Hydrometallurgy reaction kettle with blowing stirring device

By setting up multiple purifiers in the hydrometallurgical reactor, cyclonic mixing without dead ends and blind areas is achieved, which solves the problems of poor mixing effect and high energy consumption in the existing technology, and improves the recovery rate of non-ferrous metals and the life of the equipment. , adapted to the needs of modern production.

CN221832327UActive Publication Date: 2024-10-15LUOYANG KECHUANG NEW MATERIAL CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420056400.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-10
Publication Date
2024-10-15
Estimated Expiration
2034-01-10

AI Technical Summary

Technical Problem

The existing hydrometallurgical reactors have problems such as poor stirring effect, high energy consumption, short service life, and frequent maintenance, resulting in poor hydrometallurgical uniformity and low non-ferrous metal yield.

Method used

Multiple purifiers with specific stirring gas blowing directions are installed at the bottom and top of the reaction kettle to achieve cyclonic large-circulation mixing without dead corners and blind areas. The stirring gas is blown into the reaction zone through the uniform air chamber and the top stirring unit. gas, improving stirring efficiency and shortening the reaction cycle.

Benefits of technology

It improves the mixing efficiency and non-ferrous metal recovery rate, reduces energy consumption, extends the service life of the equipment, simplifies the maintenance process, and adapts to the efficient, fast and safe requirements of modern production.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221832327U_ABST
    Figure CN221832327U_ABST
Patent Text Reader

Abstract

A hydrometallurgy reaction kettle with an air blowing stirring device comprises a reaction kettle body, a separation assembly used for separating an inner cavity of the reaction kettle body into an upper reaction area and a lower air uniformizing chamber is arranged in the reaction kettle body, and a plurality of air blowing stirring devices penetrating through the separation assembly are further evenly distributed in the reaction kettle body. The wet metallurgy reaction kettle is characterized in that a gas uniformizing chamber is arranged in the reaction kettle body, the gas uniformizing chamber is arranged in the reaction kettle body, a gas conveying pipe for introducing stirring gas into the gas uniformizing chamber is arranged in the gas uniformizing chamber, the separation assembly comprises a separation plate and a plurality of bottom purifiers uniformly distributed on the separation plate, and a top stirring unit is further arranged above the separation assembly. A plurality of purifiers with specific stirring gas injection directions are arranged at the bottom and the upper part of the reaction area of the reaction kettle, so that spiral-flow type large-circulation stirring of materials to be reacted in the reaction area without dead angles and blind areas can be realized, the stirring efficiency is improved to the maximum extent, the reaction period is shortened, the recovery rate of non-ferrous metals is also improved, and the production cost is reduced. The energy consumption is reduced, and the practical effect is better.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of hydrometallurgical reaction devices, in particular to a hydrometallurgical reaction kettle with an air blowing and stirring device. Background Art

[0002] Hydrometallurgy is a process in which the concentrated ore powder and other raw materials that have been enriched by beneficiation are brought into contact with aqueous solution or other liquids, and the useful metals contained in the raw materials are transferred into the liquid phase through chemical reactions, so as to separate and recover various useful metals.

[0003] A reactor with a stirring device is usually required in the process of hydrometallurgy. The mixed liquid in the non-ferrous hydrometallurgical reactor in the prior art is usually stirred mechanically, that is, a motor and a reducer are installed on the top of the reactor, and stirring blades are installed inside the reactor. During the metal smelting process, the motor drives one or more layers of stirring blades through the reducer to continuously rotate and stir the mineral powder and the mixed solution to achieve rapid and orderly progress of hydrometallurgy.

[0004] In actual production, it was found that this conventional reactor and stirring device had the following significant defects: 1. When the cantilevered stirring blades installed inside the reactor are stirring, there are many stirring blind spots and dead angles at the bottom and sides of the reactor, resulting in poor stirring effect and poor hydrometallurgical uniformity; 2. The mud at the bottom of the reactor is seriously precipitated, and regular manual cleaning is required, which is labor-intensive; 3. Motor-driven stirring has the problems of high comprehensive energy consumption, long smelting time, and low non-ferrous metal recovery rate; 4. The stirring device has a large load, is easy to damage, and has a short service life; 5. The investment in the mechanical stirring equipment system is large and requires frequent maintenance.

[0005] Therefore, how to improve the structure of the existing hydrometallurgical reactor so that it can adapt to the modern production requirements of hydrometallurgy with high efficiency, speed, safety and high yield is of great significance to the hydrometallurgical process. Summary of the invention

[0006] In order to solve the above technical problems, the utility model provides a hydrometallurgical reactor with an air blowing stirring device, which can realize cyclone-type large-circulation stirring of the materials to be reacted in the reaction zone without dead corners or blind spots by arranging multiple purifiers with specific stirring gas blowing directions at the bottom and top of the reaction zone of the reactor. While maximizing the stirring efficiency, it shortens the reaction cycle, improves the recovery rate of non-ferrous metals, reduces energy consumption, and has a good practical effect.

[0007] In order to achieve the above technical purpose, the technical scheme adopted is: a hydrometallurgical reactor with a blowing and stirring device, comprising a reactor body, a partition assembly for dividing its internal chamber into an upper reaction zone and a lower homogenizing chamber is arranged inside the reactor body, and a plurality of gas pipes penetrating the partition assembly are evenly distributed in the reactor body to introduce stirring gas into the homogenizing chamber, the partition assembly comprises a partition plate and a plurality of bottom purifiers evenly arranged on the partition plate, the partition plate and the bottom purifier are both air-permeable element structures with diffuse or slit-shaped microporous channels inside, so that the stirring gas homogenized in the homogenizing chamber can be blown into the reaction zone via the partition plate and the plurality of bottom purifiers to achieve dead-angle and blind-spot stirring of the materials to be reacted in the reaction zone;

[0008] A top stirring unit is also arranged above the partition assembly, and the top stirring unit includes a plurality of top purifiers arranged in contact with the inner wall surface of the reactor body, and the top purifier is a breathable element structure with diffuse or slit-shaped microporous channels inside. The plurality of top purifiers are evenly arranged along the circumference of the reactor body, and the plurality of top purifiers are all connected to the air supply pipeline, and the blowing direction of each top purifier has the same angle with the horizontal plane, so that the top stirring unit can realize swirl jet stirring of the materials to be reacted in the reaction zone.

[0009] Furthermore, the partition assembly is horizontally arranged at the lower part of the reactor body.

[0010] Furthermore, the partition assembly also includes a filling and knotting material fixed on the upper surface of the partition plate and used to fill the gaps between the multiple bottom purifiers.

[0011] Furthermore, the top stirring unit is arranged on the upper part of the reactor body.

[0012] Furthermore, the gas delivery pipe is arranged close to the inner wall of the reactor body.

[0013] Furthermore, the number of the gas pipes is four.

[0014] Furthermore, the multiple bottom purifiers are arranged in a plurality of concentric rings on the upper surface of the partition plate, and the multiple bottom purifiers on each ring are evenly arranged along the circumference of the ring.

[0015] Furthermore, the multiple bottom purifiers located on the outermost circle are arranged in contact with the inner wall surface of the reactor body, and the blowing direction thereof is toward the center of the circle; the blowing direction of the remaining bottom purifiers in the partition assembly is perpendicular to the upper surface of the partition plate.

[0016] Furthermore, the multiple top purifiers spray the stirring gas obliquely downward, and the angle between the blowing direction of the multiple top purifiers and the horizontal plane is 20-70°.

[0017] Furthermore, the air supply pipeline is connected in series with a plurality of top purifiers.

[0018] Beneficial effects of the utility model:

[0019] 1. The utility model discloses a hydrometallurgical reactor with an air blowing and stirring device. Aiming at the limitation of mechanical stirring of traditional reactors, a bottom blowing assembly with an air homogenizing chamber is creatively arranged at the bottom of the reaction zone of the reactor. The air homogenizing chamber itself can realize uniform treatment of the gas to be blown, and the entire bottom blowing assembly can blow high-temperature or normal-temperature gas upward from the bottom of the reaction zone along a specific angle. While realizing heating or cooling of the materials to be reacted, it can also realize dead-angle and blind-spot stirring of the materials to be reacted in the entire reaction zone, thereby greatly improving the stirring efficiency, shortening the reaction cycle of hydrometallurgy, and improving the recovery rate of the main elements in non-ferrous metals.

[0020] 2. The utility model provides a hydrometallurgical reactor with an air blowing stirring device, which has a simple structure, reasonable design and is maintenance-free during use. The top stirring unit arranged on the upper part of the reactor can spray high-temperature, high-pressure or normal-temperature stirring gas from the top in an eccentric direction to achieve swirling stirring of the materials to be reacted in the reaction zone, which not only effectively increases the reaction interface, but also further shortens the reaction cycle and improves the recovery rate of the main elements in non-ferrous metals.

[0021] 3. The utility model is a hydrometallurgical reactor with an air blowing and stirring device, which can adjust the intensity, temperature and gas type of the stirring gas blowing according to the specific requirements of hydrometallurgy, which is beneficial to the different requirements of hydrometallurgy for the blowing and stirring intensity at different stages. The coordination of the upper and lower blowing can realize the cyclone-type large-circulation stirring of the materials to be reacted in the reaction zone without dead angles and blind spots, so as to meet the production requirements of fast and efficient stirring. At the same time, the gas blowing and stirring method is also highly adapted to the current situation of hydrometallurgical raw materials with non-ferrous metal powder particle size below 200 mesh accounting for more than 90%. The stirring process is not prone to blockage. The microporous channels distributed in a dispersed or slit shape inside the purifier can effectively transport the gas out and avoid the occurrence of blockage. It avoids the problems of short service life, high energy consumption, high maintenance costs and the like of conventional mechanical stirring, and has a good practical effect. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a schematic diagram of the structure of the utility model;

[0023] Figure 2 for Figure 1 AA section view;

[0024] Figure 3 for Figure 1 BB section view;

[0025] In the figure: 1. Reactor body, 2. Reaction zone, 3. Gas homogenizing chamber, 4. Gas transmission pipe, 5. Partition plate, 6. Bottom purifier, 7. Top purifier, 8. Gas supply pipeline, 9. Filling knotting material. DETAILED DESCRIPTION

[0026] To further illustrate the technical solution of the utility model, the specific implementation methods, structural components, and features of the utility model are further described in detail below in conjunction with the accompanying drawings. The described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Other implementation methods obtained based on the embodiments in the utility model belong to the protection scope of the utility model.

[0027] As shown in the figure, a hydrometallurgical reactor with a blowing stirring device comprises a reactor body 1 with a cavity inside, a partition assembly for dividing the internal cavity into an upper reaction zone 2 and a lower uniform gas chamber 3 is horizontally arranged in the reactor body 1, and a plurality of gas pipes 4 for passing stirring gas into the uniform gas chamber 3 are evenly distributed in the reactor body 1 and penetrate the partition assembly, and the number of the gas pipes 4 is four, and they are arranged close to the inner wall of the reactor body 1;

[0028] The partition assembly includes a partition plate 5, a plurality of bottom purifiers 6 evenly arranged on the partition plate 5, and a filling knotting material 9. The plurality of bottom purifiers 6 are arranged in a plurality of concentric rings on the upper surface of the partition plate 5, and the plurality of bottom purifiers 6 on each ring are evenly arranged along the circumference of the ring where they are located. The plurality of bottom purifiers 6 located on the outermost ring are arranged in contact with the inner wall surface of the reactor body 1, and their blowing direction is toward the center of the ring; the blowing direction of the remaining bottom purifiers 6 in the partition assembly is perpendicular to the upper surface of the partition plate 5, and the filling knotting material 9 is fixed on the upper surface of the partition plate 5 to fill the gaps between the plurality of bottom purifiers 6. The partition plate 5 and the bottom purifier 6 are both air-permeable element structures with diffuse or slit-shaped microporous channels inside, so that the stirring gas homogenized in the gas-homogenizing chamber 3 can be blown into the reaction zone 2 via the partition plate 5 and the plurality of bottom purifiers 6 to achieve dead-angle and blind-spot-free stirring of the materials to be reacted in the reaction zone 2;

[0029] Above the partition assembly, a top stirring unit is also arranged at a position on the upper part of the reactor body 1, and the top stirring unit includes a plurality of top purifiers 7 arranged in contact with the inner wall surface of the reactor body 1, and the top purifier 7 is a breathable element structure with a diffuse or slit-shaped microporous channel inside. The plurality of top purifiers 7 are evenly arranged along the circumference of the reactor body 1, and the plurality of top purifiers 7 are all connected to the air supply pipe 8, that is, the air supply pipe 8 and the plurality of top purifiers 7 are arranged in series, and the blowing direction of each top purifier 7 has the same angle with the horizontal plane, and the plurality of top purifiers 7 are inclined downward to spray stirring gas, and the angle between the blowing direction of the plurality of top purifiers 7 and the horizontal plane is 20-70°, so that the top stirring unit can realize swirl spray stirring of the liquid reactant material in the reaction zone 2.

[0030] The stirring gas can be compressed air, inert gas, high-temperature gas, etc., and is routinely adjusted according to the specific needs of the process.

[0031] The utility model discloses a hydrometallurgical reactor with an air blowing stirring device, which aims at the limitations of mechanical stirring in the prior art and creatively adopts multiple bottom purifiers to spray high-temperature steam or high-temperature compressed air or normal-temperature compressed air upward from the bottom of the reactor body, so as to stir the entire solution without dead angle or blind spot while ensuring the temperature of the reacted materials is raised or lowered.

[0032] In order to further increase the reaction interface, several top purifiers are installed on the inner wall of the upper part of the reactor body. Multiple top purifiers are set at an angle and arranged in a ring on the inner wall of the reactor body. Each top purifier sprays gas toward the eccentric point of the central axis of the reactor body. The optimal eccentric angle is about 45 degrees. The purpose is to allow the liquid reactant material composed of mineral powder and other mixed materials in the reaction zone to rotate, so as to further shorten the reaction cycle and improve the recovery rate of the main elements of non-ferrous metals.

[0033] As more than 90% of nonferrous metal powders have a particle size below 200 mesh, if other upward blowing components, such as pipes, are used, clogging is likely to occur. However, both the bottom purifier and the top purifier are air-permeable component structures with diffuse or slit-shaped microporous channels inside. The dense micropores inside can effectively transport the gas out while avoiding clogging the channels.

[0034] The utility model discloses a hydrometallurgical reactor with an air blowing and stirring device. When the reactor is specifically set up and used, the gas delivery pipe is arranged close to or in contact with the inner wall of the reactor body. Four, eight or even more gas delivery pipes can be arranged according to specific needs. The partition assembly is assembled at a lower position inside the reactor body and is horizontally sealed inside the reactor body, so that the reactor body is divided into an upper reaction zone and a lower homogenizing chamber from top to bottom. The homogenizing chamber is communicated with the gas delivery pipe, so that the homogenizing treatment of the gas to be sprayed can be achieved. The high-temperature, high-pressure, or normal-temperature and normal-pressure gas transported by the gas delivery pipe is homogenized in the homogenizing chamber and then directionally sprayed from the bottom of the reaction zone into the material to be reacted through the diffuse or slit-shaped microporous channels inside the partition plate and the bottom purifier. While ensuring the temperature required for the reaction, the material to be reacted in the reaction zone is fully stirred without dead angles or blind spots.

[0035] The top stirring unit makes full use of the eccentric injection of multiple ring-shaped top purifiers to achieve large-circulation swirling stirring of the materials to be reacted in the reaction zone, so as to further increase the reaction interface, shorten the reaction cycle, and improve the recovery rate of the main elements of non-ferrous metals.

[0036] The overall structure of the device is simple and the design is ingenious, which avoids the problems of short service life and high energy consumption of conventional mechanical stirring and improves production efficiency.

[0037] It should be noted that the above embodiments are only used to illustrate the present utility model, but the present utility model is not limited to the above embodiments. Any simple modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present utility model fall within the protection scope of the present utility model.

Claims

1. A hydrometallurgical reactor with an air blowing and stirring device, comprising a reactor body (1), Features: A partition assembly is provided inside the reactor body (1) for partitioning its internal chamber into an upper reaction zone (2) and a lower homogenizing chamber (3). A plurality of gas delivery pipes (4) are evenly distributed inside the reactor body (1) and are arranged to penetrate the partition assembly so as to introduce stirring gas into the homogenizing chamber (3). The partition assembly comprises a partition plate (5) and a plurality of bottom purifiers (6) evenly distributed on the partition plate (5). Both the partition plate (5) and the bottom purifier (6) are gas permeable element structures having diffuse or slit-shaped microporous channels inside, so that the homogenized stirring gas in the homogenizing chamber (3) can be blown into the reaction zone (2) via the partition plate (5) and the plurality of bottom purifiers (6); A top stirring unit is also arranged above the partition assembly. The top stirring unit comprises a plurality of top purifiers (7) arranged in contact with the inner wall surface of the reactor body (1). The top purifier (7) is a gas permeable element structure having a diffuse or slit-shaped microporous channel inside. The plurality of top purifiers (7) are evenly arranged along the circumference of the reactor body (1). The plurality of top purifiers (7) are all connected to the air supply pipeline (8), and the blowing direction of each top purifier (7) has the same angle with the horizontal plane, so that the top stirring unit can achieve swirl spray stirring of the materials to be reacted in the reaction zone (2).

2. A hydrometallurgical reactor with an air blowing and stirring device as claimed in claim 1, Features: The partition assembly is horizontally arranged at the lower part of the reactor body (1).

3. A hydrometallurgical reactor with an air blowing and stirring device as claimed in claim 1, Features: The partition assembly also includes a filling knotting material (9) fixed on the upper surface of the partition plate (5) and used to fill the gaps between the multiple bottom purifiers (6).

4. A hydrometallurgical reactor with an air blowing and stirring device as claimed in claim 1, Features: The top stirring unit is arranged on the upper part of the reactor body (1).

5. A hydrometallurgical reactor with an air blowing and stirring device as claimed in claim 1, Features: The gas delivery pipe (4) is arranged close to the inner wall of the reactor body (1).

6. A hydrometallurgical reactor with an air blowing and stirring device as claimed in claim 1 or 5, Features: The number of the gas delivery pipes (4) is four.

7. A hydrometallurgical reactor with an air blowing and stirring device as claimed in claim 1, Features: The multiple bottom purifiers (6) are arranged in the form of multiple concentric rings on the upper surface of the partition plate (5), and the multiple bottom purifiers (6) on each ring are evenly arranged along the circumference of the ring.

8. A hydrometallurgical reactor with an air blowing and stirring device as claimed in claim 7, Features: The plurality of bottom purifiers (6) located on the outermost circular ring are arranged in contact with the inner wall surface of the reactor body (1), and their blowing direction is toward the center of the circular ring; the blowing direction of the remaining bottom purifiers (6) in the partition assembly is perpendicular to the upper surface of the partition plate (5).

9. A hydrometallurgical reactor with an air blowing and stirring device as claimed in claim 1, Features: The multiple top purifiers (7) spray the stirring gas obliquely downward, and the angle between the blowing direction of the multiple top purifiers (7) and the horizontal plane is 20-70 degrees.

10. A hydrometallurgical reactor with an air blowing and stirring device as claimed in claim 1, Features: The air supply pipeline (8) is connected in series with a plurality of top purifiers (7).