Metal slag recovery device for construction waste treatment
By using the magnet plate lower hopper and crushing assembly in the construction waste treatment device, combined with the electromagnet plate and control buttons, efficient screening and collection of metal debris in construction waste is achieved, solving the problem of metal debris recovery in the existing technology. Solve the problem of low efficiency, improve work efficiency and achieve the goal of energy conservation and environmental protection.
Patent Information
- Application Number
- CN202420379241.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-29
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2034-02-28
AI Technical Summary
Metal scraps mixed with construction waste are mixed with other waste during the recycling process, making screening and collection difficult, time-consuming and labor-intensive, making it difficult to achieve efficient recycling.
A metal scrap recycling device for construction waste treatment is designed, which includes a hopper under the magnet plate, a crushing component, a screening cylinder, an electromagnet plate and a control button. It achieves preliminary collection and screening of metal objects through magnetic attraction and screening after crushing. Classification.
It improves the screening and collection efficiency of metal scraps, reduces manual operation time and labor, and achieves the goals of efficient recycling of metal waste and energy conservation and environmental protection.
Smart Images

Figure CN221868611U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a metal slag recovery device for treating construction waste. Background Art
[0002] Construction waste refers to the slag, abandoned soil, abandoned materials, silt and other waste generated during the construction, laying, demolition and repair of various buildings, structures, pipelines, etc. by construction units or individuals.
[0003] Construction waste is usually mixed with a lot of metal waste, which needs to be recycled to achieve resource recycling. Construction waste needs to be crushed during the recycling process, and the crushed construction waste will contain mixed metal slag. The metal slag is mixed with other waste slag, making it inconvenient for workers to screen and collect, and it is time-consuming and labor-intensive, making it difficult to achieve the purpose of efficient recycling of metal slag.
[0004] Therefore, it is necessary to provide a metal scrap recovery device for construction waste treatment to solve the above problems. Utility Model Content
[0005] The technical problem to be solved by the utility model is to provide a metal slag recovery device for construction waste treatment, so as to solve the problems raised in the above-mentioned background technology.
[0006] In order to solve the above problems, the utility model adopts the following technical solutions:
[0007] A metal debris recovery device for construction waste treatment comprises a crushing box, a magnet plate hopper is arranged on the top of the crushing box, a crushing assembly is arranged inside the crushing box, a collecting box is arranged at the bottom of the crushing box, a screening drum is rotatably installed inside the collecting box, a screening net is arranged on the outside of the screening drum, a hard pipe is fixedly arranged at the bottom of the screening drum, a fixed frame is arranged at the bottom of the collecting box, a first motor is arranged at the bottom of the fixed frame, the first motor is drivingly connected to the hard pipe, the bottom of the hard pipe passes through the fixed frame and is connected to a feeding pipe through a bearing, an electromagnet plate is arranged on the inner wall of the collecting box, a control button is arranged at the front end of the collecting box, the control button is electrically connected to the electromagnet plate, and collection ports are arranged on both sides of the bottom of the collecting box.
[0008] Preferably, overlapping parts are provided on both sides of the top of the magnet plate lower hopper, and the magnet plate lower hopper is placed inside the crushing box through the overlapping parts.
[0009] Preferably, the crushing assembly includes a crushing roller, a transmission gear and a second motor. The crushing roller is rotatably installed inside the crushing box. Two crushing rollers are symmetrically arranged. One end of the two crushing rollers passes through the crushing box and is connected to the transmission gear. The two transmission gears are meshed and connected. The second motor is arranged at the front end of the crushing box, and the output shaft of the second motor passes through the crushing box and is connected to a crushing roller.
[0010] Preferably, a fixed pipe is provided at the bottom of the crushing box, and the fixed pipe is rotatably connected to the screening net through a bearing.
[0011] Preferably, an annular groove is provided at the bottom of the collecting box, and sliding blocks are provided on both sides of the bottom of the screening cylinder, and the two sliding blocks are slidably disposed in the annular groove.
[0012] Preferably, control valves are provided on the collecting ports on both sides.
[0013] Preferably, the output shaft of the first motor passes through the fixed frame and is connected to a driving gear, the outer wall of the hard tube is fixedly sleeved with a driven gear, and the driven gear is meshingly connected to the driving gear.
[0014] Preferably, the four end corners of the bottom of the collection box are all provided with supporting legs.
[0015] The beneficial effects of the utility model are as follows: construction waste is added to the crushing box through the magnet plate lower hopper, and the magnetic attraction of the magnet plate lower hopper is used to absorb the larger volume of metal waste in the construction waste to complete the preliminary collection process of metal objects, and the construction waste is crushed by the crushing assembly, and the crushed construction waste enters the screening cylinder through the fixed pipe, and the first motor, screening cylinder, screening net, control button, and control button are set to screen the metal and non-metal objects in the collection box, and different types of construction debris can be classified and collected through the control valve, control button, and lower pipe on the collection port. Through the above settings, metal waste can be crushed, and the crushed metal debris is convenient for screening and the collection process after screening, which saves time and effort, and is convenient for improving work efficiency to achieve the purpose of energy saving and environmental protection. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below, but this does not limit the protection scope of the utility model.
[0017] Figure 1 A front cross-sectional view of the entirety of the utility model;
[0018] Figure 2 A front sectional view of the collection box provided by the utility model;
[0019] Figure 3 The utility model provides Figure 2 The enlarged view of point A in the middle;
[0020] Figure 4 A front view of the lower hopper of the magnet plate provided by the utility model;
[0021] Figure 5 A top view of the hopper under the magnet plate provided by the utility model;
[0022] Figure 6 A front view of the whole provided by the utility model;
[0023] Figure 7 A top view of the crushing assembly provided by the utility model inside the crushing box;
[0024] Figure 8 A top view of the screening cylinder provided by the utility model in the collecting box;
[0025] Fig. 9 The utility model is a three-dimensional diagram of the screening drum provided by the utility model.
[0026] Among them, 1. crushing box; 2. magnet plate hopper; 3. crushing assembly; 31. crushing roller; 32. transmission gear; 33. second motor; 4. collecting box; 5. screening cylinder; 6. screening net; 7. hard pipe; 8. fixed frame; 9. first motor; 10. feeding pipe; 11. electromagnet plate; 12. control button; 13. overlap; 14. fixed pipe; 15. annular groove; 16. slider; 17. driving gear; 18. driven gear; 19. support leg; 20. control valve. DETAILED DESCRIPTION
[0027] See also Figures 1 to 9 A metal debris recovery device for construction waste treatment shown in the figure comprises a crushing box 1, a magnet plate lower hopper 2 is arranged on the top of the crushing box 1, a crushing assembly 3 is arranged inside the crushing box 1, a collecting box 4 is arranged at the bottom of the crushing box 1, a screening drum 5 is rotatably installed inside the collecting box 4, a screening net 6 is arranged on the outside of the screening drum 5, a hard pipe 7 is fixedly arranged at the bottom of the screening drum 5, a fixed frame 8 is arranged at the bottom of the collecting box 4, a first motor 9 is arranged at the bottom of the fixed frame 8, the first motor 9 is transmission-connected to the hard pipe 7, the bottom of the hard pipe 7 passes through the fixed frame 8 and is connected to a feeding pipe 10 through a bearing, an electromagnet plate 11 is arranged on the inner wall of the collecting box 4, a control button 12 is arranged at the front end of the collecting box 4, the control button 12 is electrically connected to the electromagnet plate 11, and collection ports are arranged on both sides of the bottom of the collecting box 4.
[0028] Furthermore, overlapping parts 13 are provided on both sides of the top of the magnet plate lower hopper 2 , and the magnet plate lower hopper 2 is placed inside the crushing box 1 through the overlapping parts 13 .
[0029] By setting the overlapping part 13, the magnet plate lower hopper 2 is placed on the top of the crushing box 1. After the construction waste is put in, the magnet plate lower hopper 2 can be removed to collect the metal objects adsorbed on the surface of the magnet plate lower hopper 2.
[0030] Furthermore, the crushing assembly 3 includes a crushing roller 31, a transmission gear 32 and a second motor 33. The crushing roller 31 is rotatably installed inside the crushing box 1. Two crushing rollers 31 are symmetrically arranged. One end of the two crushing rollers 31 passes through the crushing box 1 and is connected to the transmission gear 32. The two transmission gears 32 are meshed and connected. The second motor 33 is arranged at the front end of the crushing box 1. The output shaft of the second motor 33 passes through the crushing box 1 and is connected to a crushing roller 31.
[0031] The second motor 33 is started to drive the transmission gear 32 connected thereto to rotate. The two transmission gears 32 are meshed to realize the rotation of the two transmission gears 32 simultaneously and in opposite directions, thereby crushing the construction waste.
[0032] Furthermore, a fixed pipe 14 is provided at the bottom of the crushing box 1, and the fixed pipe 14 is rotatably connected to the screening net 6 through a bearing.
[0033] By setting the fixed pipe 14, all the crushed garbage can enter the screening cylinder 5 for screening.
[0034] Furthermore, a circular groove 15 is provided at the bottom of the collecting box 4 , and sliding blocks 16 are provided on both sides of the bottom of the screening drum 5 , and the two sliding blocks 16 are slidably disposed in the circular groove 15 .
[0035] The sliding block 16 and the annular groove 15 are arranged to improve the rotation stability of the screening drum 5 .
[0036] Furthermore, control valves 20 are provided on the collecting ports on both sides.
[0037] The start and stop states of the collecting port can be controlled by setting the control valve 20.
[0038] Furthermore, the output shaft of the first motor 9 passes through the fixed frame 8 and is connected to a driving gear 17 . The outer wall of the hard tube 7 is fixedly sleeved with a driven gear 18 . The driven gear 18 is meshed and connected with the driving gear 17 .
[0039] The first motor 9, the driving gear 17 and the driven gear 18 are arranged to realize the transmission connection process between the first motor 9 and the hard tube 7. The rotation of the hard tube 7 can drive the screening drum 5 on the top thereof to rotate accordingly.
[0040] Furthermore, legs 19 are provided at the four end corners of the bottom of the collecting box 4 .
[0041] The four legs 19 are provided so as to provide a stable support for the collecting box 4 .
[0042] When the utility model is used, construction waste is added into the crushing box 1 through the magnet plate lower hopper 2, and the magnetic attraction of the magnet plate lower hopper 2 is used to absorb the larger volume of metal waste in the construction waste. Then, the construction waste is crushed by the crushing component 3, and the crushed construction waste enters the screening drum 5 through the fixed pipe 14, and the first motor 9 is started to drive the screening drum 6 to rotate, and the control button 12 is pressed to drive the electromagnetic iron plate 11 to have magnetic attraction, and the screening drum 5 rotates to drive the construction waste waste inside it to rotate, and the centrifugal force generated by the rotation is used to make the construction debris pass through the screening net 6 toward the inner wall of the collection box 4 Move, and the metal debris mixed with the construction debris is attracted by the electromagnet plate 11. After the screening of the screening drum 4 is completed, the control valve 20 of the collecting port at the bottom of the collecting box 4 is opened to discharge the non-metallic construction debris. After the non-metallic debris is discharged, the electromagnet plate 11 is closed by the control button 12. The metal debris can be discharged by closing the magnetic attraction of the electromagnet plate 11 and the gravity of the metal debris. For the construction waste that always exists in the screening drum 5, the collection container can be placed under the discharge pipe 10 in advance, so that the construction waste in the screening drum 5 can be collected, so as to achieve the recovery of metal debris and the classified recovery of non-metallic debris.
[0043] The above are only specific implementations of the utility model, but the protection scope of the utility model is not limited thereto. Any changes or substitutions that are not conceived through creative work should be included in the protection scope of the utility model. Therefore, the protection scope of the utility model should be based on the protection scope defined in the claims.
Claims
1. A metal slag recovery device for construction waste treatment, characterized in that: It includes a crushing box, a magnet plate hopper is arranged on the top of the crushing box, a crushing assembly is arranged inside the crushing box, a collecting box is arranged at the bottom of the crushing box, a screening drum is rotatably installed inside the collecting box, a screening net is arranged on the outside of the screening drum, a hard tube is fixedly arranged at the bottom of the screening drum, a fixed frame is arranged at the bottom of the collecting box, a first motor is arranged at the bottom of the fixed frame, the first motor is transmission-connected to the hard tube, the bottom of the hard tube passes through the fixed frame and is connected to a feeding pipe through a bearing, an electromagnet plate is arranged on the inner wall of the collecting box, a control button is arranged at the front end of the collecting box, the control button is electrically connected to the electromagnet plate, and collection ports are arranged on both sides of the bottom of the collecting box.
2. The metal debris recovery device for construction waste treatment according to claim 1 is characterized by: Both sides of the top of the magnet plate lower hopper are provided with overlapping parts, and the magnet plate lower hopper is placed inside the crushing box through the overlapping parts.
3. The metal debris recovery device for construction waste treatment according to claim 1 is characterized by: The crushing assembly includes a crushing roller, a transmission gear and a second motor. The crushing roller is rotatably installed inside the crushing box. Two crushing rollers are symmetrically arranged. One end of the two crushing rollers passes through the crushing box and is connected to the transmission gear. The two transmission gears are meshed and connected. The second motor is arranged at the front end of the crushing box. The output shaft of the second motor passes through the crushing box and is connected to a crushing roller.
4. The metal slag recovery device for construction waste treatment according to claim 1, characterized in that: A fixed pipe is arranged at the bottom of the crushing box, and the fixed pipe is rotatably connected with the screening net through a bearing.
5. The metal debris recovery device for construction waste treatment according to claim 1, characterized in that: The bottom of the collecting box is provided with an annular groove, and both sides of the bottom of the screening cylinder are provided with sliding blocks, and the two sliding blocks are slidably arranged in the annular groove.
6. The metal debris recovery device for construction waste treatment according to claim 1, characterized in that: Control valves are provided on the collecting ports on both sides.
7. The metal debris recovery device for construction waste treatment according to claim 1 is characterized by: The output shaft of the first motor passes through the fixed frame and is connected with a driving gear, the outer wall of the hard tube is fixedly sleeved with a driven gear, and the driven gear is meshed and connected with the driving gear.
8. The metal debris recovery device for construction waste treatment according to claim 1, characterized in that: The four end corners of the bottom of the collection box are all provided with supporting legs.