Assembling and splicing device for prefabricated main and secondary beams of house

By designing the assembly and splicing device of the prefabricated primary and secondary beams in the house, using the combination of fixed position frames, intermediate position frames and adjustment position frames, combined with the design of the formwork mechanism, the problems of low efficiency and poor sealing in the splicing process of prefabricated primary and secondary beams in the house are solved, and efficient beam frame assembly and good sealing are achieved.

CN119664117APending Publication Date: 2025-03-21YIZHENG XINCHENG CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510004845.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-02
Publication Date
2025-03-21

AI Technical Summary

Technical Problem

During the splicing process of prefabricated primary and secondary beams in the house, due to the special spatial conditions at the connection between the main beam and the secondary beam, the construction efficiency of conventional slabs is low and the sealing is difficult to ensure.

Method used

A prefabricated primary and secondary beam assembly and splicing device for houses is designed, including construction frames and formwork mechanisms. The construction frame is equipped with a fixed position frame, an intermediate position frame and an adjusting position frame. The template mechanism includes a bottom plate, a side plate and a top plate. Auxiliary fixtures are used to position and fix the formwork, and the installation wing edges and mating wing edges are used to fill gaps and improve sealing.

Benefits of technology

Through this device, the assembly efficiency of the main beam and the secondary beam is significantly improved, and the sealing and stability of the formwork mechanism are also improved, solving the problems of low efficiency and poor sealing during the splicing process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119664117A_ABST
    Figure CN119664117A_ABST
Patent Text Reader

Abstract

The invention relates to a house prefabricated primary and secondary beam assembling and splicing device and belongs to the field of concrete building structure construction.The house prefabricated primary and secondary beam assembling and splicing device comprises a construction frame and a formwork mechanism, the construction frame is provided with a fixed position frame, a middle position frame and an adjusting position frame, and the fixed position frame and the adjusting position frame are located on the two opposite sides of the middle position frame correspondingly; the fixed position frame and the adjusting position frame are respectively used for placing a main beam, the middle position frame is used for placing a secondary beam, the template mechanism comprises a bottom plate, a side plate and a top plate at a single connecting position of the main beam and the secondary beam, the fixed position frame is fixedly connected with the construction frame, the adjusting position frame is slidably connected with the construction frame, and the sliding direction is close to or far away from the fixed position frame. An auxiliary clamp is arranged on the construction frame and used for temporarily fixing the bottom plate and enabling the bottom plate to abut against the main beam and the secondary beam. The method has the effects of improving the connecting efficiency of the main beam and the secondary beam and improving the building efficiency of the concrete pouring formwork at the connecting position.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of concrete building structure construction, and in particular to a device for assembling and splicing prefabricated primary and secondary beams of a house. Background Art

[0002] In modern buildings, the beams of flat-roofed buildings are mostly reinforced concrete beams, which are the main load-bearing structures of the building floors. The beams passing through the load-bearing columns or weighing walls are the main beams, and the beams on which the loads are placed are the secondary beams. The main beams and the secondary beams are usually arranged perpendicular to each other.

[0003] In the related art, the main beam and the secondary beam are prefabricated reinforced concrete components, which are assembled on the ground to form a beam frame, and then the beam frame is hoisted as a whole to the floor position. The main body of a single assembly is two adjacent parallel main beams and multiple secondary beams between the two main beams. During the assembly process, the joints of the main beam and the secondary beam are fixed with embedded steel plates or steel bars and then connected and formed with cast-in-place concrete. During the pouring of concrete, a concrete formwork needs to be built at the joint first.

[0004] In some beam frames, the upper surfaces of the main beam and the secondary beam are flush, but the lower side of the main beam is lower than the lower side of the secondary beam. Due to the particularity of the spatial conditions at the connection between the main beam and the secondary beam, conventional formwork construction is cumbersome and inefficient under the condition of ensuring sealing. Summary of the invention

[0005] In order to improve the above-mentioned problems, the present application provides a device for assembling and splicing prefabricated primary and secondary beams of a house.

[0006] The present application provides a prefabricated main and secondary beam assembly and splicing device for a house, which adopts the following technical solution: A device for assembling and splicing prefabricated main and secondary beams of a house comprises a construction frame and a formwork mechanism, wherein the construction frame is provided with a fixed frame, an intermediate frame and an adjustable frame, wherein the fixed frame and the adjustable frame are respectively located on opposite sides of the intermediate frame, wherein the fixed frame and the adjustable frame are respectively provided for placing a main beam, and the intermediate frame is provided for placing a secondary beam, wherein the formwork mechanism comprises a bottom plate, two side plates and a top plate at a single connection position between the main beam and the secondary beam, wherein the fixed frame is fixedly connected to the construction frame, and the adjustable frame is slidably connected to the construction frame, wherein the sliding direction is close to or away from the fixed frame, and wherein an auxiliary clamp is provided on the construction frame, wherein the auxiliary clamp is used for temporarily fixing the bottom plate and making the bottom plate abut against the main beam and the secondary beam.

[0007] By adopting the above technical solution, the auxiliary clamp first positions and places the base plate at the corresponding position, and the main beam and secondary beam are respectively placed on the corresponding positions for positioning in preparation for assembly, thereby improving the assembly efficiency of the main beam, secondary beam and template.

[0008] Preferably, a main adjusting roller is rotatably provided on the fixed frame and the adjusting frame, the rotation axis of the main adjusting roller is perpendicular to the length direction of the main beam and the roller surface is in contact with the bottom of the main beam, a secondary adjusting roller is rotatably connected to the intermediate frame, the rotation axis of the secondary adjusting roller is perpendicular to the length direction of the secondary beam and the roller surface is in contact with the bottom of the secondary beam, a lifting platform is slidably provided on the fixed frame and the adjusting frame along the vertical direction, the main adjusting roller is rotatably connected to the lifting platform, the fixed frame and the adjusting frame are provided with adjustment holes for the main adjusting roller to pass through, and a control component for controlling the movement of the lifting platform is provided on the fixed frame and the adjusting frame.

[0009] By adopting the above technical scheme, after the main beam and the secondary beam are hoisted to their respective corresponding frames, the main beam can move along its own length direction on the fixed frame or the adjustable frame through the main adjusting roller to adjust its own position, and the secondary beam placed on the middle frame can slide along its own length direction through the secondary adjusting roller to be able to move itself close to the main beam, thereby realizing the positioning and placement of the main beam and the secondary beam. After being placed in place, the control component controls the lifting platform to descend, the main adjusting roller does not contact the main beam, and the main beam and the fixed frame or the adjustable frame can remain stationary.

[0010] Preferably, the control component includes a control screw and a control wedge, a force-bearing wedge is fixedly connected to the lifting platform, the wedge surface of the force-bearing wedge abuts against the wedge surface of the control wedge, the control screw is rotatably connected to the fixed frame or the adjusting frame, the control wedge is slidably connected to the fixed frame or the adjusting frame, the sliding direction is horizontal, and the control wedge is threadedly connected to the control screw.

[0011] Preferably, the edge of the base plate is integrally formed with a mounting wing, and the auxiliary clamp includes a mounting shaft, which is rotatably connected to a fixed frame or an adjustable frame, and the rotation axis is parallel to the length direction of the main beam. A mounting slot is provided on the side wall of the mounting shaft, and the depth direction of the mounting slot is the radial direction of the mounting shaft. A mounting block is fixedly connected to the mounting wing, and the mounting block is inserted into the mounting slot. When the mounting shaft is rotated until the mounting wing abuts against the side of the main beam facing the secondary beam, the base plate abuts against the bottom side of the secondary beam.

[0012] By adopting the above technical solution, before the main beam is hoisted, the bottom plate is first hung on the installation shaft through the installation plug block. After the main beam and the secondary beam are positioned, the bottom plate is turned over to form a posture to be assembled.

[0013] Preferably, the side panel is integrally formed with a mating wing, the mating wing abuts against the side of the main beam facing the secondary beam, and the side panel abuts against the side wall of the secondary beam; the formwork mechanism also includes an assembly sleeve and tension bolts, the tension bolts pass through the assembly sleeve, the top plate and the bottom plate, and the side wall of the assembly sleeve abuts against the plate surface of the side panel.

[0014] By adopting the above technical solution, the wing edge is used to fill the gap between the side plate and the side wall of the main beam to improve the sealing performance, and the tension bolts are used to fix the bottom plate and the top plate, and make the bottom plate and the top plate clamp the side plate relative to each other.

[0015] Preferably, an eccentric column is rotatably connected to the base plate, the rotation axis and length direction of the eccentric column are perpendicular to the plate surface of the base plate, a centering groove is provided on the top plate for inserting the top end of the eccentric column, the side wall of the eccentric column abuts against the side of the mating wing edge facing away from the main beam, and a stopper is provided on the base plate for stopping the eccentric column from rotating.

[0016] By adopting the above technical solution, after the eccentric column is rotated until its side wall abuts against the matching wing edge, the measured position relationship relative to the main beam can be fixed.

[0017] Preferably, a locking hole is coaxially opened on the installation shaft, the locking hole is connected to the installation slot, a connecting hole is opened on the side of the installation block, the connecting hole and the locking hole are aligned and connected, a clamp pin is passed through the locking hole on the installation shaft, and the end of the clamp pin is inserted into the connecting hole.

[0018] By adopting the above technical solution, after the fixture pin is inserted into the locking hole and the connecting hole, the installation plug block cannot be disengaged from the installation slot, and the base plate is relatively fixed relative to the installation shaft.

[0019] Preferably, the stop member is a stop pin, which passes through the mounting wing and the mounting plug at the same time. The passing direction of the stop pin is perpendicular to the plate surface of the base plate. A stop spring is connected between the stop pin and the mounting wing. In a natural state, the end of the stop pin is located on the side of the base plate facing the top plate. A limiting hole is provided on the side wall of the stop pin, and the limiting hole is for inserting a clamp pin. A stop gear ring is coaxially fixedly connected to the eccentric column, and two of the serrations of the limiting gear ring are for inserting the stop pin.

[0020] By adopting the above technical solution, after the clamp pin is pulled out, it loses its limiting effect on the installation pin and the anti-rotation pin, the base plate can be detached relative to the installation shaft, and the anti-rotation pin also pops out of the plate surface of the base plate to form a anti-rotation limit for the anti-rotation gear ring.

[0021] Preferably, the main beam and the secondary beam are both fixedly connected with embedded steel plates, the embedded steel plates of the main beam and the secondary beam are overlapped with each other and fixedly connected by bolts and nuts, the plate surface of the embedded steel plate is perpendicular to the length direction of the main beam, the formwork mechanism also includes a positioning screw barrel and a positioning bolt, the positioning screw barrel is welded and fixed on the side of the embedded steel plate facing the top plate, the length direction of the positioning screw barrel is perpendicular to the plate surface of the top plate, and the positioning bolt passes through the top plate and is screwed into the positioning screw barrel.

[0022] By adopting the above technical solution, the top plate is fixed to the embedded steel plate by the positioning screw barrel and the positioning bolts, and other parts of the formwork mechanism can be relatively fixed based on the top plate.

[0023] In summary, the present application includes at least one of the following beneficial technical effects: 1. Through the setting of fixed racks, intermediate racks, adjustable racks and auxiliary fixtures, the auxiliary fixtures are used to position and place the bottom plate at the corresponding positions, and the main beams and secondary beams are placed on the corresponding racks for positioning in preparation for assembly, thereby improving the assembly efficiency of the main beams, secondary beams and templates; 2. By installing the wing edge and the setting of the matching wing edge, the two fill the gaps between the bottom plate and the side plate and the side wall of the main beam respectively, thereby improving the sealing performance of the formwork mechanism to the casting space. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a schematic diagram of the overall structure of a device for assembling and splicing prefabricated primary and secondary beams of a house in an embodiment of the present application.

[0025] Figure 2 yes Figure 1 A partial enlarged view of part A in the middle.

[0026] Figure 3 It is a schematic diagram of the structure of the main adjusting roller and the secondary adjusting roller in the embodiment of the present application.

[0027] Figure 4 It is a schematic diagram of a structural explosion used to illustrate the working principle of the auxiliary clamp in an embodiment of the present application.

[0028] Figure 5 It is a structural cross-sectional schematic diagram used to illustrate the working principle of the anti-rotation pin in the embodiment of the present application.

[0029] Explanation of reference numerals: 1. Construction frame; 11. Fixed frame; 12. Intermediate frame; 13. Adjustment frame; 14. Main adjustment roller; 15. Secondary adjustment roller; 16. Lifting platform; 161. Force wedge; 17. Control assembly; 171. Control screw; 172. Control wedge; 18. Adjustment hole; 2. Main beam; 21. Secondary beam; 22. Embedded steel plate; 3. Formwork mechanism; 31. Bottom plate; 311. Installation wing edge; 312. Installation plug; 3121. Connecting hole; 32, side plate; 321, matching wing edge; 33, top plate; 331, casting hole; 332, exhaust hole; 333, centering groove; 34, assembly sleeve; 341, tension bolt; 35, positioning screw barrel; 351, positioning bolt; 36, eccentric column; 361, anti-rotation gear ring; 37, anti-rotation pin; 371, limiting hole; 38, anti-rotation tension spring; 4, auxiliary clamp; 41, installation shaft; 411, installation slot; 412, locking hole; 42, clamp pin. DETAILED DESCRIPTION

[0030] The following is combined with Figure 1-5 This application is described in further detail.

[0031] The present application embodiment discloses a device for assembling and splicing prefabricated primary and secondary beams of a house, such as Figure 1 and 2 As shown, it includes a construction frame 1 and a formwork mechanism 3. The frame is provided with a fixed frame 11, an intermediate frame 12 and an adjustable frame 13. The fixed frame 11 and the adjustable frame 13 are respectively located on opposite sides of the intermediate frame 12. The fixed frame 11 and the adjustable frame 13 are respectively provided for placing a main beam 2, and the intermediate frame 12 is provided for placing a secondary beam 21. The formwork mechanism 3 is used to build a casting space enclosure at each connection point between the main beam 2 and the secondary beam 21. In this embodiment, the single-spliced ​​beam frame includes two main beams 2 and three secondary beams 21. The two main beams 2 are parallel and side by side. The three secondary beams 21 are located between the two main beams 2. The length direction of the secondary beam 21 is perpendicular to the length direction of the main beam 2. The upper surfaces of the main beam 2 and the secondary beam 21 are flush, but the lower side of the main beam 2 is lower than the lower side of the secondary beam 21. The side walls of the main beam 2 and the ends of the secondary beam 21 are fixedly connected with embedded steel plates 22 in a pre-embedded manner. The embedded steel plates 22 of the main beam 2 and the secondary beam 21 are overlapped with each other and fixedly connected by bolts and nuts. The plate surface of the embedded steel plate 22 is perpendicular to the length direction of the main beam 2, and the length direction of the bolts passing through it is parallel to the length direction of the main beam 2. The embedded steel plate 22 and the bolts and nuts thereon are all located in the casting space.

[0032] like Figure 1 and 3 As shown, the number of the intermediate frames 12 is consistent with the number of the secondary beams 21 and the two correspond one to one, the fixed frame 11 and the intermediate frame are fixedly connected to the construction frame 1, and the adjustment frame 13 is slidably connected to the construction frame 1, and the sliding direction is close to or away from the fixed frame 11. The fixed frame 11 and the adjustment frame 13 are both provided with a lifting platform 16 that slides in the vertical direction, and the lifting platform 16 is rotatably connected with a plurality of main adjusting rollers 14, and the arrangement direction of the plurality of main adjusting rollers 14 is the length direction of the main beam 2, and the rotation axis of the main adjusting roller 14 is consistent with the length direction of the secondary beam 21. Both the fixed frame 11 and the adjustable frame 13 are provided with adjustment holes 18, and the lifting platform 16 is located in the adjustment hole 18. The opening direction of the adjustment hole 18 is also in the vertical direction. During the up and down movement of the lifting platform 16, the opening of the adjustment hole 18 is provided for the main adjusting roller 14 to pass through. After the main adjusting roller 14 moves up and passes through the adjustment hole 18, it abuts against the bottom of the main beam 2 and lifts up the main beam 2. The main beam 2 can then move along its own length direction on the fixed frame or the adjustable frame 13 through the main adjusting roller 14.

[0033] like Figure 3As shown, the fixed frame 11 and the adjustable frame 13 are both provided with a control component 17 for controlling the movement of the lifting platform 16, and the control component 17 includes a control screw 171 and a control wedge 172. A force-bearing wedge 161 is fixedly connected to the lifting platform 16, and the wedge surface of the force-bearing wedge 161 abuts against the wedge surface of the control wedge 172. The control screw 171 is rotatably connected to the fixed frame 11 or the adjustable frame 13, and the axis of the control screw 171 is parallel to the length direction of the main beam 2. The control wedge 172 is slidably connected to the fixed frame 11 or the adjustable frame 13, and the sliding direction is horizontal. The control wedge 172 is threadedly connected to the control screw 171. When the control screw 171 is rotated to move the control wedge 172, the lifting platform 16 can be controlled to move up and down through the wedge surface.

[0034] like Figure 1 and 3 As shown, the intermediate frame 12 is rotatably connected with a plurality of secondary adjustment rollers 15, the arrangement direction of the plurality of secondary adjustment rollers 15 is consistent with the length direction of the secondary beam 21, the rotation axis of the secondary adjustment rollers 15 is perpendicular to the length direction of the secondary beam 21, and the roller surface is in contact with the bottom of the secondary beam 21; the secondary beam 21 placed on the intermediate frame 12 can slide along its own length direction through the secondary adjustment rollers 15, so as to be able to move itself close to the main beam 2. After the main beam 2 and the secondary beam 21 are placed on the corresponding fixed frame 11 or the intermediate frame 12 or the adjustment frame 13, the position of the main beam 2 along its own length direction is first changed, and then the lifting platform 16 is lowered, and the main beam 2 cannot be easily moved. Then, the secondary beam 21 is pushed to make it close to the main beam 2 on the fixed frame 11, and the main beam 2 on the adjustment frame 13 is pushed to make it close to the secondary beam 21. When the embedded steel plates 22 at each connection point are aligned, the fixed connection operation can be performed by bolts.

[0035] like Figure 1 , 2As shown in Figures 4 and 5 , the formwork mechanism 3 includes a bottom plate 31, two side plates 32 and a top plate 33 at a single connection position between the main beam 2 and the secondary beam 21. The bottom plate 31 is located below the embedded steel plate 22, the top plate 33 is located above the embedded steel plate 22, and the two side plates 32 are located on opposite sides of the embedded steel plate 22. Auxiliary clamps 4 are provided on both the fixed frame 11 and the adjustable frame 13. The auxiliary clamps 4 are used to temporarily fix the bottom plate 31 and make the bottom plate 31 abut against the main beam 2 and the secondary beam 21. The edge of the bottom plate 31 is integrally formed with a mounting wing 311. The auxiliary clamps 4 include a mounting shaft 41. The mounting shaft 41 is rotatably connected to the fixed frame 11 or the adjustable frame 13. The mounting shaft 41 is located on the side of the main beam 2 facing the secondary beam 21, and is located at a height lower than the lower surface of the secondary beam 21. The rotation axis is parallel to the length direction of the main beam 2. A mounting slot 411 is provided on the side wall of the mounting shaft 41, and the depth direction of the mounting slot 411 is the radial direction of the mounting shaft 41. A mounting plug 312 is fixedly connected to the mounting wing 311. After the mounting plug 312 is inserted into the mounting slot 411, the bottom plate 31 can rotate relying on the mounting shaft 41; when the mounting shaft 41 rotates until the mounting wing 311 and the side of the main beam 2 facing the secondary beam 21 abut, the bottom plate 31 and the bottom side of the secondary beam 21 abut, and at this time, the plate surface of the bottom plate 31 is a horizontal plane. A locking hole 412 is coaxially opened on the mounting shaft 41, and the locking hole 412 is connected to the mounting slot 411. A connecting hole 3121 is opened on the side of the mounting plug block 312, and the connecting hole 3121 is aligned and connected with the locking hole 412. A clamp pin 42 is passed through the locking hole 412 on the mounting shaft 41, and the end of the clamp pin 42 is inserted into the connecting hole 3121. At this time, the mounting plug block 312 cannot be detached from the mounting slot 411, and the connection stability between the base plate 31 and the mounting shaft 41 is relatively high.

[0036] like Figure 2 , 4As shown in Figure 5, a matching wing 321 is integrally formed on one side edge of the side plate 32, the plate surface of the side plate 32 abuts against the side wall of the secondary beam 21, and the matching wing 321 abuts against the side of the main beam 2 facing the secondary beam 21. The formwork mechanism 3 also includes an assembly sleeve 34 and a tension bolt 341, the tension bolt 341 passes through the assembly sleeve 34, the top plate 33 and the bottom plate 31, and abuts against the opposite plate surfaces of the top plate 33 and the bottom plate 31 respectively; the side wall of the assembly sleeve 34 contacts and abuts against the plate surface of the side plate 32, and after the tension bolt 341 is tightened, the top plate 33 and the bottom plate 31 abut against the upper and lower edges of the side plate 32 respectively, and the two together with the assembly sleeve 34 form a fixed restriction on the side plate 32. An eccentric column 36 is rotatably connected to the bottom plate 31, and the rotation axis and length direction of the eccentric column 36 are perpendicular to the plate surface of the bottom plate 31. A centering groove 333 is provided on the top plate 33 for the top end of the eccentric column 36 to be inserted. After the top plate 33 and the bottom plate 31 clamp the side plate 32 together, the eccentric column 36 is located close to the matching wing edge 321; rotating the eccentric column 36 can make the side wall of the eccentric column 36 press against the side of the matching wing edge 321 away from the main beam 2, thereby achieving further compression of the side plate 32.

[0037] like Figure 4 and 5 As shown, the bottom plate 31 is provided with a stopper for stopping the eccentric column 36 from rotating. After the side wall of the eccentric column 36 abuts against the matching wing edge 321, the stopper is used to keep the eccentric column 36 stationary in this state. The stopper is a stopper pin 37, which passes through the mounting wing edge 311 and the mounting plug block 312 at the same time. Its penetration direction is perpendicular to the plate surface of the bottom plate 31. A stopper tension spring 38 is connected between the stopper pin 37 and the mounting wing edge 311; a stopper toothed ring 361 is coaxially fixedly connected to one end of the eccentric column 36 close to the bottom plate 31. In the natural state, the end of the stopper pin 37 is located on the side of the bottom plate 31 facing the top plate 33, and two of the serration gaps of the limiting toothed ring are used for the stopper pin 37 to be inserted, and the limiting toothed ring and the eccentric column 36 cannot rotate. A limiting hole 371 is provided on the side wall of the stop pin 37. When the stop pin 37 is pressed until it is completely within the mounting wing 311, the limiting hole 371 and the connecting hole 3121 are aligned, that is, the limiting hole 371 can be inserted by the clamp pin 42. At this time, the stop pin 37 cannot extend from the plate surface of the base plate 31, and the eccentric column 36 can rotate freely.

[0038] like Figure 1 and 2 As shown, the formwork mechanism 3 further includes a positioning screw barrel 35 and a positioning bolt 351. The positioning screw barrel 35 is welded and fixed to the side of the embedded steel plate 22 facing the top plate 33. The length direction of the positioning screw barrel 35 is perpendicular to the plate surface of the top plate 33. The positioning bolt 351 passes through the top plate 33 and is screwed into the positioning screw barrel 35. Grouting holes and exhaust holes 332 are provided on the top plate 33. After the formwork mechanism 3 is built and fixed, concrete is poured into the interior thereof through the grouting holes and the exhaust holes 332. The exhaust holes 332 are threaded holes.

[0039] The implementation principle of the assembly and splicing device of the prefabricated primary and secondary beams of a house in the embodiment of the present application is as follows: First, hang each bottom plate 31 on the installation shaft 41, and pay attention to the clamp pin 42 to pass through the connecting hole 3121 and the limiting hole 371 at the same time; then the main beam 2 and the secondary beam 21 are hoisted to the corresponding position frame respectively, and the embedded steel plates 22 at various locations are connected and fixed after adjusting their respective positions; the fixed position of the positioning screw barrel 35 is determined by simulating the assembly template mechanism 3, the positioning screw barrel 35 is welded on the embedded steel plate 22, the top plate 33 is installed, and then the bottom plate 31 and the side plate 32 are connected based on the top plate 33. After the eccentric column 36 abuts against the matching wing edge 321, the clamp pin 42 is pulled out, and then the concrete can be poured. After the concrete fills its space, the exhaust hole 332 and the grouting hole are blocked, and it is left to stand for curing. After the curing is completed, the template mechanism 3 is removed, and the inner cavity of the positioning screw barrel 35 is blocked with filling material, and the beam frame assembly is completed.

[0040] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A device for assembling and splicing main and secondary beams of a house prefabricated, comprising a construction frame (1) and a template mechanism (3), wherein the construction frame (1) is provided with a fixed frame (11), an intermediate frame (12) and an adjustable frame (13), wherein the fixed frame (11) and the adjustable frame (13) are respectively located on opposite sides of the intermediate frame (12), wherein the fixed frame (11) and the adjustable frame (13) are respectively provided for placing a main beam (2), and the intermediate frame (12) is provided for placing a secondary beam (21), wherein the template mechanism (3) comprises a bottom plate (31), two side plates (32) and a top plate (33) at a single connection position between the main beam (2) and the secondary beam (21), and wherein: The fixed frame (11) is fixedly connected to the construction frame (1), and the adjustable frame (13) is slidably connected to the construction frame (1), wherein the sliding direction is toward or away from the fixed frame (11). An auxiliary clamp (4) is provided on the construction frame (1), and the auxiliary clamp (4) is used to temporarily fix the bottom plate (31) and make the bottom plate (31) abut against the main beam (2) and the secondary beam (21).

2. The assembly and splicing device for prefabricated primary and secondary beams of a house according to claim 1, characterized in that: A main adjusting roller (14) is rotatably provided on both the fixed frame (11) and the adjusting frame (13), the rotation axis of the main adjusting roller (14) being perpendicular to the length direction of the main beam (2) and the roller surface being in contact with the bottom of the main beam (2); a secondary adjusting roller (15) is rotatably connected to the intermediate frame (12), the rotation axis of the secondary adjusting roller (15) being perpendicular to the length direction of the secondary beam (21) and the roller surface being in contact with the bottom of the secondary beam (21); a lifting platform (16) is slidably provided on both the fixed frame (11) and the adjusting frame (13) in a vertical direction, the main adjusting roller (14) being rotatably connected to the lifting platform (16); an adjusting hole (18) for the main adjusting roller (14) to pass through is provided on both the fixed frame (11) and the adjusting frame (13); and a control component (17) for controlling the movement of the lifting platform (16) is provided on both the fixed frame (11) and the adjusting frame (13).

3. The assembly and splicing device for prefabricated primary and secondary beams of a house according to claim 2, characterized in that: The control assembly (17) comprises a control screw (171) and a control wedge (172); a force-bearing wedge (161) is fixedly connected to the lifting platform (16); the wedge surface of the force-bearing wedge (161) abuts against the wedge surface of the control wedge (172); the control screw (171) is rotatably connected to the fixed frame (11) or the adjustment frame (13); the control wedge (172) is slidably connected to the fixed frame (11) or the adjustment frame (13); the sliding direction is horizontal; and the control wedge (172) is threadedly connected to the control screw (171).

4. The assembly and splicing device for prefabricated primary and secondary beams of a house according to claim 1, characterized in that: The edge of the bottom plate (31) is integrally formed with a mounting wing (311); the auxiliary fixture (4) comprises a mounting shaft (41); the mounting shaft (41) is rotatably connected to the fixed frame (11) or the adjustable frame (13); the rotation axis is parallel to the length direction of the main beam (2); a mounting slot (411) is provided on the side wall of the mounting shaft (41); the depth direction of the mounting slot (411) is the radial direction of the mounting shaft (41); a mounting plug (312) is fixedly connected to the mounting wing (311); the mounting plug (312) is inserted into the mounting slot (411); when the mounting shaft (41) rotates until the mounting wing (311) and the main beam (2) abut against one side facing the secondary beam (21), the bottom side of the bottom plate (31) and the secondary beam (21) abut against each other.

5. The assembly and splicing device for prefabricated primary and secondary beams of a house according to claim 4, characterized in that: A matching wing edge (321) is integrally formed on the side plate (32), the matching wing edge (321) abuts against a side of the main beam (2) facing the secondary beam (21), and the side plate (32) abuts against a side wall of the secondary beam (21); The template mechanism (3) also includes an assembly sleeve (34) and tension bolts (341), wherein the tension bolts (341) pass through the assembly sleeve (34), the top plate (33) and the bottom plate (31), and the side wall of the assembly sleeve (34) is in contact with the plate surface of the side plate (32).

6. The assembly and splicing device for prefabricated primary and secondary beams of a house according to claim 5, characterized in that: An eccentric column (36) is rotatably connected to the bottom plate (31), the rotation axis and length direction of the eccentric column (36) are perpendicular to the plate surface of the bottom plate (31), a centering groove (333) is provided on the top plate (33) for the top end of the eccentric column (36) to be inserted, the side wall of the eccentric column (36) abuts against the side of the matching wing edge (321) facing away from the main beam (2), and a rotation stopper is provided on the bottom plate (31) for stopping the eccentric column (36) from rotating.

7. The assembly and splicing device for prefabricated primary and secondary beams of a house according to claim 6, characterized in that: A locking hole (412) is coaxially provided on the installation shaft (41), the locking hole (412) is communicated with the installation slot (411), a connecting hole (3121) is provided on the side of the installation plug block (312), the connecting hole (3121) and the locking hole (412) are aligned and communicated with each other, a clamp pin (42) is passed through the locking hole (412) on the installation shaft (41), and an end of the clamp pin (42) is inserted into the communicating hole (3121).

8. The assembly and splicing device for prefabricated primary and secondary beams of a house according to claim 7, characterized in that: The anti-rotation member is an anti-rotation pin (37), and the anti-rotation pin (37) is simultaneously passed through the mounting wing (311) and the mounting plug block (312). The passing direction of the anti-rotation pin (37) is perpendicular to the plate surface of the bottom plate (31). An anti-rotation tension spring (38) is connected between the anti-rotation pin (37) and the mounting wing (311). In a natural state, the end of the anti-rotation pin (37) is located on the side of the bottom plate (31) facing the top plate (33). A limiting hole (371) is opened on the side wall of the anti-rotation pin (37), and the limiting hole (371) is for the clamp pin (42) to be inserted; A stop gear ring (361) is coaxially fixedly connected to the eccentric column (36), and two serration gaps of the limit gear ring are used for inserting the stop pin (37).

9. A prefabricated main and secondary beam assembly and splicing device for a house according to any one of claims 4 to 8, characterized in that: The main beam (2) and the secondary beam (21) are both fixedly connected with embedded steel plates (22). The embedded steel plates (22) of the main beam (2) and the secondary beam (21) overlap each other and are fixedly connected by bolts and nuts. The plate surface of the embedded steel plate (22) is perpendicular to the length direction of the main beam (2). The template mechanism (3) also includes a positioning screw barrel (35) and a positioning bolt (351). The positioning screw barrel (35) is welded and fixed to a side of the embedded steel plate (22) facing the top plate (33). The length direction of the positioning screw barrel (35) is perpendicular to the plate surface of the top plate (33). The positioning bolt (351) passes through the top plate (33) and is inserted into the positioning screw barrel (35).