A chuck and its cleaning method, chuck cleaning accessories, and cleaning equipment.
By setting blind holes and connecting holes in the chuck body, and utilizing gravity and turbulence cleaning technology, the problem of cleaning crystal deposits inside the back-wash chuck is solved, realizing an efficient and safe non-disassembly cleaning method, reducing costs and health risks.
Patent Information
- Application Number
- CN202611365191.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-03
- Publication Date
- 2026-11-17
AI Technical Summary
In existing technologies, acidic crystal deposits in the nitrogen distribution chamber and air passage inside the backwash chuck are difficult to remove effectively, leading to wafer contamination. Furthermore, traditional cleaning methods require disassembling the equipment, which is time-consuming, costly, and poses health risks.
A first blind hole and a connecting hole are provided in the chuck body. The holes are sealed by a sealing component. The cleaning fluid can enter the fluid distribution chamber and fluid channel from the upper end face to achieve efficient cleaning without disassembly. The flushing force is enhanced by gravity and turbulence.
It achieves efficient cleaning without disassembling the upper and lower layers of the chuck, shortens cleaning time, reduces labor costs and equipment precision loss, and ensures operational safety.
Smart Images

Figure CN123124744A_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of semiconductor technology, and in particular to a chuck and its cleaning method, chuck cleaning accessories, and cleaning equipment. Background Technology
[0002] In semiconductor wafer manufacturing, wet cleaning is a core process for removing contaminants from the wafer's surface and back side. The back-wash chuck is a key component in wet cleaning equipment, used to hold the wafer and perform back-side cleaning. It typically consists of an upper and lower chuck body secured with screws and mounted on a high-speed rotating spindle. The upper surface of the upper chuck body forms the chuck's upper end face, supporting the wafer. This upper end face may have inner vertical nitrogen orifices and outer oblique nitrogen orifices for nitrogen ejection. A nitrogen distribution chamber is located between the upper and lower chuck bodies. Nitrogen enters the distribution chamber through the lower chuck's internal intake channel, then is distributed to multiple vertical and oblique gas channels within the upper chuck body, finally exiting through the nitrogen orifices on the upper end face. After the wafer is placed on the upper end face of the chuck, acidic cleaning solution is sprayed from above the chuck onto the back side of the wafer, using chemical action and centrifugal force to remove back-side contaminants.
[0003] However, in actual production, acidic cleaning solutions inevitably seep into the chuck through the assembly gaps between the upper and lower chuck bodies and the screw hole gaps, entering the nitrogen distribution chamber and gas passages. As the equipment operates, temperature changes and nitrogen purging occurs, the moisture in the seeping solution gradually evaporates, leaving acidic substances and reaction products that remain and crystallize on the inner walls of the chambers and gas passages, forming acidic crystalline deposits. These crystalline deposits are carried by the high-speed airflow and sprayed onto the front side of the wafer when nitrogen is normally introduced into the chuck, forming hard particle contamination, which can lead to wafer scrap in severe cases. Summary of the Invention
[0004] This application provides a chuck, including: a chuck body and a sealing member. The chuck body has a fluid distribution cavity and a fluid channel communicating with the fluid distribution cavity. The fluid channel is configured to transport fluid. The chuck body also has an upper end face and a lower end face that are disposed opposite to each other. The chuck body also has a first blind hole and a connecting hole. The opening 2152 of the first blind hole is located on the upper end face of the chuck body, and the first blind hole extends from the upper end face of the chuck body to the lower end face of the chuck body. The connecting hole is connected to the first blind hole and the fluid distribution cavity respectively. The plugging element is removably disposed at the opening 2152 of the first blind hole, and the plugging element is configured to block the opening 2152 of the first blind hole.
[0005] According to an embodiment of this application, a chuck cleaning accessory is also provided, which is used to assemble on the upper surface of the chuck body when cleaning the chuck provided in this application. The chuck cleaning accessory includes an upper end cover, which is detachably fitted onto the upper surface of the chuck body and forms a cavity between the upper end cover and the upper surface of the chuck body. A through hole is provided on the upper end cover, and the through hole of the upper end cover is configured to be connected to a cleaning liquid source or an air source.
[0006] According to an embodiment of this application, a cleaning device is also provided, which includes the chuck provided in this application.
[0007] According to an embodiment of this application, a chuck cleaning method is also provided, applied to the chuck provided in this application. The upper end face of the chuck is equipped with the chuck cleaning accessory provided in this application, and the fluid channel of the chuck includes a first fluid channel and a second fluid channel, which are respectively connected to a fluid distribution chamber. The chuck cleaning method includes: Remove the sealing parts and place the upper cover onto the upper surface of the chuck body; The cleaning fluid source is connected to the through hole of the upper end cover, so that the cleaning fluid flows into the cavity through the through hole of the upper end cover, and then flows into the fluid distribution cavity through the first blind hole and the connecting hole in sequence. It further flows into the first fluid channel and the second fluid channel connected to the fluid distribution cavity to flush the inner walls of the fluid distribution cavity, the first fluid channel and the second fluid channel. The flushed cleaning fluid is discharged from the first fluid channel. After rinsing, remove the cleaning fluid source and connect the air source to the through hole of the upper end cover to purge and dry the first blind hole, connecting hole, fluid distribution chamber, first fluid channel and second fluid channel. Attached Figure Description
[0008] The accompanying drawings, which are included to provide a further understanding of this application and form part of this application, illustrate exemplary embodiments and are used to explain this application, but do not constitute an undue limitation of this application. In the drawings: Figure 1A A front view of a back-wash chuck in the related art is shown; Figure 1B A perspective view of a back-wash chuck in the related art is shown; Figure 2 This illustration shows a cross-sectional structural diagram of a chuck provided in an embodiment of this application; Figure 3A This illustration shows a structural diagram of the layout of a first sub-hole and a second sub-hole according to an embodiment of this application; Figure 3B This diagram illustrates a structural layout of another first sub-hole and second sub-hole provided in an embodiment of this application. Figure 4AThis illustration shows a structural diagram of the layout of a connecting hole and a chuck body according to an embodiment of this application; Figure 4B This illustration shows a structural schematic diagram of another layout of the connecting hole and the chuck body provided in an embodiment of this application; Figure 5 A top cross-sectional view of the chuck provided in an embodiment of this application is shown; Figure 6 This illustration shows a schematic diagram of a first blind hole provided in an embodiment of this application; Figure 7 This paper shows a schematic diagram of another first blind hole structure provided in an embodiment of this application; Figure 8 This shows a front view of the mounting slot area of the chuck body provided in an embodiment of this application; Figure 9 A top view of the mounting slot area of the chuck body provided in an embodiment of this application is shown; Figure 10 This illustration shows a top cross-sectional view of a partial clamping mechanism provided in an embodiment of this application; Figure 11 This shows a top cross-sectional view of another partial clamping mechanism provided in an embodiment of this application; Figure 12 This illustration shows a structural schematic diagram of a chuck cleaning accessory provided in an embodiment of this application; Figure 13 A flowchart of the chuck cleaning method provided in an embodiment of this application is shown.
[0009] In the picture: Backwash chuck 100; upper plate body 110; vertical air passage 111; oblique air passage 112; lower plate body 120; upper end face 130; inner ring vertical nitrogen port 131; outer ring oblique nitrogen port 132; gas distribution chamber 140; air inlet pipe 150; chuck 200; chuck body 210; upper plate body 210a; lower plate body 210b; fluid distribution chamber 211; first fluid distribution chamber 211a; second fluid distribution chamber 211b; fluid channel 212; first fluid channel 212a; second fluid channel 212b; vertical flow channel 2121; oblique flow channel 2122; upper end face 213 of chuck body; fluid hole 2131; lower end face 214 of chuck body; first blind hole 215; bottom closed. End 2151; Opening 2152; Connecting hole 216; First sub-hole 2161; Second sub-hole 2162; Central axis of the first sub-hole AA'; Central axis of the second sub-hole BB'; Extension direction of the connecting hole CC'; Radial direction of the chuck body DD'; Extension direction of the first blind hole EE'; Thickness direction of the chuck body FF'; Sealing element 220; Mounting groove 230; First groove 231; Second groove 232; Baffle 233; Clamping mechanism 240; Elastic element 241; Positioning element 242; Clamping element 243; Clamping element body 2431; Protrusion 2432; Second blind hole 244; Limiting element 245; Chuck cleaning accessory 300; Upper end cover 310; Through hole 311; Cavity 320. Detailed Implementation
[0010] Hereinafter, embodiments of the present application will be described with reference to the accompanying drawings. However, it should be understood that these descriptions are merely exemplary and not intended to limit the scope of the present application. Repeated reference numerals may be used in the various embodiments; these repeated reference numerals are for simplicity and clarity only and do not indicate a relationship between the various embodiments.
[0011] In semiconductor wafer manufacturing, wet cleaning is a core process for removing contaminants from the wafer surface and back side. As the feature linewidth of integrated circuits continues to shrink, the sensitivity of wafer surfaces to particulate and metal ion contamination increases dramatically. Even minute surface contaminants can lead to device failure or a significant drop in yield. Therefore, the process stability and cleanliness control capabilities of wet cleaning equipment directly affect the overall yield and production cost of semiconductor manufacturing.
[0012] The back-side clean chuck (BS clean chuck) is a core component in wet cleaning equipment used to hold wafers and perform back-side cleaning. Figure 1A The front view of a back-wash chuck 100 in the related art is shown. Figure 1B A perspective view of a back-wash chuck 100 in the related art is shown. (See diagram below.) Figure 1A and Figure 1BAs shown, the backwash chuck 100 is typically made of polyvinylidene fluoride (PVDF) and consists of an upper chuck body 110 and a lower chuck body 120, which are fixed together by screws and mounted on a high-speed rotating spindle (not shown in the figure). The upper surface of the upper chuck body 110 is the upper end face 130 of the backwash chuck 100, used to support the wafer. The upper end face 130 has chuck pins (not shown in the figure) for clamping the wafer, as well as inner ring vertical nitrogen holes 131 and outer ring oblique nitrogen holes 132 for ejecting nitrogen gas. A gas distribution chamber 140 is provided inside the upper chuck body 110 to evenly distribute nitrogen gas from the bottom inlet pipe 150 to each nitrogen gas channel. Nitrogen gas enters from the inlet below the rotating spindle and then passes through the inlet... Gas channel 150 enters the corresponding gas distribution chamber 140, and then the gas is diverted from the corresponding gas distribution chamber 140 to multiple vertical gas channels 111 and multiple oblique gas channels 112 inside the upper plate 110. Finally, it is ejected from the inner ring vertical nitrogen hole 131 and the outer ring oblique nitrogen hole 132 of the upper end face 130, forming a dynamic gas curtain at the edge of the wafer to support the wafer before it is clamped and fixed by the chuck pin (not shown in the figure), and to prevent the cleaning fluid from flowing around the edge of the wafer to the front side after the wafer is clamped.
[0013] In actual production, after the wafer (not shown in the figure) is fixed on the back-wash chuck 100, the rotating spindle drives the back-wash chuck 100 and the wafer to rotate at high speed together. Acidic cleaning solutions (such as standard cleaning solution SC1, standard cleaning solution SC2, diluted hydrofluoric acid DHF, etc.) are sprayed from nozzles (not shown in the figure) above the back-wash chuck 100 onto the back side of the wafer (i.e., the side facing upwards), using chemical action and centrifugal force to remove contaminants from the back side. During this process, the acidic cleaning solution can seep into the chuck through the assembly gap between the upper plate 110 and the lower plate 120, the screw hole gaps, and multiple vertical air channels 111 and multiple oblique air channels 112, entering the nitrogen distribution chamber and the interior of the multiple vertical air channels 111 and multiple oblique air channels 112. As the equipment operates, temperature changes and nitrogen purging occur, causing the moisture in the infiltrated chemical solution to gradually evaporate. However, the acidic substances and reaction products in the solution remain and crystallize on the inner walls of the nitrogen distribution chamber, multiple vertical gas channels 111, and multiple oblique gas channels 112, forming acidic crystalline deposits primarily composed of ammonium salts and fluorides. When nitrogen is normally introduced into the backwash chuck 100, these crystalline deposits are carried by the high-speed airflow and sprayed onto the front side of the wafer, forming hard, difficult-to-remove particulate contamination. In severe cases, this can lead to dozens to hundreds of fatal particle defects on a single wafer, directly causing wafer scrap. As the equipment operates over time, the amount of crystallization within the gas channels continuously increases, and the frequency of excessive particle counts rises, eventually necessitating shutdown for cleaning and maintenance.
[0014] To address the aforementioned issue of gas channel crystallization contamination, the cleaning method employed in related technologies involves completely disassembling the backwash chuck 100 from the equipment, separating the upper plate 110 and lower plate 120 of the backwash chuck 100, and having technicians manually wipe and clean the exposed nitrogen distribution chamber, the inner walls of the multiple vertical gas channels 111 and the multiple oblique gas channels 112. After cleaning, the equipment is reassembled, calibrated, and reinstalled. However, this cleaning method has several drawbacks. Firstly, a single cleaning session takes 20 to 30 hours, during which time the equipment is completely unusable for production, resulting in a loss of 2,000 to 3,500 wafers per cleaning session per unit. Secondly, each cleaning session requires 2 to 3 skilled technicians working together, involving multiple complex steps such as disassembly, cleaning, reassembly, and precision calibration, leading to high labor costs and demanding a high level of technical proficiency from the operators. Furthermore, frequent disassembly and reassembly increase the critical fitting precision of the chuck, such as coaxiality and flatness. Simultaneously, the screw holes experience accelerated wear due to repeated stress, and the resulting debris further increases the risk of secondary contamination within the cavity. In the long term, frequent disassembly can shorten the chuck's lifespan by more than 30%, increasing equipment maintenance costs. Additionally, operators need to directly contact acidic residual crystals adhering to the airway walls, posing a health threat to the skin and respiratory tract. Moreover, the open operation during disassembly and cleaning also introduces the risk of secondary contamination.
[0015] Therefore, how to achieve efficient cleaning of the air intake channel 150, gas distribution chamber 140, multiple vertical air channels 111, and multiple oblique air channels 112 inside the back-washing chuck 100 without disassembling the upper plate 110 and lower plate 120, so as to shorten cleaning time, reduce production capacity loss and labor costs, protect equipment precision, and improve operational safety, is a technical problem that urgently needs to be solved in this field.
[0016] To address the aforementioned problems, this application provides a chuck and its cleaning method, chuck cleaning accessories, and cleaning equipment. The technical solution provided by this application allows cleaning fluid to enter and flow through the closed fluid distribution chamber and fluid channels inside the chuck without disassembling the upper and lower layers of the chuck, effectively removing crystalline deposits from the inner walls of the fluid distribution chamber and fluid channels.
[0017] Figure 2 A cross-sectional structural schematic diagram of a chuck 200 provided in an embodiment of this application is shown. Figure 2 As shown, the chuck 200 includes a chuck body 210 and a sealing element 220.
[0018] The chuck body 210 has a fluid distribution chamber 211 and a fluid channel 212 communicating with the fluid distribution chamber 211. The fluid channel 212 is configured to transport fluid. It is understood that the fluid here may include gas or liquid, etc., and is not limited thereto.
[0019] In some embodiments, the chuck body 210 may include an upper chuck body 210a and a lower chuck body 210b. The chuck body 210 also has an upper end surface 213 and a lower end surface 214 disposed opposite to each other. The upper surface of the upper chuck body 210a is the upper end surface 213 of the chuck body, and the lower surface of the upper chuck body 210a is the lower end surface 214 of the chuck body. The upper end surface 213 of the chuck body is provided with chuck pins for clamping wafers and fluid holes 2131 for ejecting fluid. A fluid distribution cavity 211 is disposed within the upper chuck body 210a. In some embodiments, the fluid channel 212 includes a first fluid channel 212a and a second fluid channel 212b, which are respectively connected to the fluid distribution cavity 211. When the chuck 200 is in operation, the first fluid channel 212a is configured to introduce fluid into the fluid distribution cavity 211, and the second fluid channel 212b is configured to discharge the fluid from the fluid distribution cavity 211 to the upper end face 213 of the chuck body. The second fluid channel 212b may include multiple vertical flow channels 2121 and multiple oblique flow channels 2122 formed inside the upper chuck body 210a, respectively connected to the inner ring vertical fluid holes 2131 and the outer ring oblique fluid holes 2131 of the upper end face 213 of the chuck body. After the fluid enters through the first fluid channel 212a below the chuck body 210, it enters the corresponding fluid distribution chamber 211 through the first fluid channel 212a inside the lower plate body 210b, and then is diverted from the fluid distribution chamber 211 to the corresponding second fluid channel 212b. Finally, it is ejected from the inner ring vertical fluid hole 2131 and the outer ring oblique fluid hole 2131 on the upper end face 213 of the chuck body to support the wafer, form a dynamic air curtain at the edge of the wafer, and prevent the cleaning fluid from flowing around the edge of the wafer to the front side.
[0020] A first blind hole 215 is also formed inside the chuck body 210, and the opening 2152 of the first blind hole 215 (see reference) Figure 3A The first blind hole 215 is located on the upper end face 213 of the chuck body, and extends from the upper end face 213 of the chuck body towards the lower end face 214 of the chuck body. It can be understood that the first blind hole 215 here is a blind hole structure opened inside the chuck body 210, that is, it has a bottom closed end 2151 (see reference). Figure 4AThe first blind hole 215 has an opening 2152 located on the upper end face 213 of the chuck body. By placing the opening 2152 of the first blind hole 215 on the upper end face 213 of the chuck body, the cleaning fluid can flow directly from top to bottom under gravity after entering through the opening 2152, and enter the fluid distribution chamber 211 and fluid channel 212 through the connecting hole 216. This eliminates the need for additional work to overcome gravity, resulting in low water inlet resistance, improved cleaning effect, and reduced pressure requirements on the cleaning equipment. In some embodiments, the radial dimension of the first blind hole 215 is larger than the radial dimension of the fluid channel 212. This saves cleaning time, improves rinsing efficiency, and facilitates the flow of cleaning fluid into multiple channels for cleaning.
[0021] The number of first blind holes 215 can be one or more. When there are multiple first blind holes 215, the openings 2152 of the multiple first blind holes 215 can be symmetrically distributed on the upper end face 213 of the chuck body, for example, evenly spaced in the circumferential direction. Each first blind hole 215 can be respectively provided with a connecting hole 216, and each connecting hole 216 is connected to the fluid distribution chamber 211. During cleaning, the cleaning fluid enters from multiple first blind holes 215 simultaneously, flows into the fluid distribution chamber 211 through their respective connecting holes 216, forming multiple parallel cleaning fluid channels, which allows the cleaning fluid to fill the fluid distribution chamber 211 and fluid channel 212 more quickly, shortening the filling time of the cleaning fluid and improving the rinsing efficiency. Meanwhile, the arrangement of multiple first blind holes 215 allows the cleaning fluid to enter simultaneously from different directions of the fluid distribution cavity 211, which helps to form a more complex turbulent flow field in the fluid distribution cavity 211, enhances the flushing effect on the inner wall of the fluid distribution cavity 211 and the fluid channel 212, and further improves the uniformity and thoroughness of cleaning.
[0022] The chuck body 210 also has a connecting hole 216, which communicates with the first blind hole 215 and the fluid distribution chamber 211. One end of the connecting hole 216 communicates with the first blind hole 215, and the other end communicates with the fluid distribution chamber 211, thus allowing the first blind hole 215 to communicate with the fluid distribution chamber 211 through the connecting hole 216. When cleaning is required, cleaning fluid is injected through the opening 2152 of the first blind hole 215, flows sequentially through the first blind hole 215 and the connecting hole 216, and then enters the fluid distribution chamber 211. It then flows into the fluid channel 212, which communicates with the fluid distribution chamber 211, rinsing the inner walls of the fluid distribution chamber 211 and the fluid channel 212. This allows for cleaning of the chuck 200 without disassembling the upper chuck body 210a and the lower chuck body 210b. In some embodiments, the radial dimension of the connecting hole 216 is larger than the radial dimension of the fluid channel 212. This saves cleaning time, improves rinsing efficiency, and facilitates the flow of cleaning fluid into multiple channels for cleaning.
[0023] A sealing element 220 is removably disposed at the opening 2152 of the first blind hole 215, and is configured to block the opening 2152 of the first blind hole 215. During normal operation of the chuck 200, the sealing element 220 blocks the opening 2152, ensuring the sealing of the first blind hole 215 and preventing fluid in the fluid distribution chamber 211 from leaking from the opening 2152, while also preventing external contaminants from entering the first blind hole 215 and the fluid distribution chamber 211. When cleaning is required, the operator can remove the sealing element 220, exposing the opening 2152 of the first blind hole 215, so that cleaning fluid can be injected into the first blind hole 215 through the opening 2152. The sealing element 220 can be made of the same or compatible material as the chuck body 210 to avoid sealing failure due to differences in thermal expansion coefficients between different materials. The shape of the sealing element 220 can be a columnar structure or a composite structure, etc., and is not limited thereto. For example, the sealing member 220 may include a main body and a sealing part. The main body may be conical in shape for extending through the clamping member into the first blind hole, and the sealing part may be cylindrical in shape, with a groove provided at the part of the cylindrical shape that contacts the clamping member (see reference). Figure 8 This is to ensure that when the clamping member 243 clamps the sealing member 220, the clamping member can be located in the groove of the sealing member 220 to improve the stability of the clamping.
[0024] As can be seen from the above, in one or more technical solutions provided in the embodiments of this application, by forming a first blind hole and a connecting hole in the chuck body, setting the opening of the first blind hole on the upper end face of the chuck body, and extending the first blind hole from the upper end face of the chuck body to the lower end face of the chuck body, when cleaning is required, the cleaning fluid can enter through the opening and flow from top to bottom by gravity without having to do extra work to overcome gravity. Under the same injection pressure, a larger flow rate and a faster flow velocity can be obtained, and the scouring force on the wall crystals is stronger, thereby improving the cleaning effect and reducing the requirements for the pressure supply capacity of the cleaning equipment.
[0025] Based on this, the connecting hole is connected to both the first blind hole and the fluid distribution chamber, and a removable plug is installed at the opening of the first blind hole. Thus, when cleaning is required, the operator only needs to remove the plug to inject cleaning fluid from the outside of the chuck body through the opening of the first blind hole. The cleaning fluid flows through the first blind hole and the connecting hole into the fluid distribution chamber and fluid channel, rinsing their inner walls. Finally, the waste liquid carrying crystals is discharged from the first fluid channel 212a (fluid inlet channel) of the chuck body. The entire cleaning process does not require disassembling the upper and lower layers of the chuck body, avoiding the decrease in fitting accuracy and shortened service life caused by frequent disassembly and assembly. Furthermore, the operator does not need to directly contact acidic residual crystals, eliminating health and safety hazards.
[0026] In some embodiments, Figure 3AThis diagram illustrates a structural layout of a first sub-hole 2161 and a second sub-hole 2162 provided in an embodiment of this application. Figure 3B This diagram illustrates a structural layout of another first sub-hole 2161 and second sub-hole 2162 provided in an embodiment of this application. Figure 2 , Figure 3A and Figure 3B As shown, the connecting hole 216 includes at least a first sub-hole 2161 and a second sub-hole 2162, both of which are connected to the first blind hole 215 and the fluid distribution cavity 211, respectively.
[0027] like Figure 2 , Figure 3A and Figure 3B As shown, the first sub-hole 2161 and the second sub-hole 2162 can be two independent channel structures opened inside the chuck body 210. They can be located at the same horizontal level or at different horizontal levels. One end of both the first sub-hole 2161 and the second sub-hole 2162 is connected to the first blind hole 215, and the other end is connected to the fluid distribution cavity 211, thus forming two parallel fluid channels. By setting the first sub-hole 2161 and the second sub-hole 2162, when the cleaning fluid enters from the first blind hole 215, it is split at the first sub-hole 2161 and the second sub-hole 2162, and flows into the fluid distribution cavity 211 through the first sub-hole 2161 and the second sub-hole 2162 respectively. When the two fluids flow in different directions and meet in the fluid distribution cavity 211, local turbulence is formed inside the fluid distribution cavity 211. Under turbulent conditions, the fluid velocity increases, the shear force on the flowing wall is enhanced, and the crystalline deposits attached to the inner wall of the fluid distribution cavity 211 can be more effectively peeled off, thereby improving the cleaning effect and cleaning efficiency.
[0028] like Figure 2 , Figure 3A and Figure 3B As shown, there is an angle between the projection of the central axis AA' of the first sub-hole 2161 onto the upper end face 213 of the chuck body and the projection of the central axis BB' of the second sub-hole 2162 onto the upper end face 213 of the chuck body. It can be understood that the angle between the first sub-hole 2161 and the second sub-hole 2162 determines the convergence angle and collision intensity of the fluid within the fluid distribution chamber 211. When the angle is 180°, the central axis AA' of the first sub-hole 2161 coincides with the central axis BB' of the second sub-hole 2162. The two fluids within the first sub-hole 2161 and the second sub-hole 2162 flow in opposite directions, resulting in the most intense collision, the highest turbulence intensity, and the best cleaning effect (reference). Figure 3A When the included angle is between 90° and 180°, the two fluids can also converge within the fluid distribution chamber 211, generating a certain degree of turbulence, which can improve the cleaning effect (see reference). Figure 3B ).
[0029] In some embodiments, Figure 4A This illustration shows a structural diagram of the layout of the connecting hole 216 and the chuck body 210 according to an embodiment of this application. Figure 4B This diagram illustrates a structural schematic of another layout of the connecting hole 216 and the chuck body 210 provided in an embodiment of this application. Figure 2 , Figure 4A and Figure 4B As shown, the extending direction CC' of the connecting hole 216 and the radial direction DD' of the chuck body 210, that is, the extending direction of the plane where the fluid distribution cavity 211 is located, can be the same (see reference). Figure 4A It can also have an angle α with the radial direction DD' of the chuck body 210, that is, the extension direction of the plane where the fluid distribution cavity 211 is located (see reference). Figure 4B This allows the connecting hole 216 to be flexibly set according to the actual space of the fluid distribution cavity 211. By adjusting the angle α between the connecting hole 216 and the radial direction DD' of the chuck body 210, the connecting hole 216 can be adapted to a specific position and depth of the fluid distribution cavity 211, avoiding interference with other internal structures or existing flow channels, thereby reducing processing difficulty and improving the manufacturability of the structure.
[0030] In some embodiments, Figure 5 A top cross-sectional view of the chuck 200 provided in an embodiment of this application is shown. Figures 2-5 As shown, the first blind hole 215 is located within the projection area of the fluid distribution cavity 211 onto the upper end face 213 of the chuck body. That is, the orthographic projection of the first blind hole 215 onto the upper end face 213 of the chuck body falls within the orthographic projection area of the fluid distribution cavity 211 on that plane. Since the first blind hole 215 is a blind hole structure extending from the upper end face 213 of the chuck body 210 towards the fluid distribution cavity 211, the position of its bottom end determines the starting position of the connecting hole 216. When the first blind hole 215 is located within the orthographic projection area of the fluid distribution cavity 211, the connecting hole 216 does not need to take a long detour inside the chuck body 210 when connecting the first blind hole 215 and the fluid distribution cavity 211, thus shortening the length of the connecting hole 216, reducing the resistance of the cleaning fluid flowing through the connecting hole 216, and facilitating the entry of the cleaning fluid into the fluid distribution cavity 211 with lower pressure loss, thereby improving rinsing efficiency.
[0031] In some examples, such as Figures 2-5As shown, the orthographic projection of the first blind hole 215 onto the upper end face 213 of the chuck body can fall at the center of the orthographic projection area of the fluid distribution cavity 211 on that plane. Since the connecting hole 216 includes a first sub-hole 2161 and a second sub-hole 2162, both of which extend from the bottom end of the first blind hole 215 to the fluid distribution cavity 211. When the first blind hole 215 is located at the center of the orthographic projection area of the fluid distribution cavity 211, the path lengths of the first sub-hole 2161 and the second sub-hole 2162 from the bottom of the first blind hole 215 to the fluid distribution cavity 211 are basically equal. This makes the flow resistance of the two channels tend to be consistent, and the flow distribution of the cleaning fluid into the fluid distribution cavity 211 through the first sub-hole 2161 and the second sub-hole 2162 is more uniform. This avoids the situation where the flow rate is large on one side and small on the other side due to the difference in flow resistance. As a result, the momentum of the two fluids is more matched when they meet in the fluid distribution cavity 211, which is conducive to forming a more sufficient turbulence effect. This improves the cleaning effect, simplifies the processing and positioning, reduces the processing difficulty and positioning error, and improves the processing efficiency and yield.
[0032] In some embodiments, Figure 6 A schematic diagram of the structure of a first blind hole 215 provided in an embodiment of this application is shown. Figure 2 , Figure 4A , Figure 4B and Figure 6 As shown, the extension direction of the first blind hole 215 can be the same as the thickness direction of the chuck body 210 (see reference). Figure 2 , Figure 4A and Figure 4B ), or they can be different (see reference) Figure 6 For example, the extension direction EE' of the first blind hole 215 has an angle β with the thickness direction FF' of the chuck body 210. It can be understood that the extension direction of the first blind hole 215 here can be the direction in which the central axis of the first blind hole 215 extends from the opening 2152 end of the first blind hole 215 to the bottom closed end 2151 of the first blind hole 215.
[0033] When the extension direction of the first blind hole 215 is the same as the thickness direction of the chuck body 210 (refer to...) Figure 2 , Figure 4A and Figure 4B The first blind hole 215 extends along the axial direction of the chuck body 210. At this point, the machining is simplest, and the flow path of the cleaning fluid is the shortest and the resistance is the least, which is conducive to the cleaning fluid entering the fluid distribution chamber 211 at a faster flow rate.
[0034] However, due to the limited internal space and complex structure of the chuck body 210, its upper and lower plates are fixed together by multiple screws, and it also contains a fluid distribution chamber 211, a fluid channel 212, and multiple screw holes, which occupy different positions within the chuck body 210. In actual machining, if the vertically extending path of the first blind hole 215 interferes with the aforementioned existing structure, it cannot be directly drilled. In this case, the extension direction of the first blind hole 215 can be set to have an angle β with the thickness direction of the chuck body 210 (see reference). Figure 6 By tilting the first blind hole 215 at a certain angle relative to the axial direction of the chuck body 210, the first blind hole 215 can avoid internal screw holes and other structures. This effectively avoids interference with the existing structure while ensuring communication between the first blind hole 215 and the fluid distribution chamber 211, ensuring machining feasibility and reducing machining difficulty and manufacturing costs. It is understood that the specific value of this angle can be flexibly selected according to the actual layout of the internal structure of the chuck body 210. For example, the angle can be between 0° and 30°. While meeting the avoidance requirements, the angle should not be too large to reduce the friction loss of the cleaning fluid in the tilted channel, ensuring that the cleaning fluid can smoothly reach the fluid distribution chamber 211.
[0035] In some embodiments, such as Figure 2 , Figure 4A , Figure 4B and Figure 6 As shown, the distance from the bottom of the first blind hole 215 to the upper end face 213 of the chuck body is less than or equal to the distance from the bottom of the fluid distribution cavity 211 to the upper end face 213 of the chuck body. It should be noted that the distance from the bottom of the first blind hole 215 to the upper end face 213 of the chuck body refers to the vertical distance measured along the thickness direction of the chuck body 210, from the bottom closed end 2151 of the first blind hole 215 to the upper end face 213 of the chuck body; the distance from the bottom of the fluid distribution cavity 211 to the upper end face 213 of the chuck body refers to the vertical distance measured along the same direction, from the bottom of the fluid distribution cavity 211 to the upper end face 213 of the chuck body. The former being less than or equal to the latter indicates that the bottom closed end 2151 of the first blind hole 215 is located above the bottom of the fluid distribution cavity 211, or is flush with it in the thickness direction.
[0036] When the distance from the bottom of the first blind hole 215 to the upper end face 213 of the chuck body is less than the distance from the bottom of the fluid distribution cavity 211 to the upper end face 213 of the chuck body, the bottom closed end 2151 of the first blind hole 215 is located above the bottom of the fluid distribution cavity 211 (see reference). Figure 4BAt this time, the connecting hole 216 extends obliquely downward from the side wall of the bottom closed end 2151 of the first blind hole 215 to the bottom of the fluid distribution chamber 211, so that the cleaning fluid obtains a downward velocity component when flowing through the connecting hole 216, and uses gravity to assist the flow to reduce flow resistance.
[0037] When the distance from the bottom of the first blind hole 215 to the upper end face 213 of the chuck body is equal to the distance from the bottom of the fluid distribution chamber 211 to the upper end face 213 of the chuck body (refer to...) Figure 2 , Figure 4A and Figure 6 The bottom closed end 2151 of the first blind hole 215 is flush with the bottom of the fluid distribution cavity 211 in the thickness direction, or slightly lower than the bottom of the fluid distribution cavity 211 when viewed from the upper end face 213 to the lower end face 214 of the chuck body. At this time, the connecting hole 216 can extend horizontally to connect the two, which has the shortest path, the least resistance, and the simplest processing, which helps to reduce processing difficulty and manufacturing cost.
[0038] In some embodiments, Figure 7 A schematic diagram of another first blind hole 215 provided in an embodiment of this application is shown. Figure 2 and Figure 7 As shown, in some embodiments, the fluid distribution cavity 211 may include a first fluid distribution cavity 211a and a second fluid distribution cavity 211b, and the connecting hole 216 communicates with the first fluid distribution cavity 211a and the second fluid distribution cavity 211b respectively. When the connecting hole 216 includes a first sub-hole 2161 and a second sub-hole 2162, the first fluid distribution cavity has a first sub-hole 2161 and a second sub-hole 2162 respectively connected to the first fluid distribution cavity 211a; the second fluid distribution cavity 211b has a first sub-hole 2161 and a second sub-hole 2162 respectively connected to the second fluid distribution cavity 211b.
[0039] For example, the distance from the bottom of the first fluid distribution cavity 211a to the upper end face 213 of the chuck body is less than the distance from the bottom of the second fluid distribution cavity 211b to the upper end face 213 of the chuck body. That is, the first fluid distribution cavity 211a is located at a relatively shallow position inside the chuck body 210, and the second fluid distribution cavity 211b is located at a relatively deep position. The distance from the bottom of the first blind hole 215 to the upper end face 213 of the chuck body is less than or equal to the distance from the bottom of the second fluid distribution cavity 211b to the upper end face 213 of the chuck body. It should be noted that the distance from the bottom of the first fluid distribution cavity 211a to the upper end face 213 of the chuck body refers to the vertical distance measured along the thickness direction of the chuck body 210, from the bottom of the first fluid distribution cavity 211a to the upper end face 213 of the chuck body; the distance from the bottom of the second fluid distribution cavity 211b to the upper end face 213 of the chuck body refers to the vertical distance measured along the same direction, from the bottom of the second fluid distribution cavity 211b to the upper end face 213 of the chuck body.
[0040] Because the second fluid distribution cavity 211b is located at a deeper position, the distance from its bottom to the upper end face 213 of the chuck body is relatively large. The distance from the bottom of the first blind hole 215 to the upper end face 213 of the chuck body is less than or equal to the distance from the bottom of the second fluid distribution cavity 211b to the upper end face 213 of the chuck body. Furthermore, the path from the bottom area of the first blind hole 215 through the connecting hole 216 to the second fluid distribution cavity 211b extends horizontally or diagonally downwards. Therefore, during the cleaning process, the cleaning fluid does not flow against gravity, and the flow resistance is small, which helps the cleaning fluid to smoothly reach the deeper second fluid distribution cavity 211b, improving cleaning efficiency and cleaning effect.
[0041] In some embodiments, such as Figure 2 , Figure 4A , Figure 4B , Figure 6 and Figure 7As shown above, the fluid channel 212 includes a first fluid channel 212a and a second fluid channel 212b. The first fluid channel 212a and the second fluid channel 212b are respectively connected to the fluid distribution chamber 211. When the chuck 200 is in operation, the first fluid channel 212a is configured to introduce fluid into the fluid distribution chamber 211, and the second fluid channel 212b is configured to discharge the fluid in the fluid distribution chamber 211 to the upper end face 213 of the chuck body. In some specific examples, the first fluid channel 212a can be an inlet fluid channel formed in the lower part of the fluid distribution cavity 211, extending from the inlet fluid port below the chuck body 210 along the thickness direction of the chuck body 210 to the fluid distribution cavity 211. It is used to transport fluid from the bottom inlet fluid port to the fluid distribution cavity 211 and can also be used to discharge waste liquid from subsequent chuck cleaning. The second fluid channel 212b includes a vertical flow channel 2121 and / or an inclined flow channel 2122 formed in the fluid distribution cavity 211, extending from the fluid distribution cavity 211 to the upper end face 213 of the chuck body. It is used to transport the fluid in the fluid distribution cavity 211 to the corresponding three-dimensional hole on the upper end face 213 of the chuck body and eject it. It is understood that the first fluid channel 212a, the second fluid channel 212b, and the fluid distribution cavity 211 together form a complete flow path for the fluid from the inlet fluid port to the upper end face 213 of the chuck body. During chuck cleaning, the cleaning fluid flows into the fluid distribution chamber 211 through the first blind hole 215 and the connecting hole 216. Part of it flows into the second fluid channel 212b and is discharged from the fluid hole 2131 on the upper end face 213 of the chuck body, while the other part flows downward through the first fluid channel 212a and is discharged from the bottom of the chuck body 210, thereby achieving simultaneous cleaning of the first fluid channel 212a and the second fluid channel 212b.
[0042] In some embodiments, Figure 8 A front view of the mounting slot 230 area of the chuck body 210 provided in an embodiment of this application is shown. Figure 8As shown, the upper end face 213 of the chuck body is provided with a mounting groove 230, which is recessed into the interior of the chuck body 210 from the upper end face 213. The opening 2152 of the first blind hole 215 is located on the bottom wall of the mounting groove 230. The chuck 200 also includes a clamping mechanism 240, which is detachably installed in the mounting groove 230 and configured to fix the sealing member 220. It can be understood that the mounting groove 230 is a groove structure formed at the upper end face 213 of the chuck body 210 to accommodate the clamping mechanism 240. By setting the opening 2152 of the first blind hole 215 in the mounting groove 230, the clamping mechanism 240 can be arranged around the opening 2152 of the first blind hole 215, thereby applying a uniform clamping force to the sealing member 220 in the mounting groove space around the opening 2152, improving the fixing reliability of the sealing member 220. Meanwhile, the mounting slot 230 provides mounting space for the clamping mechanism 240, allowing it to be fully or partially embedded in the upper end surface 213 of the chuck body 210, thus preventing the clamping mechanism 240 from protruding from the upper end surface 213 of the chuck body and interfering with the wafer's bearing and rotation.
[0043] like Figure 8 As shown, the clamping mechanism 240 is detachably installed in the mounting groove 230. For example, the clamping mechanism 240 and the mounting groove 230 can be installed and removed through threaded connection, snap-fit connection, interference fit, etc., so that the clamping mechanism 240 can be reliably held in the mounting groove 230 during use and removed from the mounting groove 230 when maintenance or replacement is required. The clamping mechanism 240 is configured to fix the sealing member 220. That is, the clamping mechanism 240 is used to fix the sealing member 220 at the opening 2152 of the first blind hole 215 when the chuck 200 is working normally, to prevent fluid from leaking from the first blind hole. At the same time, when the chuck 200 needs to be cleaned, the clamping mechanism 240 can be operated to release the sealing member 220 to achieve cleaning of the fluid distribution chamber 211 and the fluid channel 212. By setting up the clamping mechanism 240, the sealing component 220 can be quickly disassembled and assembled, which improves the convenience and efficiency of cleaning operations and avoids thread wear and debris caused by repeated thread disassembly and assembly.
[0044] In some examples, Figure 9 A top view of the mounting slot 230 area of the chuck body 210 provided in an embodiment of this application is shown. Figure 8 and Figure 9As shown, the clamping mechanism 240 can be an elastic clamping mechanism. In this case, the clamping mechanism 240 may include an elastic element 241, a positioning element 242, and a clamping element 243, all of which are disposed within the mounting groove 230. One end of the positioning element 242 is fixed to the side wall of the mounting groove 230, and the other end abuts against the clamping element 243. For example, one end of the positioning element 242 can be fixed to the side wall of the mounting groove 230 by bolt connection. At least a portion of the positioning element 242 is sleeved on the outer periphery of the elastic element 241 to serve as a guide and limiting structure for the elastic element 241, restricting the movement direction of the elastic element 241 so that the elastic element 241 always moves in a predetermined direction during compression and recovery, thereby ensuring the stability of the movement trajectory of the clamping element 243.
[0045] One end of the elastic element 241 abuts against the side wall of the mounting groove 230, and the other end abuts against the clamping element 243. The elastic element 241 is configured to drive the clamping element 243 to move toward or away from the first blind hole 215 to clamp or release the sealing element 220. It is understood that the elastic element 241 here can be a coil spring, a wave spring, or other element with elastic restoring force, and this application is not limited to this. After being compressed, the elastic element 241 has a tendency to return to its natural state, and the elastic force generated by this tendency is transmitted to the clamping element 243 through the abutment relationship, driving the clamping element 243 to slide within the mounting groove 230.
[0046] In some specific examples, Figure 10 This illustration shows a top cross-sectional view of a partial clamping mechanism 240 provided in an embodiment of this application. (See attached image.) Figure 10 As shown, the clamping member 243 may include a clamping member body 2431 and a protrusion 2432. The shape of the clamping member body 2431 can match the shape of the sealing member 220 for clamping the sealing member 220. The side of the clamping member body 2431 near the first blind hole 215 may have an arc-shaped surface or a V-shaped surface, which adapts to the shape of the outer peripheral wall of the sealing member 220. When the clamping member body 2431 moves towards the first blind hole 215 under the drive of the elastic member 241, the arc-shaped surface or V-shaped surface of the clamping member body 2431 can conform to the outer peripheral wall of the sealing member 220, increasing the contact area and distributing the clamping force evenly. This prevents damage to the surface of the sealing member 220 due to localized stress concentration, thus avoiding the generation of debris that contaminates the wafer.
[0047] like Figure 10As shown, the protrusion 2432 is fixedly connected to the clamping body 2431 and extends into the interior of the positioning member 242. It can be understood that the protrusion 2432 can be a columnar structure, with one end connected to the side of the clamping body 2431 opposite to the first blind hole 215, and the other end extending into the internal cavity of the positioning member 242 along the extending direction of the mounting groove 230. One end of the elastic member 241 abuts against the protrusion 2432, and the other end abuts against the side wall of the mounting groove 230. The elastic member 241 is configured to drive the protrusion 2432 to move the clamping body 2431 towards the first blind hole 215.
[0048] When it is necessary to fix the sealing member 220, the operator can place the sealing member 220 at the opening 2152 of the first blind hole 215 and press the sealing member 220 in the direction toward the bottom of the first blind hole 215. During this process, the outer wall of the sealing member 220 contacts the end of the clamping member body 2431 and slides relative to it. The sealing member 220 pushes the clamping member body 2431 away from the first blind hole 215 through the guide surface and other structures on its side wall. At this time, the protrusion 2432 also moves synchronously with the clamping member body 2431 and compresses the elastic member 241. When the sealing member 220 is pressed to the target position, the clamping member body 2431 is reset under the elastic restoring force of the elastic member 241, so that its arc-shaped surface or V-shaped surface presses against the outer peripheral wall of the sealing member 220, thereby fixing the sealing member 220 at the opening 2152 of the first blind hole 215.
[0049] Of course, a manual compression operation can also be used. The operator first pushes the clamping body 2431 or the protrusion 2432 along the direction of the compression elastic member 241, so that the protrusion 2432 moves toward the interior of the positioning member 242. At this time, the opening 2152 of the first blind hole 215 is fully exposed. Then, the sealing member 220 is placed into the opening 2152 of the first blind hole 215. Finally, the clamping body 2431 or the protrusion 2432 is released. The clamping body 2431 is reset under the elastic restoring force of the elastic member 241 and presses against the outer peripheral wall of the sealing member 220, thereby fixing the sealing member 220 at the opening 2152 of the first blind hole 215.
[0050] When it is necessary to release the sealing member 220, the operator can push the clamping member body 2431 or the protrusion 2432 away from the first blind hole 215, so that the protrusion 2432 compresses the elastic member 241 and moves towards the side wall of the mounting groove 230. The protrusion 2432 drives the clamping member body 2431 away from the first blind hole 215, releasing the pressure of the clamping member body 2431 on the sealing member 220. At this time, the sealing member 220 is released, and the operator can take it out from the opening 2152 of the first blind hole 215. Since the protrusion 2432 extends into the interior of the positioning member 242, the positioning member 242 constrains and guides the movement direction of the protrusion 2432, so that the protrusion 2432 always slides along the extension direction of the mounting groove 230, avoiding the protrusion 2432 from deflecting during movement, thereby ensuring the accuracy of the clamping position of the clamping member body 2431 on the sealing member 220, and improving the operational stability and reliability of the clamping mechanism 240.
[0051] In other embodiments, Figure 11 This illustration shows a top cross-sectional view of another partial clamping mechanism 240 provided in an exemplary embodiment of this application. The specific structure and mating relationship of the elastic member 241, the positioning member 242, and the clamping member 243 can be further configured as follows: Figure 11 The structure shown. (As illustrated) Figure 8 and Figure 9 As shown, the mounting groove 230 includes a first groove 231 and a second groove 232 sequentially formed along the thickness direction of the chuck body 210, and a baffle 233 disposed between the first groove 231 and the second groove 232. When the clamping member 243 clamps the sealing member 220, the length of the baffle 233 in the radial direction of the chuck body 210 is less than the minimum distance from the side wall of the clamping member 243 near the elastic member 241 to the inner side wall of the first groove 231 on the same side, so as to ensure that the clamping member 243 will not interfere with the baffle 233 during movement, thus ensuring the smooth movement of the clamping member 243.
[0052] like Figure 8 and Figure 9 As shown, the baffle 233 can be a protruding structure extending from the sidewall of the mounting groove 230 toward the first blind hole 215, dividing the interior of the mounting groove 230 into a first groove 231 and a second groove 232 arranged sequentially along the thickness direction. The first groove 231 is closer to the upper end face 213 of the chuck body than the second groove 232, while the second groove 232 is closer to the plane where the opening 2152 of the first blind hole 215 is located. The length of the baffle 233 is less than the distance from the sidewall of the first groove 231 to the first blind hole 215, so that the baffle 233 does not completely close the side of the first groove 231 near the first blind hole 215, thereby forming a reserved space at the end of the baffle 233 near the first blind hole 215, providing room for the clamping member 243 to move toward or away from the first blind hole 215.
[0053] like Figure 8 , Figure 9 and Figure 11 As shown, the elastic element 241 and the positioning element 242 are located within the first groove 231, and the length of the elastic element 241 is greater than the length of the positioning element 242. The clamping element 243 has a second blind hole 244 on the side near the elastic element 241. The elastic element 241 and the positioning element 242 at least partially extend into the second blind hole 244 and abut against the bottom wall of the second blind hole 244. That is, one end of the positioning element 242 is fixed to the side wall of the first groove 231 away from the first blind hole 215, and the other end extends into the second blind hole 244 along the extending direction of the mounting groove 230. The elastic element 241 is at least partially located inside the positioning element 242, and the length of the elastic element 241 is greater than the length of the positioning element 242, such that one end of the elastic element 241 abuts against the side wall of the first groove 231, and the end extending out of the positioning element 242 extends into the second blind hole 244 and abuts against the bottom wall of the second blind hole 244. When the elastic element 241 is compressed, its elastic restoring force pushes the clamping element 243 towards the first blind hole 215 by abutting against the bottom wall of the second blind hole 244, thereby fixing the sealing element 220. A sliding fit can be formed between the outer wall of the positioning element 242 and the inner wall of the second blind hole 244 to guide the movement direction of the clamping element 243, ensuring that the clamping element 243 always slides radially along the mounting groove 230.
[0054] like Figure 8 , Figure 9 , Figure 10 and Figure 11As shown, the clamping mechanism 240 also includes a limiting member 245 fixedly connected to the clamping member 243, the limiting member 245 being located within the second groove 232. When the clamping member 243 clamps the sealing member 220, there is a gap between the limiting member 245 and the inner wall of the second groove 232, and there is also a gap between the clamping member 243 and the baffle 233. This gap provides clearance for the limiting member 245 as it moves with the clamping member 243. The limiting member 245 is configured to move towards or away from the first blind hole 215 under the action of the clamping member 243, and to limit the axial displacement of the clamping member 243. Understandably, the axial dimension of the limiting member 245 (i.e., the thickness direction of the chuck body 210) matches the axial dimension of the second groove 232. This ensures that the limiting member 245 can only slide radially within the second groove 232 along the mounting groove 230, while being constrained axially by the top wall (i.e., the baffle 233) and bottom wall of the second groove 232, preventing axial movement and thus limiting the axial displacement of the clamping member 243. Consequently, when the sealing member 220 is subjected to fluid impact, the clamping member 243 will not displace axially and will always maintain a stable clamping position, thereby preventing the sealing failure of the sealing member 220 due to axial displacement of the clamping member 243.
[0055] In some embodiments, the clamping mechanism 240 includes at least two, that is, the number of clamping mechanisms 240 can be two or more. The multiple clamping mechanisms 240 are distributed circumferentially at intervals along the first blind hole 215, for example, arranged symmetrically in the circumferential direction. Taking two clamping mechanisms 240 as an example, the two clamping mechanisms 240 can be arranged radially opposite to each other along the first blind hole 215, that is, the two clamping mechanisms 240 are respectively located on both sides of the first blind hole 215, and their clamping members 243 are arranged opposite to each other. Thus, when the two clamping mechanisms 240 simultaneously clamp the sealing member 220, the two clamping members 243 apply clamping forces from both sides of the sealing member 220, making the force on the sealing member 220 more uniform, avoiding the problems of skewing or uneven force that may occur when clamping from one side, and improving the stability and reliability of clamping.
[0056] It should be understood that the elastic clamping mechanism is only one exemplary implementation of the clamping mechanism 240. In other embodiments, the clamping mechanism 240 can also be implemented in other ways, such as directly pressing the sealing member 220 with a threaded locking member or engaging with the sealing member 220 with a snap-fit structure. As long as the sealing member 220 can be fixed during normal operation and released during cleaning, this application does not impose any restrictions on this.
[0057] In some examples, the clamping mechanism 240 can also be a threaded locking clamping mechanism, which includes a threaded locking element, such as a lock nut or a threaded cap. An internal thread can be provided on the inner wall of the mounting groove 230, and an external thread can be provided on the outer periphery of the lock nut or threaded cap to mate with it. After the sealing member 220 is accommodated in the mounting groove 230, tightening the lock nut or threaded cap presses it against the sealing member 220, thereby fixing the sealing member 220 at the opening 2152 of the first blind hole 215. When it is necessary to release the sealing member 220, simply unscrew the lock nut or threaded cap in the reverse direction to remove the sealing member 220. Alternatively, an internal thread can be provided directly on the inner wall of the first blind hole 215, and an external thread can be provided on the outer periphery of the sealing member 220 to mate with it. Tightening the sealing member 220 fixes it at the opening 2152 of the first blind hole 215. When it is necessary to release the sealing member 220, simply unscrew it in the reverse direction to loosen it.
[0058] In other examples, the clamping mechanism 240 can also be a snap-fit clamping mechanism, which includes a snap-fit element and an engaging portion. The snap-fit element is disposed on one of the inner wall of the mounting groove 230 and the sealing element 220, and the engaging portion is disposed on the other. Through the engaging engagement of the snap-fit element and the engaging portion, the sealing element 220 is fixed at the opening 2152 of the first blind hole 215. When it is necessary to release the sealing element 220, the operator presses or moves the snap-fit element to disengage it from the engaging portion, and the sealing element 220 can be removed.
[0059] It should be noted that the elastic clamping mechanism, threaded locking clamping mechanism and snap-on clamping mechanism listed above are only illustrative examples. Those skilled in the art can select or combine the above mechanisms according to actual needs and specific application scenarios, as long as the sealing component 220 can be detachably fixed.
[0060] This application embodiment also provides a chuck cleaning accessory 300, which is used to be assembled on the upper end face 213 of the chuck body when cleaning the chuck 200 provided in this application embodiment. Figure 12 A schematic diagram of the structure of a chuck cleaning accessory 300 provided in an embodiment of this application is shown. Figure 12 As shown, the chuck cleaning accessory 300 includes an upper cover 310, which is detachably fitted onto the upper end face 213 of the chuck body and forms a cavity 320 between the upper cover 310 and the upper end face 213 of the chuck body. The upper cover 310 has a through hole 311, which is configured to be connected to a cleaning liquid source or an air source.
[0061] In some embodiments, such as Figure 12As shown, the upper end cover 310 is a component independent of and compatible with the chuck 200. Its shape is adapted to the shape of the upper end face 213 of the chuck body, covering the upper end face 213 and forming a sealed cavity 320 between it and the upper end face 213. The upper end cover 310 can be detachably installed on the side wall of the chuck body 210 or the edge of the upper end face 213 of the chuck body using threads, bolts, or snaps. It is installed when cleaning is required and removed after cleaning. This connection method provided in this embodiment does not require modification of the original structure of the chuck body 210, maintaining the structural integrity of the chuck body 210. It is understood that the height of the cavity 320 can be 3mm-10mm. For example, the height of the cavity 320 can be 3mm, 4mm, 7mm, or 10mm, etc., and is not limited thereto. More preferably, the height of the cavity 320 can be 5mm. By setting the height of cavity 320 to meet the aforementioned requirements, cavity 320 has a suitable volume, providing sufficient temporary storage space for the cleaning fluid when it flows into cavity 320 through through hole 311. This allows the cleaning fluid to be evenly distributed within cavity 320 and smoothly enter the opening of the first blind hole 215. At the same time, it prevents excessive retention of cleaning fluid within cavity 320 due to excessive height, thereby increasing the amount of residual cleaning fluid and reducing the burden and time of subsequent purging and drying. It also prevents cavity 320 from being too small, which would affect the cleaning effect.
[0062] In some embodiments, such as Figure 12 As shown, the number of through holes 311 can be one or more, and there is no limitation here. When there is only one through hole 311, it can be located at the center of the upper end cover 310. This allows the through hole 311 to be positioned opposite the opening 2152 of the first blind hole 215. After the cleaning fluid flows into the cavity 320 through the through hole 311, it can directly align with the opening 2152 of the first blind hole 215, reducing the retention and diversion of the cleaning fluid in the cavity 320 and allowing the cleaning fluid to enter the first blind hole 215 more quickly, thus improving cleaning efficiency. When there are multiple through holes 311, for example, two through holes 311 can be symmetrically arranged on the upper end cover 310 (see reference). Figure 12 The two through holes 311 can be used to connect the cleaning liquid source and / or the air source respectively. The opening or closing of different through holes 311 can be controlled by switching the valve, or liquid / air can be introduced at the same time through multiple through holes to improve cleaning efficiency.
[0063] In some embodiments, such as Figure 12As shown, the through hole 311 can be a threaded hole or a quick-connect fitting mounting hole. When the through hole 311 is a threaded hole, the pipeline of the cleaning fluid source or air source can be connected to the through hole 311 through a threaded connection, achieving quick and reliable connection and disassembly. When the through hole 311 is a quick-connect fitting mounting hole, it can be connected to the pipeline of the cleaning fluid source or air source through a quick-connect fitting, achieving quick insertion and removal, further improving the ease of operation.
[0064] During cleaning operations, the sealing member 220 can be removed from the opening 2152 of the first blind hole 215, and then the upper end cover 310 can be placed on the upper end face 213 of the chuck body 210, forming a cavity 320 between the upper end cover 310 and the upper end face 213 of the chuck body. At this time, the opening 2152 of the first blind hole 215 and the outlet of the fluid channel 212 on the upper end face 213 of the chuck body are both located in the cavity 320. A through hole 311 is opened on the upper end cover 310, one end of which communicates with the cavity 320, and the other end is used to connect to a cleaning fluid source or an air source.
[0065] When the through-hole 311 is connected to the cleaning fluid source, the cleaning fluid flows into the cavity 320 through the through-hole 311. The cleaning fluid in the cavity 320 enters the first blind hole 215 through the opening 2152 of the first blind hole 215, and then flows into the fluid distribution cavity 211 through the connecting hole 216. The cleaning fluid entering the fluid distribution cavity 211 is divided into two parts: one part flows into the fluid channel 212, flushes the inner wall of the fluid channel 212, and flows out from the outlet of the fluid channel 212 at the upper end face 213 of the chuck body, and re-enters the cavity 320; the other part is discharged from the first fluid channel 212a connected to the fluid distribution cavity 211. The first fluid channel 212a is the channel through which the fluid enters the chuck body 210 under normal operating conditions. The cleaning fluid discharged from the first fluid channel 212a carries away the crystals attached to the inner wall of the first fluid channel 212a, achieving simultaneous cleaning of the first fluid channel 212a. The cleaning fluid flowing out of the fluid channel 212 and into the cavity 320 collects within the cavity 320 and can then re-enter the first blind hole 215 through the opening 2152, forming a circulating flush and reducing the consumption of cleaning fluid. Furthermore, because the upper end cover 310 and the upper end face 213 of the chuck body are sealed, the cleaning fluid within the cavity 320 will not leak into the external environment, ensuring the safety of the cleaning process.
[0066] After rinsing is complete, for example, when the rinsing time reaches a preset duration, the through hole 311 can be switched to connect with the air source. Gas enters the cavity 320 and the first blind hole 215 through the through hole 311, purging and drying the cavity 320, the first blind hole 215, the connecting hole 216, the fluid distribution cavity 211, and the fluid channel 212 to remove residual cleaning fluid. During the purging process, gas flows out from the outlet of the fluid channel 212 and enters the cavity 320, carrying away the residual moisture in the cavity 320, and finally discharges from the first fluid channel 212a at the bottom of the chuck body 210, achieving complete drying of the chuck 200.
[0067] In some embodiments, such as Figure 12 As shown, the chuck cleaning accessory 300 also includes a seal (not shown in the figure). The seal is located in the contact area between the upper end cover 310 and the chuck 200, and is used to fill the tiny gap between the upper end cover 310 and the side wall of the chuck 200. This allows the upper end cover 310 to seal against the upper end face 213 of the chuck body 210 through the seal, preventing cleaning fluid from leaking into the external environment from the connection between the upper end cover 310 and the side wall during rinsing, thus improving the safety and reliability of the cleaning process. It is understood that the seal can be fixed to the inner edge of the upper end cover 310 or to a corresponding position on the side wall of the chuck body 210; its specific position is not limited, as long as a seal can be formed between the two. The seal can be an O-ring, a gasket, or silicone sealant, etc.
[0068] In some examples, since the cleaning fluid used in the cleaning process may have certain acidity, alkalinity and corrosiveness, and the flushing pressure is high, the material of the seal can be a corrosion-resistant material such as fluororubber or polytetrafluoroethylene with good chemical corrosion resistance and high temperature resistance, so as to maintain stable sealing performance in the cleaning fluid environment, extend the service life of the seal, and avoid seal failure caused by seal corrosion.
[0069] In some examples, the inner wall edge of the upper cover 310 may be provided with a sealing groove, in which the sealing element is partially embedded. The sealing groove serves to accommodate and secure the sealing element, preventing it from shifting or falling off during the installation or removal of the upper cover 310. Simultaneously, the sealing groove also provides radial positioning for the sealing element, ensuring its stability under cleaning fluid pressure and preventing it from being squeezed out of its sealing position.
[0070] When the upper cover 310 is installed on the side wall of the chuck body 210, the upper cover 310 can be pressed against the side wall by fasteners such as bolts or clips. This causes the seal to deform under pressure between the upper cover 310 and the side wall, generating an elastic restoring force, thereby tightly filling the gap between the upper cover 310 and the side wall and forming a reliable seal. When the upper cover 310 is removed after cleaning, the seal returns to its natural state without damaging the side wall of the chuck body 210.
[0071] This application also provides a cleaning device, which includes the aforementioned chuck. In some embodiments, the cleaning device can be a semiconductor wet cleaning device, such as a back-wash cleaning station, for cleaning the back side of a wafer. The cleaning device may include a device cavity, a rotating spindle, a cleaning solution supply system, and the chuck provided in this application embodiment. The chuck is mounted on the upper end of the rotating spindle, and the rotating spindle drives the chuck and the wafer placed on the chuck to rotate at high speed together. The cleaning solution supply system is located above the chuck and is used to spray cleaning solution onto the back side of the wafer. Because this cleaning device uses the aforementioned chuck, and because the chuck, by setting a first blind hole and a connecting hole, achieves cleaning of the fluid distribution chamber and fluid channels inside the chuck without disassembling the upper and lower layers of the chuck structure, this cleaning device can significantly shorten cleaning time during maintenance, reducing production capacity loss and labor costs.
[0072] When the chuck in the cleaning equipment develops crystallization contamination in its internal channels due to long-term use, there is no need to disassemble and separate the upper and lower discs of the chuck or wipe it manually. Simply remove the chuck as a whole from the cleaning equipment, remove the sealing parts, install the chuck cleaning accessories provided in this application embodiment, and introduce cleaning fluid to perform internal cleaning. After cleaning, reinstall it into the cleaning equipment to continue production.
[0073] This application embodiment also provides a chuck cleaning method, applied to the chuck provided in this application embodiment. The upper end face of the chuck body is fitted with the chuck cleaning accessory provided in this application embodiment, and the fluid channel of the chuck includes a first fluid channel and a second fluid channel. The first fluid channel and the second fluid channel are respectively connected to a fluid distribution cavity. When the chuck is in operation, the first fluid channel is configured to introduce fluid into the fluid distribution cavity, and the second fluid channel is configured to discharge the fluid in the fluid distribution cavity to the upper end face of the chuck body.
[0074] Figure 13 A flowchart of the chuck cleaning method provided in an embodiment of this application is shown. Figure 13 As shown, the chuck cleaning method includes the following steps.
[0075] Step 110: Remove the sealing element and attach the upper cover to the upper surface of the chuck body. In one example, the chuck can first be removed from the machine and placed in a cleaning station, which is a specialized operating device for handling wastewater generated during parts cleaning and has a built-in drainage function. It is equipped with a wastewater outlet for collecting and discharging waste liquid generated during the cleaning process. Then, remove the sealing element to expose the opening of the first blind hole. Next, install the sealing element inside the upper cover. The upper cover can be installed on the side wall of the chuck body by snap-fit or bolt connection, forming a cavity between the upper cover and the upper surface of the chuck body. At this time, the opening of the first blind hole and the outlet of the fluid passage on the upper surface of the chuck body are both located within the cavity.
[0076] Step 120: Connect the cleaning fluid source to the through hole of the upper end cover, so that the cleaning fluid flows into the cavity through the through hole of the upper end cover, and then flows into the fluid distribution cavity through the first blind hole and the connecting hole in sequence, and further flows into the first fluid channel and the second fluid channel connected to the fluid distribution cavity to flush the inner walls of the fluid distribution cavity, the first fluid channel and the second fluid channel. The flushed cleaning fluid is discharged from the first fluid channel.
[0077] In some examples, the cleaning fluid source is connected to the through-hole of the upper end cover via a cleaning fluid supply pipeline. This pipeline, once connected to the through-hole, can be threaded and locked to prevent the high-pressure cleaning fluid from loosening due to pressure during rinsing. Driven by pressure, the cleaning fluid enters the cavity through the through-hole. The cleaning fluid within the cavity then enters the first blind hole through its opening, and subsequently flows through the connecting hole into the fluid distribution chamber to rinse its inner wall. Part of the cleaning fluid entering the fluid distribution chamber flows into the second fluid channel, rinsing its inner wall, and exits from the outlet at the upper end face of the chuck body, re-entering the cavity. After accumulating within the cavity, it can re-enter the first blind hole through its opening, forming a circulating rinse. The other part is discharged from the first fluid channel, which is connected to the fluid distribution chamber, carrying away any crystals adhering to the inner wall of the first fluid channel, thus achieving simultaneous cleaning of the first fluid channel. Driven by water pressure and gravity, wastewater carrying crystal particles is continuously discharged from the first fluid channel below the chuck body and flows into the wastewater outlet of the cleaning table.
[0078] In some embodiments, the cleaning fluid provided by the cleaning fluid source can be deionized water, diluted acidic cleaning fluid, or diluted alkaline cleaning fluid, etc., and the appropriate cleaning fluid can be selected according to the type of actual contaminant, without limitation. Ultrasonic vibration or bubble agitation can also be added to the deionized water to enhance the cleaning effect. The flushing pressure can be 0.15MPa~1.0MPa, for example, 0.15MPa, 0.5MPa, or 1.0MPa, etc., and is not limited thereto. By setting a flushing pressure that meets this range, the cleaning fluid can acquire greater flow kinetic energy, generating strong shear force when flowing through the fluid distribution chamber and fluid channel, thereby effectively peeling off and carrying away acidic crystalline deposits adhering to the inner wall, while avoiding excessive pressure that could damage the internal structure of the chuck body or cause seal failure.
[0079] In some embodiments, the flushing flow rate of the cleaning fluid can be 0.5L / min to 5L / min, for example, the flushing flow rate can be 0.5L / min, 2.5L / min or 5L / min, etc., and is not limited thereto, so as to ensure that the cleaning fluid maintains an appropriate flow rate in the fluid distribution chamber and fluid channel, avoid insufficient flushing force of the cleaning fluid due to too small a flow rate, and avoid waste of cleaning fluid and excessive burden on the pipeline system due to too large a flow rate.
[0080] In some embodiments, the rinsing time of the cleaning solution can be 10 min to 30 min, for example, 10 min, 25 min, or 30 min, and is not limited thereto. It is understood that the rinsing time of the cleaning solution can be flexibly adjusted according to the degree of contamination inside the chuck body 210. A shorter rinsing time can be used for light contamination, and a longer rinsing time can be used for heavy contamination to ensure the cleaning effect.
[0081] Step 130: After rinsing, remove the cleaning fluid source and connect the air source to the through hole of the upper end cover to purge and dry the first blind hole, connecting hole, fluid distribution chamber, first fluid channel, and second fluid channel. In some examples, after the rinsing time reaches the preset duration, close the valve between the cleaning fluid source and the through hole, remove the cleaning fluid pipeline on the upper end cover, connect the gas inlet pipe to the through hole of the upper end cover and tighten it with threads for subsequent purging and drying. During the purging and drying process, gas enters the cavity and the first blind hole through the through hole to purge and dry the cavity, the first blind hole, connecting hole, fluid distribution chamber, first fluid channel, and second fluid channel, removing residual cleaning fluid. During the purging process, gas flows out from the outlet of the fluid channel and enters the cavity, carrying away residual moisture in the cavity, and finally exits from the air inlet at the bottom of the chuck body, achieving complete drying.
[0082] In some embodiments, the gas supplied by the gas source can be nitrogen. After rinsing, nitrogen can be introduced for purging and drying. Since nitrogen is an inert gas, it will not chemically react with residual substances inside the chuck body, and it also has a good drying effect, effectively removing cleaning fluid residue on the inner wall of the flow channel, preventing moisture residue from causing secondary pollution or affecting the normal operation of the chuck body 210. The purging time can be 10 min to 20 min, for example, 10 min, 15 min, or 20 min, etc., and is not limited to this. A purging time of 10 min to 20 min ensures the drying effect without being too long and affecting the cleaning efficiency. After purging, the upper cover is removed, and the sealing component is reinstalled at the opening of the first blind hole, restoring the chuck to its working state, and it can then be reinstalled on the machine for continued production.
[0083] In some embodiments, different rinsing parameters can be selected according to the degree of contamination inside the chuck body 210. For example, for light contamination (routine preventative cleaning), the rinsing pressure can be 0.15 MPa to 0.3 MPa, the rinsing flow rate can be 1 L / min to 2 L / min, the rinsing time can be 10 min, and the nitrogen purging time can be 10 min; for moderate contamination (with a small amount of particles exceeding the standard), the rinsing pressure can be 0.3 MPa to 0.6 MPa, the rinsing flow rate can be 2 L / min to 3 L / min, the rinsing time can be 20 min, and the nitrogen purging time can be 15 min; for heavy contamination (with significant crystal formation and severely excessive particles), the rinsing pressure can be 0.6 MPa to 1.0 MPa, the rinsing flow rate can be 3 L / min to 5 L / min, the rinsing time can be 30 min, and the nitrogen purging time can be 20 min. By setting different cleaning parameters for different degrees of contamination, the waste of resources and time caused by over-cleaning can be avoided while ensuring cleaning effectiveness, achieving a balance between cleaning efficiency and cleaning effect.
[0084] In some embodiments, after connecting the cleaning fluid source to the through hole of the upper end cover, so that the cleaning fluid flows into the cavity through the through hole of the upper end cover, the chuck cleaning method further includes: filling the cavity with cleaning fluid.
[0085] In some embodiments, when the cleaning fluid begins to flow into the cavity, the supply pressure and flow rate of the cleaning fluid are increased, allowing the cleaning fluid to rapidly enter the cavity at a higher flow rate and larger flow rate, completely filling the cavity in a short time. After the cavity is filled, the cleaning fluid forms a continuous and stable liquid flow within the cavity, passing through the first blind hole and the connecting hole into the fluid distribution chamber. As the cleaning fluid continuously enters under pressure, the cavity remains full. Under the combined action of gravity and supply pressure, the cleaning fluid, which might have flowed from the second fluid channel to the fluid hole on the upper end face of the chuck body, changes its flow direction under the liquid pressure, instead flowing downwards through the fluid distribution chamber and into the first fluid channel for discharge. This creates a unidirectional and smooth flow path for the cleaning fluid inside the chuck. It flows sequentially from the through hole in the upper cover through the cavity, the first blind hole, the connecting hole, the fluid distribution chamber, the first fluid channel, and the second fluid channel, and finally exits entirely from the first fluid channel below the chuck body. Throughout the process, the cleaning fluid will not spray out from the fluid hole on the upper surface of the chuck body, ensuring the controllability and safety of the cleaning process.
[0086] As can be seen from the above, in the chuck cleaning method provided in this application embodiment, the entire cleaning process does not require disassembling the upper and lower chuck bodies. It only requires removing the sealing components, installing the upper end cover, flushing with cleaning fluid, purging with gas after flushing, removing the upper end cover after purging, and reinstalling the sealing components. Therefore, the chuck cleaning method provided in this application embodiment significantly shortens cleaning time, reduces production capacity loss and labor costs, avoids the decrease in accuracy and shortened service life caused by frequent disassembly and assembly, and eliminates health and safety hazards as operators do not need to directly contact acidic residual crystals. Furthermore, the method of this application only requires opening a first blind hole and a connecting hole on the original chuck and adding an upper end cover, without replacing the main chuck structure, resulting in low modification costs and strong compatibility.
[0087] It is understood that the actions and steps described in the above embodiments and accompanying drawings can be performed in different orders to achieve the technical effects expected in this application, and are not limited to the order described in the above embodiments and accompanying drawings.
[0088] The embodiments of this application have been described above. However, these embodiments are merely illustrative and not intended to limit the scope of this application. The scope of this application is defined by the appended claims and their equivalents. Various substitutions and modifications can be made by those skilled in the art without departing from the scope of this application, and all such substitutions and modifications should fall within the scope of this application.
Claims
1. A chuck, characterized in that, include: The chuck body and the sealing component, wherein the chuck body has a fluid distribution cavity and a fluid channel communicating with the fluid distribution cavity, the fluid channel being configured to transport fluid, and the chuck body also has an upper end face and a lower end face that are disposed opposite to each other; The chuck body also has a first blind hole and a connecting hole. The opening of the first blind hole is located on the upper end face of the chuck body, and the first blind hole extends from the upper end face of the chuck body to the lower end face of the chuck body. The connecting hole is connected to the first blind hole and the fluid distribution cavity respectively. The sealing element is removably disposed at the opening of the first blind hole, and the sealing element is configured to block the opening of the first blind hole.
2. The chuck according to claim 1, characterized in that, The connecting hole includes at least a first sub-hole and a second sub-hole. The projection of the central axis of the first sub-hole onto the upper surface of the chuck body and the projection of the central axis of the second sub-hole onto the upper surface of the chuck body form an angle. The first sub-hole and the second sub-hole are respectively connected to the first blind hole and the fluid distribution cavity.
3. The chuck according to claim 1, characterized in that, The fluid distribution cavity includes a first fluid distribution cavity and a second fluid distribution cavity, and the connecting hole is connected to the first fluid distribution cavity and the second fluid distribution cavity respectively.
4. The chuck according to claim 1, characterized in that, The extension direction of the connecting hole is the same as the radial direction of the chuck body, or... The extension direction of the connecting hole forms an angle with the radial direction of the chuck body.
5. The chuck according to claim 1, characterized in that, The first blind hole is located within the projection area of the fluid distribution cavity on the upper end face of the chuck body.
6. The chuck according to claim 1, characterized in that, The first blind hole extends in the same direction as the thickness direction of the chuck body, or... The extension direction of the first blind hole forms an angle with the thickness direction of the chuck body.
7. The chuck according to any one of claims 1 to 6, characterized in that, The distance from the bottom of the first blind hole to the upper end face of the chuck body is less than or equal to the distance from the bottom of the fluid distribution cavity to the upper end face of the chuck body; and / or, The radial dimension of the first blind hole is larger than the radial dimension of the fluid channel; And / or, The fluid channel includes a first fluid channel and a second fluid channel, which are respectively connected to the fluid distribution cavity. When the chuck is in operation, the first fluid channel is configured to introduce fluid into the fluid distribution cavity, and the second fluid channel is configured to discharge the fluid in the fluid distribution cavity to the upper end face of the chuck body.
8. The chuck according to any one of claims 1 to 6, characterized in that, The upper end face of the chuck body is provided with a mounting groove, which is formed by recessing from the upper end face of the chuck body into the interior of the chuck body; the opening of the first blind hole is located on the bottom wall of the mounting groove. The chuck also includes a clamping mechanism, which is detachably installed in the mounting slot and configured to fix the sealing element.
9. The chuck according to claim 8, characterized in that, The clamping mechanism includes an elastic element, a positioning element, and a clamping element. The elastic element, the positioning element, and the clamping element are all disposed in the mounting groove. One end of the positioning element is fixed to the side wall of the mounting groove, and the other end abuts against the clamping element. At least part of the positioning element is sleeved on the outer periphery of the elastic element to restrict the movement direction of the elastic element. One end of the elastic element abuts against the side wall of the mounting groove, and the other end abuts against the clamping member. The elastic element is configured to drive the clamping member to move toward or away from the first blind hole in order to clamp or release the sealing member.
10. The chuck according to claim 9, characterized in that, The mounting groove includes a first groove and a second groove sequentially formed along the thickness direction of the chuck body, and a baffle disposed between the first groove and the second groove. When the clamping member clamps the sealing member, the length of the baffle in the radial direction of the chuck body is less than the minimum distance from the side wall of the clamping member near the elastic member to the inner side wall of the first groove on the same side. The elastic member and the positioning member are located within the first groove; and / or, The clamping mechanism further includes a limiting member fixedly connected to the clamping member. The limiting member is located in the second groove. When the clamping member clamps the sealing member, there is a gap between the limiting member and the inner wall of the second groove. The limiting member is configured to move towards or away from the first blind hole under the action of the clamping member, and to limit the displacement of the clamping member in the axial direction.
11. The chuck according to claim 9, characterized in that, The clamping member includes a clamping member body and a protrusion. The shape of the clamping member body can match the shape of the sealing member for clamping the sealing member. The protrusion is fixedly connected to the clamping member body and extends into the interior of the positioning member; or, The clamping member has a second blind hole on the side near the elastic member, and the elastic member and the positioning member extend at least partially into the second blind hole and abut against the bottom wall of the second blind hole.
12. The chuck according to claim 8, characterized in that, The clamping mechanism includes at least two.
13. A chuck cleaning accessory, characterized in that, For use in cleaning the chuck as described in any one of claims 1 to 12, the chuck cleaning accessory is mounted on the upper end face of the chuck body. The upper end cover is detachably fitted onto the upper end face of the chuck body and forms a cavity between the upper end cover and the upper end face of the chuck body. The upper end cover has a through hole configured to connect to a cleaning liquid source or an air source.
14. The chuck cleaning accessory according to claim 13, characterized in that, The chuck cleaning accessory also includes a seal, which is located in the contact area between the upper cover and the chuck, and the upper cover is sealed to the upper surface of the chuck body through the seal.
15. The chuck cleaning accessory according to claim 13, characterized in that, The height of the cavity is 3mm-10mm.
16. A cleaning device, characterized in that, The cleaning equipment includes a chuck as described in any one of claims 1 to 12.
17. A chuck cleaning method, characterized in that, A chuck as described in any one of claims 1 to 12 is provided, wherein the upper end face of the chuck is fitted with a chuck cleaning accessory as described in any one of claims 13 to 15, and the fluid channel of the chuck includes a first fluid channel and a second fluid channel, the first fluid channel and the second fluid channel respectively communicating with a fluid distribution chamber, and the chuck cleaning method includes: Remove the sealing parts and place the upper cover onto the upper surface of the chuck body; The cleaning fluid source is connected to the through hole of the upper end cover, so that the cleaning fluid flows into the cavity through the through hole of the upper end cover, and then flows into the fluid distribution cavity through the first blind hole and the connecting hole in sequence, and further flows into the first fluid channel and the second fluid channel connected to the fluid distribution cavity, so as to flush the inner wall of the fluid distribution cavity, the first fluid channel and the second fluid channel. The flushed cleaning fluid is discharged from the first fluid channel. After rinsing, remove the cleaning liquid source, connect the air source to the through hole of the upper end cover, and purge and dry the first blind hole, the connecting hole, the fluid distribution chamber, the first fluid channel and the second fluid channel.
18. The chuck cleaning method according to claim 17, characterized in that, After connecting the cleaning fluid source to the through hole of the upper end cover, so that the cleaning fluid flows into the cavity through the through hole of the upper end cover, the chuck cleaning method further includes: filling the cavity with cleaning fluid.