Building steel structure corridor construction device
By introducing designs such as counterweight bases, universal wheels and electric cylinders into the steel structure corridor construction equipment, the problems of fixation and unstable support of the equipment are solved, the flexible movement of the equipment and the stable lifting of the components are realized, improving the construction efficiency. flexibility and security.
Patent Information
- Application Number
- CN202323601884.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-27
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2033-12-27
AI Technical Summary
When the existing steel structure corridor overall lifting construction device is in use, the overall structure is fixed and difficult to move flexibly, and the support is unstable after the components are lifted, causing safety hazards.
A construction device including a counterweight base, a universal wheel, a push frame, an electric lifting frame, a U-shaped support plate and a telescopic support plate is designed. Flexible movement is achieved through the universal wheel, and the electric cylinder and telescopic rod ensure that the components are lifted during the lifting process. Stable clamping and support in the.
It realizes the flexible movement of the device and the stable lifting and retrieval of components, reducing potential safety hazards during construction and improving the flexibility and safety of construction.
Smart Images

Figure CN221836654U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of steel structure construction, in particular to a construction device for a building steel structure corridor. Background Art
[0002] With the rapid development of domestic urbanization, construction technology has advanced rapidly. Large-scale steel structure projects have been the fastest growing field in the past decade, because such projects have a high degree of industrialization and commercialization and good comprehensive benefits. The construction time of steel structures is short, and the steel structure components used for construction can be produced in the factory and assembled on site, which greatly shortens the construction time. In addition, the construction materials of steel structure buildings can be recycled, which can reduce a large amount of construction waste and achieve sustainable development. The conventional practice for constructing large-scale steel structure projects is to use single-component hoisting. This practice has a long construction period and complex procedures. The quality of high-strength bolts and weld connections on the construction site is difficult to control, and there are great safety hazards in construction. In particular, multi-layer special-shaped structures with the center of gravity outside the plane are very prone to rollover during construction, leading to safety accidents.
[0003] The Chinese patent with patent number CN206428974U discloses a multi-story steel structure corridor overall lifting construction device, including a lifting bracket, a hydraulic lifter, a steel strand guide frame, a steel strand, a hydraulic pump station, a control signal line, a power supply and a computer synchronization system.
[0004] Although the overall lifting construction device for the steel structure corridor described in the above patent can realize the convenient lifting of the steel structure corridor components by hoisting when in use to facilitate the construction of the steel structure corridor, under the above hoisting and lifting method, on the one hand, due to the fixed overall structure of the device, it is not convenient to flexibly move and use according to actual lifting needs, resulting in poor flexibility in the use of the device during the construction of the steel structure corridor. On the other hand, since the entire component of the steel structure corridor is in a suspended state after the lifting of the component, it is easy for the component to slip due to unstable support when it is taken after lifting, thereby causing safety hazards. Utility Model Content
[0005] 1. Technical issues to be resolved
[0006] The technical problem to be solved by the utility model is to provide a construction device for a steel structure corridor in response to the current status of the existing technology, which can not only realize the flexible mobile use of the device according to actual construction needs, but also provide stable support for the steel structure corridor components during the entire lifting and access process.
[0007] (II) Technical solution
[0008] The utility model is achieved through the following technical scheme: the utility model proposes a construction device for a steel structure corridor, including a counterweight base, universal wheels are fixed at the four corners of the bottom end of the counterweight base by bolts, push frames are symmetrically fixed on both sides of the upper end of the counterweight base, an electric lifting frame 1 is installed in the middle of the upper end of the counterweight base, a connecting plate is fixed on the top of the electric lifting frame 1, an electric lifting frame 2 is installed on the top of the connecting plate, a U-shaped support plate is connected to the top of the electric lifting frame 2, two grooves are symmetrically provided on both sides of the U-shaped support plate, and each of the grooves is connected to a telescopic support plate through an electric telescopic rod.
[0009] Furthermore, two electric cylinders are symmetrically installed on both side walls of the U-shaped support plate, and a clamping plate is fixed to the telescopic part of each electric cylinder.
[0010] By adopting the above technical solution, the electric cylinder will drive the clamping plate to move after being started, so as to clamp the steel structure corridor components and prevent the steel structure corridor components from sliding relative to the U-shaped support plate when lifted.
[0011] Furthermore, the exposed end of the telescopic support plate is flush with the inner bottom of the U-shaped support plate, and the electric telescopic rod is bolted to the groove and the telescopic support plate.
[0012] By adopting the above technical solution, the electric telescopic rod can adjust the telescopic length of the telescopic support plate, so as to stably support steel structure corridor components of different lengths.
[0013] Furthermore, the electric cylinder is connected to the U-shaped support plate bolts, and the telescopic portion of the electric cylinder passes through the side wall of the U-shaped support plate and is connected to the clamping plate bolts.
[0014] By adopting the above technical solution, it is ensured that the electric cylinder can realize the convenient movement of the clamping plate, so as to reliably clamp the steel structure corridor components when lifting.
[0015] Furthermore, a bottom end of the electric lifting frame is hinged to the counterweight base, and a top end of the electric lifting frame is hinged to the bottom end of the connecting plate.
[0016] By adopting the above technical solution, the electric lifting frame is mainly used to achieve the initial lifting of the U-shaped support plate.
[0017] Furthermore, the second bottom end of the electric lifting frame is hinged to the connecting plate, and the second top end of the electric lifting frame is hinged to the bottom end of the U-shaped support plate.
[0018] By adopting the above technical solution, the second electric lifting frame is mainly used to realize the secondary lifting of the U-shaped support plate, ensuring that the steel structure corridor components can be lifted to a specified height.
[0019] Furthermore, there are two push racks, one of which has an operation panel fixed on the top, and a battery installed on one side of the upper end of the counterweight base.
[0020] By adopting the above technical solution, the electric lifting frame 1, the electric lifting frame 2, the electric telescopic rod and the electric cylinder can be opened and closed in an orderly manner under the action of the operation panel to ensure efficient use of the device.
[0021] (III) Beneficial effects
[0022] Compared with the prior art, the utility model has the following beneficial effects:
[0023] In order to solve the problem that the existing overall lifting construction device for steel structure corridors can realize the convenient lifting of steel structure corridor components in a hoisting manner when in use, so as to facilitate the construction of the steel structure corridor, but in the above hoisting and lifting manner, on the one hand, due to the fixed overall structure of the device, it is not convenient to flexibly move and use according to the actual lifting needs, resulting in poor flexibility in the use of the device during the construction of the steel structure corridor. On the other hand, since the entire component of the steel structure corridor is in a suspended state after the lifting of the component, it is easy for the component to slip due to unstable support when it is taken after lifting, thereby causing safety hazards. When in use, the utility model can, on the one hand, be able to move flexibly under the action of the counterweight base, the push frame and the universal wheel, so as to realize the convenient lifting of the corresponding components according to the construction needs at different positions of the steel structure corridor, and ensure the convenient construction of the steel structure corridor. On the other hand, with the help of U-shaped support plates and telescopic support plates, the steel structure corridor components are supported during the lifting process, which can ensure the stability of the steel structure corridor components during the entire lifting and taking process, and avoid the steel structure corridor components from slipping due to unstable support when being taken after lifting, so that the steel structure corridor components are safer during the lifting construction. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a front view of a construction device for a building steel structure corridor described in the utility model;
[0025] Figure 2 It is a structural schematic diagram of a U-shaped support plate in a construction device for a building steel structure corridor described in the utility model;
[0026] Figure 3 It is a top main sectional view of a U-shaped support plate in a construction device for a building steel structure corridor described in the utility model.
[0027] The following are the descriptions of the reference numerals:
[0028] 1. U-shaped support plate; 2. Telescopic support plate; 3. Electric lifting frame 2; 4. Connecting plate; 5. Electric lifting frame 1; 6. Push frame; 7. Battery; 8. Universal wheel; 9. Counterweight base; 10. Operation panel; 11. Electric cylinder; 12. Clamp; 13. Electric telescopic rod; 14. Groove. DETAILED DESCRIPTION
[0029] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.
[0030] like Figure 1-Figure 3 As shown, a construction device for a steel structure corridor in this embodiment includes a counterweight base 9, universal wheels 8 are fixed at the four corners of the bottom end of the counterweight base 9 by bolts, and push frames 6 are symmetrically fixed on both sides of the upper end of the counterweight base 9. The universal wheels 8 and the push frames 6 can realize the flexible movement and use of the device, so as to realize the lifting of the steel structure corridor components according to actual construction needs. An electric lifting frame 1 5 is installed in the middle of the upper end of the counterweight base 9, and a connecting plate 4 is fixed on the top of the electric lifting frame 1 5. The top of the connecting plate 4 is installed with an electric lifting frame 2 3, and the electric lifting frame A U-shaped support plate 1 is connected to the top of the second 3. The electric lifting frame 15 is mainly used to realize the initial lifting of the U-shaped support plate 1. The electric lifting frame 23 is mainly used to realize the secondary lifting of the U-shaped support plate 1 to ensure that the steel structure corridor components can be lifted to a specified height. Two grooves 14 are symmetrically provided on both sides of the U-shaped support plate 1. A telescopic support plate 2 is connected to each groove 14 through an electric telescopic rod 13. The electric telescopic rod 13 can adjust the telescopic length of the telescopic support plate 2 so as to provide stable support for steel structure corridor components of different lengths.
[0031] like Figure 1-Figure 3 As shown, in the present embodiment, two electric cylinders 11 are symmetrically installed on the two side walls of the U-shaped support plate 1, and a clamp 12 is fixed to the telescopic part of each electric cylinder 11. After the electric cylinder 11 is started, it will drive the clamp 12 to move, so as to clamp the steel structure corridor components, and prevent the steel structure corridor components from sliding relative to the U-shaped support plate 1 when lifting. The electric cylinder 11 is bolted to the U-shaped support plate 1, and the telescopic part of the electric cylinder 11 passes through the side wall of the U-shaped support plate 1 and is bolted to the clamp 12, ensuring that the electric cylinder 11 can realize the convenient movement of the clamp 12, so as to reliably clamp the steel structure corridor components when lifting.
[0032] like Figure 1-Figure 3As shown, in this embodiment, the exposed end of the telescopic support plate 2 is flush with the inner bottom of the U-shaped support plate 1, the electric telescopic rod 13 is bolted to the groove 14 and the telescopic support plate 2, the bottom end of the electric lifting frame 1 5 is hinged to the counterweight base 9, the top end of the electric lifting frame 1 5 is hinged to the bottom end of the connecting plate 4, the bottom end of the electric lifting frame 2 3 is hinged to the connecting plate 4, the top end of the electric lifting frame 2 3 is hinged to the bottom end of the U-shaped support plate 1, there are two push frames 6, one of which is also fixed with an operation panel 10 at the top, and a battery 7 is also installed on one side of the upper end of the counterweight base 9. Under the action of the operation panel 10, the electric lifting frame 1 5, the electric lifting frame 2 3, the electric telescopic rod 13 and the electric cylinder 11 can be opened and closed in an orderly manner to ensure efficient use of the device.
[0033] The specific implementation process of this embodiment is as follows: when in use, first move the device to the designated position according to the actual construction needs of the steel structure corridor, then place the steel structure corridor components on the U-shaped support plate 1, and clamp them under the action of the clamping plate 12, and then use the electric lifting frame 1 5 and the electric lifting frame 2 3 to lift the steel structure corridor components to the designated construction position. Under the above-mentioned lifting construction method, not only can the device be flexibly moved under the action of the counterweight base 9, the push frame 6 and the universal wheel 8, so as to realize the convenient lifting of the corresponding components according to the construction needs of different positions of the steel structure corridor, thereby ensuring the convenient construction of the steel structure corridor, but also use the U-shaped support plate 1 and the telescopic support plate 2 to support the steel structure corridor components during the lifting process, which can ensure the stability of the steel structure corridor components during the entire lifting and taking process, and avoid the steel structure corridor components from slipping due to unstable support when being taken after lifting, so that the steel structure corridor components are safer during the lifting construction.
[0034] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A construction device for a steel structure corridor, characterized in that: The invention comprises a counterweight base (9), wherein universal wheels (8) are fixed at four corners of the bottom of the counterweight base (9) by bolts, push frames (6) are symmetrically fixed on both sides of the upper end of the counterweight base (9), an electric lifting frame (5) is installed in the middle of the upper end of the counterweight base (9), a connecting plate (4) is fixed on the top of the electric lifting frame (5), an electric lifting frame (2) (3) is installed on the top of the connecting plate (4), a U-shaped support plate (1) is connected to the top of the electric lifting frame (3), two grooves (14) are symmetrically provided on both sides of the U-shaped support plate (1), and each of the grooves (14) is connected to a telescopic support plate (2) via an electric telescopic rod (13).
2. A construction device for a steel structure corridor according to claim 1, characterized in that: Two electric cylinders (11) are symmetrically mounted on both side walls of the U-shaped support plate (1), and a clamping plate (12) is fixed to the telescopic portion of each electric cylinder (11).
3. A construction device for a steel structure corridor according to claim 1, characterized in that: The exposed end of the telescopic support plate (2) is flush with the inner bottom of the U-shaped support plate (1), and the electric telescopic rod (13) is bolted to the groove (14) and the telescopic support plate (2).
4. A construction device for a steel structure corridor according to claim 2, characterized in that: The electric cylinder (11) is bolted to the U-shaped support plate (1), and the telescopic portion of the electric cylinder (11) penetrates the side wall of the U-shaped support plate (1) and is bolted to the clamping plate (12).
5. The construction device for a steel structure corridor according to claim 1 is characterized in that: The bottom end of the electric lifting frame (5) is hinged to the counterweight base (9), and the top end of the electric lifting frame (5) is hinged to the bottom end of the connecting plate (4).
6. The construction device for a steel structure corridor according to claim 1, characterized in that: The bottom end of the second electric lifting frame (3) is hinged to the connecting plate (4), and the top end of the second electric lifting frame (3) is hinged to the bottom end of the U-shaped support plate (1).
7. The construction device for a steel structure corridor according to claim 1, characterized in that: Place There are two push racks (6), and an operation panel (10) is fixed on the top of one of the push racks (6). A storage battery (7) is also installed on one side of the upper end of the counterweight base (9).