Resistance compensation-based ultra-long tunnel moving train fire metamorphosis size reduction experiment device
By setting up an adjustable resistance grid and increasing the wall roughness in the ultra-long subway tunnel fire experimental device, the length of the tunnel model is shortened, the problems of too long a device and large amount of calculations in the existing technology are solved, and the experimental efficiency and Calculation speed.
Patent Information
- Application Number
- CN202420376140.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-28
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-02-28
AI Technical Summary
In the existing technology, the ultra-long subway tunnel fire experimental device is too long, the experimental site is difficult to meet, the operation is difficult, and the numerical model calculation amount is large, resulting in low research efficiency.
Design an experimental device for fire shrinkage of ultra-long tunnel motion trains based on resistance compensation. By setting up an adjustable resistance grid and increasing the wall roughness in the tunnel model, the longitudinal length of the tunnel is shortened, and multi-section modular tunnel standard sections are used. Collect images with a high-definition digital camera to ensure equivalent resistance.
While ensuring the experimental accuracy, the length of the experimental device is shortened, the difficulty of experimental operation is reduced, and the numerical model is simplified through the resistance compensation method, which improves the calculation speed and reduces the file occupancy.
Smart Images

Figure CN221927382U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a reduced-size experimental device for fire of multiple moving bodies in a super-long subway single tunnel, in particular to a deformed reduced-size experimental device for fire of moving trains in a super-long tunnel with an adjustable resistance grid. Background Art
[0002] With the construction of my country's transportation power, the scale of subway construction has expanded year by year. As a narrow and long building, the length of the subway tunnel is much larger than the cross-sectional size. In order to study the complex flow field characteristics of the subway tunnel, numerical simulation and experimental research methods are mainly used. Although numerical simulation has strong capabilities for real conditions and ideal conditions, the numerical model of super-long subway tunnels over 3 km has a large amount of calculation, which leads to a decrease in calculation speed and consumes more computing resources, which is not conducive to the development of numerical simulation research. Experimental research can truly reflect all the characteristics of the research object and is used to verify the accuracy of the numerical model. It is an indispensable research method. The experimental method is mainly divided into full-scale experiments and reduced-scale experiments. Considering the great destructiveness of full-scale fire experiments, the high cost of experiments, the long cycle, poor controllability and other factors, it is difficult to have experimental conditions in actual research. The reduced-scale experiment can overcome these characteristics and is adopted by most researchers. However, the reduced-scale experiment is designed based on the similarity theory. The prototype and model need to meet geometric similarity, motion similarity and dynamic similarity, so that the experimental results can be extended to the full-scale engineering experiment. This requires that the scaled-down model of the ultra-long tunnel needs a narrower and longer experimental site. In order to ensure that the flow field inside the scaled experiment is in a turbulent state, the width and height of the model cannot be less than 0.3m. After the ultra-long tunnel of more than 3km is scaled according to a certain similarity ratio, the length of the model tunnel will reach about 200 meters, which is difficult to meet in the usual laboratory site, and the experimental operation becomes more difficult and the accuracy cannot be guaranteed. Therefore, current research urgently needs to establish a deformed scaled-down experimental device that can realize the study of the combustion characteristics of multi-moving body fires and smoke diffusion characteristics in ultra-long tunnels. How to further shorten the length of the scaled-down experimental device while ensuring the experimental accuracy is a practical problem that needs to be solved urgently, especially the resistance equivalence before and after the model is deformed should be guaranteed. Utility Model Content
[0003] With regard to the above-mentioned prior art, considering the narrow and long structural characteristics of the tunnel, the longitudinal length of the tunnel is much larger than the size of the tunnel cross section. Due to the limitation of the length of the experimental site, the reduced-size model often needs to shorten the longitudinal length of the model. Considering that the ventilation physical model test is often a study of the flow field of a specific local complex part or part of the tunnel section, under the premise of not affecting the flow field distribution in the study area, the longitudinal length of the tunnel is shortened by omitting some sections, and the local resistance of the resistance grid is used, or the wall roughness of some tunnel sections is increased to compensate for the resistance with a larger resistance along the way, so as to ensure that the resistance of the equivalent model and the actual model is equal.
[0004] The construction of a deformed and reduced-size experimental device is of great significance for promoting experimental research on super-long tunnels. In order to solve the problems existing in the prior art, the utility model provides a super-long tunnel moving train fire deformed and reduced-size experimental device based on resistance compensation, which overcomes the problem that the super-long moving train fire experimental device in the prior art is too long, making it difficult to meet the experimental site and the experimental operation is difficult by designing the adjustable resistance grid angle and the wall roughness height.
[0005] In order to solve the above technical problems, the utility model proposes a super-long tunnel moving train fire deformation scale-down experimental device based on resistance compensation, comprising a scaled-down model of a super-long tunnel and a plurality of high-definition digital cameras connected to a host computer, wherein a data acquisition system is installed in the host computer; the scaled-down model of the super-long tunnel is a tunnel body supported by two brackets; the tunnel body is a longitudinal channel with a rectangular cross-section surrounded by a top plate, a rear side wall, a bottom plate and a flame observation window located at the front side, and the tunnel body is composed of a plurality of through-section modular standard tunnel sections; the high-definition digital camera is arranged in front of the flame observation window and faces the flame observation window; a longitudinal track is provided on the bottom plate of the tunnel body, and a plurality of train models are arranged on the longitudinal track, Each train model is slidably matched with the longitudinal track through a pulley arranged at the bottom of the train model, and each train model is provided with a mutually independent driving system. A travel switch of each train model is arranged on the bottom plate of the tunnel body, and a burner is arranged on the top of each train model; adjustable resistance grids are arranged at the entrance and exit ends of the tunnel body; a rough element is arranged on the inner wall of the longitudinal channel of the tunnel body, from 1 / 5 to 1 / 2 of the distance from the exit end of the tunnel body to the exit end; a set of test units are respectively arranged on the top plate of each standard section of the tunnel, and the test units include a pressure test system, a temperature test system, a smoke composition and concentration test system and a piston wind speed test system, all of which are connected to the host computer; a tunnel axial flow fan is arranged on the top plate of the tunnel body.
[0006] Furthermore, the fire deformation and reduction size experimental device for ultra-long tunnel moving train based on resistance compensation described in the utility model, wherein:
[0007] Adjacent standard sections of tunnels are connected by flanges.
[0008] The driving system of the train model includes a sprocket / chain transmission mechanism driven by a control motor, the sprocket / chain transmission mechanism includes a driving sprocket plate, a transmission chain, a chain tensioning device and a passive sprocket plate, and the driving sprocket plate is connected to the output end of the control motor through a coupling; the train model and the transmission chain are connected to form a closed-loop motion system, including a part A located in the longitudinal channel of the tunnel body and a part B located outside the longitudinal channel of the tunnel body, and the train model is connected to the part A through the transmission chain tensioners at the front and rear ends.
[0009] The length of the train model is L1, the distance between the adjustable resistance grids at the entrance and exit of the tunnel body is L, and the maximum number of the train models is N, N=[L / L1].
[0010] The adjustable resistance grid is a double-layer louver grid structure or a multi-layer diffuser grid structure or a porous plate structure.
[0011] The adjustable resistance grille is a double-layer louver grille structure, including a small motor and a herringbone louver regulating valve driven by the small motor. Flow equalizing grilles are provided on both sides of the inlet and outlet of the herringbone louver regulating valve. The angle of the herringbone louver regulating valve can be adjusted in the range of 0 to 90°.
[0012] The rough elements arranged on the inner wall of the longitudinal channel of the tunnel body are convex structures arranged on the inner wall surface.
[0013] The shape of the protrusion structure is a conical protrusion, a rectangular protrusion or a hemispherical protrusion; the conditions for determining the height and two-dimensional spacing of the protrusion structure are: the height does not exceed 10% of the equivalent diameter of the tunnel, and the two-dimensional spacing is not less than 1 times the equivalent diameter of the root of the protrusion structure.
[0014] Each high-definition digital camera is responsible for collecting images of a standard section of the tunnel, and the images collected by two adjacent high-definition digital cameras cannot be interrupted.
[0015] The top of the train model is provided with an installation groove for installing the burner. The burner comprises a combustion disk, and the combustion disk is divided into a plurality of small grid spaces.
[0016] Compared with the prior art, the beneficial effects of the utility model are:
[0017] The deformed reduced-size experimental device constructed by the utility model can effectively shorten the length of the tunnel model by installing a resistance grid and increasing the wall roughness in the tunnel ventilation model under the premise of ensuring that the tunnel prototype and the model have similar resistance. The system overcomes the problems of the long length of the super-long moving train fire experimental device and the large amount of numerical model calculation in the prior art, and solves the problems of difficult experimental site and high difficulty in experimental operation.
[0018] The idea of shortening the tunnel length based on the resistance compensation method can also be applied to the process of establishing the numerical model, overcoming the problem of excessive calculation of the numerical model of the fire of the super-long moving train in the existing technology. By shortening the length of the numerical model, the numerical model can reduce the number of grids, improve the numerical calculation speed and reduce the memory usage of the file, thereby simplifying the numerical model. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 Schematic diagram of the experimental device for the fire deformation of multiple moving bodies in super-long subway tunnels;
[0020] Figure 2(a) is Figure 1 A schematic diagram of the three-dimensional structure of the tunnel body shown in FIG.
[0021] FIG2( b ) is a cross-sectional view of the tunnel body shown in FIG2( a );
[0022] Figure 3 yes Figure 1 The structural diagram of the train model driving system shown in;
[0023] FIG4(a) is a schematic diagram of the three-dimensional structure of the combustion disk shown in FIG2(b);
[0024] FIG4( b ) is a top view of the combustion disk of FIG4( a );
[0025] Figure 5(a) is Figure 1 An enlarged view of the structure of the resistance grid shown in;
[0026] FIG5(b) is a partial enlarged view of the herringbone electric split shutter air valve shown in FIG5(a);
[0027] Figure 6(a) is Figure 1 Schematic diagram of the structures of three shapes of rough elements shown in;
[0028] Figure 6(b) is Figure 1 An enlarged cross-sectional view of the tunnel body at the rough element shown in FIG.
[0029] FIG. 6( c ) is a side view of the rectangular raised roughness element shown in FIG. 6( b ).
[0030] In the figure:
[0031] 1-Tunnel body 1-1-High temperature resistant tunnel body standard section 1-2-High temperature resistant flame observation window
[0032] 1-3-Flange 2-Adjustable resistance grid 2-1-Small motor
[0033] 2-2-Herringbone double shutter air valve 2-3-Flow equalizing grille 3-Pressure test system
[0034] 4-Temperature test system 5-Smoke composition and concentration test system 6-Piston wind speed test system
[0035] 7- Train model 8- Burner 9- Pulley
[0036] 10-Longitudinal track 11-Active system 11-1-Coupling
[0037] 11-2-driving sprocket 11-3-driving sprocket fixing bracket 12-control motor
[0038] 13-driven system 13-1-driven sprocket 13-2-driven sprocket fixing bracket
[0039] 14- transmission chain 15- chain tensioner 16- chain roller
[0040] 7- tunnel axial flow fan 18- travel switch 19- bracket
[0041] 20-HD digital camera 21-Rough element 21-1-Conical protrusion
[0042] 21-2-Rectangular protrusion 21-3-Hemispherical protrusion DETAILED DESCRIPTION
[0043] The design idea of the super-long tunnel moving train fire deformation and reduction scale experimental device based on resistance compensation proposed in the utility model is: through a single tunnel chain towing a multi-moving body fire reduction experimental device, it mainly includes a pressure test system, a temperature test system, a smoke analysis system and a piston wind speed test system arranged on the tunnel body, and a train model and a burner arranged in the train model are arranged in the tunnel body. The burner can be placed at the front, rear or middle position of the train model; the burner includes a combustion disk, the size of the combustion disk corresponds to the size of the burner slot of the train model, and the combustion disk is divided into a plurality of small grids. The inlet and outlet sections of the tunnel body are both provided with an adjustable resistance grid to overcome the excessive length of the super-long moving train fire experimental device in the prior art, and a structural form composed of a plurality of evenly distributed rough elements is arranged on the inner wall on the outlet side of the tunnel body to realize the adjustment of the resistance coefficient along the way, so that the adjustment of the resistance coefficient along the way is realized by adjusting the height, longitudinal spacing and circumferential spacing of the rough elements. In the utility model, the tunnel body and the train model are composed of a plurality of sections of reduced-size model experimental standard sections, the train model is two or more, the front and rear of each train model are respectively connected with their own train model motion active system and train model motion driven system through chains, a longitudinal track is provided on the bottom plate of the tunnel body, and a pulley for train motion positioning which is slidably matched with the longitudinal track is provided at the bottom of the train model.
[0044] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments, but the following embodiments are by no means intended to limit the present invention in any way.
[0045] like Figure 1 As shown, taking the subway tunnel multi-moving body fire experimental device as an example, the utility model proposes a super-long tunnel moving train fire deformation and reduction scale experimental device based on resistance compensation, including a reduced-scale model of the super-long tunnel and multiple high-definition digital cameras 20 connected to the host computer, in which a data acquisition system is installed.
[0046] The reduced-size model of the super-long tunnel comprises a tunnel body 1 supported by two brackets 19; the tunnel body 1 is a longitudinal passage with a rectangular cross section surrounded by a top plate, a rear side wall, a bottom plate and flame observation windows 1-2 located at the front side.
[0047] As shown in FIG2(a), in the present invention, the tunnel body is composed of multiple sections of reduced-size model test standard sections, that is, the tunnel body 1 is composed of multiple sections of modular tunnel standard sections 1-1 (including high-temperature resistant flame observation windows 1-2 arranged on the front side), and adjacent tunnel standard sections 1-1 are connected by flanges 1-3. FIG2(a) shows the flange connection formation, where flanges 1-3 are installed at the ends of the tunnel standard sections, and the flanges 1-3 on the adjacent two sections of the tunnel standard sections are fastened together with bolts, and then the connected tunnel body is placed on the tunnel body bracket 19. Figure 1 As shown, a set of test units are respectively provided on the top plate of each standard section 1-1 of the tunnel, and the test units include a pressure test system 3, a temperature test system 4, a smoke composition and concentration test system 5 and a piston wind speed test system 6, which are all connected to the host computer, and can measure and record the pressure, temperature, wind speed, smoke composition, concentration and other parameters in the tunnel in real time.
[0048] An adjustable resistance grid 2 is provided in the tunnel body 1, and the adjustable resistance grid can be placed at a position such as the exit of the tunnel body that does not affect the movement of the train model. In this embodiment, the adjustable resistance grid 2 is arranged at the entrance and exit ends of the tunnel body 1.
[0049] A tunnel axial flow fan 17 is provided on the top plate of the tunnel body 1 .
[0050] In the present invention, the high-definition digital camera 20 is arranged in front of the flame observation window 1-2 and faces the flame observation window 1-2. The material of the flame observation window 1-2 adopts a high-temperature resistant transparent material. Each high-definition digital camera 20 is responsible for the image acquisition work of a tunnel standard section 1-1. The images collected by two adjacent high-definition digital cameras 20 cannot be interrupted, that is, they have a small overlap, such as Figure 3 shown.
[0051] A longitudinal track 10 is provided on the bottom plate of the tunnel body 1, and a plurality of train models 7 are arranged on the longitudinal track 10. In the present utility model, the length of the train model 7 is L1, the distance between the adjustable resistance grid 2 at the entrance and exit ends of the tunnel body 1 is L, and the maximum number of the train models 7 is N, N = [L / L1]. In the present embodiment, two train models 7 are provided, and each train model 7 is slidably matched with the longitudinal track 10 through a pulley 9 provided at the bottom of the train model 7. FIG2(b) shows a schematic diagram of the cross-sectional structure of the train model 7 in the present utility model, which shows the relative positional relationship between the longitudinal track 10 and the pulley 9. Among them, the pulley 9 is installed on the bottom of the train model 7 through a pulley seat, and a longitudinal track 10 is provided in the middle of the bottom plate of the tunnel body 1. When the train model 7 moves, the pulley 9 is located in the longitudinal track 10, and the longitudinal track 10 plays a role in limiting the movement of the train, ensuring that the train model 7 can only move in a straight line. In this embodiment, the longitudinal track 10 is in a "C" shape, which limits the pulley 9 to the track groove, thereby ensuring that the train model 7 will not tip over when moving at high speed. The longitudinal track 10 can adopt a modular design, and the adjacent tracks are connected by segmented splicing. The connection between the front and rear sections of the track is set in the form of a "mother-and-child buckle", which is plugged in section by section. The main body of the longitudinal track 10 is fixed to the bottom plate of the tunnel body 1 through screw holes. Similarly, the train model 7 can also be connected by a standard segment splicing combination. It is conducive to studying the influence of train length on piston wind, and its influence on smoke diffusion, fire characteristics, etc.
[0052] Each train model 7 is equipped with a mutually independent driving system. Figure 1 , Figure 2(b) and Figure 3 The driving system of the train model 7 in this embodiment is shown, and the driving system of the train model 7 includes a sprocket / chain transmission mechanism driven by a control motor 12, and the sprocket / chain transmission mechanism includes an active system 11, a driven system 13, a chain tensioning device and a transmission chain 14. The active system 11 includes an active sprocket 11-2 supported by an active sprocket fixed bracket 11-3 located at one end of the tunnel body 1, and the active sprocket 11-2 is connected to the output end of the control motor 12 through a coupling 11-1. In order to ensure the transmission stability of the transmission chain 14, the chain tensioning device in this embodiment includes a transmission chain roller bracket chain roller 16, and chain rollers 16 for tensioning the transmission chain 14 are respectively provided at the bottom of both ends of the tunnel body 1 through the transmission chain roller bracket, as shown in FIG. Figure 1As shown. Chain tensioners 15 are provided at the front and rear positions of the train model 7, and a steel ring is provided at the end of the transmission chain 14. The train model 7 and the transmission chain 14 are connected through the chain tensioner 15 and the steel ring to form a closed-loop motion system. The closed-loop motion system includes a part A located in the longitudinal channel of the tunnel body 1 and a part B located outside the longitudinal channel of the tunnel body 1. The train model 7 is connected to the part A located in the longitudinal channel of the tunnel body 1. The end of the transmission chain 14 is connected to the chain tensioner 15. By rotating the chain tensioner 15, the transmission chain 14 is gradually tightened. The control motor 12 transmits power to the active sprocket 11-2 through the coupling 11-1. The active sprocket 11-2 rotates and drives the transmission chain 14 and the driven sprocket 13-1 to move. The transmission chain 14 pulls the train model 7 to move according to the specified motion law. Since the front and rear of the train model 7 are connected to the transmission chain 14, a closed-loop connection is formed. The pulley arranged at the bottom of the train model 7 is used to limit the train model 7 to travel within the track and prevent it from tipping over. The bottom plate of the tunnel body 1 is provided with a travel switch 18 for each train model 7. In the utility model, by controlling the sprocket / chain transmission mechanism driven by the motor 12, the transmission chain 14 can control the acceleration movement of the train model 7 and the deceleration braking of the train model 7. The control method of another model train in the tunnel body 1 is the same. In this embodiment, the active systems of the two train models 7 are placed at the left end of the tunnel body, and the driven systems are placed at the right end of the tunnel body 1. The active system 11, the driven system 13, and the train model 7 are connected into a closed-loop motion system through the transmission chain 14. The entire motion system can realize the acceleration, deceleration, and uniform speed control of the model train. In addition, the travel switch 18 is used to control the interval of the train movement to prevent the model train from exceeding the predetermined movement area, thereby ensuring the safety of the model experiment.
[0053] A burner 8 is provided on the top of each train model 7. The burner 8 on the top of the train can be placed at the front, rear and middle of the train model 7, and can be used to study the smoke diffusion characteristics when a single train fire or multiple trains catch fire at the same time or when fires occur at different positions of the train. The top of the train model 7 is provided with a mounting groove for installing the burner 8. The burner 8 includes a combustion disk. FIG4(a) and FIG4(b) respectively show the side view and top view of the combustion disk. The size of the combustion disk corresponds to the size of the burner slot of the train model. During the experiment, the combustion disk is placed in the burner slot. At the same time, the combustion disk is divided into a plurality of small grid spaces, which is suitable for studying the fire characteristics of moving bodies and smoke diffusion characteristics of fires of different intensities.
[0054] In the utility model, the adjustable resistance grid 2 is a double-layer louver grid structure or a multi-layer diffuser grid structure or a porous plate structure. In this embodiment, the adjustable resistance grid 2 is a double-layer louver grid structure. Figures 5(a) and 5(b) show the adjustable resistance grid of this structure, including a small motor 2-1, a herringbone split louver regulating valve 2-2 and flow equalizing grids 2-3 on both sides. The small motor 2-1 drives the herringbone split louver regulating valve 2-2. Two flow equalizing grids 2-3 are respectively arranged on both sides of the inlet and outlet of the herringbone split louver regulating valve 2-2. The small motor 2-1 drives the herringbone split louver regulating valve 2-2 to rotate and change its angle. The adjustable range of the angle α of the herringbone split louver regulating valve 2-2 is 0 to 90°. The flow equalizing grids 2-3 arranged on both sides of the herringbone split louver regulating valve 2-2 can reduce the flow field influence range caused by the grid. Since different angles of α produce different local resistances in the tunnel, when building a full-scale model of an ultra-long tunnel, the length of the main section of the ultra-long tunnel can be shortened by adjusting the angle of α, so as to achieve equivalent resistance before and after the deformation of the ultra-long tunnel model, thereby ensuring the similarity of the Euler criterion.
[0055] A rough element 21 is provided on the inner wall of the longitudinal channel of the tunnel body 1, from 1 / 5 to 1 / 2 of the exit end of the tunnel body 1 to the exit end. The rough element 21 is a protrusion structure provided on the inner wall surface. The shape of the protrusion structure is a conical protrusion 21-1 or a rectangular protrusion 21-2 or a hemispherical protrusion 21-3. FIG6(a) shows rough elements of different shapes. Due to the different local resistances generated in the tunnel by different heights, axial spacings and circumferential spacings of rough elements, when building a scaled-down model of an ultra-long tunnel, the length of the ultra-long main body section can be shortened by changing the roughness, so as to achieve resistance equivalence before and after the deformation of the ultra-long tunnel model. Therefore, in the present utility model, the conditions for determining the height and two-dimensional spacing of the protrusion structure are: the height does not exceed 10% of the equivalent diameter of the tunnel, and the two-dimensional spacing is not less than 1 times the equivalent diameter of the root of the protrusion structure. Figures 6(b) and 6(c) show that the protruding structure of the rough element on the inner wall of the tunnel body in this embodiment is a rectangular protrusion 21-2, that is, taking a commonly used rubber block with a rectangular base as an example, it is adhered to the inner wall surface of the tunnel body (the inner wall within 1 / 5 of the range of the exit end of the longitudinal channel) by double-sided tape, and the adjustment of the drag coefficient along the way is achieved by adjusting the height, longitudinal spacing and circumferential spacing of the rough element. The adjustable wall roughness height is achieved by means of spraying paint with particles of different particle sizes, selecting materials with specific roughness, internally pasting sandpaper and gauze, etc.
[0056] In the present invention, multiple high-definition digital cameras 20 are arranged outside the flame observation windows 1-2 to record the movement of the train model and the state of its flame in real time, and are responsible for collecting relevant image data of the fire characteristics of the moving body. Multiple high-definition digital cameras 20 adopt a segmented acquisition method, and each camera is responsible for the image acquisition work of a standard section of the model tunnel, such as Figure 3 As shown, the images collected by two adjacent cameras will overlap in a small range. After the image collection is completed, the images of each high-definition digital camera 20 are spliced into an overall image using professional software.
[0057] The working process of the utility model experimental device is as follows:
[0058] 1) Place three high-definition digital cameras 20 outside the flame observation window 1-2, with the lens of the high-definition digital camera 20 facing the flame observation window 1-2 and the distance from the flame observation window 1-2 is about 1.5m. The positions of the three high-definition digital cameras 20 are fixed throughout the experiment; then, before the experiment begins, unify the system time of each camera (with an error within ±1s), and adjust them to be in the shooting state, and the shooting process is operated by the experimenter.
[0059] 2) Check the working status of the pressure test system 3, temperature test system 4, smoke composition and concentration test system 5 and piston wind speed test system 6 in the test unit. Start the data acquisition system and check whether the data acquisition of each channel is normal. After confirming that there is no problem, start the recording function of each data acquisition instrument.
[0060] 3) Weigh the fuel according to the fuel weight specified in the hot smoke test specification and inject it into the combustion pan of the train model 7.
[0061] 4) Start the tunnel axial flow fan 17, and adjust the air valve angle of the herringbone double-leaf louver regulating valve 2-2 in the adjustable resistance grille 2 according to the test data of the piston wind speed test system 6 and the pressure test system 5. On this basis, adjust the rotation speed of the tunnel axial flow fan 17, conduct multiple working condition tests, and finally make the resistance characteristic curve in the longitudinal channel of the tunnel main body reach the set experimental working condition.
[0062] 5) Taking a single train fire scenario as an example, according to the driving direction, the front train is designated as the fire train, and the rear train is designated as the non-fire train. Use a long-handled torch to ignite the burner 8 of the front train in the train model 7.
[0063] 6) Start the control motor 12 of the driving system, and drive the train model 7 to run in the tunnel at a set speed through the transmission chain 14.
[0064] 7) After running for a period of time, the fire train model is braked first, and after the non-fire train model continues to move for a period of time, the non-fire train model is braked.
[0065] 8) Fire extinguishing and weighing. The above process is the complete process of the experiment. After the train model completes a trip, the burning disk is extinguished with a fire extinguisher and weighed.
[0066] After the experimental device has cooled to its initial state, prepare for the next round of experiments and repeat the above process 1) to 8).
[0067] Although the utility model has been described above in conjunction with the accompanying drawings, the utility model is not limited to the above-mentioned specific embodiments, which are merely illustrative rather than restrictive. Under the guidance of the utility model, ordinary technicians in this field can make many improvements and changes without departing from the purpose of the utility model, all of which are within the protection of the utility model.
Claims
1. A super-long tunnel moving train fire deformation scale-down experimental device based on resistance compensation, comprising a scale-down model of a super-long tunnel and a plurality of high-definition digital cameras (20) connected to a host computer, wherein a data acquisition system is installed in the host computer; characterized in that: The reduced-size model of the super-long tunnel comprises a tunnel body (1) supported by two brackets (19); The tunnel body (1) is a longitudinal passage with a rectangular cross section, which is surrounded by a top plate, a rear side wall, a bottom plate and a flame observation window (1-2) located at the front side. The tunnel body (1) is composed of a plurality of through-going modular tunnel standard sections (1-1); the high-definition digital camera (20) is arranged in front of the flame observation window (1-2) and faces the flame observation window (1-2); A longitudinal track (10) is provided on the bottom plate of the tunnel body (1), and a plurality of train models (7) are arranged on the longitudinal track (10). Each train model (7) is slidably matched with the longitudinal track (10) via a pulley (9) provided at the bottom of the train model (7). Each train model (7) is provided with a mutually independent driving system. A travel switch (18) of each train model (7) is provided on the bottom plate of the tunnel body (1), and a burner (8) is provided on the top of each train model (7); The inlet and outlet ends of the tunnel body (1) are both provided with adjustable resistance grids (2); A rough element (21) is provided on the inner wall of the longitudinal passage of the tunnel body (1) from 1 / 5 to 1 / 2 of the distance from the exit end of the tunnel body (1) to the exit end; A set of test units is respectively provided on the top plate of each standard tunnel section (1-1), the test units comprising a pressure test system (3), a temperature test system (4), a smoke composition and concentration test system (5) and a piston wind speed test system (6) all connected to the host computer; A tunnel axial flow fan (17) is provided on the top plate of the tunnel body (1).
2. The ultra-long tunnel moving train fire deformation and reduction experimental device based on resistance compensation according to claim 1 is characterized in that: Adjacent standard tunnel sections (1-1) are connected by flanges (1-3).
3. The fire deformation and reduction experimental device for ultra-long tunnel moving train based on resistance compensation according to claim 1 is characterized in that: The driving system of the train model (7) comprises a sprocket / chain transmission mechanism driven by a control motor (12), the sprocket / chain transmission mechanism comprising a driving sprocket disc (11-2), a transmission chain (14), a chain tensioning device and a driven sprocket disc (13-1), the driving sprocket disc (11-2) being connected to the output end of the control motor (12) via a coupling (11-1); The train model (7) and the transmission chain (14) are connected to form a closed-loop motion system, comprising a part A located in the longitudinal channel of the tunnel body (1) and a part B located outside the longitudinal channel of the tunnel body (1), and the train model (7) is connected to the part A via transmission chain tensioners (15) at the front and rear ends.
4. The fire deformation and reduction experimental device for ultra-long tunnel moving train based on resistance compensation according to claim 1 is characterized in that: The length of the train model (7) is L1, the distance between the adjustable resistance grids (2) located at the entrance and exit ends of the tunnel body (1) is L, and the maximum number of the train models (7) is N, N = [L / L1].
5. The ultra-long tunnel moving train fire deformation and reduction experimental device based on resistance compensation according to claim 1 is characterized in that: The adjustable resistance grid (2) is a double-layer louver grid structure or a multi-layer diffuser grid structure or a porous plate structure.
6. The fire deformation and reduction experimental device for ultra-long tunnel moving train based on resistance compensation according to claim 5 is characterized in that: The adjustable resistance grille (2) is a double-layer louver grille structure, comprising a small motor (2-1) and a herringbone-shaped split louver regulating valve (2-2) driven by the small motor (2-1), flow equalizing grilles (2-3) being provided on both sides of the inlet and outlet of the herringbone-shaped split louver regulating valve (2-2), and the angle of the herringbone-shaped split louver regulating valve (2-2) can be adjusted within a range of 0 to 90 degrees.
7. The ultra-long tunnel moving train fire deformation and reduction experimental device based on resistance compensation according to claim 1 is characterized in that: The rough elements (21) arranged on the inner wall of the longitudinal channel of the tunnel body (1) are convex structures arranged on the inner wall surface.
8. The fire deformation and reduction experimental device for ultra-long tunnel moving train based on resistance compensation according to claim 7 is characterized in that: The shape of the protrusion structure is a conical protrusion (21-1) or a rectangular protrusion (21-2) or a hemispherical protrusion (21-3); the conditions for determining the height and two-dimensional spacing of the protrusion structure are: the height does not exceed 10% of the equivalent diameter of the tunnel, and the two-dimensional spacing is not less than 1 times the equivalent diameter of the root of the protrusion structure.
9. The ultra-long tunnel moving train fire deformation and reduction experimental device based on resistance compensation according to claim 1 is characterized in that: Each high-definition digital camera (20) is responsible for the image acquisition work of a standard tunnel section (1-1), and the images acquired by two adjacent high-definition digital cameras (20) cannot be interrupted.
10. The fire deformation and reduction experimental device for ultra-long tunnel moving train based on resistance compensation according to claim 1 is characterized in that: The top of the train model (7) is provided with a mounting groove for mounting the burner (8), and the burner (8) comprises a combustion disk, wherein the combustion disk is divided into a plurality of small grid spaces.
