Pressure relief type tunnel center drainage ditch structure

By canceling the graded gravel and using permeable cover plates, permeable cushions and drainage pipes, the problems of poor drainage and excessive lining water pressure in the tunnel center drainage ditch were solved, achieving efficient drainage and construction convenience, and avoiding the need for lining cracking.

CN221921067UActive Publication Date: 2024-10-29CHINA SHANDONG INT ECONOMIC & TECH COOP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420352137.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-26
Publication Date
2024-10-29
Estimated Expiration
2034-02-26

AI Technical Summary

Technical Problem

In the existing tunnel center drainage ditch construction plan, the water permeability of graded gravel gradually disappears, resulting in road water being unable to enter the central drainage ditch. The horizontal drainage pipes are easily blocked, making construction difficult, and the accumulated water behind the lining cannot be drained in time, resulting in Excessive water pressure can easily cause lining cracks.

Method used

Adopt a pressure-relievable tunnel central drainage ditch structure, cancel the graded gravel, and allow road water to seep into the central drainage ditch through the permeable cover plate and permeable cushion. The transverse drainage pipes are directly introduced, and a drainage pipe is set up to connect to the bottom of the inverted arch lining to reduce the pressure. water pressure.

Benefits of technology

It achieves efficient drainage, avoids the problems of graded gravel blockage and difficult construction, reduces lining water pressure, avoids lining cracking, and improves construction convenience and drainage capacity.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221921067U_ABST
    Figure CN221921067U_ABST
Patent Text Reader

Abstract

The utility model discloses a pressure relief type tunnel center drainage ditch structure, which relates to the field of tunnel construction, and comprises a center drainage ditch, the center drainage ditch extends along the longitudinal length of a tunnel, the top of the center drainage ditch is provided with a permeable cover plate, and the permeable cover plate is provided with longitudinally through permeable holes; a water-permeable cushion layer is arranged above the water-permeable cover plate; the inner wall of the central drainage ditch is connected with a drainage system by connecting transverse drainage pipes; water from the road surface permeates into the central drainage ditch through the permeable cover plate and the permeable cushion layer, and is not blocked by graded broken stones, so that the drainage is smoother and more efficient; meanwhile, graded broken stone is omitted, the transverse drainage pipe can be directly led into the center drainage ditch, the graded broken stone is prevented from blocking a reserved hole of a drainage pipe in a traditional center drainage ditch, the effectiveness of a drainage system is guaranteed, and the drainage capacity is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of tunnel construction, in particular to a pressure-relieving tunnel central drainage ditch structure. Background Art

[0002] Tunnel drainage engineering is an important task during tunnel construction and operation. Tunnel leakage and road surface water discharge are one of the main diseases of tunnels during operation. The longitudinal central drainage ditch of the tunnel serves as a bridge between the drainage system inside the tunnel and the drainage outside the tunnel. The drainage capacity of the central drainage ditch directly affects whether the water in the tunnel can be discharged smoothly outside the tunnel.

[0003] At present, the commonly used central drainage ditch construction plan in tunnels is to place a prefabricated circular culvert in the reserved groove, set graded gravel on the top of the circular culvert, and connect the tunnel transverse drainage pipe to the center drainage ditch. Due to construction quality or long-term siltation, the permeability of graded gravel gradually disappears, and the water from the road surface cannot enter the central drainage ditch; on the other hand, the tunnel transverse drainage pipe collects the leakage water into the central ditch through the reserved holes of the central ditch. If the transverse drainage pipe is connected to the graded gravel, it is easy to be blocked. If the transverse drainage pipe is connected to the center ditch, the position of the reserved hole of the central ditch is difficult to determine, the construction is difficult, and the quality is difficult to control; at this time, the leakage water behind the lining cannot be effectively discharged to the outside of the cave through the central drainage ditch. At the same time, if the water in the tunnel and behind the surrounding rock cannot be discharged into the central ditch in time, the water pressure of the lining structure will increase, which is easy to cause lining cracks. Utility Model Content

[0004] In view of the deficiencies in the above-mentioned prior art, the utility model provides a pressure-relief tunnel central drainage ditch structure, which eliminates graded gravel, allows road surface water to infiltrate into the central drainage ditch through a permeable cover plate and a permeable cushion layer, and at the same time, a transverse drainage pipe is directly introduced into the central drainage ditch without the obstruction of graded gravel, so that drainage is smooth and efficient; at the same time, a drainage pipe is added at the bottom of the tunnel central drainage ditch to connect the bottom of the invert lining with the central drainage ditch. When the water pressure behind the tunnel lining is relatively high, the accumulated water behind the lining can be directly discharged into the central drainage pipe, which greatly reduces the lining pressure and avoids lining cracking due to excessive water pressure.

[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0006] A pressure-relieving tunnel central drainage ditch structure, comprising:

[0007] A central drainage ditch extends along the longitudinal length of the tunnel; a permeable cover is arranged on the top of the central drainage ditch, and the permeable cover is provided with longitudinally penetrating permeable holes; a permeable cushion layer is arranged above the permeable cover; the inner wall of the central drainage ditch is connected to the drainage system by connecting a transverse drainage pipe.

[0008] As a further implementation, the central drainage ditch has an inclined slope.

[0009] As a further implementation method, the permeable cushion layer adopts a plastic drainage blind ditch, and the thickness of the permeable cushion layer is 5-10 cm.

[0010] As a further implementation method, the permeable cover plate adopts a prefabricated concrete structure, and the permeable holes are completed when the permeable cover plate is prefabricated. On the one hand, it is convenient for construction, and on the other hand, it can ensure the quality of the permeable cover plate.

[0011] As a further implementation, the water-permeable holes include a plurality of holes, and the plurality of water-permeable holes are evenly distributed on the water-permeable cover plate to ensure a hydrophobic effect.

[0012] As a further implementation method, the central drainage ditch is arranged on the upper part of the inverted arch filling, and is formed by arranging a template on the inverted arch filling. The construction is convenient, and the inner surface of the central drainage ditch is smooth.

[0013] As a further implementation method, the lower part of the invert filling is an invert lining, which serves as a load-bearing structure of the tunnel.

[0014] As a further implementation, a tunnel pavement structure is located above the central drainage ditch, and the permeable cushion layer is located below the tunnel pavement structure.

[0015] As a further implementation method, a drain pipe is arranged at the bottom of the central drain ditch, one end of the drain pipe is located in the central drain ditch, and the other end passes through the inverted arch lining, connecting the central drain ditch with the bottom of the inverted arch lining. The accumulated water on the bottom surface of the inverted arch lining can be discharged into the central drain ditch, thereby reducing the water pressure on the bottom surface of the inverted arch lining and avoiding cracking of the lining.

[0016] As a further implementation method, a plurality of drainage holes are provided along the pipe wall at one end of the drainage pipe close to the invert lining, which can promote the discharge of water accumulated at the bottom and back of the lining and reduce the lining pressure.

[0017] By adopting the above technical solution, the beneficial effects of the utility model are as follows:

[0018] 1. The utility model allows the road surface water to infiltrate into the central drainage ditch through the permeable cover plate and the permeable cushion layer, without the obstruction of graded gravel, and the drainage is smoother and more efficient; at the same time, the graded gravel is eliminated, and the horizontal drainage pipe can be directly introduced into the central drainage ditch, avoiding the graded gravel to block the drainage pipe reserved holes in the traditional central drainage ditch, ensuring the effectiveness of the drainage system and improving the drainage capacity.

[0019] 2. In the utility model, the transverse drainage pipe is directly connected to the inner wall of the central drainage ditch, and there is no need to set a reserved hole in the central drainage ditch, which greatly improves the convenience of construction.

[0020] 3. The central drainage ditch is constructed directly during the pouring of the tunnel invert by setting up an inner mold. It does not need to be prefabricated separately. At the same time, the inner wall is smooth and flat, which improves the construction speed and drainage capacity at the same time.

[0021] 4. The utility model is provided with a drain pipe connected to the bottom of the inverted arch lining in the central drain ditch, which can discharge the accumulated water into the central drain ditch in time when the water pressure on the bottom of the inverted arch lining is high, effectively reducing the water pressure on the bottom of the lining inverted arch and avoiding lining cracking. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] The drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The illustrative embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation on the present invention.

[0023] Figure 1 This is a schematic diagram of the traditional construction structure of the drainage ditch in this center;

[0024] Figure 2 It is the front view of the utility model;

[0025] Figure 3 It is a side view of the utility model;

[0026] Figure 4 It is a top view of the water-permeable cover plate of the utility model;

[0027] Figure 5 It is a side view of the water-permeable cover plate of the utility model.

[0028] In the figure: 1, central drainage ditch; 2, permeable cover plate; 21, permeable hole; 3, permeable cushion layer; 4, transverse drainage pipe; 5, invert filling; 6, invert lining; 7, tunnel pavement structure; 9, drainage pipe; 91, drainage hole;

[0029] 81. Prefabricated central drainage ditch; 82. Drainage ditch cushion; 83. Graded crushed stone; 84. Reserved hole for drainage pipe; 85. Drainage pipe. DETAILED DESCRIPTION

[0030] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. It should be noted that the following detailed descriptions are illustrative and are intended to provide further explanation of the utility model. Unless otherwise specified, all technical and scientific terms used in the utility model have the same meanings as those commonly understood by ordinary technicians in the technical field to which the utility model belongs. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.

[0031] Embodiment 1

[0032] like Figure 1 As shown, the traditional tunnel central drainage ditch construction plan is to place a prefabricated circular pipe culvert in the reserved groove to form a prefabricated central drainage ditch 81, set graded crushed stone 83 above the prefabricated central drainage ditch 81, set a drainage ditch cushion layer below, and connect the tunnel drainage pipe 85 to the drainage pipe reserved hole 84 of the prefabricated central drainage ditch to connect with the drainage system. However, in this structure, due to construction quality or long-term siltation and other reasons, the water permeability of the graded crushed stone 83 will gradually disappear, resulting in the road surface water being unable to enter the prefabricated central drainage ditch 1, resulting in poor drainage. On the other hand, the drainage pipe 85 of the tunnel collects the leaked water into the prefabricated central drainage ditch through the drainage pipe reserved hole 84. If the drainage pipe is connected to the graded gravel for leakage, it is easy to get blocked. If the drainage pipe is directly connected to the inside of the central ditch, due to the existence of the graded gravel 83 outside the circular culvert and the drainage ditch cushion layer 82, the position of the drainage pipe reserved hole is difficult to determine. Therefore, the construction is difficult and the quality is difficult to control. The leaked water behind the lining cannot be effectively discharged to the outside of the cave through the traditional prefabricated central drainage ditch. When the water pressure on the bottom and back of the lining is high, it is easy to cause the lining to crack, affecting the safety of tunnel construction.

[0033] In a typical embodiment of the present application, a pressure relief tunnel central drainage ditch structure is provided, such as Figure 2-5 As shown, it includes a central drainage ditch 1, which extends along the longitudinal length of the tunnel. A permeable cover plate 2 is arranged on the top of the central drainage ditch. The permeable cover plate 2 is provided with longitudinally penetrating permeable holes 21. The permeable holes can realize a one-way water flow function to ensure that the central drainage ditch will not overflow the road surface when it is full. The permeable cover plate 2 is located above the tunnel pavement structure 7. A permeable cushion layer 3 is arranged between the permeable cover plate 2 and the tunnel pavement structure 7 to form a low-lying water collection structure, which can introduce the flowing water in the tunnel pavement structure layer into the central drainage ditch 1 through the permeable cover plate; the inner wall of the central drainage ditch 1 is connected to the drainage system of the tunnel by connecting the transverse drainage pipe 4.

[0034] The inverted arch lining 6 is a part of the secondary lining of the tunnel, located at the bottom of the entire central drainage ditch structure, and is supported as a force-bearing structure of the tunnel, with surrounding rock below. Above the inverted arch lining 6 is the inverted arch filling 5, which is usually filled with stone slabs or low-grade concrete. The central drainage ditch 1 is arranged on the upper part of the inverted arch filling 5. The central drainage ditch is formed by arranging a central drainage ditch template on the inverted arch filling, which does not require prefabrication and is easy to construct. The inner surface of the formed central drainage ditch is smooth and flat.

[0035] Specifically, Figure 2As shown, the central drainage ditch 1 has an inclined slope, which can better drain the water accumulated in the road surface into the central ditch. The permeable cover plate 2 is made of precast concrete and can be prefabricated in the factory, which improves the construction efficiency and ensures the quality of the cover plate. The transverse drainage pipe 4 serves as a passage between the drainage system behind the lining and the central drainage ditch. One end is directly connected to the inner wall of the central drainage ditch to ensure smooth drainage, avoid the problem of graded gravel blocking the drainage pipe and the difficulty in determining the position of the reserved hole, and ensure the effectiveness of the drainage system.

[0036] And, if Figure 2-3 As shown, a drainage pipe 9 is provided at the bottom of the central drainage ditch. The drainage pipe 9 is arranged up and down, with one end located in the central drainage ditch 1 and the other end located at the bottom of the inverted arch lining 6, thereby connecting the central drainage ditch 1 and the inverted arch lining 6, so that the accumulated water on the bottom surface of the inverted arch can be discharged into the central drainage ditch through the secondary lining, reducing the water pressure on the bottom surface of the lining inverted arch and avoiding lining cracking. At the same time, at one end of the drainage pipe 9 connected to the inverted arch lining 6, a plurality of drainage holes 91 are opened on the outer circular tube wall of the drainage pipe 9, which can further promote the discharge of the accumulated water behind the lining, play a role in pressure relief, and avoid the lining cracking caused by excessive water pressure behind the lining.

[0037] like Figure 4-5 As shown, the permeable cover plate 2 is provided with a plurality of permeable holes 21, and the plurality of permeable holes 21 are evenly distributed on the permeable cover plate 2 to ensure the hydrophobic effect and prevent the leakage water from accumulating on the permeable cushion layer.

[0038] Compared with the traditional central drainage ditch structure, this embodiment eliminates the graded gravel, making the drainage smoother and more efficient, and improving the drainage capacity. At the same time, the central drainage pipe is connected to the bottom of the invert lining through the drain pipe, which can release pressure in time, avoid lining cracking, and ensure the stability of the lining structure and the safety of tunnel construction.

[0039] The above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. For those skilled in the art, the utility model may have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.

Claims

1. A pressure relief tunnel central drainage ditch structure, characterized in that: include: A central drainage ditch extends along the longitudinal length of the tunnel; a permeable cover is arranged on the top of the central drainage ditch, and the permeable cover is provided with longitudinally penetrating permeable holes; a permeable cushion layer is arranged above the permeable cover; the inner wall of the central drainage ditch is connected to the drainage system by connecting a transverse drainage pipe.

2. A pressure relief tunnel central drainage ditch structure as claimed in claim 1, characterized in that: The central drainage ditch has an inclined slope.

3. A pressure-relief tunnel central drainage ditch structure as claimed in claim 1, characterized in that: The permeable cushion layer adopts a plastic drainage blind ditch, and the thickness of the permeable cushion layer is 5-10cm.

4. A pressure-relief tunnel central drainage ditch structure as claimed in claim 1, characterized in that: The permeable cover plate adopts a prefabricated concrete structure.

5. The pressure-relief tunnel central drainage ditch structure according to claim 1, characterized in that: The water permeable holes include a plurality of holes, and the plurality of water permeable holes are evenly distributed on the water permeable cover plate.

6. A pressure relief tunnel central drainage ditch structure as claimed in claim 1, characterized in that: The central drainage ditch is arranged on the upper part of the inverted arch filling and is formed by arranging a template on the inverted arch filling.

7. A pressure-relief tunnel central drainage ditch structure as claimed in claim 6, characterized in that: The lower part of the invert filling is the invert lining.

8. The pressure-relief tunnel central drainage ditch structure according to claim 1, characterized in that: The tunnel pavement structure is located above the central drainage ditch, and the permeable cushion layer is located below the tunnel pavement structure.

9. A pressure-relief tunnel central drainage ditch structure as claimed in claim 7, characterized in that: A drainage pipe is arranged at the bottom of the central drainage ditch, one end of the drainage pipe is located in the central drainage ditch, and the other end passes through the inverted arch lining to connect the central drainage ditch with the bottom of the inverted arch lining.

10. A pressure-relief tunnel central drainage ditch structure as claimed in claim 9, characterized in that: A plurality of drainage holes are provided along the pipe wall of the drainage pipe at one end close to the invert lining.