Material preparation bin feeding structure with anti-blocking screen
By introducing a vibration motor and inspection holes into the feed structure of the preparation bin, the problem of screen clogging is solved, the smooth filtration of high-temperature powder and the convenient cleaning of the screen are achieved, improving production efficiency and equipment life.
Patent Information
- Application Number
- CN202323380042.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-12
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2033-12-12
AI Technical Summary
During the copper smelting process, the screens in the material preparation bins are easily clogged, affecting material transportation, and cleaning is complicated, resulting in production shutdowns and a long time-consuming process.
A feeding structure including main pipes, screens, connecting components and mounting supports is designed. It is equipped with a vibration motor and inspection holes. The vibration motor is started regularly to prevent clogging. The inspection holes are convenient for workers to enter and clean debris.
It effectively prevents clogging of high-temperature powder, simplifies the screen cleaning process, improves production efficiency, and extends the service life of the equipment.
Smart Images

Figure CN221915720U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of material conveying, in particular to a material preparation bin feeding structure with an anti-blocking screen. Background Art
[0002] In industrial production, during the copper smelting process, high-temperature powder materials will be added through the feed port of the preparation bin. Because there are many vulnerable parts in the upstream facilities connected to the preparation bin, these facilities will have parts damaged and fallen off after long-term operation, forming debris. The debris will enter the preparation bin, and then enter the downstream equipment or facilities with the materials in the preparation bin for use, affecting subsequent production. When feeding, the debris will be transported together with the materials, which will cause the materials to be mixed with debris, which will affect normal production and processing. Based on the above problems, during the existing operation, a screen will be set at the feed port of the preparation bin. However, it was found during use that although the screen can block the debris, long-term use can easily cause the material to accumulate above the screen surface, which will cause the screen to be blocked. At this time, it will still affect the feeding of the preparation bin, and maintenance and cleaning require production to be stopped, and workers need to use slings to enter for inspection or cleaning. The operation is labor-intensive, time-consuming and complicated, thus affecting the overall production progress. Summary of the invention
[0003] In view of the shortcomings that the screen of the above-mentioned material preparation bin is easily blocked during use, affecting the normal transportation of materials, and the screen is not convenient to clean after being blocked, the utility model provides a high-temperature powder material preparation bin with an anti-blocking screen, which can avoid the blockage of high-temperature powder materials during use and is convenient for cleaning the debris on the screen.
[0004] To achieve the above purpose, the technical solution of the utility model is as follows:
[0005] A material preparation bin feeding structure with an anti-blocking screen comprises a main pipeline, a screen, a connecting assembly and a mounting support; a feed port is provided on the top of the main pipeline, and the screen is installed directly below the feed port, wherein an inspection hole is also provided on the main pipeline above the screen; one end of the screen passes through the main pipeline and is connected to the connecting assembly, the connecting assembly is connected to the mounting support, and a vibration motor is also connected in the middle of the connecting assembly; the mounting support is connected to the outside of the main pipeline by bolts.
[0006] Further, the mounting support includes an annular plate; at least one pair of connecting plates is provided on the outer periphery of one end of the annular plate, and a stopper block cooperating with the connecting assembly is provided on the other end, wherein each pair of connecting plates is symmetrically arranged on the outer wall of the annular plate along the center of the annular plate; bolts A are provided on the connecting plate, and bolts A connect the connecting plate to the main pipeline. Bolts A connect the connecting plate to the main pipeline, so that the connection between the annular plate and the main pipeline is stable and reliable; the connecting assembly is connected to the stopper block, so that the screen and the vibration motor are stably connected to the main pipeline, and the connection is convenient.
[0007] Furthermore, the connecting plate is an L-shaped plate, the bottom surface of the L-shaped plate is fixedly connected to the outer diameter of the annular plate, and the side surface is connected to the main pipeline by bolts. The connecting plate is an L-shaped plate, which can facilitate the connection between the annular plate and the main pipeline.
[0008] Furthermore, the limit block is a flange ring, and the inner diameter of the flange ring is welded to the outer diameter of the main pipe; the connection assembly includes a flange sleeve, bolts B and nuts that cooperate with each other, wherein the flange sleeve cooperates with the inner diameter of the main pipe, and one end cooperates with the flange ring, and the bolt B passes through the flange ring and the flange sleeve and is locked with the nut; a mounting plate is also provided inside the flange sleeve, one end of the mounting plate is connected to the screen, and the other end is connected to the vibration motor. Bolt B passes through the flange ring and the flange sleeve and cooperates with the nut, and then tightens the nut to fix the flange ring and the flange sleeve together, which is flexible to disassemble and assemble, and convenient for maintenance; when in use, the vibration motor starts to drive the mounting plate and the screen on the mounting plate.
[0009] Furthermore, the connection assembly also includes a shock-absorbing pad, which is arranged between the flange ring and the flange sleeve. The shock-absorbing pad is used to buffer the force of the vibration motor on the main pipeline, which can reduce the damage to the main pipeline and extend the service life of the feeding mechanism.
[0010] Furthermore, the inspection hole includes a man-shaped pipe and a cover, one end of the man-shaped pipe is connected to the main pipe and fixedly connected to the main pipe, and the other end is installed with a circular limit frame, the side of the limit frame is hinged to the cover through a hinge, and a handle is also provided on the outside of the cover. The design of the circular limit frame and the cover is consistent with the principle of the door frame and the entrance door. The handle can be used to quickly open or close the cover, making it convenient for workers to enter the main pipe to check the screen or clean up debris.
[0011] The use of the utility model:
[0012] When the feeding structure is in use, high-temperature powder materials are added into the feeding port, and then the high-temperature powder materials pass through the partition screen into the preparation bin, and debris will be blocked by the partition screen after falling into the feeding port, so as to prevent the debris from falling into the preparation bin; during use, the vibration motor can be started regularly, and after the vibration motor is turned on, it drives the connecting components and the partition screen to vibrate, and the high-temperature powder materials on the partition screen can be made to fall into the preparation bin through vibration, so as to prevent blockage; the inspection hole can facilitate the staff to regularly enter the main pipeline to clean up the debris on the partition screen, or to regularly clean or inspect the partition screen.
[0013] Compared with the prior art, the utility model has the following advantages and beneficial effects:
[0014] 1. The utility model screen cooperates with the mounting support, and the material enters from the feed port, and then enters the ash bin after being filtered through the screen, so that the material entering the preparation bin is prevented from being mixed with foreign matter; the connecting component connects the screen and the vibration motor, and the vibration motor is started according to a periodic timing. The vibration of the vibration motor can make the material accumulated on the surface of the screen fall into the preparation bin, so that the screen is prevented from being blocked; at the same time, the design of the main pipe to the upper inspection hole can facilitate the workers to clean and inspect the screen, and the accumulated foreign matter on the screen can be cleaned up quickly and conveniently, the operation is simple, and the use effect is good.
[0015] 2. The bolt A of the utility model connects the connecting plate and the main pipe together, and the connection is stable and reliable; the connecting assembly cooperates with the limit block, so that the screen and the vibration motor can be stably connected to the main pipe through the mounting plate of the connecting assembly, which is convenient to use; the shock-absorbing pad arranged between the flange ring and the flange sleeve can reduce the damage of the vibration motor to the main pipe when in use, and extend the service life of the feeding mechanism; the cover of the pedestrian pipe hinged by the hinge can be quickly opened or closed by the handle, which is simple and convenient to use. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a main structural schematic diagram of the utility model.
[0017] Figure 2 It is a schematic structural sectional view of the main view of the utility model.
[0018] Figure 3 yes Figure 2 A magnified schematic diagram of the structure in the middle.
[0019] Figure 4 It is a side structural schematic diagram of the inspection hole of the utility model.
[0020] Figure 5 It is a schematic diagram of the structure section of the utility model from a top view.
[0021] Figure ID:
[0022] Main pipeline-1, feed inlet-11, inspection hole-12, man-shaped pipeline-121, cover-122, circular limit frame-123, handle-124, screen-2, connecting assembly-3, flange sleeve-31, mounting plate-311, bolt B-32, nut-33, shock-absorbing pad-34, mounting support-4, annular plate-41, connecting plate-42, limit block-43, bolt A-44, vibration motor-5. DETAILED DESCRIPTION
[0023] The utility model is further described below in conjunction with the accompanying drawings.
[0024] Embodiment 1: A material preparation bin feeding structure with an anti-blocking screen, comprising a main pipeline 1, a screen 2, a connecting assembly 3 and a mounting support 4; a feed port 11 is provided on the top of the main pipeline 1, and the screen 2 is installed directly below the feed port 11, wherein an inspection hole 12 is also provided on the main pipeline 1 above the screen 2; one end of the screen 2 passes through the main pipeline 1 and is connected to the connecting assembly 3, the connecting assembly 3 is connected to the mounting support 4, and a vibration motor 5 is also connected in the middle of the connecting assembly 3; the mounting support 4 is connected to the outer side of the main pipeline 1 by bolts.
[0025] When the feeding structure is in use, high-temperature powder materials are added to the feeding port 11, and then the high-temperature powder materials enter the preparation bin through the screen 2, and the debris will be blocked by the screen 2 after falling into the feeding port 11, so as to prevent the debris from falling into the preparation bin; during use, the vibration motor 5 can be started regularly, and after the vibration motor 5 is turned on, it drives the connecting component 3 and the screen 2 to vibrate, and the high-temperature powder materials on the screen 2 can be made to fall into the preparation bin through vibration to prevent blockage; the inspection hole 12 can facilitate the staff to regularly enter the main pipeline 1 to clean up the debris on the screen 2, or to regularly clean or inspect the screen 2.
[0026] Embodiment 2: The difference from Embodiment 1 is that the mounting support 4 includes an annular plate 41; at least one pair of connecting plates 42 is provided on the outer periphery of one end of the annular plate 41, and a stopper 43 cooperating with the connecting assembly 3 is provided on the other end, wherein each pair of connecting plates 42 is symmetrically arranged on the outer wall of the annular plate 41 along the center of the annular plate 41; bolts A44 are provided on the connecting plate 42, and the bolts A44 connect the connecting plate 42 with the main pipeline 1. Bolts A44 connect the connecting plate 42 with the main pipeline 1, so that the connection between the annular plate 41 and the main pipeline 1 is stable and reliable; the connecting assembly 3 is connected with the stopper 43, so that the screen 2 and the vibration motor 5 are stably connected with the main pipeline 1, and the connection is convenient.
[0027] The stopper 43 is a flange ring, and the inner diameter of the flange ring is welded to the outer diameter of the main pipe 1; the connection assembly 3 includes a flange sleeve 31, bolts B32 and nuts 33 that cooperate with each other, wherein the flange sleeve 31 cooperates with the inner diameter of the main pipe 1, and one end cooperates with the flange ring, and the bolts B32 pass through the flange ring and the flange sleeve 31 and are locked by the nut 33; a mounting plate 311 is also provided inside the flange sleeve 31, and one end of the mounting plate 311 is connected to the screen 2, and the other end is connected to the vibration motor 5. The bolts B32 pass through the flange ring and the flange sleeve 31 and cooperate with the nut 33, and then tighten the nut 33 to fix the flange ring and the flange sleeve 31 together, which is flexible to disassemble and assemble, and convenient for maintenance; when in use, the vibration motor 5 is started to drive the mounting plate 311 and the screen 2 on the mounting plate 311.
[0028] Embodiment 3: The difference from Embodiment 2 is that the connecting plate 42 is an L-shaped plate, the bottom surface of the L-shaped plate is fixedly connected to the outer diameter of the annular plate 41, and the side surface is connected to the main pipeline 1 by bolts. The connecting plate 42 is an L-shaped plate, which can facilitate the connection between the annular plate 41 and the main pipeline 1.
[0029] The connection assembly 3 further includes a shock absorbing pad 34, which is disposed between the flange ring and the flange sleeve 31. The shock absorbing pad 34 is used to buffer the force of the vibration motor 5 on the main pipeline 1, thereby reducing damage to the main pipeline 1 and extending the service life of the feeding mechanism.
[0030] The inspection hole 12 includes a man-shaped pipe 121 and a cover 122. One end of the man-shaped pipe 121 is connected to the main pipe 1 and fixedly connected to the main pipe 1, and the other end is installed with a circular limit frame 123. The side of the limit frame is hinged to the cover 122 through a hinge, and a handle 124 is also provided on the outside of the cover 122. The design of the circular limit frame 123 and the cover 122 is consistent with the principle of the door frame and the entrance door. The cover 122 can be quickly opened or closed by the handle 124, which is convenient for workers to enter the main pipe 1 to check the screen 2 or clean up debris.
[0031] In the specification of the present utility model, a lot of specific details are described. However, it is understood that the embodiments of the present utility model can be practiced without these specific details. In some examples, well-known methods, structures and techniques are not shown in detail so as not to obscure the understanding of this specification.
[0032] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model, rather than to limit it. Although the utility model has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein by equivalents. These modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the utility model, and they should all be included in the scope of the claims and specification of the utility model.
Claims
1. A feed storage structure with an anti-blocking screen, characterized in that: The invention comprises a main pipeline (1), a screen (2), a connecting assembly (3) and a mounting support (4); a feed port (11) is provided on the top of the main pipeline (1), a screen (2) is installed directly below the feed port (11), and an inspection hole (12) is also provided on the main pipeline (1) above the screen (2); one end of the screen (2) passes through the main pipeline (1) and is connected to the connecting assembly (3), the connecting assembly (3) is connected to the mounting support (4), and a vibration motor (5) is also connected in the middle of the connecting assembly (3); the mounting support (4) is connected to the outer side of the main pipeline (1) by bolts.
2. A material preparation bin feeding structure with anti-blocking screen as claimed in claim 1, characterized in that: The mounting support (4) comprises an annular plate (41); at least one pair of connecting plates (42) is provided on the outer periphery of one end of the annular plate (41); a stop block (43) cooperating with the connecting assembly (3) is provided on the other end, wherein each pair of connecting plates (42) is symmetrically arranged on the outer wall of the annular plate (41) along the center of the annular plate (41); bolts A (44) are provided on the connecting plates (42), and the bolts A (44) connect the connecting plates (42) to the main pipeline (1).
3. A material preparation bin feeding structure with anti-blocking screen as claimed in claim 2, characterized in that: The connecting plate (42) is an L-shaped plate, the bottom surface of the L-shaped plate is fixedly connected to the outer diameter of the annular plate (41), and the side surface is connected to the main pipeline (1) by bolts.
4. A material preparation bin feeding structure with anti-blocking screen as claimed in claim 2, characterized in that: The stop block (43) is a flange ring, and the inner diameter of the flange ring is welded to the outer diameter of the main pipe (1); the connection assembly (3) comprises a flange sleeve (31), bolts B (32) and nuts (33) that cooperate with each other, wherein the flange sleeve (31) cooperates with the inner diameter of the main pipe (1), and one end cooperates with the flange ring, and the bolts B (32) pass through the flange ring and the flange sleeve (31) and are locked with the nut (33); a mounting plate (311) is also provided inside the flange sleeve (31), one end of the mounting plate (311) is connected to the screen (2), and the other end is connected to the vibration motor (5).
5. A material preparation bin feeding structure with anti-blocking screen as claimed in claim 4, characterized in that: The connection assembly (3) further comprises a shock absorbing pad (34), wherein the shock absorbing pad (34) is arranged between the flange ring and the flange sleeve (31).
6. A material preparation bin feeding structure with anti-blocking screen as claimed in claim 1, characterized in that: The inspection hole (12) comprises a man-shaped pipe (121) and a cover (122); one end of the man-shaped pipe (121) is connected to the main pipe (1) and is fixedly connected to the main pipe (1); the other end is provided with a circular limit frame (123); the side of the limit frame is hinged to the cover (122) via a hinge; and a handle (124) is also provided on the outside of the cover (122).