Reinforcement cage device for house building engineering

By adopting the steel cage assembly design including clamping plates, riveting grooves and positioning clamping plates in housing construction projects, the problems of high labor intensity and low efficiency in the traditional production process have been solved, and the efficient and precise assembly of the steel cages has been achieved, improving the Structural stability and construction safety.

CN221920014UActive Publication Date: 2024-10-29SHAANXI CONSTR ENG GRP CO LTD THE FIRST BUILDING
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420255878.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-02
Publication Date
2024-10-29
Estimated Expiration
2034-02-02

AI Technical Summary

Technical Problem

In housing construction projects, the production process of traditional steel cages is labor-intensive, inefficient, and can easily lead to inaccurate dimensions, affecting the accuracy and stability of the structure.

Method used

The design includes the first connection component and the second connection component, and through structures such as clamping plates, riveting grooves, positioning clamping plates and hidden grooves, the steel cage can be assembled quickly and accurately, reducing welding and binding, and ensuring accurate dimensions. properties and structural stability.

Benefits of technology

It improves the production efficiency and structural accuracy of the steel cage, enhances the tensile and shear properties, reduces labor intensity, reduces construction safety hazards, and ensures the quality and safety of construction projects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221920014U_ABST
    Figure CN221920014U_ABST
Patent Text Reader

Abstract

The utility model discloses a reinforcement cage device for house building engineering in the technical field of house building engineering, which comprises a first connecting component and second connecting components, a plurality of groups of second connecting components are distributed on the outer side of the periphery of the first connecting component, and the first connecting component comprises a first connecting part and a second connecting part which are used for house building engineering. The second connecting component is arranged between the two ends of the two sets of first connecting components, the second connecting component comprises a metal rod piece, and a plurality of sets of connecting external threads are formed in the outer side of the metal rod piece, batch manufacturing of the reinforcement cage designed through the scheme is faster, welding or binding is not needed, the manufacturing period is greatly shortened, and the manufacturing efficiency is improved; the accuracy of the size of the reinforcement cage is ensured through the standardized connecting parts, the structural precision is effectively improved, the quality of constructional engineering is ensured, the overall structure is firmer through matched connection of the connecting assemblies, the tensile and shear resistance of the reinforcement cage is improved, and the stability of the structure is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of housing construction engineering, in particular to a steel bar cage device for housing construction engineering. Background Art

[0002] A steel cage is a structural reinforcement device commonly used in housing construction projects. It is made of steel bars woven according to design specifications and requirements to form a cage-like structure. This device is often used in concrete structures to enhance their tensile and shear strength. The steel cage is embedded in the concrete at the building foundation, columns, beams, etc., and is firmly connected to the concrete to improve the bearing capacity and stability of the overall structure. It not only increases the tensile strength of concrete, but also helps prevent cracks and improve the durability of the structure. This device is widely used in construction projects to ensure that the building has sufficient structural strength and safety during use.

[0003] In current housing construction projects, the production of steel cages is usually done by welding and tying. Although this method has a certain effect in providing structural strength, it also has some problems. In order to adapt to different construction requirements, it is often necessary to cut the steel bars. This step is not only time-consuming and labor-intensive, but also relatively labor-intensive, affecting the overall construction progress. In addition, the cutting process may cause inaccurate steel bar dimensions, thus affecting the accuracy and stability of the structure.

[0004] Therefore, seeking a more efficient and accurate method for making a steel cage is a direction worthy of attention and improvement in current construction projects. To this end, we propose a steel cage device for housing construction projects. Summary of the invention

[0005] The purpose of this section is to summarize some aspects of the embodiments of the utility model and briefly introduce some preferred embodiments. Some simplifications or omissions may be made in this section and the abstract of the specification and the name of the utility model to avoid blurring the purpose of this section, the abstract of the specification and the name of the utility model, and such simplifications or omissions cannot be used to limit the scope of the utility model.

[0006] Therefore, the purpose of the utility model is to provide a steel cage device for housing construction projects, which can solve the problems of high labor intensity, low efficiency, and easy to cause inaccurate size in traditional manual production of steel cages.

[0007] In order to solve the above technical problems, the utility model provides a steel cage device for housing construction engineering, which adopts the following technical solution: comprising a first connecting assembly and a second connecting assembly, wherein a plurality of groups of second connecting assemblies are distributed around the outside of the first connecting assembly, wherein the first connecting assembly comprises a first connecting component and a second connecting component for housing construction engineering, wherein the second connecting component is arranged between the two ends of the two groups of first connecting components;

[0008] The second connection assembly includes a metal rod, a plurality of groups of connecting external threads are arranged on the outer side of the metal rod, and a fixing nut is threadedly connected to a portion of the metal rod close to the connecting external threads.

[0009] By adopting the above technical scheme, the present scheme uses the clamping plate and the rivet groove provided at one end of the first side panel, the second side panel, the third side panel and the fourth side panel. Because the rivet groove matches the clamping plate structure and the rivet groove and the clamping plate are clamped together, the first side panel and the second side panel, the third side panel and the fourth side panel can be spliced ​​together at the end. In combination with the two groups of third fixing holes opened in the middle of one end of the first side panel, the second side panel, the third side panel and the fourth side panel, the first side panel and the second side panel spliced ​​together end to end can also be spliced ​​together. The side panel, the third side panel and the fourth side panel are fixed by bolts, and the limiting slots are respectively opened at one end of the first side panel and the second side panel, and the positioning card plate is installed on the inner side of one end of the third side panel and the fourth side panel. Because the positioning card plate matches the limiting slot structure, and the positioning card plate and the limiting slot are snap-fitted, the two groups of first connecting parts can be spliced ​​between the two ends of the two groups of second connecting parts, and the first fixing hole and the second fixing hole can be matched, and the two groups of first connecting parts and the two groups of second connecting parts spliced ​​together can be fixed by bolts.

[0010] In this solution, two groups of fourth fixing holes are opened through the inner side of the hidden groove. Since the fourth fixing holes match the metal rod structure and the fourth fixing holes and the metal rod are plug-fitted, multiple groups of second connection components can be connected through the periphery of the first connection component. With the external threads and fixing nuts provided on the outer side of the metal rod, multiple groups of metal rods connected through the periphery of the first connection component can be bolted and fixed. Through the fixed connection between multiple groups of first connection components and multiple groups of second connection components, a steel cage for housing construction can be assembled;

[0011] From the above, it can be seen that the steel cage manufacturing process designed in this scheme brings many advantages, making the production of steel cages more efficient, accurate and safe. First of all, through this device, the batch production of steel cages becomes faster, without welding or binding, which greatly shortens the production cycle and improves production efficiency. Secondly, standardized connecting components ensure the accuracy of the steel cage size, effectively improve the accuracy of the structure, and help ensure the quality of the construction project. The coordinated connection of the connecting components not only makes the overall structure more solid, but also improves the tensile and shear resistance of the steel cage, and increases the stability of the structure. In addition, the manufactured steel cage has a compact structure, which is easy to hoist, transport and install, making the entire construction process more convenient. Most importantly, the device reduces labor intensity, significantly improves construction safety, and reduces potential safety hazards during construction. This innovation has a positive role in promoting the smooth progress of modern construction projects.

[0012] Optionally, the first connecting component includes a first side panel, and one side of the first side panel is connected to the second side panel.

[0013] By adopting the above technical solution, the connection between the first side plate and the second side plate in the first connecting component of this solution not only helps to maintain the structural integrity of the entire connecting assembly, but also plays a key role in the stability, resistance and structural accuracy of the entire steel cage. This design helps to ensure that the steel cage can withstand various forces and loads in construction projects, and ensure the safety and reliability of the structure.

[0014] Optionally, the second connecting component includes a third side panel, and a fourth side panel is disposed on one side of the third side panel.

[0015] By adopting the above-mentioned technical scheme, the connection design of the third side panel and the fourth side panel in the second connecting component of this scheme can effectively enhance the structural stability of the entire connecting assembly, so that it can better cooperate with the first connecting assembly to form a stable and solid overall structure, thereby ensuring that the steel cage device used in housing construction projects can work stably and reliably under various construction conditions.

[0016] Optionally, one end of each of the first side plate and the second side plate is provided with a limit slot, and a first fixing hole is formed through a middle portion of the limit slot.

[0017] By adopting the above technical solution, the present solution can splice and fix two groups of first connecting components and two groups of second connecting components together end to end by respectively providing the limiting slots and the first fixing holes at one end of the first side panel and the second side panel.

[0018] Optionally, a positioning clamp is installed on the inner side of one end of the third side plate and the fourth side plate, and a second fixing hole is also pierced through the middle of the positioning clamp, and the second fixing hole has the same structure as the first fixing hole.

[0019] By adopting the above-mentioned technical scheme, the present scheme can provide a more powerful connection and positioning function by setting the positioning clamp plate and the second fixing hole on the third side panel and the fourth side panel, which helps to ensure that the entire connection assembly maintains the firmness and stability of the structure during assembly and use, thereby improving the manufacturing accuracy and structural reliability of the steel cage device. This design is crucial to ensuring that the steel cage device used in housing construction projects has sufficient stability and strength during use.

[0020] Optionally, the positioning card plate matches the limiting card slot structure, and the positioning card plate and the limiting card slot are snap-fitted.

[0021] By adopting the above technical scheme, this scheme improves the assembly accuracy and connection strength between the two groups of first connecting parts and the two groups of second connecting parts through the structural design of the snap-fit ​​between the positioning clamping plate and the limiting clamping groove, and enhances the stability and structural reliability of the steel cage device used in the entire house construction project. This design has significant advantages in ensuring the quality and performance of the steel cage device.

[0022] Optionally, a clamping plate is installed at the bottom of one end of the first side panel, the second side panel, the third side panel and the fourth side panel, and a rivet groove is also provided on one side of one end of the first side panel, the second side panel, the third side panel and the fourth side panel near the rivet groove, the rivet groove matches the clamping plate structure, and the rivet groove and the clamping plate are clamped together, and two groups of third fixing holes are also provided in the middle of one end of the first side panel, the second side panel, the third side panel and the fourth side panel near the rivet groove.

[0023] By adopting the above technical solution, this solution provides a stronger connection and support structure through the combined structural design of the clamping plate, the rivet groove and the third fixing hole, so that the steel cage device used in the entire house construction project can maintain higher firmness and stability during assembly and use, which is very critical to ensure that the steel cage can have sufficient strength and stability when bearing force and load.

[0024] Optionally, a plurality of groups of hidden grooves are respectively provided on the outer sides of the first side panel, the second side panel, the third side panel and the fourth side panel, and two groups of fourth fixing holes are also penetrated through the inner sides of the hidden grooves. The fourth fixing holes match the metal rod structure, and the fourth fixing holes and the metal rod are plug-fitted.

[0025] By adopting the above technical scheme, the present scheme has two groups of fourth fixing holes opened through the inner side of the hidden groove. Since the fourth fixing holes match the metal rod structure and the fourth fixing holes and the metal rod are plug-fitted, multiple groups of second connection components can be connected through the outside of the first connection components. In combination with the external threads and fixing nuts provided on the outside of the metal rod, multiple groups of metal rods connected through the outside of the first connection components can be bolted. Through the fixed connection between the multiple groups of first connection components and the multiple groups of second connection components, a steel cage for use in the construction of housing construction projects can be assembled.

[0026] In summary, the present invention has at least one of the following beneficial effects:

[0027] 1. The steel cage manufacturing process designed in this scheme brings many advantages, making the production of steel cages more efficient, accurate and safe. First of all, through this device, the batch production of steel cages becomes faster, without welding or binding, which greatly shortens the production cycle and improves the production efficiency;

[0028] 2. Secondly, the device ensures the accuracy of the steel cage size through standardized connection components, effectively improves the accuracy of the structure, and helps to ensure the quality of the construction project. The coordinated connection of the connection components not only makes the overall structure more solid, but also improves the tensile and shear resistance of the steel cage, increasing the stability of the structure;

[0029] 3. In addition, the manufactured steel cage has a compact structure, which is convenient for lifting, transportation and installation, making the entire construction process more convenient. Most importantly, the device reduces labor intensity, significantly improves construction safety, and reduces potential safety hazards during construction. This innovation has a positive role in promoting the smooth progress of modern construction projects. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] In order to more clearly illustrate the technical solutions of the embodiments of the utility model, the drawings required for describing the embodiments are briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0031] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0032] Figure 2 This is a schematic diagram of the structure of the first connecting component of the utility model;

[0033] Figure 3 This is a schematic diagram of the metal rod structure of the utility model;

[0034] Figure 4 This is a schematic diagram of the disassembly of the first connecting component of the utility model;

[0035] Figure 5 This is a schematic diagram of the disassembly of the second connecting component of the utility model;

[0036] Figure 6 This is a schematic diagram of the hidden groove structure of the utility model.

[0037] Explanation of the accompanying drawings: 100, first connecting component; 101, first connecting part; 101a, first side panel; 101a-1, limiting slot; 101a-2, first fixing hole; 101b, second side panel; 101b-1, hidden groove; 101b-2, fourth fixing hole; 102, second connecting part; 102a, third side panel; 102a-1, positioning plate; 102a-2, second fixing hole; 102b, fourth side panel; 102b-1, clamping plate; 102b-2, rivet groove; 102b-3, third fixing hole; 200, second connecting component; 201, metal rod; 202, connecting external thread; 203, fixing nut. DETAILED DESCRIPTION

[0038] The following is combined with Figure 1-6 The utility model is described in further detail.

[0039] Embodiment 1, refer to Figure 1-4 The utility model discloses a steel cage device for housing construction engineering.

[0040] The invention comprises a first connection assembly 100 and a second connection assembly 200. A plurality of second connection assemblies 200 are distributed around the first connection assembly 100. The first connection assembly 100 comprises a first connection component 101 and a second connection component 102 for a housing construction project. The second connection component 102 is arranged between the two ends of the two groups of first connection components 101.

[0041] The second connection assembly 200 includes a metal rod 201 . A plurality of connecting external threads 202 are formed on the outer side of the metal rod 201 . A fixing nut 203 is threadedly connected to a portion of the metal rod 201 close to the connecting external threads 202 .

[0042] The first connecting component 101 includes a first side plate 101a, and one side of the first side plate 101a is connected to the second side plate 101b. The connection between the first side plate 101a and the second side plate 101b in the first connecting component 101 of the present embodiment not only helps to maintain the structural integrity of the entire connecting assembly, but also plays a key role in the stability, resistance and structural accuracy of the entire steel cage. This design helps to ensure that the steel cage can withstand various forces and loads in construction projects, thereby ensuring the safety and reliability of the structure.

[0043] Example 2, refer to Figure 4-5 In order to solve the problems of high labor intensity, low efficiency, and inaccurate size of traditional manual steel cage production, based on the same concept as the first embodiment, the steel cage device for housing construction engineering also includes:

[0044] The second connecting component 102 includes a third side panel 102a, and a fourth side panel 102b is arranged on one side of the third side panel 102a. The connection design of the third side panel 102a and the fourth side panel 102b in the second connecting component 102 of this scheme can effectively enhance the structural stability of the entire connecting component, so that it can better cooperate with the first connecting component 101 to form a stable and solid overall structure, thereby ensuring that the steel cage device used in the housing construction project can work stably and reliably under various construction conditions.

[0045] A limiting slot 101a-1 is provided at one end of the first side panel 101a and the second side panel 101b, and a first fixing hole 101a-2 is penetrated in the middle of the limiting slot 101a-1. By means of the limiting slot 101a-1 and the first fixing hole 101a-2 respectively provided at one end of the first side panel 101a and the second side panel 101b, the two groups of first connecting components 101 and the two groups of second connecting components 102 can be spliced ​​and fixed together end to end.

[0046] A positioning clamp 102a-1 is installed on the inner side of one end of the third side panel 102a and the fourth side panel 102b, and a second fixing hole 102a-2 is also penetrated through the middle of the positioning clamp 102a-1. The second fixing hole 102a-2 has the same structure as the first fixing hole 101a-2. By arranging the positioning clamp 102a-1 and the second fixing hole 102a-2 on the third side panel 102a and the fourth side panel 102b, a stronger connection and positioning function can be provided, which helps to ensure that the entire connection assembly maintains a firm and stable structure during assembly and use, thereby improving the manufacturing accuracy and structural reliability of the steel cage device. This design is crucial to ensuring that the steel cage device used in housing construction projects has sufficient stability and strength during use.

[0047] Example 3, refer to Figure 3-6 In order to solve the problems of high labor intensity, low efficiency, and inaccurate size of traditional manual steel cage production, based on the same concept as the first embodiment, the steel cage device for housing construction engineering also includes:

[0048] The positioning card plate 102a-1 is matched with the limiting card slot 101a-1 structure, and the positioning card plate 102a-1 and the limiting card slot 101a-1 are snap-fitted. Through the structural design of the snap-fitting between the positioning card plate 102a-1 and the limiting card slot 101a-1, the assembly accuracy and connection strength between the two groups of first connecting parts 101 and the two groups of second connecting parts 102 are improved, and the stability and structural reliability of the steel cage device used in the entire house construction project are enhanced. This design has significant advantages in ensuring the quality and performance of the steel cage device.

[0049] A clamping plate 102b-1 is installed at the bottom of one end of the first side panel 101a, the second side panel 101b, the third side panel 102a and the fourth side panel 102b. A rivet groove 102b-2 is also provided on one side of the first side panel 101a, the second side panel 101b, the third side panel 102a and the fourth side panel 102b near the rivet groove 101b-2. The rivet groove 102b-2 matches the structure of the clamping plate 102b-1. The rivet groove 102b-2 and the clamping plate 102b-1 are clamped together. Two groups of third fixing holes 102b-3 are also provided in the middle of one end of the second side panel 101b, the third side panel 102a and the fourth side panel 102b near the rivet groove 101b-2. Through the combined structural design of the clamping plate 102b-1, the rivet groove 102b-2 and the third fixing holes 102b-3, a stronger connection and support structure is provided, so that the steel cage device used in the entire house construction project can maintain higher firmness and stability during assembly and use, which is critical to ensure that the steel cage has sufficient strength and stability when bearing force and load.

[0050] The outer sides of the first side panel 101a, the second side panel 101b, the third side panel 102a and the fourth side panel 102b are respectively provided with a plurality of groups of hidden grooves 101b-1, and the inner sides of the hidden grooves 101b-1 are also provided with two groups of fourth fixing holes 101b-2, the fourth fixing holes 101b-2 are matched with the structure of the metal rod 201, and the fourth fixing holes 101b-2 and the metal rod 201 are plug-fitted, and the fourth fixing holes 101b-2 and the metal rod 201 are provided with two groups of fourth fixing holes 101b-2 provided on the inner sides of the hidden grooves 101b-1. The structure of the metal rod 201 matches, and the fourth fixing hole 101b-2 and the metal rod 201 are plug-in fit, so that multiple groups of second connecting components 200 can be connected through the outside of the first connecting component 100, and with the external thread 202 and the fixing nut 203 set on the outside of the metal rod 201, the multiple groups of metal rods 201 connected through the outside of the first connecting component 100 can also be bolted. Through the fixed connection between the multiple groups of first connecting components 100 and the multiple groups of second connecting components 200, they can be assembled into a steel cage for use in the construction of housing construction projects.

[0051] The above are all preferred embodiments of the present utility model, and are not intended to limit the protection scope of the present utility model. Therefore, any equivalent changes made based on the structure, shape, and principle of the present utility model should be included in the protection scope of the present utility model.

Claims

1. A steel cage device for a housing construction project, comprising a first connection assembly (100) and a second connection assembly (200), wherein a plurality of second connection assemblies (200) are distributed around the first connection assembly (100), and characterized in that: The first connection assembly (100) comprises a first connection component (101) and a second connection component (102) for a housing construction project, wherein the second connection component (102) is arranged between two ends of two sets of first connection components (101); The second connection assembly (200) comprises a metal rod (201), the outer side of the metal rod (201) is provided with a plurality of groups of connecting external threads (202), and a fixing nut (203) is threadedly connected to a portion of the metal rod (201) close to the connecting external threads (202).

2. A steel cage device for housing construction engineering according to claim 1, characterized in that: The first connecting component (101) comprises a first side plate (101a), and one side of the first side plate (101a) is connected to a second side plate (101b).

3. A steel cage device for housing construction engineering according to claim 2, characterized in that: The second connecting component (102) comprises a third side plate (102a), and a fourth side plate (102b) is provided on one side of the third side plate (102a).

4. A steel cage device for housing construction engineering according to claim 3, characterized in that: One end of each of the first side plate (101a) and the second side plate (101b) is provided with a limit slot (101a-1), and a first fixing hole (101a-2) is formed through a middle portion of the limit slot (101a-1).

5. A steel cage device for housing construction engineering according to claim 4, characterized in that: A positioning clamp (102a-1) is installed on the inner side of one end of the third side plate (102a) and the fourth side plate (102b), and a second fixing hole (102a-2) is also penetrated through the middle of the positioning clamp (102a-1), and the second fixing hole (102a-2) has the same structure as the first fixing hole (101a-2).

6. A steel cage device for housing construction engineering according to claim 5, characterized in that: The positioning card plate (102a-1) matches the limiting card slot (101a-1) in structure, and the positioning card plate (102a-1) and the limiting card slot (101a-1) are in a snap-fitting manner.

7. A steel cage device for housing construction engineering according to claim 6, characterized in that: A clamping plate (102b-1) is installed at the bottom of one end of each of the first side plate (101a), the second side plate (101b), the third side plate (102a) and the fourth side plate (102b); and a rivet groove (102b-2) is also provided on one side of one end of each of the first side plate (101a), the second side plate (101b), the third side plate (102a) and the fourth side plate (102b) near the rivet groove (102b-2). 2), the rivet groove (102b-2) matches the structure of the clamping plate (102b-1), the rivet groove (102b-2) and the clamping plate (102b-1) are clamped together, and two groups of third fixing holes (102b-3) are further provided in the middle of one end of the first side plate (101a), the second side plate (101b), the third side plate (102a) and the fourth side plate (102b) close to the rivet groove (102b-2).

8. A steel cage device for housing construction engineering according to claim 7, characterized in that: The first side plate (101a), the second side plate (101b), the third side plate (102a) and the fourth side plate (102b) are respectively provided with a plurality of groups of hidden grooves (101b-1) on their outer sides, and two groups of fourth fixing holes (101b-2) are also provided through the inner sides of the hidden grooves (101b-1), the fourth fixing holes (101b-2) are matched with the metal rod (201) in structure, and the fourth fixing holes (101b-2) and the metal rod (201) are plug-fitted.