Large-span protective net mounting mechanism

By using "U"-shaped hooks and limit components in the installation mechanism of the large-span protective net, the problem of long installation time is solved, efficient installation and disassembly is achieved, the installation process is simplified, and the installation efficiency is improved.

CN221878787UActive Publication Date: 2024-10-22CHINA CONSTR FOURTH BUREAU CIVIL ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323550739.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-26
Publication Date
2024-10-22
Estimated Expiration
2033-12-26

AI Technical Summary

Technical Problem

In building construction, when installing large-span protective nets, the existing technology requires a large number of bolts, which results in a long installation time and affects the progress of the project.

Method used

A large-span protective net installation mechanism is designed, which uses "U"-shaped hooks and limit components. The hooks are hooked on the scaffolding and the limit rods and tension springs are used to install and disassemble the protective net, avoiding the need for fastening. Bolt steps.

Benefits of technology

It greatly simplifies the installation process, improves the installation efficiency of the protective net, and allows the protective net to be moved freely during the installation process, which facilitates splicing and positioning and simplifies the overall installation process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221878787U_ABST
    Figure CN221878787U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of installation mechanisms, and discloses a large-span protective net installation mechanism which comprises a protective frame, a protective net body is fixedly installed in the middle of the protective frame, an installation assembly is fixedly installed on the back face of the protective frame and comprises a connecting rod, and the connecting rod is fixedly installed on the surface of the protective frame. A clamping hook is fixedly installed at the end, away from the protection frame, of the connecting rod, the clamping hook is in a U shape, an opening of the clamping hook faces downwards, the clamping hook can be arranged on a scaffold in a clamped mode, a limiting assembly is arranged at the opening of the clamping hook, and limiting of the clamping hook and the scaffold is achieved through the limiting assembly. In the whole installation process, a user does not need to fasten the bolt, and only needs to hook the clamping hook on a scaffold, so that the installation mode is greatly simplified, the installation efficiency of the whole protective net can be greatly improved, and meanwhile, the user can conveniently install the protective net according to the actual installation requirement. The protective net can be freely dragged to move on the scaffold, and installation is more flexible.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of installation mechanisms, and more specifically to an installation mechanism for a large-span protection net. Background Art

[0002] During the construction process, it is often necessary to install a protective net on the facade of the building to achieve the corresponding protective effect. When this type of protective net is used, it is mostly fixed to the scaffolding through buckles and bolts to achieve installation.

[0003] However, under this installation method, when the span of the building is large, a lot of bolts need to be installed, which will undoubtedly take up a lot of installation time and may even affect the progress of the project.

[0004] To this end, the utility model provides a large-span protection net installation mechanism that is easy to install. Utility Model Content

[0005] In order to overcome the above-mentioned defects of the prior art, the utility model provides a large-span protective net installation mechanism to solve the problems existing in the above-mentioned background technology.

[0006] The utility model provides the following technical solutions: a large-span protective net installation mechanism, comprising a protective frame, a body of the protective net is fixedly installed in the middle of the protective frame, a mounting assembly is fixedly installed on the back of the protective frame, the mounting assembly comprises a connecting rod, the connecting rod is fixedly installed on the surface of the protective frame, a hook is fixedly installed at the end of the connecting rod away from the protective frame, the hook is in a "U" shape, and the opening is downward, and the hook can be clamped on a scaffold, a limiting assembly is arranged at the opening of the hook, and the limiting of the hook and the scaffold is achieved by the limiting assembly, so that it is only necessary to lift the protective net, and then align the opening of the hook 4 with the scaffold 5, and then let the entire protective net descend, at this time, the hook 4 will be clamped on the crossbar of the scaffold 5, and then the limiting assembly will limit the hook 4 and the scaffold 5, so that the installation of the entire protective net is achieved, and during the entire installation process, the user is no longer required to tighten the bolts, and only needs to hook the hook 4 on the scaffold 5. In comparison, its installation method is greatly simplified, so that the installation efficiency of the entire protective net can be greatly improved.

[0007] Furthermore, the limiting assembly includes a limiting rod, which is arranged in the middle of the hook.

[0008] Furthermore, a through slot is provided on the side of the hook, and the through slot passes through the hook.

[0009] Furthermore, the first connecting seat and the second connecting seat are fixedly mounted on the two end surfaces of the hook respectively, and the through groove passes through the first connecting seat and the second connecting seat at the same time.

[0010] Furthermore, one end of the limit rod is arranged in the middle of the through groove of the first connecting seat and is rotatably connected to the first connecting seat. In this way, when the hook 4 is hooked on the cross bar of the scaffolding 5, the cross bar of the scaffolding 5 will push the limit rod 6 open, thereby being clamped into the hook 4. When the cross bar of the scaffolding 5 reaches the annular surface of the hook 4, the limit rod 6 will be reset and re-clamped on the cross bar of the scaffolding 5 under the action of the tension spring 11, thereby achieving limitation.

[0011] Furthermore, a threaded hole is provided in the middle of the second connecting seat, and a limit bolt is installed on the middle thread of the threaded hole.

[0012] Furthermore, a tension spring is fixedly mounted on the lower surface of the connecting rod, and the end of the tension spring away from the connecting rod is fixedly connected to the end of the limiting rod.

[0013] Furthermore, the limit rod is tightly attached to the surface of the limit bolt under the action of the tension spring. In this way, when dismantling is required, it is only necessary to pull out the limit bolt 11. At this time, the limit rod 6 will be rotated out of the hook 4 under the action of the tension spring 11. After that, it is only necessary to lift the protective net to achieve dismantling.

[0014] Technical effects and advantages of the utility model:

[0015] 1. In the entire installation process, the utility model does not require the user to tighten the bolts, but only needs to hook the hooks on the scaffolding. In comparison, the installation method is greatly simplified, thus greatly improving the installation efficiency of the entire protective net.

[0016] 2. During use of the utility model, since the hook is hooked on the crossbar of the scaffolding, the user can freely drag the protective net on the scaffolding according to actual installation requirements. In this way, during the installation process, the protective net can be installed first, and then the mobile protective net can be spliced, and finally the protective net can be limited on both sides of the entire protective net group, which further facilitates the installation of the entire protection. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a three-dimensional installation schematic diagram of the utility model.

[0018] Figure 2 It is a schematic diagram of the three-dimensional structure of the utility model.

[0019] Figure 3 for Figure 2 Enlarged schematic diagram at point A in the middle.

[0020] The reference numerals in the drawings are: 1 protective frame, 2 main body, 3 connecting rod, 4 hook, 5 scaffolding, 6 limiting rod, 7 through groove, 8 first connecting seat, 9 second connecting seat, 10 threaded hole, 11 tension spring, 12 limiting bolt. DETAILED DESCRIPTION

[0021] The following will clearly and completely describe the technical solution of the utility model in conjunction with the drawings in the utility model. In addition, the forms of the various structures recorded in the following embodiments are merely illustrative. The large-span protective net installation mechanism involved in the utility model is not limited to the various structures recorded in the following embodiments. All other implementations obtained by ordinary technicians in this field without making creative work belong to the scope of protection of the utility model.

[0022] Reference Figure 1-3 The utility model provides a large-span protective net installation mechanism, including a protective frame 1, a protective net body 2 is fixedly installed in the middle of the protective frame 1, a mounting assembly is fixedly installed on the back of the protective frame 1, and the mounting assembly includes a connecting rod 3, the connecting rod 3 is fixedly installed on the surface of the protective frame 1, and a hook 4 is fixedly installed at the end of the connecting rod 3 away from the protective frame 1. The hook 4 is in a "U" shape and has an opening facing downward, and the hook 4 can be clamped on a scaffold 5. A limiting assembly is arranged at the opening of the hook 4, and the limiting assembly is used to realize the limiting of the hook 4 and the scaffold 5.

[0023] When in use, it is only necessary to lift the protective net, then align the opening of the hook 4 with the scaffolding 5, and then let the entire protective net descend. At this time, the hook 4 will be stuck on the crossbar of the scaffolding 5, and then the limiting component will limit the hook 4 and the scaffolding 5, so that the installation of the entire protective net is realized.

[0024] During the entire installation process, the user is no longer required to tighten the bolts, but only needs to hook the hook 4 onto the scaffold 5. In comparison, the installation method is greatly simplified, thus greatly improving the installation efficiency of the entire protective net.

[0025] At the same time, during use, since the hook 4 is hooked on the crossbar of the scaffolding 5, the user can freely drag the protective net on the scaffolding 5 according to actual installation requirements. In this way, during the installation process, the protective net can be installed first, and then the mobile protective net can be spliced, and finally the protective net can be limited on both sides of the entire protective net group, which further facilitates the installation of the entire protection.

[0026] The limiting assembly includes a limiting rod 6, which is arranged in the middle of the hook 4. A through groove 7 is provided on the side of the hook 4, and the through groove 7 passes through the hook 4. The first connecting seat 8 and the second connecting seat 9 are fixedly installed on the two end surfaces of the hook 4, respectively, and the through groove 7 passes through the first connecting seat 8 and the second connecting seat 9 at the same time. One end of the limiting rod 6 is arranged in the middle of the through groove 7 of the first connecting seat 8 and is rotatably connected to the first connecting seat 8. A threaded hole 10 is provided in the middle of the second connecting seat 9, and a limiting bolt 11 is installed on the middle thread of the threaded hole 10. A tension spring 12 is fixedly installed on the lower surface of the connecting rod 3, and the end of the tension spring 12 away from the connecting rod 3 is fixedly connected to the end of the limiting rod 6. Under the action of the tension spring 12, the limiting rod 6 is tightly attached to the surface of the limiting bolt 11.

[0027] In this way, when the hook 4 is hooked on the cross bar of the scaffolding 5, the cross bar of the scaffolding 5 will push the limit rod 6 away, thereby being stuck in the hook 4. When the cross bar of the scaffolding 5 reaches the annular surface of the hook 4, the limit rod 6 will be reset and re-set on the cross bar of the scaffolding 5 under the action of the tension spring 11. In this way, the limit is achieved. When it needs to be dismantled, it is only necessary to pull out the limit bolt 11. At this time, the limit rod 6 will be rotated out of the hook 4 under the action of the tension spring 11. Then, it is only necessary to lift the protective net to achieve disassembly.

[0028] Therefore, the detailed steps of use are: first, lift the protective net, then align the opening of the hook 4 with the scaffolding 5, and then let the entire protective net descend. At this time, the cross bar of the scaffolding 5 will push open the limit rod 6, thereby being clamped into the hook 4. When the cross bar of the scaffolding 5 reaches the annular surface of the hook 4, the limit rod 6 will be reset and re-clamped on the cross bar of the scaffolding 5 under the action of the tension spring 11. In this way, the installation of the entire protective net is realized.

[0029] Finally, a few points should be explained: First, in the description of this application, it should be noted that, unless otherwise specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, which may refer to mechanical connection or electrical connection, or internal communication between two components, or direct connection. "upper", "lower", "left", "right", etc. are only used to indicate relative positional relationships. When the absolute position of the object being described changes, the relative positional relationship may change;

[0030] Secondly: In the drawings of the embodiments disclosed in the present utility model, only the structures related to the embodiments disclosed in the present utility model are involved, and other structures can refer to the general design. In the absence of conflict, the same embodiment and different embodiments of the present utility model can be combined with each other;

[0031] Finally: The above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present utility model should be included in the protection scope of the present utility model.

Claims

1. A large-span protective net installation mechanism, comprising a protective frame (1), a protective net body (2) fixedly installed in the middle of the protective frame (1), Features: A mounting assembly is fixedly mounted on the back of the protective frame (1), and the mounting assembly comprises a connecting rod (3), the connecting rod (3) is fixedly mounted on the surface of the protective frame (1), and a hook (4) is fixedly mounted on the end of the connecting rod (3) away from the protective frame (1), the hook (4) is in a "U" shape, and its opening faces downward, and the hook (4) can be mounted on a scaffold (5), and a limiting assembly is arranged at the opening of the hook (4), and the limiting assembly is used to realize the limiting of the hook (4) and the scaffold (5).

2. A large-span protective net installation mechanism according to claim 1, Features: The limiting assembly comprises a limiting rod (6), and the limiting rod (6) is arranged in the middle of the hook (4).

3. A large-span protective net installation mechanism according to claim 2, Features: A through slot (7) is provided on the side of the hook (4), and the through slot (7) passes through the hook (4).

4. A large-span protective net installation mechanism according to claim 3, Features: A first connecting seat (8) and a second connecting seat (9) are respectively fixedly mounted on the two end surfaces of the hook (4), and the through groove (7) penetrates both the first connecting seat (8) and the second connecting seat (9).

5. A large-span protective net installation mechanism according to claim 4, Features: One end of the limiting rod (6) is arranged in the middle of the through slot (7) of the first connecting seat (8) and is rotatably connected to the first connecting seat (8).

6. A large-span protective net installation mechanism according to claim 5, Features: A threaded hole (10) is provided in the middle of the second connecting seat (9), and a limit bolt (11) is installed in the middle thread of the threaded hole (10).

7. A large-span protection net installation mechanism according to claim 6, Features: A tension spring (12) is fixedly mounted on the lower surface of the connecting rod (3), and the end of the tension spring (12) away from the connecting rod (3) is fixedly connected to the end of the limiting rod (6).

8. A large-span protection net installation mechanism according to claim 7, Features: The limiting rod (6) is tightly attached to the surface of the limiting bolt (11) under the action of the tension spring (12).