Heterojunction texturing workshop ash area isolation air conditioning system

By dividing the workshop into the front film area, gray area and back film area, and setting up isolation walls and supplementary air supply outlets at the corresponding boundaries, the problem of low cleanliness of the existing air conditioning system in the heterojunction cell texturing process is solved. , achieving more efficient dust control and maintenance convenience.

CN221923767UActive Publication Date: 2024-10-29江苏源一工程科技有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420054414.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-10
Publication Date
2024-10-29
Estimated Expiration
2034-01-10

AI Technical Summary

Technical Problem

The existing air conditioning system cannot effectively reduce dust pollution in the heterojunction cell texturing process, resulting in low cleanliness in the workshop.

Method used

A heterojunction texturing workshop gray area isolation air conditioning system is designed. The workshop shell is divided into a front film area, a gray area and a back film area, and isolation walls are provided at the corresponding boundaries. A vacuum pump is used for exhaust treatment. The dust-producing area is reduced to the gray area, and a supplementary air supply outlet is set at the top of the gray area to ensure the air volume. A hinged return air outlet is used to facilitate maintenance and filter replacement.

Benefits of technology

It improves the cleanliness and work efficiency of the workshop, reduces dust pollution by reducing the dust-producing area to the gray area, and simplifies the subsequent maintenance and filter replacement process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221923767U_ABST
    Figure CN221923767U_ABST
Patent Text Reader

Abstract

The utility model provides a heterojunction texturing workshop ash area isolation air conditioning system, which is characterized in that a workshop shell is divided into a front film area, an ash area and a back film area, isolation wall plates are arranged between the front film area and one side edge of the ash area and between the back film area and the other side edge of the ash area, and the output end of each processing machine table is connected with the input end of each vacuum pump. The vacuum pumps are used for exhaust treatment, the output end of each vacuum pump is connected with the input end of external waste gas treatment equipment through an exhaust pipe, a dust production area is reduced and controlled into an ash area from a large range, an original workshop structure is replaced, the cleanliness of a workshop is improved, and meanwhile, a plurality of supplementary air supply outlets are formed in the top of the ash area; the fresh air handling unit is connected with the supplement air supply outlet through the air supply pipe and used for supplementing fresh air to ensure that the air volume in the ash area is smaller than the pressure in the front membrane area and the back membrane area, the door hinge type air return opening is adopted, later maintenance and filter replacement are facilitated, and the working efficiency is greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of clean room air conditioning, and more specifically to an air conditioning system for isolating a gray area in a heterojunction velvet-making workshop. Background Art

[0002] Heterojunction battery is a chemical power source with lithium ions as the medium. It has good performance, high density, light weight, high safety, large capacity and high recycling value. It is widely used in aerospace, electric vehicles, digital products and other fields. Texturing is required in the manufacturing process of heterojunction battery. Its main purpose is to remove the texturing hair and residue on the surface of the battery to reduce the irregular shape of the electrode structure and material surface and increase the surface area of ​​the electrode material.

[0003] The steps of the texturing process are divided into scribing, pressing, texturing, cleaning and drying. A lot of dust will be generated during the texturing step. The existing air conditioning system (publication number: CN214701025U) is a large space return and supply air system. The dust in the workshop is captured by a high-efficiency filter, and the return air from the elevated floor to the dry coil sent back from the technical alley is heated and sent to the air supply duct, but it still cannot meet the high efficiency and cleanliness requirements.

[0004] Publication number: CN214701025U, a thousand-class clean room air conditioning system, the air is filtered and humidified by the fresh air system or surface cooled and dehumidified, and then passes through an air supply duct at the top of the inner shell of the clean room. The air supply duct is provided with air supply ports and clean air supply units FFU. The air is evenly supplied from the air supply ports to the bottom. The particles are captured by the high-efficiency filter in the FFU to obtain a higher cleanliness. The dust generated by the process or the staff can be quickly captured by the high-efficiency filter, and the dry coil returned from the elevated floor to the technical alley is heated and then sent to the air supply duct. The circulating air is heated and refluxed through the dry coil, so that the constant temperature and humidity effect inside the indoor shell of the clean room is better. At the same time, a layer of epoxy resin is provided on the outer layer of the technical alley and the air supply duct to prevent dust from falling on the outer layer of the alley and the air supply duct, and the cleanliness is higher.

[0005] In view of this, the utility model proposes an air conditioning system for isolating the gray area of ​​a heterojunction velveting workshop, which is partition-isolated, has high cleanliness and a simple structure. Utility Model Content

[0006] In view of this, in order to solve the problem of low cleanliness of the existing workshop, the utility model proposes an air conditioning system for isolating the gray area of ​​a heterojunction cashmere workshop, which divides the workshop shell 2 into a positive film area 4, a gray area 5, and a back film area 6, and is provided with isolation wall panels 7 between the positive film area 4 and one side of the gray area 5, and between the back film area 6 and the other side of the gray area 5. The output end of each processing machine 8 is connected to the input end of each vacuum pump 9, and the vacuum pump 9 performs exhaust treatment. The output end of each vacuum pump 9 is connected to the input end of an external exhaust gas treatment device through an exhaust pipe, and the dust-producing area is reduced from a large range to the gray area, replacing the original workshop structure and improving the cleanliness of the workshop. At the same time, a plurality of supplementary air supply ports 51 are provided on the top of the gray area 5, and the fresh air unit 1 is connected to the supplementary air supply port 51 through an air supply pipe 10. The fresh air unit 1 is used to supplement fresh air to ensure that the air volume in the gray area 5 makes its pressure less than the pressure in the positive film area 4 and the back film area 6, and adopts a door hinge type return air port, which is convenient for later maintenance and replacement of filters, thereby greatly improving work efficiency.

[0007] An air conditioning system for isolating the gray area of ​​a heterojunction texturing workshop, comprising: a fresh air unit 1, a workshop shell 2, and a control box 3, characterized in that: the workshop shell 2 comprises a positive film area 4, a gray area 5, and a back film area 6, and isolation wall panels 7 are provided between one side of the positive film area 4 and the gray area 5, and between the other side of the back film area 6 and the gray area 5, and a plurality of processing machines 8 are provided in the positive film area 4 and the back film area 6, and a plurality of vacuum pumps 9 are provided in the gray area 5, and the output end of each processing machine 8 is connected to the input end of each vacuum pump 9, and the vacuum pump 9 performs exhaust treatment, and the output end of each vacuum pump 9 is connected to the input end of an external exhaust gas treatment device through an exhaust pipe, and a plurality of supplementary air supply ports 51 are provided on the top of the gray area 5, and the fresh air unit 1 is provided with a fresh air unit 2, and the fresh air unit 2 is provided with a fresh air unit 3, and the fresh air unit 3 is provided with a fresh air unit 4, and a fresh air unit 5 is provided with a fresh air unit 5, and a fresh air unit 5 is provided with a fresh air unit 6 ... Group 1 is connected to the supplementary air supply port 51 through the air supply pipe 10. The fresh air unit 1 is used to supplement the fresh air to ensure the air volume in the gray zone 5 so that its pressure is less than the pressure in the positive membrane zone 4 and the back membrane zone 6. The positive membrane zone 4 and the back membrane zone 6 are provided with an FFU clean air supply unit 11. A first return air port is provided on each isolation wall plate 7 near the FFU clean air supply unit 11, and a dry coil 12 is provided at the first return air port. A second return air port 13 is provided below the isolation wall plate 7. The gas output by the FFU clean air supply unit in the positive membrane zone and the back membrane zone is returned to the input end of the FFU clean air supply unit through the second return air port and the first return air port in turn. The control box 3 is electrically connected to the fresh air unit 1 and the FFU clean air supply unit 11.

[0008] Furthermore, the second return air outlet 13 is a door-hinged return air outlet, and the core frame and the outer frame of the return air outlet are connected by door hinges, which is convenient for cleaning, dust removal, maintenance and replacement of the filter.

[0009] Furthermore, a removable filter is provided in the door hinged return air vent to assist in filtering pollutants in some workshops.

[0010] Furthermore, the dry coil 12 is connected to a medium-temperature water system 14, which is used to heat the return air. The medium-temperature water system 14 includes a medium-temperature return water pipe 141 and a medium-temperature water supply pipe 142. The water temperature of the medium-temperature return water pipe 141 is 18°C, and the water temperature of the medium-temperature water supply pipe 142 is 13°C.

[0011] Furthermore, the air supply pipe 10 is provided with an electric air valve 101, which is used to adjust the air supply volume of the supplementary air supply port 51. Each supplementary air supply port 51 is also provided with a fireproof manual valve 102 for assisting in shutting off the pipeline.

[0012] Furthermore, each FFU clean air supply unit 11 is distributed throughout the inner top of the positive film area 4 and the back film area 6 , and each FFU clean air supply unit 11 is provided with a motor, a fan and a high-efficiency filter.

[0013] Furthermore, a first differential pressure sensor is provided above each FFU clean air supply unit 11 for monitoring the pressure difference at the FFU clean air supply unit 11 , and the first differential pressure sensor is electrically connected to the control box 3 .

[0014] Furthermore, each isolation wall plate 7 is provided with a second pressure difference sensor 52, a humidity sensor 53, and a temperature sensor 54 in sequence on the side close to the gray zone 5. The second pressure difference sensor 52 is used to monitor the pressure in the gray zone 5, the humidity sensor 53 is used to monitor the humidity in the gray zone 5, and the temperature sensor 54 is used to monitor the temperature in the gray zone 5. The second pressure difference sensor 52, the humidity sensor 53, and the temperature sensor 54 are electrically connected to the control box 3.

[0015] Furthermore, the fresh air unit 1 is provided with a primary filter section 15, a medium-efficiency filter section 16, a preheating section 17, a surface cooling section 18, a first heating section 19, a humidifying section 20, a variable frequency fan 22, a high-efficiency filter section 23, and a flow equalizing plate from right to left. The air passes through the primary filter section 15 and the medium-efficiency filter section 16 in turn, and then selects the temperature of the surface cooling section 18 or the first heating section 19 to reach the temperature of the workshop shell 2. Then, the air is blown to the humidifier section by the variable frequency fan 22 for humidification, and then passes through the high-efficiency filter section 23 and the flow equalizing plate to be evenly blown to the supplementary air supply port 51. The preheating section 17 is used for preheating in winter.

[0016] Furthermore, a second heating section 21 is provided between the humidification section 20 and the variable frequency fan 22, and auxiliary heating is performed again when the temperature of the wind does not reach the set value after humidification.

[0017] The beneficial effects of the utility model are as follows: the utility model proposes an air conditioning system for isolating the gray area of ​​a heterojunction cashmere workshop, which divides the workshop shell 2 into a positive film area 4, a gray area 5, and a back film area 6, and is provided with isolation wall panels 7 between the positive film area 4 and one side of the gray area 5, and between the back film area 6 and the other side of the gray area 5, and each processing machine 8 output end is connected to each vacuum pump 9 input end, and the vacuum pump 9 performs exhaust treatment, and the output end of each vacuum pump 9 is connected to the input end of an external exhaust gas treatment device through an exhaust pipe, so that the dust-producing area is reduced from a large range to the gray area, replacing the original workshop structure and improving the cleanliness of the workshop, and at the same time, a plurality of supplementary air supply ports 51 are provided on the top of the gray area 5, and the fresh air unit 1 is connected to the supplementary air supply port 51 through an air supply pipe 10, and the fresh air unit 1 is used to supplement fresh air to ensure that the air volume in the gray area 5 makes its pressure less than the pressure in the positive film area 4 and the back film area 6, and adopts a door hinge type return air port, which is convenient for later maintenance and replacement of filters, thereby greatly improving work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a structural schematic diagram of the gray area isolation air conditioning system of the heterojunction velveting workshop of the utility model.

[0019] Figure 2 It is a partial structural schematic diagram of the gray area isolation air conditioning system of the heterojunction velveting workshop of the utility model.

[0020] Figure 3 It is a partial structural schematic diagram of the gray area isolation air conditioning system of the heterojunction velveting workshop of the utility model.

[0021] Main component symbols

[0022]

[0023]

[0024] The following specific implementation manner will further illustrate the present utility model in conjunction with the above-mentioned drawings. DETAILED DESCRIPTION

[0025] like Figure 1 As shown, it is a structural schematic diagram of the gray area isolation air conditioning system of the heterojunction velveting workshop of the utility model; Figure 2 As shown, it is a partial structural schematic diagram of the gray area isolation air conditioning system of the heterojunction texturing workshop of the utility model; Figure 3 The figure shows a partial structural diagram of the gray area isolation air conditioning system of the heterojunction velveting workshop of the utility model.

[0026] An air conditioning system for isolating the gray area of ​​a heterojunction texturing workshop, comprising: a fresh air unit 1, a workshop shell 2, and a control box 3, characterized in that: the workshop shell 2 comprises a positive film area 4, a gray area 5, and a back film area 6, and isolation wall panels 7 are provided between one side of the positive film area 4 and the gray area 5, and between the other side of the back film area 6 and the gray area 5, and a plurality of processing machines 8 are provided in the positive film area 4 and the back film area 6, and a plurality of vacuum pumps 9 are provided in the gray area 5, and the output end of each processing machine 8 is connected to the input end of each vacuum pump 9, and the vacuum pump 9 performs exhaust treatment, and the output end of each vacuum pump 9 is connected to the input end of an external exhaust gas treatment device through an exhaust pipe, and a plurality of supplementary air supply ports 51 are provided on the top of the gray area 5, and the fresh air unit 1 is provided with a fresh air unit 2, and the fresh air unit 2 is provided with a fresh air unit 3, and the fresh air unit 3 is provided with a fresh air unit 4, and a fresh air unit 5 is provided with a fresh air unit 5, and a fresh air unit 5 is provided with a fresh air unit 6 ... Group 1 is connected to the supplementary air supply port 51 through the air supply pipe 10. The fresh air unit 1 is used to supplement the fresh air to ensure the air volume in the gray zone 5 so that its pressure is less than the pressure in the positive membrane zone 4 and the back membrane zone 6. The positive membrane zone 4 and the back membrane zone 6 are provided with an FFU clean air supply unit 11. A first return air port is provided on each isolation wall plate 7 near the FFU clean air supply unit 11, and a dry coil 12 is provided at the first return air port. A second return air port 13 is provided below the isolation wall plate 7. The gas output by the FFU clean air supply unit in the positive membrane zone and the back membrane zone is returned to the input end of the FFU clean air supply unit through the second return air port and the first return air port in turn. The control box 3 is electrically connected to the fresh air unit 1 and the FFU clean air supply unit 11.

[0027] The second return air outlet 13 is a door-hinged return air outlet, and the core frame and the outer frame of the return air outlet are connected by door hinges, which is convenient for cleaning, dust removal, maintenance and replacement of the filter.

[0028] A removable filter is provided in the door hinged return air vent to assist in filtering out pollutants in some workshops.

[0029] The dry coil 12 is connected to a medium-temperature water system 14 for heating return air. The medium-temperature water system 14 includes a medium-temperature return water pipe 141 and a medium-temperature supply water pipe 142. The water temperature of the medium-temperature return water pipe 141 is 18°C, and the water temperature of the medium-temperature supply water pipe 142 is 13°C.

[0030] The air supply pipe 10 is provided with an electric air valve 101, which is used to adjust the air supply volume of the supplementary air supply port 51. Each supplementary air supply port 51 is also provided with a fireproof manual valve 102 for assisting in shutting off the pipeline.

[0031] Each FFU clean air supply unit 11 is distributed throughout the inner top of the positive film area 4 and the back film area 6 , and a motor, a fan and a high-efficiency filter are arranged inside each FFU clean air supply unit 11 .

[0032] A first differential pressure sensor is provided above each FFU clean air supply unit 11 for monitoring the differential pressure at the FFU clean air supply unit 11 . The first differential pressure sensor is electrically connected to the control box 3 .

[0033] A second pressure difference sensor 52, a humidity sensor 53, and a temperature sensor 54 are provided in sequence on the side of each isolation wall plate 7 close to the gray zone 5. The second pressure difference sensor 52 is used to monitor the pressure in the gray zone 5, the humidity sensor 53 is used to monitor the humidity in the gray zone 5, and the temperature sensor 54 is used to monitor the temperature in the gray zone 5. The second pressure difference sensor 52, the humidity sensor 53, and the temperature sensor 54 are electrically connected to the control box 3.

[0034] The fresh air unit 1 is provided with a primary filter section 15, a medium-efficiency filter section 16, a preheating section 17, a surface cooling section 18, a first heating section 19, a humidifying section 20, a variable frequency fan 22, a high-efficiency filter section 23, and a flow equalizing plate from right to left. The air passes through the primary filter section 15 and the medium-efficiency filter section 16 in turn, and then selects the temperature of the surface cooling section 18 or the first heating section 19 to reach the temperature of the workshop shell 2. Then, the air is blown to the humidifier section for humidification by the variable frequency fan 22, and then passes through the high-efficiency filter section 23 and the flow equalizing plate to be evenly blown to the supplementary air supply port 51. The preheating section 17 is used for preheating in winter.

[0035] A second heating section 21 is also provided between the humidifying section 20 and the variable frequency fan 22. When the temperature of the wind does not reach the set value after humidification, auxiliary heating is performed again.

[0036] The beneficial effects of the utility model are as follows: the utility model proposes an air conditioning system for isolating the gray area of ​​a heterojunction cashmere workshop, which divides the workshop shell 2 into a positive film area 4, a gray area 5, and a back film area 6, and is provided with isolation wall panels 7 between the positive film area 4 and one side of the gray area 5, and between the back film area 6 and the other side of the gray area 5, and each processing machine 8 output end is connected to each vacuum pump 9 input end, and the vacuum pump 9 performs exhaust treatment, and the output end of each vacuum pump 9 is connected to the input end of an external exhaust gas treatment device through an exhaust pipe, so that the dust-producing area is reduced from a large range to the gray area, replacing the original workshop structure and improving the cleanliness of the workshop, and at the same time, a plurality of supplementary air supply ports 51 are provided on the top of the gray area 5, and the fresh air unit 1 is connected to the supplementary air supply port 51 through an air supply pipe 10, and the fresh air unit 1 is used to supplement fresh air to ensure that the air volume in the gray area 5 makes its pressure less than the pressure in the positive film area 4 and the back film area 6, and adopts a door hinge type return air port, which is convenient for later maintenance and replacement of filters, thereby greatly improving work efficiency.

[0037] The above-mentioned embodiments only express several implementation methods of the utility model, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the patent of the utility model. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the utility model, and these all belong to the protection scope of the utility model. Therefore, the protection scope of the utility model patent shall be based on the attached claims.

Claims

1. A gray area isolation air conditioning system for a heterojunction texturing workshop, comprising: Fresh air The unit (1), workshop shell (2), and control box (3) are characterized in that: the workshop shell (2) includes a positive film area (4), a gray area (5), and a back film area (6); a partition wall plate (7) is provided between one side of the positive film area (4) and the gray area (5), and between the other side of the back film area (6) and the gray area (5); a plurality of processing machines (8) are provided in the positive film area (4) and the back film area (6); a plurality of vacuum pumps (9) are provided in the gray area (5); the output end of each processing machine (8) is connected to the input end of each vacuum pump (9); the vacuum pump (9) performs exhaust treatment; the output end of each vacuum pump (9) is connected to the input end of an external exhaust gas treatment device through an exhaust pipe; the gray area (5) A plurality of supplementary air supply ports (51) are provided at the top of the air conditioner. The fresh air unit (1) is connected to the supplementary air supply ports (51) via an air supply pipe (10). The fresh air unit (1) is used to supplement fresh air to ensure the air volume in the gray zone (5) so that its pressure is less than the pressure in the positive membrane zone (4) and the back membrane zone (6). The positive membrane zone (4) and the back membrane zone (6) are provided with an FFU clean air supply unit (11). A first return air port is provided on each isolation wall plate (7) near the FFU clean air supply unit (11). A dry coil (12) is provided at the first return air port. A second return air port (13) is provided below the isolation wall plate (7). The control box (3) is electrically connected to the fresh air unit (1) and the FFU clean air supply unit (11).

2. The gray area isolation air conditioning system for heterojunction texturing workshop according to claim 1 is characterized by: The second air return port (13) is a door-hinged air return port, the core frame and the outer frame of which are connected by door hinges, so as to facilitate the cleaning, dust removal, maintenance and replacement of the filter screen.

3. The gray area isolation air conditioning system for heterojunction texturing workshop according to claim 1 is characterized by: A removable filter is provided in the door hinged return air vent to assist in filtering out pollutants in some workshops.

4. The gray area isolation air conditioning system for heterojunction texturing workshop according to claim 1 is characterized in that: The dry coil (12) is connected to a medium-temperature water system (14). The dry coil (12) is used to heat the return air. The medium-temperature water system (14) includes a medium-temperature return water pipe (141) and a medium-temperature water supply pipe (142). The water temperature of the medium-temperature return water pipe (141) is 18° C., and the water temperature of the medium-temperature water supply pipe (142) is 13° C.

5. The gray area isolation air conditioning system for heterojunction texturing workshop according to claim 1 is characterized by: The air supply pipe (10) is provided with an electric air valve (101), and the air supply volume of the supplementary air supply port (51) is adjusted by the electric air valve (101). Each supplementary air supply port (51) is also provided with a fire prevention manual valve (102) for assisting in shutting off the pipeline.

6. The gray area isolation air conditioning system for heterojunction texturing workshop according to claim 1 is characterized by: Each FFU clean air supply unit (11) is fully distributed on the inner top of the front film area (4) and the back film area (6), and each FFU clean air supply unit (11) is provided with a motor, a fan and a high-efficiency filter.

7. The gray area isolation air conditioning system for heterojunction texturing workshop according to claim 1 is characterized by: A first differential pressure sensor is provided above each FFU clean air supply unit (11) for monitoring the differential pressure at the FFU clean air supply unit (11); the first differential pressure sensor is electrically connected to the control box (3).

8. The gray area isolation air conditioning system for heterojunction texturing workshop according to claim 1 is characterized by: A second pressure difference sensor (52), a humidity sensor (53), and a temperature sensor (54) are provided in sequence on the side of each isolation wall plate (7) close to the gray zone (5); the second pressure difference sensor (52) is used to monitor the pressure in the gray zone (5); the humidity sensor (53) is used to monitor the humidity in the gray zone (5); and the temperature sensor (54) is used to monitor the temperature in the gray zone (5); the second pressure difference sensor (52), the humidity sensor (53), and the temperature sensor (54) are electrically connected to the control box (3).

9. The gray area isolation air conditioning system for heterojunction texturing workshop according to claim 1 is characterized by: The fresh air unit (1) is provided with a primary filter section (15), a medium filter section (16), a preheating section (17), a surface cooling section (18), a first heating section (19), a humidifying section (20), a variable frequency fan (22), a high efficiency filter section (23), and a flow equalizing plate in sequence from right to left. The air passes through the primary filter section (15) and the medium filter section (16) in sequence and then selects the temperature of the surface cooling section (18) or the first heating section (19) to the workshop shell (2). The air is then blown to the humidifier section for humidification by the variable frequency fan (22), and then passes through the high efficiency filter section (23) and the flow equalizing plate to be evenly blown to the supplementary air supply port (51). The preheating section (17) is used for preheating in winter.

10. The gray area isolation air conditioning system for heterojunction texturing workshop according to claim 9, characterized in that: A second heating section (21) is also provided between the humidifying section (20) and the variable frequency fan (22), and auxiliary heating is performed again when the temperature of the wind does not reach the set value after humidification.