Cable guiding tool for high-place operation

By designing cable guide tooling for high-altitude operations and using the limit ring structure of the rotating rod and drawbar, the problem of cables being entangled during the transfer process is solved, and the cable is smoothly transferred to high places.

CN221929124UActive Publication Date: 2024-10-29GUANGDONG ZHAOWAN ENGINEERING CONSULTING CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420514599.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-15
Publication Date
2024-10-29
Estimated Expiration
2034-03-15

AI Technical Summary

Technical Problem

During the construction process, the weight of the cable drum caused the cable to rotate around the drum during the transfer process, causing entanglement and affecting the construction progress.

Method used

Design a cable guide tooling for high-altitude operations, including a rotating rod, a drawbar and a connecting rod. By setting bearings and limiting rings, ensure that the cable avoids contact with the drum during the pulling process, and utilizes the rotating rod and drawbar. The unique limit ring structure allows the cable to change its position from horizontal to vertical to avoid entanglement.

Benefits of technology

It effectively avoids the entanglement of the cable and the drum, improves the construction progress, and ensures the smooth transmission of the cable to high places.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221929124U_ABST
    Figure CN221929124U_ABST
Patent Text Reader

Abstract

The utility model provides a cable guiding tool for high-place operation, which comprises a tool body, and the tool body comprises a rotating rod, a traction rod and a connecting rod. A plurality of bearings are arranged on the rotating rod in a penetrating mode, a first limiting ring for a cable to penetrate through is arranged at the top of the rotating rod, the two ends of the connecting rod are connected with the rotating rod and the traction rod respectively, and a second limiting ring for the cable to penetrate through is arranged at the bottom of the traction rod. The utility model provides a cable guiding tool for high-place operation, which can be used for a cable drum on the ground and can prevent a cable from being wound in the process of pulling the cable to a roof.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction equipment, in particular to a cable guiding tool for high-altitude operations. Background Art

[0002] Existing distributed photovoltaic power stations are usually built on the roofs of buildings. During the construction process, the cables need to be transferred to the roofs of a certain height. Due to the heavy weight of the cable reel, the cable reel is usually placed on the ground, and one end of the cable is pulled to the roof for processing. However, since the cable reel itself is fixed, the cable will rotate around the reel during the transfer, causing the cable to become entangled with the reel itself, thereby affecting the construction progress. Therefore, there is an urgent need for a tooling that can guide the cable to avoid the reel when pulling the cable. Utility Model Content

[0003] In view of the deficiencies in the prior art, the utility model proposes a cable guiding tool for high-altitude operations, which can be used on a cable reel on the ground to prevent the cable from being entangled during the process of pulling the cable to the roof.

[0004] The technical solution of the utility model is achieved in this way:

[0005] A cable guiding tool for working at heights comprises a tool body, wherein the tool body comprises a rotating rod, a traction rod and a connecting rod; a plurality of bearings are passed through the rotating rod, a first limiting ring is provided on the top of the rotating rod for the cable to pass through, two ends of the connecting rod are respectively connected to the rotating rod and the traction rod, and a second limiting ring is provided at the bottom of the traction rod for the cable to pass through.

[0006] Furthermore, the length of the rotating rod is greater than that of the traction rod.

[0007] Furthermore, the number of the bearings is at least two, and the bearings are arranged on the lower side of the connecting rod.

[0008] Furthermore, it also includes a reinforcing rod, which is respectively connected to the rotating rod and the connecting rod.

[0009] Furthermore, the rotating rod is arranged in parallel with the traction rod.

[0010] Furthermore, the rotating rod and the connecting rod are connected by screws, and the connecting rod and the traction rod are connected by screws.

[0011] Furthermore, the contour cross section of the first limiting ring is arranged parallel to the ground.

[0012] Furthermore, the contour cross section of the second limiting ring is arranged perpendicular to the ground.

[0013] Compared with the prior art, the utility model has the following advantages:

[0014] In the implementation manner of the utility model, the rotating rod is set at the center of the cable drum, and the cable passes through the second limiting ring on the traction rod and the first limiting ring on the top of the rotating rod in sequence, so as to realize the position change from horizontal to vertical direction. Since the connecting rod has a certain length, when the length of the connecting rod is greater than the radius of the cable reel, the cable inside the reel is limited by the second limiting ring during the traction process, thereby avoiding contact with the reel and reducing the possibility of cable entanglement. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] In order to more clearly illustrate the implementation methods of the utility model or the technical solutions in the prior art, the drawings required for use in the implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some implementation methods of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0016] Figure 1 The utility model is a schematic structural diagram of a cable guide tool for high-altitude operations.

[0017] Figure identification: 1-rotating rod; 2-connecting rod; 3-traction rod; 4-bearing; 5-first limiting ring; 6-second limiting ring; 7-reinforcement rod. DETAILED DESCRIPTION

[0018] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0019] In the description of the present utility model, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific position, be constructed and operated in a specific position, and therefore cannot be understood as limiting the present utility model. In addition, the terms "first", "second", "third", "fourth", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.

[0020] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0021] See also Figure 1 The utility model discloses a cable guide tool for high-altitude operation, including a tool body, the tool body including a rotating rod 1, a traction rod 3 and a connecting rod 2; the rotating rod 1 is provided with a plurality of bearings 4, the top of the rotating rod is provided with a first limit ring 5 for the cable to pass through, the two ends of the connecting rod 2 are respectively connected to the rotating rod 1 and the traction rod 3, and the bottom of the traction rod 3 is provided with a second limit ring 6 for the cable to pass through. The contour section of the first limit ring 5 is parallel to the ground, and the contour section of the second limit ring 6 is perpendicular to the ground.

[0022] The working principle of the utility model is as follows: first, insert the rotating rod 1 into the middle of the cable drum whose side is placed parallel to the ground, adjust the position of the bearing 4 so that the bearing 4 abuts against the inner wall of the center of the drum, ensure that the rotating rod 1 can rotate at the center of the drum, the distance between the traction rod 3 and the rotating rod 1 should be greater than the radius of the drum, at this time, the traction rod 3 is located on the outside of the cable drum in the horizontal direction, and the cable in the drum is passed through the second limiting ring 6 of the traction rod 3 and the first limiting ring 5 of the rotating rod 1 in turn. Since the length of the rotating rod 1 is greater than the traction rod 3, the height of the first limiting ring 5 is higher than the second limiting ring 6. During the cable traction process, since the drum itself will not rotate, the tooling itself will rotate with the different positions when the cable is pulled out. Specifically, during the traction process, the cable is first limited by the second limiting ring 6 away from the drum, and then is pulled by the first limiting ring 5 on the top, and starts to move upward to the roof.

[0023] Furthermore, the number of the bearings 4 is at least two, and the bearings 4 are arranged on the lower side of the connecting rod 2. The distance between the two bearings 4 is smaller than the thickness of the cable drum, ensuring that both bearings 4 can contact the central inner wall of the drum.

[0024] Furthermore, a reinforcing rod 7 is included, and the reinforcing rod 7 is respectively connected to the rotating rod 1 and the connecting rod 2. A stable triangle is formed between the reinforcing rod 7, the connecting rod 2 and the rotating rod 1 to prevent the connecting rod 2 from deforming and shaking during the rotation process.

[0025] Furthermore, the rotating rod 1 and the traction rod 3 are arranged in parallel.

[0026] Furthermore, the rotating rod 1 is connected to the connecting rod 2 by screws, and the connecting rod 2 is connected to the traction rod 3 by screws. The screw connection allows the tool to be easily disassembled and assembled, so other connection methods such as plug-in, slot, etc. that can achieve convenient assembly and disassembly are also within the protection scope of this embodiment.

[0027] The beneficial effects of the utility model are:

[0028] By setting the rotating rod at the center of the cable drum, the cable passes through the second limiting ring on the traction rod and the first limiting ring on the top of the rotating rod in sequence, so as to realize the position change from horizontal to vertical direction. Since the connecting rod has a certain length, when the length of the connecting rod is greater than the radius of the cable drum, the cable inside the drum is limited by the second limiting ring during the traction process, thereby avoiding contact with the drum and reducing the possibility of cable entanglement.

[0029] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A cable guide tool for high-altitude operations, comprising a tool body, characterized in that: The tool body comprises a rotating rod (1), a traction rod (3) and a connecting rod (2); a plurality of bearings (4) are provided on the rotating rod (1); a first limiting ring (5) for a cable to pass through is provided on the top of the rotating rod; two ends of the connecting rod (2) are respectively connected to the rotating rod (1) and the traction rod (3); a second limiting ring (6) for a cable to pass through is provided on the bottom of the traction rod (3).

2. The cable guide tool for high-altitude operation according to claim 1, characterized in that: The length of the rotating rod (1) is greater than that of the traction rod (3).

3. The cable guide tool for high-altitude operation according to claim 1, characterized in that: The number of the bearings (4) is at least two, and the bearings (4) are arranged on the lower side of the connecting rod (2).

4. The cable guide tool for high-altitude operation according to claim 1, characterized in that: It also comprises a reinforcing rod (7), wherein the reinforcing rod (7) is respectively connected to the rotating rod (1) and the connecting rod (2).

5. The cable guide tool for high-altitude operation according to claim 1, characterized in that: The rotating rod (1) and the traction rod (3) are arranged in parallel.

6. The cable guide tool for high-altitude operation according to claim 1, characterized in that: The rotating rod (1) and the connecting rod (2) are connected by screws, and the connecting rod (2) and the traction rod (3) are connected by screws.

7. The cable guide tool for high-altitude operation according to claim 1, characterized in that: The profile cross section of the first limiting ring (5) is arranged parallel to the ground.

8. The cable guide tool for high-altitude operation according to claim 1, characterized in that: The profile cross section of the second limiting ring (6) is arranged perpendicular to the ground.