Drainage structure for top structure leakage at communication port

By arranging water diversion trays and hydrophobic structures of drainage pipes at construction joints, the problem of construction joint leakage is solved, centralized discharge of leaking water is achieved, re-leakage is avoided, construction operations are simplified and costs are saved.

CN221919843UActive Publication Date: 2024-10-29CHINA CONSTR EIGHT ENG DIV CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420320412.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-21
Publication Date
2024-10-29
Estimated Expiration
2034-02-21

AI Technical Summary

Technical Problem

During construction, leakage often occurs in construction joints at the connecting entrances of subway stations. Existing leakage plugging methods have reliability risks, especially when outdoor groundwater pressure is high, it is easy to leak again.

Method used

A hydrophobic structure including structural beams, structural bottom plates, rolling shutter doors, water diversion trays and drainage pipes is adopted. The bottom of the water diversion tray is provided with through holes to connect to the drainage pipes. The leaking water is directed to the drainage ditch on the structural bottom plate through the vertical drainage pipes. Avoid leaks again.

Benefits of technology

It effectively solves the leakage problem at construction joints, is simple to operate, reduces construction costs, and avoids leakage again.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221919843U_ABST
    Figure CN221919843U_ABST
Patent Text Reader

Abstract

The utility model discloses a drainage structure for top structure leakage at a communication port, which comprises a structural beam, a structural bottom plate and a roller shutter door connected between the structural beam and the structural bottom plate, and further comprises a water diversion tray which is fixedly mounted at the bottom of the structural beam and wraps the structural beam, and a first through hole is formed in the bottom of the water diversion tray; the side, away from the structural beam, of the first through hole is communicated with a drainage pipe, a drainage ditch is formed in the structural bottom plate, and the end, away from the water diversion tray in the length direction, of the drainage pipe extends to the structural bottom plate and is communicated with the drainage ditch. The leakage accumulated water in the water diversion tray is drained into the drainage ditch in the structural bottom plate through the vertical drainage pipe to be intensively drained, the leakage problem at the construction joint is effectively solved, the phenomenon of leakage after construction is avoided, and compared with a grouting leakage stopping method, operation is easy, the construction cost is saved, and certain popularization value is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to a water-repellent structure for leakage of a top structure at a communication port. Background Art

[0002] Construction joints refer to the joints formed between the concrete poured earlier and later during the concrete pouring process, which is caused by the design requirements or construction needs of the concrete being poured in sections. Construction joints are usually set at the connecting ports of subway stations, which leads to water leakage after the structure is connected in the later stage. The existing plugging methods usually cut grooves along the leaking parts of the construction joints, clean them, drill grouting holes, perform chemical grouting, make a 5mm-10mm basement plugging layer, and then apply 2mm-3mm basement plugging slurry and 10mm-15mm basement plugging mortar twice. However, the above plugging methods rely on slurry for plugging, and there is a certain risk of reliability, especially for outdoor groundwater pressure, which is high, and it is easy to leak again in a short time. Utility Model Content

[0003] The utility model aims to overcome the defects of the prior art and provide a drainage structure for top structure leakage at a connecting port, so as to replace blocking with drainage and avoid leakage again after construction.

[0004] In order to achieve the above technical effects, the utility model provides a hydrophobic structure for preventing leakage of the top structure at the communication port, comprising a structural beam, a structural bottom plate, and a rolling shutter door connected between the structural beam and the structural bottom plate, and further comprising:

[0005] A water diversion tray is fixedly installed at the bottom of the structural beam and wraps the structural beam, a first through hole is opened at the bottom of the water diversion tray, a side of the first through hole away from the structural beam is connected to a drainage pipe, a drainage ditch is opened in the structural bottom plate, and the drainage pipe extends from one end away from the water diversion tray along the length direction to the structural bottom plate and is connected to the drainage ditch.

[0006] Preferably, a water diversion pipe is installed on a side of the first through hole away from the structural beam, and the drainage pipe is sleeved and installed on an end of the water diversion pipe away from the structural beam.

[0007] Preferably, an installation space is reserved between the structural beam and the rolling door, and one end of the water guide tray close to the rolling door passes through the installation space and is fixedly connected to the side of the structural beam by a first fixing bolt.

[0008] Preferably, the water guide tray includes a drain section parallel to the bottom edge of the structural beam and a retaining section fixedly connected to the drain section and parallel to the side edge of the structural beam, and the drain section is provided with a water retaining flange along the height direction.

[0009] Preferably, a supporting bracket is correspondingly installed at the bottom of the water guide tray, and a first end of the supporting bracket along the length direction extends to the rolling door, and a second end is fixedly connected to the structural beam by a second fixing bolt.

[0010] Preferably, a second through hole is formed on the support bracket corresponding to the first through hole, and the water pipe passes through the second through hole and is connected with the first through hole.

[0011] Preferably, the supporting bracket includes a horizontal section installed parallel to the bottom of the hydrophobic section and a vertical section fixedly connected to the horizontal section and parallel to the enclosure section, and one end of the horizontal section away from the vertical section extends to the rolling door, and one end of the vertical section away from the horizontal section is fixedly connected to the structural beam by the second fixing bolt.

[0012] Due to the adoption of the above technical solution, the technical effects achieved by the utility model are:

[0013] By setting up a water diversion tray and a drainage pipe, drainage is used instead of plugging leaks. The leaked water in the water diversion tray is drained through a vertical drainage pipe to the drainage ditch on the structure bottom plate for centralized discharge. This effectively solves the leakage problem at the construction joint and avoids leakage again after construction. Compared with the grouting plugging method, it is simple to operate and saves construction costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0015] Figure 1 It is a top view of the hydrophobic structure with leakage at the top structure of the connecting port of an embodiment of the utility model.

[0016] Figure 2 This is a detailed diagram of the water diversion tray in the embodiment of the utility model.

[0017] Figure 3 It is a front view of the hydrophobic structure with leakage at the top structure of the connecting port of an embodiment of the utility model.

[0018] The corresponding relationship of the numbers in the accompanying drawings is as follows:

[0019] 1-structural beam; 2-structural bottom plate; 3-water diversion tray; 31-drainage section; 32-enclosure section; 4-supporting trailer; 5-water diversion pipe; 6-drainage pipe; 7-drainage ditch; 8-rolling door; 91-first fixing bolt; 92-second fixing bolt; 10-water retaining flange. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0021] See also Figure 1 As shown, an embodiment of the utility model provides a hydrophobic structure for top structural leakage at a connecting port, comprising a structural beam 1, a structural base plate 2, and a rolling shutter door 8 connected between the structural beam 1 and the structural base plate 2, and also comprising a water diversion tray 3 fixedly installed at the bottom of the structural beam 1 and wrapping the structural beam 1, a first through hole is provided at the bottom of the water diversion tray 3, a side of the first through hole away from the structural beam 1 is connected to a drainage pipe 6, a drainage ditch 7 is provided in the structural base plate 2, and the drainage pipe 6 extends from one end of the drainage pipe 6 away from the water diversion tray 3 along the length direction to the structural base plate 2 and is connected to the drainage ditch 7, and in this embodiment, a PVC pipe is used for the drainage pipe 6.

[0022] Furthermore, a water diversion pipe 5 is installed on the side of the first through hole away from the structural beam 1, and a drainage pipe 6 is sleeved and installed on the end of the water diversion pipe 5 away from the structural beam 1. An installation space is reserved between the structural beam 1 and the rolling door 8. The end of the water diversion tray 3 close to the rolling door 8 passes through the installation space and is fixedly connected to the side of the structural beam 1 through the first fixing bolt 91. Preferably, the water diversion tray 3 includes a drain section 31 parallel to the bottom edge of the structural beam 1 and a retaining section 32 fixedly connected to the drain section 31 and parallel to the side of the structural beam 1. The drain section 31 is provided with a water retaining flange 10 along the height direction. In this embodiment, the water diversion tray 3 is made of 2mm thick 304 stainless steel, with a total length of 7400mm, and the height of the water retaining flange 10 is 100mm.

[0023] Furthermore, a supporting bracket 4 is installed corresponding to the bottom of the water diversion tray 3, and the first end of the supporting bracket 4 along the length direction extends to the rolling door 8, and the second end is fixedly connected to the structural beam 1 by a second fixing bolt 92. A second through hole is opened on the supporting bracket 4 corresponding to the first through hole, and the water diversion pipe 5 passes through the second through hole and is connected with the first through hole. Preferably, the supporting bracket 4 in this embodiment adopts angle steel, and each standard length of water diversion tray 3 is provided with 6 groups of angle steels for support. The supporting bracket 4 includes a horizontal section installed parallel to the bottom of the drain section 31 and a vertical section fixedly connected to the horizontal section and parallel to the enclosure section. The end of the horizontal section away from the vertical section extends to the rolling door 8, and the end of the vertical section away from the horizontal section is fixedly connected to the structural beam 1 by a second fixing bolt 92.

[0024] The utility model adopts the drainage structure of the top structure leakage at the connecting port, and a water diversion tray and a drainage pipe are set to drain water instead of plugging the leak. The leaked water in the water diversion tray is drained through the vertical drainage pipe to the drainage ditch on the structure bottom plate for centralized discharge, which effectively solves the leakage problem at the construction joint and avoids leakage after construction. Compared with the grouting plugging method, it is simple to operate and saves construction costs, and has certain promotion value.

[0025] Parts not involved in the present invention are the same as the prior art or can be implemented by the prior art. Although the embodiments of the present invention have been shown and described, it is understood by those skilled in the art that various changes, modifications, substitutions and variations can be made to these embodiments without departing from the principles and spirit of the present invention, and the scope of the present invention is defined by the attached claims and their equivalents.

Claims

1. A hydrophobic structure for preventing leakage from the top structure at a communication port, comprising a structural beam, a structural bottom plate, and a rolling shutter door connected between the structural beam and the structural bottom plate, characterized in that: It also includes a water diversion tray fixedly installed on the bottom of the structural beam and wrapping the structural beam, a first through hole is opened at the bottom of the water diversion tray, a side of the first through hole away from the structural beam is connected to a drainage pipe, a drainage ditch is opened in the structural bottom plate, and the drainage pipe extends from one end away from the water diversion tray along the length direction to the structural bottom plate and is connected to the drainage ditch.

2. The hydrophobic structure for preventing leakage from the top structure of the communication port as claimed in claim 1, characterized in that: A water diversion pipe is installed on a side of the first through hole away from the structural beam, and the drainage pipe is sleeved and installed on an end of the water diversion pipe away from the structural beam.

3. The hydrophobic structure for preventing leakage from the top structure of the communication port according to claim 1, characterized in that: An installation space is reserved between the structural beam and the rolling door, and one end of the water guide tray close to the rolling door passes through the installation space and is fixedly connected to the side of the structural beam by a first fixing bolt.

4. The hydrophobic structure for preventing leakage from the top structure of the communication port as claimed in claim 2, characterized in that: The water guide tray comprises a drain section parallel to the bottom edge of the structural beam and a retaining section fixedly connected to the drain section and parallel to the side edge of the structural beam. The drain section is provided with a water retaining flange along the height direction.

5. The hydrophobic structure for preventing leakage from the top structure of the communication port as claimed in claim 4, characterized in that: A supporting bracket is correspondingly installed at the bottom of the water guide tray, and a first end of the supporting bracket along the length direction extends to the rolling door, and a second end is fixedly connected to the structural beam through a second fixing bolt.

6. The hydrophobic structure for preventing leakage from the top structure at the communication port as claimed in claim 5, characterized in that: The support bracket is provided with a second through hole corresponding to the first through hole, and the water diversion pipe passes through the second through hole and is communicated with the first through hole.

7. The hydrophobic structure for preventing leakage from the top structure of the communication port as claimed in claim 5, characterized in that: The supporting bracket includes a horizontal section installed parallel to the bottom of the hydrophobic section and a vertical section fixedly connected to the horizontal section and parallel to the enclosure section. One end of the horizontal section away from the vertical section extends to the rolling door, and one end of the vertical section away from the horizontal section is fixedly connected to the structural beam by the second fixing bolt.