device and method for controlling cracks in sluice piers. Summary of the invention
[0004] The object of the present invention is to provide a device and method for controlling the filling of cracks in sluice piers, so as to solve the problems existing in the prior art.
[0005] To achieve the above object, the present invention provides the following solution: The present invention provides a filling device for controlling cracks in a sluice pier, comprising:
[0006] An outer box body, wherein the outer box body is made of rubber;
[0007] A deformation frame, wherein the deformation frame is installed in the outer box body, the deformation frame comprises four groups of enclosures, the four groups of enclosures are combined to form a rectangular frame, the contact surfaces of adjacent enclosures are set as inclined surfaces, sliders are fixedly connected to the inclined surfaces of the enclosures on the left and right sides, and sliding grooves are opened on the inclined surfaces of the enclosures on the front and rear sides, and the sliders are slidably connected in the sliding grooves, and a connecting rod is fixedly connected between the enclosure and the inner wall of the outer box body;
[0008] A stress absorbing component, wherein the stress absorbing component is provided in a plurality of groups, and the plurality of groups of the stress absorbing components are respectively arranged between the enclosures located at the front and rear sides and between the enclosures located at the left and right sides;
[0009] Wherein, stress absorbing material is filled between the inner wall of the outer box body and the outer wall of the deformation frame; and a plurality of through holes are opened on the outer box body.
[0010] According to the filling device for controlling cracks in sluice piers provided by the present invention, the stress absorbing material is acrylic emulsion mortar.
[0011] According to the filling device for controlling cracks in sluice piers provided by the present invention, the acrylic emulsion mortar is prepared by weight percentage by weight of 20.0-45.0% of silicate cement; 20-40.0% of acrylic emulsion; 20.0-60.0% of sand; 0-1.2% of water reducing agent; and 5.0-15.0% of water, and the total of the components is 100%.
[0012] According to the filling device for controlling cracks in sluice piers provided by the present invention, the stress absorbing material is a mixture of rubber aggregate and acrylic mortar.
[0013] According to the filling device for controlling cracks in sluice piers provided by the present invention, the mixture of rubber aggregate and acrylic emulsion mortar is prepared by weight percentage by 40.0-60.0% of silicate cement; 20.0-30.0% of acrylic emulsion; 20.0-40.0% of rubber powder; 0-20.0% of sand; 0.3-1.2% of water reducer; and 5.0-10.0% of water, and the total of the components is 100%.
[0014] According to the filling device for controlling cracks in sluice piers provided by the present invention, the stress absorbing component includes a sleeve and a sliding rod, the sliding rod is sleeved in the sleeve, and the ends of the sleeve and the sliding rod that are away from each other are respectively fixedly connected between the two oppositely arranged enclosures, and a spring is arranged in the sleeve, and the spring abuts against the enclosure and the sliding rod.
[0015] A method for controlling cracks in a sluice pier comprises the following steps:
[0016] Step 1: an embedding groove is provided at a position corresponding to the gate pier in the gate bottom plate, and the notch area of the embedding groove is the same as the bottom area of the gate pier;
[0017] Step 2: vertically arrange steel bars on the gate bottom plate embedded in the bottom of the groove;
[0018] Step 3: placing the outer box body in the embedding groove, and passing the steel bar through the outer box body through the through hole;
[0019] Step 4: Pour the gate pier concrete on the embedded groove to complete the construction.
[0020] According to the method for controlling cracks in sluice piers provided by the present invention, the embedding groove depth is 20-50 cm.
[0021] The present invention discloses the following technical effects:
[0022] The present invention provides a stress absorbing layer between the bottom plate and the gate pier, and the stress absorbing material is embedded in the gate bottom plate, thereby overcoming the stress constraint of the bottom plate on the gate pier concrete, solving the technical problem of easy cracking of the gate pier, improving the durability of the gate pier, and facilitating the safe operation of the sluice. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0024] Figure 1 It is a structural schematic diagram of the gate pier and the gate bottom plate in the present invention;
[0025] Figure 2 It is a schematic diagram of the structure of the filling device in the present invention;
[0026] Figure 3 It is a schematic structural diagram of the stress absorption component of the present invention.
[0027] Among them, 1. gate bottom plate; 2. gate pier; 3. embedded groove; 4. notch; 5. outer box body; 6. enclosure; 7. stress absorbing material; 8. through hole; 9. sleeve; 10. slide rod; 11. spring. DETAILED DESCRIPTION
[0028] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0029] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0030] Reference Figure 1-Figure 3 The present invention provides a filling device for controlling cracks in a sluice pier, comprising:
[0031] The outer box body 5 is made of rubber;
[0032] Deformation frame, the deformation frame is installed in the outer box body 5, the deformation frame includes four groups of panels 6, the four groups of panels 6 are combined to form a rectangular frame, the contact surfaces of adjacent panels 6 are set as inclined surfaces, the inclined surfaces of the panels 6 on the left and right sides are fixedly connected with sliders, the inclined surfaces of the panels 6 on the front and rear sides are provided with sliding grooves, the sliders are slidably connected in the sliding grooves, and the panels 6 and the inner wall of the outer box body 5 are fixedly connected with connecting rods;
[0033] Stress absorbing components, the stress absorbing components are provided in a plurality of groups, and the plurality of groups of stress absorbing components are respectively provided between the enclosures 6 located at the front and rear sides and between the enclosures 6 located at the left and right sides;
[0034] The space between the inner wall of the outer box body 5 and the outer wall of the deformation frame is filled with stress absorbing material 7 ; and a plurality of through holes 8 are formed on the outer box body 5 .
[0035] According to a further optimization scheme, the stress absorbing material 7 is acrylic emulsion mortar.
[0036] According to a further optimization plan, acrylic emulsion mortar is made up of 20.0-45.0% by weight of Portland cement, 20-40.0% by weight of acrylic emulsion, 20.0-60.0% by weight of sand, 0-1.2% by weight of water reducer, and 5.0-15.0% by weight of water, and the total of each component is 100%.
[0037] According to a further optimization scheme, the stress absorbing material 7 is a mixture of rubber aggregate and acrylic mortar.
[0038] To further optimize the plan, the mixture of rubber aggregate and acrylic emulsion mortar is composed of 40.0-60.0% by weight of Portland cement; 20.0-30.0% of acrylic emulsion; 20.0-40.0% of rubber powder; 0-20.0% of sand; 0.3-1.2% of water reducer; and 5.0-10.0% of water, and the total of each component is 100%.
[0039] A further optimized solution is that the stress absorbing component includes a sleeve 9 and a sliding rod 10. The sliding rod 10 is sleeved in the sleeve 9. The ends of the sleeve 9 and the sliding rod 10 that are away from each other are fixedly connected between two oppositely arranged enclosures 6. A spring 11 is arranged in the sleeve 9, and the spring 11 abuts against the enclosure 6 and the sliding rod 10.
[0040] A method for controlling cracks in a sluice pier comprises the following steps:
[0041] Step 1: an embedding groove 3 is provided at a position corresponding to the gate pier 2 in the gate bottom plate 1, and the area of the notch 4 of the embedding groove 3 is the same as the bottom area of the gate pier 2;
[0042] Step 2: vertically arrange steel bars on the gate bottom plate 1 embedded at the bottom of the groove 3;
[0043] Step 3, placing the outer box 5 in the embedding groove 3, and passing the steel bar through the outer box 5 through the through hole 8;
[0044] Step 4: pour the pier 2 concrete on the embedded groove 3 to complete the construction.
[0045] The scheme is further optimized, and the depth of the embedded groove 3 is 20-50cm.
[0046] In the description of the present invention, it should be understood that the terms "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside" and "outside" etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0047] The embodiments described above are only descriptions of the preferred modes of the present invention, and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should all fall within the protection scope determined by the claims of the present invention.
Claims
1. A filling device for controlling cracks in sluice piers, characterized in that: include: An outer box body (5), wherein the outer box body (5) is made of rubber; A deformation frame, wherein the deformation frame is installed in the outer box body (5), and the deformation frame includes four groups of panels (6), and the four groups of panels (6) are combined to form a rectangular frame, and the contact surfaces of adjacent panels (6) are set as inclined surfaces, and sliders are fixedly connected to the inclined surfaces of the panels (6) located on the left and right sides, and sliding grooves are opened on the inclined surfaces of the panels (6) located on the front and rear sides, and the sliders are slidably connected in the sliding grooves, and connecting rods are fixedly connected between the panels (6) and the inner wall of the outer box body (5); A stress absorbing component, wherein the stress absorbing component is provided in a plurality of groups, and the plurality of groups of the stress absorbing components are respectively arranged between the enclosures (6) located at the front and rear sides and between the enclosures (6) located at the left and right sides; Wherein, a stress absorbing material (7) is filled between the inner wall of the outer box body (5) and the outer wall of the deformation frame; and a plurality of through holes (8) are provided on the outer box body (5).
2. A filling device for controlling cracks in sluice piers according to claim 1, characterized in that: The stress absorbing material (7) is acrylic mortar.
3. A filling device for controlling cracks in sluice piers according to claim 2, characterized in that: The acrylic emulsion mortar comprises, by weight, 20.0-45.0% of Portland cement; 20-40.0% of acrylic emulsion; 20.0-60.0% of sand; and 0-1.2% of a water reducing agent. It is mixed with 5.0-15.0% water, and the total of each component is 100%.
4. A filling device for controlling cracks in sluice piers according to claim 1, characterized in that: The stress absorbing material (7) is a mixture of rubber aggregate and acrylic mortar.
5. A filling device for controlling cracks in sluice piers according to claim 4, characterized in that: The mixture of the rubber aggregate and acrylic emulsion mortar comprises 40.0-60.0% of Portland cement and 20.0-30.0% of acrylic emulsion in weight percentage; 20.0-40.0% rubber powder; 0-20.0% sand; 0.3-1.2% water reducer; It is mixed with 5.0-10.0% water, and the total of each component is 100%.
6. A filling device for controlling cracks in sluice piers according to claim 1, characterized in that: The stress absorbing component comprises a sleeve (9) and a sliding rod (10), wherein the sliding rod (10) is sleeved in the sleeve (9), and ends of the sleeve (9) and the sliding rod (10) which are away from each other are respectively fixedly connected between two oppositely arranged enclosures (6), and a spring (11) is arranged in the sleeve (9), and the spring (11) is in contact with the enclosure (6) and the sliding rod (10).
7. A method for controlling cracks in a sluice pier, based on the filling device for controlling cracks in a sluice pier according to any one of claims 1 to 6, characterized in that: The steps include: Step 1: an embedding groove (3) is provided at a position corresponding to the gate pier (2) in the gate bottom plate (1), and the area of the notch (4) of the embedding groove (3) is the same as the bottom area of the gate pier (2); Step 2, vertically arranging steel bars on the gate bottom plate (1) embedded at the bottom of the groove (3); Step 3, placing the outer box body (5) in the embedding groove (3), and passing the steel bar through the outer box body (5) through the through hole (8); Step 4: pouring the gate pier (2) concrete on the embedded groove (3) to complete the construction.
8. A method for controlling cracks in sluice piers according to claim 7, characterized in that: The embedding groove (3) has a depth of 20-50 cm.