Distributed drainage device

Through the design of the filter holes and drainage pipes of the distributed drainage device, the problem of difficult cleaning of accumulated water on construction sites is solved, and efficient filtration of water is achieved and water is discharged directly into drainage points, which improves cleaning efficiency and avoids clogging of drainage points.

CN221919681UActive Publication Date: 2024-10-29CHINA CONSTR EIGHT ENG DIV CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420250072.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-01
Publication Date
2024-10-29
Estimated Expiration
2034-02-01

AI Technical Summary

Technical Problem

It is difficult to clean up the accumulated water on the floors of the construction site. The traditional method requires multiple people to sweep into the drainage points, and low-lying areas are easily blocked, which is labor-intensive and time-consuming.

Method used

Design a distributed drainage device that filters the water flow through the first and second filter holes in the box body to prevent construction waste from clogging the drainage points and directly flows into the drainage points through the drainage pipes.

Benefits of technology

It achieves high-efficiency filtration of water and direct discharge into drainage points, reducing the need for construction workers to sweep water in relays, improving cleaning efficiency and avoiding clogging of drainage points.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221919681U_ABST
    Figure CN221919681U_ABST
Patent Text Reader

Abstract

The utility model relates to a distributed drainage device which comprises a supporting cylinder. The box body is arranged at the top of the supporting cylinder, a water pouring opening is formed in one side of the box body, and the water pouring opening is connected with a water drainage pipe; the partition plate is vertically arranged in the box body and opposite to the water pouring opening, the partition plate divides the box body into a first water pouring space and a second water pouring space, the water pouring opening is located in the second water pouring space, and a plurality of first water filtering holes are formed in the partition plate; the filtering plate is arranged in the second water pouring space and is opposite to the water pouring opening, a plurality of second water filtering holes are formed in the filtering plate, and the diameter of the second water filtering holes is smaller than that of the first water filtering holes; the water pouring device has the advantages that the structure is simple, and the water pouring device is convenient to use.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of water accumulation drainage, in particular to a distributed drainage device. Background Art

[0002] There is often water accumulation on the floors of construction sites. Due to the negligence of workers in leveling when pouring the floor slabs, there will be low-lying areas after the floor slabs are poured and formed. After the rain, the water accumulation in some locations is large and shallow, which is difficult to clean. The traditional way of cleaning up the accumulated water is restricted by the terrain. It requires multiple people to use brooms to sweep into the drainage points step by step in the form of relays. It is very troublesome and labor-intensive. In addition, some small stones and other construction waste often gather in the low-lying areas, which can easily block the drainage points. When cleaning, the construction workers also need to pick out the construction waste, which requires a huge amount of manpower and time. Utility Model Content

[0003] The purpose of the utility model is to overcome the defects of the prior art and provide a distributed drainage device, which guides water from low-lying areas into a box body, filters it through the first water filter hole and the second water filter hole in the box body, and filters it with water flow, thereby avoiding the clogging of the drainage point by construction waste, and directly collects the filtered water into the drainage point through a drainage pipe, so as to avoid the construction workers sweeping the water into the drainage point in the form of relay.

[0004] The technical solution to achieve the above purpose is a distributed drainage device, comprising:

[0005] Support tube;

[0006] A box body is arranged on the top of the support tube, a water pouring port is formed on one side of the box body, and the water pouring port is connected to a drainage pipe;

[0007] A partition plate vertically arranged in the box body and arranged opposite to the water pouring port, the partition plate divides the box body to form a first water pouring space and a second water pouring space, the water pouring port is located in the second water pouring space, and the partition plate is formed with a plurality of first water filtering holes;

[0008] a filter plate disposed in the second water pouring space and opposite to the water pouring port, wherein the filter plate is formed with a plurality of second water filter holes, wherein the diameter of the second water filter holes is smaller than the diameter of the first water filter holes; and

[0009] A slideway connecting a plurality of the second water filter ports and the water pouring ports.

[0010] Furthermore, a slot is formed at the top of the support tube, and a setting block is formed at the bottom of the box body corresponding to the slot.

[0011] Furthermore, a fixing plate is fixedly installed on the top of the support tube, the fixing plate is formed with a through hole, a clamping tube is fixedly installed in the through hole, one end of the clamping tube forms a first joint corresponding to the drain pipe, and the drain pipe is passed through the first joint.

[0012] Furthermore, an extension tube is fixed to one end of the card tube away from the first connector.

[0013] Furthermore, a second joint is fixed to one end of the clamping tube away from the first joint corresponding to the extension tube, and the extension tube is fixed to the second joint.

[0014] Furthermore, a clamping block is fixedly installed on the top of the support tube, and a fixing groove is formed in the clamping block corresponding to the fixing plate, and the fixing plate is arranged in the fixing groove.

[0015] Furthermore, the fixing plate comprises:

[0016] Two card plates, each card plate has an arc-shaped groove formed on its side, and the arc-shaped grooves of the two card plates are spliced ​​together to form the through hole; and

[0017] A sleeve plate is sleeved on the top of the two card plates.

[0018] Furthermore, a handle is fixedly mounted on the side of the support tube.

[0019] Furthermore, the drainage pipe is connected to a water receiving tray.

[0020] Furthermore, an end of the slideway close to the second water filter outlet is higher than an end of the slideway close to the drain pipe.

[0021] Compared with the prior art, the utility model has the following beneficial effects:

[0022] By directing water from low-lying areas into the box body, filtering through the first and second filter holes in the box body, filtering with water flow, thereby preventing construction waste from clogging the drainage point, and directly collecting the filtered water into the drainage point through the drainage pipe, so as to avoid construction workers sweeping the water into the drainage point in a relay manner. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 The utility model is a structural schematic diagram of a distributed drainage device.

[0024] Figure 2 It is a front view of a distributed drainage device of the utility model.

[0025] Figure 3 It is a right view of a distributed drainage device of the utility model.

[0026] Figure 4 This is a usage effect diagram of a distributed drainage device of the utility model.

[0027] Figure 5 This is a storage effect diagram of a distributed drainage device of the utility model.

[0028] Legend: 1. Box body; 2. Partition plate; 3. Filter plate; 4. Slide; 5. Drain pipe; 6. Sleeve plate; 7. Clamp plate; 8. Second joint; 9. Extension pipe; 10. Clamp block; 11. Setting block; 12. Clamp slot; 13. Support tube; 14. Water tray; 15. Conduit; 16. Handle; 17. Threaded rod; 18. Baffle; 19. Threaded tube. DETAILED DESCRIPTION

[0029] The utility model is further described below in conjunction with the accompanying drawings and specific embodiments.

[0030] See also Figures 1 to 3 A distributed drainage device comprises: a support cylinder 13; a box body 1 arranged on the top of the support cylinder 13, a water pouring port being formed on one side of the box body 1, and the water pouring port being connected to a drainage pipe 5; a partition plate 2 vertically arranged in the box body 1 and arranged opposite to the water pouring port, the partition plate 2 divides the box body 1 into a first water pouring space and a second water pouring space, the water pouring port is located in the second water pouring space, and the partition plate 2 is formed with a plurality of first water filtering holes; a filter plate 3 arranged in the second water pouring space and arranged opposite to the water pouring port, the filter plate 3 is formed with a plurality of second water filtering holes, and the diameter of the second water filtering holes is smaller than the diameter of the first water filtering holes; and a slide 4 connecting a plurality of the second water filtering ports and the water pouring ports.

[0031] See also Figure 5In the present invention, a preferred embodiment is: the accumulated water in the water accumulation point is poured into the upper part of the first pouring space by a shovel, the poured water is filtered through the first water filter hole and the second water filter hole to filter out large particles of impurities in the water, and the filtered water is discharged into the designated drainage point through the drain pipe 5. Preferably, the box body 1 is detachably mounted on the top of the support tube 13, and an opening is formed on the side of the support tube 13 away from the box body 1. After the drainage is completed, the box body 1 is removed and a baffle 1 is provided. 8. The baffle 18 is formed with a plurality of threaded holes, and a threaded tube 19 is fixed to the bottom wall of the support tube 13 corresponding to the threaded opening, and a threaded rod 17 is rotatably installed in the threaded tube 19. The box body 1 is placed on the baffle 18, and the threaded rod 17 is inserted into the threaded hole. The portion of the threaded rod 17 exposed from the baffle 18 is fixed by a nut to place the box body 1 in the support tube 13. Preferably, the box body 1 is inverted on the baffle 18 to pour out the residual water in the box body 1 to avoid residual water.

[0032] Furthermore, a slot 12 is formed at the top of the support tube 13, and a setting block 11 is formed at the bottom of the box body 1 corresponding to the slot 12. Preferably, the box body 1 is fixed to the top of the support tube 13 by locking the setting block 11 in the slot 12. When in use, the construction personnel fix the support tube 13 and the box body 1 by sliding the setting block 11 into the slot 12. After use, the construction personnel slide the setting block 11 out of the slot 12 to release the fixation of the support tube 13 and the box body 1.

[0033] Furthermore, a fixing plate is fixedly installed on the top of the support tube 13, and a through hole is formed on the fixing plate. A clamping tube is fixedly installed in the through hole, and a first joint is formed at one end of the clamping tube corresponding to the drain pipe 5, and the drain pipe 5 is penetrated in the first joint. By placing the drain pipe 5 in the first joint, it is convenient for construction workers to fix the drain pipe 5.

[0034] Furthermore, an extension pipe 9 is fixed to one end of the clamping pipe away from the first joint. The extension pipe 9 extends the drain pipe 5 to prevent the drain pipe 5 from being insufficiently long and unable to extend to the drainage point. Preferably, the extension pipe 9 is a special pipe, and the diameter of the special pipe can be determined according to the application.

[0035] Further, the end of the clamp tube away from the first joint corresponds to the extension tube 9 and is fixed with a second joint 8, and the extension tube 9 is fixed to the second joint 8. Preferably, the extension tube 9 and the second joint 8 are connected by rivets or hot melt.

[0036] Furthermore, a clamping block 10 is fixedly mounted on the top of the support tube 13 , and a fixing groove is formed on the clamping block 10 corresponding to the fixing plate, and the fixing plate is arranged in the fixing groove.

[0037] Further, the fixing plate comprises: two clamping plates 7, the sides of the clamping plates 7 are formed with arc grooves, the arc grooves of the two clamping plates 7 are spliced ​​together to form the through hole; and a sleeve plate 6 sleeved on the tops of the two clamping plates 7. The sleeve plate 6 can prevent the two clamping plates 7 from separating.

[0038] Furthermore, a handle 16 is fixedly mounted on the side of the support tube 13. The handle 16 can facilitate construction workers to transfer the support tube 13.

[0039] See also Figure 4 Furthermore, the drain pipe 5 is connected to a water receiving tray 14.

[0040] In the present invention, a preferred implementation is: when there are multiple water accumulation points in the construction area, multiple box bodies 1 and support tubes 13 can be provided, and a box body 1 and a support tube 13 are set at multiple water accumulation points, and the drainage pipe 5 of each box body 1 is connected to the water receiving tray 14, so that multiple construction workers can drain water at the water accumulation points to achieve the effect of rapid construction. Preferably, the water receiving tray 14 can be used as a temporary water storage structure to collect water from each water accumulation point, and a conduit 15 can also be connected to the bottom of the water receiving tray 14 to discharge the water in the water receiving tray 14 to the drainage point.

[0041] Furthermore, an end of the slide 4 close to the second water filter outlet is higher than an end of the slide 4 close to the drain pipe 5 .

[0042] The following is an explanation of the use process of a distributed drainage device of the utility model.

[0043] The accumulated water in the water accumulation point is poured into the top of the first pouring space by using a shovel, the poured water is filtered through the first water filter hole and the second water filter hole to filter out large particles of impurities in the water, and the filtered water is discharged into the designated drainage point through the drain pipe 5. Preferably, the box body 1 is detachably mounted on the top of the support tube 13, and an opening is formed on the side of the support tube 13 away from the box body 1. After the drainage is completed, the box body 1 is dismantled and a baffle 18 is provided, and the baffle 18 forms a There are several threaded holes, and a threaded tube 19 is fixed to the bottom wall of the support tube 13 corresponding to the threaded mouth, and a threaded rod 17 is rotatably installed in the threaded tube 19. The box body 1 is placed on the baffle 18, and the threaded rod 17 is inserted into the threaded hole. The part of the threaded rod 17 exposed from the baffle 18 is fixed by a nut to place the box body 1 in the support tube 13. Preferably, the box body 1 is inverted on the baffle 18 to pour out the residual water in the box body 1 to avoid residual water.

[0044] The utility model is described in detail above in conjunction with the embodiments of the drawings. A person skilled in the art can make various variations of the utility model according to the above description. Therefore, some details in the embodiments should not constitute a limitation of the utility model, and the scope of protection of the utility model shall be defined by the scope of the attached claims.

Claims

1. A distributed drainage device, characterized in that: include: Support tube; A box body is arranged on the top of the support tube, a water pouring port is formed on one side of the box body, and the water pouring port is connected to a drainage pipe; A partition plate vertically arranged in the box body and arranged opposite to the water pouring port, the partition plate divides the box body to form a first water pouring space and a second water pouring space, the water pouring port is located in the second water pouring space, and the partition plate is formed with a plurality of first water filtering holes; a filter plate disposed in the second water pouring space and opposite to the water pouring port, wherein the filter plate is formed with a plurality of second water filter holes, and the diameter of the second water filter holes is smaller than the diameter of the first water filter holes; and A slideway connecting a plurality of the second water filtering holes and the water pouring port.

2. A distributed drainage device according to claim 1, characterized in that: A slot is formed on the top of the support tube, and a setting block is formed on the bottom of the box body corresponding to the slot.

3. A distributed drainage device according to claim 1, characterized in that: A fixing plate is fixedly installed on the top of the support tube, and a through hole is formed on the fixing plate. A clamping tube is fixedly installed in the through hole, and a first joint is formed at one end of the clamping tube corresponding to the drain pipe, and the drain pipe is penetrated through the first joint.

4. A distributed drainage device according to claim 3, characterized in that: An extension tube is fixed to one end of the clamping tube away from the first connector.

5. A distributed drainage device according to claim 4, characterized in that: A second joint is fixed to an end of the clamping tube away from the first joint corresponding to the extension tube, and the extension tube is fixed to the second joint.

6. A distributed drainage device according to claim 3, characterized in that: A clamping block is fixedly installed on the top of the support tube, and a fixing groove is formed in the clamping block corresponding to the fixing plate, and the fixing plate is arranged in the fixing groove.

7. A distributed drainage device according to claim 3, characterized in that: The fixing plate comprises: Two card plates, each card plate has an arc-shaped groove formed on its side, and the arc-shaped grooves of the two card plates are spliced ​​together to form the through hole; and A sleeve plate is sleeved on the top of the two card plates.

8. A distributed drainage device according to claim 1, characterized in that: A handle is fixedly mounted on the side of the support tube.

9. A distributed drainage device according to claim 1, characterized in that: The drain pipe is connected with a water receiving tray.

10. A distributed drainage device according to claim 1, characterized in that: An end of the slideway close to the second water filter hole is higher than an end of the slideway close to the drain pipe.