By using sliding material control plates and sliding mechanisms in the sloped roof concrete pouring construction device, the problem of difficult control of the flow rate of concrete is solved, the effect of slowing down the flow rate and improving construction efficiency is achieved, and the problem of uneven pouring is avoided.
Patent Information
- Application Number
- CN202420507914.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-15
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-03-15
AI Technical Summary
During the concrete pouring construction process of the sloped roof, the concrete is affected by the slope of the roof formwork and its own fluidity, causing the concrete to flow naturally, making it difficult to control the flow speed, increasing the secondary processing time, and affecting the construction efficiency.
A construction device including roof bottom formwork, side formwork and material control plate is designed. The material control plate is connected to the side formwork through a sliding mechanism. When subjected to concrete pressure, it slides downward along the slope of the roof bottom formwork to block the flow of concrete and slow down its flow. speed. There are strip openings on the material control plate to avoid uneven pouring, and the sliding mechanism adopts a sliding shaft, movable sleeve and ball structure to ensure flexibility and smooth movement.
It effectively slows down the flow rate of concrete, reduces secondary processing time, improves construction efficiency, and avoids the problem of uneven pouring through the design of the material control plate, improving the convenience of construction.
Smart Images

Figure CN221920257U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of sloping roof construction, in particular to a sloping roof concrete pouring construction device. Background Art
[0002] Sloped roofs usually refer to roofs with steeper slopes, and their slopes are generally greater than 10%. Sloped roofs are widely used in buildings, mainly single-slope, double-slope, four-slope and folded-waist types. Double-slope and four-slope types are more commonly used. The form and slope of the sloping roof mainly depend on factors such as the building plane, structural form, roofing materials, climate environment, customs and habits, and architectural shape.
[0003] At present, during the concrete pouring construction of the sloping roof, the concrete will flow downward along the template naturally due to the influence of the slope of the roof template and its own fluidity. If the appropriate method is not adopted to control the speed of the concrete flowing downward, the secondary processing time will be increased, which will make the concrete pouring construction of the sloping roof very difficult and affect the construction efficiency. Utility Model Content
[0004] The technical problem to be solved by the utility model is: in view of the above existing problems, a construction device for pouring concrete on a sloping roof is provided.
[0005] The technical solution adopted by the utility model is: a sloping roof concrete pouring construction device, characterized in that it includes:
[0006] Roof bottom formwork;
[0007] Side forms are arranged on both sides of the roof bottom formwork and are used to cooperate with the roof bottom formwork to form a concrete pouring space;
[0008] A material control plate, arranged above the top surface of the roof bottom formwork, used to block the concrete to slow down its flow speed;
[0009] The sliding mechanism is arranged at both ends of the material control plate and connected to the side formwork on the corresponding side, and is used for: when the material control plate is subjected to the pressure of concrete, the material control plate can slide from the top of the roof bottom formwork along its slope to the bottom.
[0010] Through the above technical means, a space for pouring concrete is formed by utilizing the roof bottom formwork and the side forms on both sides thereof, and the material control plate is connected to the side forms via a sliding mechanism, and the sliding mechanism can enable the material control plate above the roof bottom formwork to slide along the slope; when pouring concrete, the concrete accumulated above the material control plate exerts pressure on the material control plate, so that the concrete will push the material control plate to slide downward, and since the material control plate has a certain degree of blocking effect on the originally naturally flowing concrete, the flow speed of the concrete is effectively slowed down, which is beneficial to reducing the time of secondary processing and can improve the efficiency of construction.
[0011] In some embodiments, the sliding mechanism includes a sliding shaft, a movable sleeve and a fixed component. The movable sleeve can slide with the sliding shaft. Both ends of the side mold are correspondingly connected to the sliding shaft via the fixed component. The sliding shaft is arranged parallel to the side mold. Both ends of the material control plate are connected to the movable sleeve via a connecting rod, and the movable sleeve sliding sleeves at both ends of the material control plate are arranged on the corresponding sliding shafts.
[0012] Through the above-mentioned technical means, the sliding shaft is fixed on the side form with a fixing assembly, and movable sleeves are connected to both ends of the material control plate. With the help of the sliding cooperation between the movable sleeves and the sliding shaft, when the material control plate is subjected to the pressure of concrete, the movable sleeves at both ends of the material control plate can drive the material control plate to slide along the axial direction of the sliding shaft.
[0013] In some embodiments, the inner wall of the movable sleeve is provided with a plurality of ball grooves, balls are rollingly connected in the ball grooves, and the movable sleeve slides outside the sliding shaft through the balls.
[0014] Through the above technical means, a ball is added between the movable sleeve and the sliding shaft, and the ball rolls in the ball groove. The movable sleeve can slide more smoothly on the outside of the sliding shaft through the ball, so as to ensure the flexibility of the material control plate to move synchronously with the concrete.
[0015] In some embodiments, the fixing assembly includes a positioning plate, a fastening plate, a fastening sleeve and a locking member. The positioning plate is connected to the end side wall of the sliding shaft. The positioning plate is provided with two through holes for the fastening sleeve to pass through. The opening direction of the through holes is perpendicular to the side mold. The two through holes are respectively located on both sides of the side mold. The fastening plates are respectively provided on both sides of the side mold. The fastening plates are connected to the fastening sleeves passing through the corresponding through holes. The locking member is used to connect and fix the two fastening sleeves, so that the two fastening sleeves clamp and fix the side mold.
[0016] In some embodiments, the locking member includes a stud and a locking bolt. The stud passes through the two fastening sleeves on the same positioning plate. The stud is clamped on a side of the positioning plate away from the fastening plate. Locking bolts are provided at both ends of the stud.
[0017] In some embodiments, a rubber pad is bonded to the side wall of the fastening plate facing the side mold.
[0018] In some embodiments, the material control plate and the connecting rod are connected by bolts.
[0019] Through the above technical means, the material control plate and the connecting rod are connected by bolts, so that the material control plate can be disassembled and assembled, thereby making the application more convenient.
[0020] In some embodiments, a steel mesh is laid on the top end surface of the roof bottom formwork, and the steel mesh is located between the roof bottom formwork and the material control plate.
[0021] In some embodiments, the material control plate is provided with a plurality of strip-shaped openings.
[0022] Through the above technical means, the strip openings on the material control board can unload part of the concrete when the material control board blocks the concrete, thereby avoiding the problem of uneven pouring caused by the material control board blocking a large amount of concrete.
[0023] The beneficial effects of the utility model are:
[0024] 1. The concrete pouring space is formed by the cooperation of the roof bottom formwork, side formwork and steel mesh. The poured concrete flows downward along the slope of the formwork under the influence of the slope of the roof formwork and its own fluidity. The concrete is blocked to a certain extent by the control plate in the process of flowing downward. As the pressure of the concrete on the control plate continues to increase, the control plate slides downward with the help of the sliding mechanism under the push of the concrete, thereby effectively slowing down the flow speed of the concrete, avoiding the need to consume a lot of time for secondary processing due to the excessive flow speed of the concrete, improving the convenience of construction and ensuring the efficiency of construction.
[0025] 2. By evenly opening multiple strip openings on the material control plate, when the material control plate blocks the concrete, part of the concrete can be dispersed and discharged through the strip openings, thereby avoiding the problem of uneven pouring caused by the large amount of concrete blocked by the material control plate.
[0026] 3. Through the sliding cooperation between the movable sleeves and the sliding shafts at both ends of the material control plate, the material control plate can slide along the slope of the roof bottom mold. Ball grooves are opened inside the movable sleeves and additional balls are added, so that the movable sleeves and the sliding shafts can slide more smoothly through the balls, thereby ensuring the flexibility of the material control plate to move synchronously with the concrete. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is a schematic diagram of the structure of this application.
[0028] Figure 2 It is a structural schematic diagram of the control material board in this application.
[0029] Figure 3 It is a schematic diagram of the structure of the fixed components in this application.
[0030] Figure 4 yes Figure 1 Schematic diagram of the enlarged structure at point A in the middle.
[0031] Description of reference numerals:
[0032] 1. Roof bottom formwork; 2. Side formwork; 3. Steel mesh; 4. Sliding shaft; 5. Movable sleeve; 6. Material control plate; 7. Positioning plate; 8. Fastening plate; 9. Fastening sleeve; 10. Through hole; 11. Stud; 12. Locking bolt; 13. Strip opening; 14. Ball bearing. DETAILED DESCRIPTION
[0033] In order to enable those skilled in the art to better understand the technical solution of the present utility model, the technical solution of the present utility model is further described below in conjunction with specific embodiments.
[0034] Combination Figures 1 to 4 As shown, this embodiment is a concrete pouring construction device for a sloping roof, comprising a roof bottom form 1, a side form 2, a material control plate 6 and a sliding mechanism. The roof bottom form 1 is installed on the top of the sloping roof, and the side forms 2 are installed on both sides of the roof bottom form 1. A steel mesh 3 is laid on the top end surface of the roof bottom form 1. The roof bottom form 1, the side form 2 and the steel mesh 3 together form a concrete pouring space for the sloping roof. The side forms 2 on both sides of the roof bottom form 1 are connected to a sliding mechanism, and a transversely arranged material control plate 6 is provided above the steel mesh 3. Both ends of the material control plate 6 are connected to the sliding mechanism on the corresponding side. The material control plate 6 can play a certain degree of blocking role on the concrete, thereby slowing down the flow speed of the concrete. The sliding mechanism is used to control the material control plate 6 to slide along the slope of the roof bottom form 1.
[0035] Further, such as Figure 2 As shown, the material control plate 6 is a strip-shaped rectangular structure as a whole, and a plurality of strip-shaped openings 13 are evenly opened on the material control plate 6. When the concrete is blocked by the material control plate 6, the plurality of strip-shaped openings 13 can discharge part of the concrete, thereby avoiding the problem of uneven pouring caused by the large amount of concrete blocked by the material control plate 6.
[0036] In some embodiments, such as Figure 3As shown, the sliding mechanism includes a sliding shaft 4, a movable sleeve 5 and a fixed component. The sliding shaft 4 is provided on the outer side of the side molds 2 on both sides of the roof bottom mold 1. The sliding shaft 4 is arranged in parallel with the side molds 2. Both ends of the sliding shaft 4 are connected to the corresponding side molds 2 through the fixed component. The two ends of the material control plate 6 are detachably connected with connecting rods. In this embodiment, the material control plate 6 and the connecting rod are connected by bolts. Both ends of the material control plate 6 are connected with movable sleeves 5 through connecting rods. The movable sleeves 5 at both ends of the material control plate 6 are respectively sleeved on the outside of the sliding shaft 4 on the corresponding side, and the movable sleeves 5 are slidably connected with the sliding shaft 4.
[0037] Furthermore, a plurality of ball grooves are provided on the inner wall of the movable sleeve 5, and balls 14 are rollingly connected in the ball grooves, so that the movable sleeve 5 can slide more smoothly outside the sliding shaft 4 through the balls 14, so as to ensure the flexibility of the material control plate 6 to move synchronously with the concrete.
[0038] When pouring concrete on the steel mesh 3, the concrete flows downward during the pouring process and contacts the material control plate 6. The material control plate 6 has a certain blocking effect on the concrete. The material control plate 6 is subjected to the pressure of the concrete. Under the push of the concrete, the material control plate 6 can slide downward on the outside of the sliding shaft 4 through the movable sleeve 5 when subjected to force, thereby allowing the material control plate 6 to slow down the flow speed of the concrete, thereby avoiding a rapid downward flow of the concrete and a large increase in the secondary processing time.
[0039] In some embodiments, such as Figure 3 and Figure 4 As shown, the fixing assembly includes a positioning plate 7, a fastening plate 8, a fastening sleeve 9 and a locking member. Positioning plates 7 are welded on the side walls at both ends of the sliding shaft 4. A pair of through holes 10 are penetrated through the positioning plate 7. The opening direction of the through holes 10 is perpendicular to the side mold 2. The pair of through holes 10 are respectively located on both sides of the side mold 2. The width of the through holes 10 is greater than the width of the fastening sleeve 9, and the through holes 10 can allow the fastening sleeve 9 to pass through. Fastening plates 8 are provided on both sides of the side mold 2. The two fastening plates 8 are respectively welded with corresponding fastening sleeves 9. The two fastening plates 8 pass through the corresponding through holes 10 through their respective fastening sleeves 9 to form a clamping state for the side mold 2. The locking member is located on the side of the positioning plate 7 away from the fastening plate 8. The locking member is used to horizontally penetrate the two fastening sleeves 9 and fix the two fastening sleeves 9.
[0040] Furthermore, the locking member includes a stud 11 and a locking bolt 12. The stud 11 passes through two fastening sleeves 9 on the same positioning plate 7. The two ends of the stud 11 are threadedly connected with locking bolts 12. The two fastening sleeves 9 are clamped and fixed by the locking bolts 12 at both ends, so that the stability of the sliding shaft 4 installed on the outside of the side form 2 can be ensured during the pouring of concrete. A rubber pad is bonded and fixed to the inner side wall of the fastening plate 8 facing the side form 2, so that the position of the fastening plate 8 can be fine-tuned to ensure that the fastening plate 8 is more firmly clamped at the corresponding position of the side form 2.
[0041] This embodiment is a method for using a sloping roof concrete pouring construction device:
[0042] When concrete pouring is required after the roof bottom formwork 1, side formwork 2 and steel mesh 3 are laid on the top of the sloping roof, the two sliding shafts 4 are first arranged in parallel on the outer sides of the corresponding side formwork 2, and then the positioning plates 7 at both ends of the sliding shaft 4 are overlapped at the corresponding positions on the side formwork 2. When the positioning plates 7 are overlapped, the two inner fastening plates 8 are placed on both sides of the corresponding positions of the side formwork 2 for clamping, and the fastening sleeves 9 are used to fine-tune the position of the fastening plates 8 in the through holes 10, so that the two fastening plates 8 are firmly attached to the side formwork 2, and then the studs 11 are used to horizontally penetrate the two fastening sleeves 9 and are fixed with locking bolts 12.
[0043] After the two sliding shafts 4 are installed, the material control plate 6 is fixed between the two movable sleeves 5 by bolt connection, and the material control plate 6 is placed on the upper end surface of the steel mesh 3 .
[0044] When the concrete flows downward during the pouring process, the concrete will contact the control plate 6. The control plate 6 is subjected to the impact force of the concrete and drives the movable sleeve 5 to slide downward outside the sliding shaft 4. At this time, the control plate 6 has a certain degree of blocking effect on the poured concrete to slow down its downward flow speed, thereby reducing the time of secondary processing, which is conducive to improving the convenience of the concrete pouring construction of the sloping roof and improving the efficiency of the construction. While the control plate 6 blocks the concrete, part of the concrete can also be dispersed and discharged through a number of strip openings 13, avoiding the problem of uneven pouring caused by the control plate 6 blocking a large amount of concrete.
[0045] The above are all preferred embodiments of the present utility model, and are not intended to limit the protection scope of the present utility model. Therefore, any equivalent changes made based on the structure, shape, and principle of the present utility model should be included in the protection scope of the present utility model.
Claims
1. A construction device for pouring concrete on a sloping roof, characterized in that: include: Roof bottom formwork (1); Side molds (2) are arranged on both sides of the roof bottom mold (1) and are used to cooperate with the roof bottom mold (1) to form a concrete pouring space; A material control plate (6) is arranged above the top surface of the roof bottom formwork (1) and is used to block the concrete to slow down its flow speed; The sliding mechanism is arranged at both ends of the material control plate (6) and is connected to the side form (2) on the corresponding side, and is used for: when the material control plate (6) is subjected to the pressure of concrete, the material control plate (6) can slide from the top of the roof bottom form (1) along its slope to the bottom.
2. A sloping roof concrete pouring construction device according to claim 1, characterized in that: The sliding mechanism comprises a sliding shaft (4), a movable sleeve (5) and a fixed component, the movable sleeve (5) can be slidably matched with the sliding shaft (4), both ends of the side mold (2) are correspondingly connected to the sliding shaft (4) via the fixed component, the sliding shaft (4) and the side mold (2) are arranged parallel to each other, both ends of the material control plate (6) are connected to the movable sleeve (5) via a connecting rod, and the movable sleeves (5) at both ends of the material control plate (6) are slidably sleeved on the corresponding sliding shaft (4).
3. A sloping roof concrete pouring construction device according to claim 2, characterized in that: The inner wall of the movable sleeve (5) is provided with a plurality of ball grooves, in which balls (14) are rollingly connected, and the movable sleeve (5) slides outside the sliding shaft (4) through the balls (14).
4. A sloping roof concrete pouring construction device according to claim 2, characterized in that: The fixing assembly comprises a positioning plate (7), a fastening plate (8), a fastening sleeve (9) and a locking member. The positioning plate (7) is connected to the end side wall of the sliding shaft (4). The positioning plate (7) is provided with two through holes (10) for the fastening sleeve (9) to pass through. The opening direction of the through holes (10) is perpendicular to the side mold (2). The two through holes (10) are respectively located on both sides of the side mold (2). The fastening plates (8) are respectively provided on both sides of the side mold (2). The fastening plates (8) are connected to the fastening sleeves (9) passing through the corresponding through holes (10). The locking member is used to connect and fix the two fastening sleeves (9), so that the two fastening sleeves (9) clamp and fix the side mold (2).
5. A sloping roof concrete pouring construction device according to claim 4, characterized in that: The locking member comprises a stud (11) and a locking bolt (12); the stud (11) passes through the two fastening sleeves (9) on the same positioning plate (7); the stud (11) is clamped on a side of the positioning plate (7) away from the fastening plate (8); and locking bolts (12) are sleeved on both ends of the stud (11).
6. A sloping roof concrete pouring construction device according to claim 4, characterized in that: A rubber pad is bonded to the side wall of the fastening plate (8) facing the side mold (2).
7. The device for pouring concrete on a sloping roof according to claim 2, characterized in that: The material control plate (6) and the connecting rod are connected by bolts.
8. The device for pouring concrete on a sloping roof according to claim 1, characterized in that: A steel mesh (3) is laid on the top end surface of the roof bottom formwork (1), and the steel mesh (3) is located between the roof bottom formwork (1) and the material control plate (6).
9. The device for pouring concrete on a sloping roof according to claim 1, characterized in that: The material control plate (6) is provided with a plurality of strip-shaped openings (13).