Formwork mounting device for one-time pouring of pier column and inter-pier straining beam

By introducing shock absorber and buffer spring into the formwork installation device for single-use casting between the pier column and the pier beam, combined with the design of hydraulic cylinder and counterweight plate, the problem of instability of formwork installation in the prior art is solved, and the Better buffering effect and stability, and improve the protection and applicability of the device.

CN221956526UActive Publication Date: 2024-11-05SHANXI CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323413784.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-14
Publication Date
2024-11-05
Estimated Expiration
2033-12-14

AI Technical Summary

Technical Problem

The existing formwork installation device for single-use casting between pier columns and pier beams is not convenient to provide good buffering effect in support operations, resulting in shaking and wear of the casting formwork during installation, affecting the use effect.

Method used

A template installation device including a main mechanism and a support mechanism is designed. The main mechanism uses shock absorbers and buffer springs to perform vibration buffering, and improves stability through hydraulic cylinders and counterweight plates. The support mechanism passes through rollers, hydraulic cylinders, and transmission motors. and threaded rods for height adjustment and secure placement.

Benefits of technology

It effectively reduces the shaking and wear of the pouring formwork during installation, improves the protection and stability of the device, enhances the resistance to external factors, and ensures the stability and use effect of the pouring formwork.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221956526U_ABST
    Figure CN221956526U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of pouring formworks, and discloses a formwork installation device for one-time pouring of a pier column and an inter-pier straining beam, the formwork installation device comprises a main body mechanism and a supporting mechanism, the supporting mechanism is located above the main body mechanism, and the main body mechanism comprises a device body, a bearing plate, an installation supporting table and a shock absorber. According to the template mounting device for one-time pouring of the pier column and the inter-pier straining beam, through the mounting main body mechanism, when the device body is used for mounting a template for one-time pouring of the pier column and the inter-pier straining beam, a certain protection effect is provided for the pouring template; through the design of a shock absorber and a buffer spring, vibration generated in the installation process of the pouring formwork and impact force borne by the device body in the using process can be buffered, shaking brought to the pouring formwork is reduced, the stability of the pouring formwork in the installation process is guaranteed, abrasion, caused by the influence of external factors, of the device body to the pouring formwork is reduced, and the service life of the device body is prolonged. And the protection performance of the device body is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of casting templates, in particular to a template installation device for one-time casting of pier columns and tie beams between piers. Background Art

[0002] In the one-time casting construction technology of pier columns and tie beams between piers, the tie beams use pier column formwork as support columns, changing the traditional method of relying on pier support to achieve simultaneous construction of pier column and tie beam concrete. During the installation of the casting formwork for pier columns and tie beams between piers, an installation device is required to support the casting formwork to ensure the stability of the entire formwork.

[0003] The existing patent document of technical disclosure number CN214364956U provides a fixed support frame for casting building formwork. The winch arranged in the utility model can tighten the wire rope to drive the support column to move up quickly so that the fine-adjustment device reaches the support position, thereby meeting the need for rapid adjustment when supporting at different heights; a card block is inserted in the utility model to ensure that the support column will not move down during support, thereby ensuring the stability and reliability of the support; several fine-adjustment devices are arranged to fine-tune the height of different support positions, further improving the support effect; a movable support seat is arranged to be telescopically adjusted according to needs, meeting the needs of supports of different widths and improving the use effect.

[0004] However, the existing installation device is not convenient for providing a good buffering effect for the casting formwork during the support operation of the casting formwork. During the installation operation of the casting formwork, a certain vibration will be generated. When the device body is affected by external factors, it will cause shaking to the casting formwork, which is easy to cause a certain degree of wear to the casting formwork, thereby directly affecting the use effect of the casting formwork. Utility Model Content

[0005] 1. Technical issues to be resolved

[0006] The purpose of the utility model is to provide a formwork installation device for one-time casting of pier columns and tie beams between piers, so as to solve the problem in the above-mentioned background technology that the existing installation device is not convenient for providing a good buffering effect for the casting formwork during the supporting operation of the casting formwork.

[0007] (II) Technical solution

[0008] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a template installation device for one-time pouring of pier columns and tie beams between piers, comprising a main body mechanism and a support mechanism, wherein the support mechanism is located above the main body mechanism, the main body mechanism comprises a device body, a bearing plate, a mounting support platform and a shock absorber, wherein the bearing plate is fixedly mounted above the device body, the mounting support platform is located above the bearing plate, the shock absorber is fixedly mounted on the upper end of the device body, and the bearing plate is located at the upper end of the shock absorber;

[0009] The main mechanism also includes a connecting rod, a fixed rod, a slider and a buffer spring. The connecting rod is fixedly installed at the lower end of the supporting plate, the fixed rod is fixedly installed at the inner end of the device body, the slider is movably installed at the outer end of the fixed rod, the lower end of the connecting rod is fixedly connected to the slider, and the buffer spring is fixedly installed at the left and right ends of the outer end of the fixed rod.

[0010] Preferably, the supporting mechanism includes a roller and a hydraulic cylinder, the roller is fixedly mounted on the lower end of the device body, and the hydraulic cylinder is fixedly mounted on the left and right ends of the device body. The design of the roller improves the convenience of the device body.

[0011] Preferably, the support mechanism also includes an adjusting rod and a counterweight plate, the adjusting rod is fixedly mounted on the transmission end of the lower end of the hydraulic cylinder, and the counterweight plate is fixedly mounted on the lower end of the adjusting rod. The design of the counterweight plate increases the contact area between the device body and the ground.

[0012] Preferably, the support mechanism also includes a support frame and a transmission motor. The support frame is fixedly mounted on the middle of the left and right ends of the upper end of the supporting plate, and the transmission motor is fixedly mounted on the upper end of the inner end of the support frame. The transmission motor is designed to drive the movable nut to move on the threaded rod.

[0013] Preferably, the supporting mechanism also includes a threaded rod and a movable disk, the threaded rod is fixedly mounted on the transmission end of the lower end of the transmission motor, the movable disk is fixedly mounted on the lower end of the inner end of the supporting frame, the lower end of the threaded rod is rotatably connected to the movable disk, and the design of the movable disk provides a supporting effect for the threaded rod.

[0014] Preferably, the supporting mechanism also includes a movable nut, a support plate and a support column, the movable nut is threadedly connected to the outer end of the threaded rod, the support plate is fixedly mounted on the inner end of the movable nut, the support column is fixedly mounted on the upper end of the support plate, and the mounting support platform is located at the upper end of the support column. The movable nut can push the mounting support platform to adjust to a suitable height to support the casting formwork.

[0015] Compared with the prior art, the beneficial effects of the utility model are:

[0016] 1. The installation device for the one-time pouring formwork of the pier column and the tie beam between the piers can provide a certain protection effect for the pouring formwork when the installation operation of the one-time pouring formwork of the pier column and the tie beam between the piers is carried out by installing the main body mechanism. The design of the shock absorber and the buffer spring can buffer the vibration generated during the installation of the pouring formwork and the impact force received by the device body during the use, reduce the shaking of the pouring formwork, ensure the stability of the pouring formwork during the installation process, reduce the wear of the pouring formwork caused by external factors on the device body, and improve the protection of the device body;

[0017] 2. The one-time pouring formwork installation device for the pier column and the tie beam between the piers can realize that when the device body is performing auxiliary operations for formwork installation, the staff can adjust the height of the installation support platform appropriately through operation to meet the installation requirements of the pouring formwork, thereby improving the flexibility and applicability of the device body;

[0018] 3. The one-time casting formwork installation device for pier columns and tie beams between piers is realized by installing a hydraulic cylinder and a counterweight plate. When the device body is performing the installation operation of the one-time casting formwork for pier columns and tie beams between piers, the design of the hydraulic cylinder and the counterweight plate increases the contact area between the device body and the ground, making the placement of the device body more stable, so as to ensure the normal installation operation of the casting formwork and improve the stability of the use of the device body. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 It is a schematic diagram of the three-dimensional structure of the utility model;

[0020] Figure 2 This is a schematic diagram of the cross-sectional structure of the main mechanism of the utility model;

[0021] Figure 3 This is a schematic diagram of the three-dimensional structure of the support mechanism of the utility model;

[0022] Figure 4 It is a schematic diagram of the partial three-dimensional structure of the load-bearing plate of the utility model.

[0023] In the figure: 1. main mechanism; 101. device body; 102. load-bearing plate; 103. mounting support platform; 104. shock absorber; 105. connecting rod; 106. fixing rod; 107. slider; 108. buffer spring; 2. supporting mechanism; 201. roller; 202. hydraulic cylinder; 203. adjusting rod; 204. counterweight plate; 205. supporting frame; 206. transmission motor; 207. threaded rod; 208. movable disk; 209. movable nut; 210. supporting plate; 211. supporting column. DETAILED DESCRIPTION

[0024] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0025] See also Figure 1 - Figure 4 The utility model provides a technical solution: a template installation device for one-time pouring of pier columns and tie beams between piers, comprising a main mechanism 1 and a support mechanism 2, the support mechanism 2 is located above the main mechanism 1, the main mechanism 1 comprises a device body 101, a bearing plate 102, a mounting support platform 103 and a shock absorber 104, the bearing plate 102 is fixedly mounted above the device body 101, the mounting support platform 103 is located above the bearing plate 102, the shock absorber 104 is fixedly mounted on the upper end of the device body 101, and the bearing plate 102 is located at the upper end of the shock absorber 104;

[0026] The main mechanism 1 also includes a connecting rod 105, a fixed rod 106, a slider 107 and a buffer spring 108. The connecting rod 105 is fixedly installed at the lower end of the bearing plate 102, the fixed rod 106 is fixedly installed at the inner end of the device body 101, and the slider 107 is movably installed at the outer end of the fixed rod 106. The lower end of the connecting rod 105 is fixedly connected to the slider 107, and the buffer spring 108 is fixedly installed at the left and right ends of the outer end of the fixed rod 106. During the installation operation of the casting template, a certain amount of shaking will be generated. The shock absorber 104 buffers the longitudinal vibration of the device body 101. The bearing plate 102 is forced to drive the slider 107 to slide on the fixed rod 106, thereby compressing the buffer spring 108. The buffer spring 108 uses its elastic potential energy to buffer the lateral vibration of the device body 101, thereby ensuring the stability of the installation operation of the template for one-time casting of the pier column and the tie beam between the piers.

[0027] The supporting mechanism 2 includes a roller 201 and a hydraulic cylinder 202, the roller 201 is fixedly mounted at the lower end of the device body 101, the hydraulic cylinder 202 is fixedly mounted at the left and right ends of the device body 101, the supporting mechanism 2 also includes an adjusting rod 203 and a counterweight plate 204, the adjusting rod 203 is fixedly mounted on the transmission end of the lower end of the hydraulic cylinder 202, the counterweight plate 204 is fixedly mounted on the lower end of the adjusting rod 203, the supporting mechanism 2 also includes a supporting frame 205 and a transmission motor 206, the supporting frame 205 is fixedly mounted at the middle of the left and right ends of the upper end of the bearing plate 102, the transmission motor 206 is fixedly mounted on the upper end of the inner end of the supporting frame 205, the supporting mechanism 2 also includes a threaded rod 207 and a movable disk 208, the threaded rod 207 is fixedly mounted on the transmission end of the lower end of the transmission motor 206, the movable disk 208 is fixedly mounted on the lower end of the inner end of the supporting frame 205, the lower end of the threaded rod 207 is rotatably connected to the movable disk 208, the supporting mechanism 2 also includes a movable nut 209, a supporting plate 210 and a supporting frame 205. The support column 211 and the movable nut 209 are threadedly connected to the outer end of the threaded rod 207, and the support plate 210 is fixedly installed on the inner end of the movable nut 209. The support column 211 is fixedly installed on the upper end of the support plate 210, and the installation support platform 103 is located at the upper end of the support column 211. When the device body 101 is used to install the template for one-time casting of the pier column and the tie beam between the piers, the staff pushes the device body 101 to drive the roller 201 to rotate and move it to the place where it is needed, then steps on the foot brake to stop the roller 201 from rotating, starts the hydraulic cylinder 202 to push the counterweight plate 204 to fully contact the ground and support it, so that the device body 101 is firmly placed on the ground, and the transmission motor 206 drives the movable nut 209 to move on the screw rod, and the movable nut 209 drives the support plate 210 to move, and the support plate 210 drives the support column 211 to move, so that the installation support platform 103 is adjusted to a suitable height to support the casting template.

[0028] Working principle: When the device body 101 is used to install the formwork for the one-time pouring of the pier column and the tie beam between the piers, the worker pushes the device body 101 to drive the roller 201 to rotate and move it to the place where it is needed, then steps on the foot brake to stop the roller 201 from rotating, starts the hydraulic cylinder 202 to push the counterweight plate 204 to fully contact the ground and support it, so that the device body 101 is firmly placed on the ground, the transmission motor 206 works to drive the movable nut 209 to move on the screw rod, the movable nut 209 drives the support plate 210 to move, and the support plate 210 is moved. 10 drives the support column 211 to move, thereby adjusting the installation support platform 103 to a suitable height to support the casting template. During the installation operation of the casting template, a certain amount of shaking will occur. The shock absorber 104 buffers the longitudinal vibration of the device body 101. The load-bearing plate 102 is forced to drive the slider 107 to slide on the fixed rod 106, thereby compressing the buffer spring 108. The buffer spring 108 uses its elastic potential energy to buffer the lateral vibration of the device body 101, thereby ensuring the stability of the template installation operation for the one-time casting of the pier column and the tie beam between the piers.

[0029] Finally, it should be noted that the above content is only used to illustrate the technical solution of the utility model, rather than to limit the protection scope of the utility model. Simple modifications or equivalent substitutions of the technical solution of the utility model by ordinary technicians in this field do not deviate from the essence and scope of the technical solution of the utility model.

Claims

1. A formwork installation device for one-time pouring of pier columns and tie beams between piers, comprising a main body mechanism (1) and a support mechanism (2), characterized in that: The support mechanism (2) is located above the main mechanism (1); the main mechanism (1) comprises a device body (101), a bearing plate (102), a mounting support platform (103) and a shock absorber (104); the bearing plate (102) is fixedly mounted above the device body (101); the mounting support platform (103) is located above the bearing plate (102); the shock absorber (104) is fixedly mounted on the upper end of the device body (101); and the bearing plate (102) is located at the upper end of the shock absorber (104); The main body mechanism (1) further comprises a linkage rod (105), a fixed rod (106), a slider (107) and a buffer spring (108); the linkage rod (105) is fixedly mounted on the lower end of the carrier plate (102); the fixed rod (106) is fixedly mounted on the inner end of the device body (101); the slider (107) is movably mounted on the outer end of the fixed rod (106); the lower end of the linkage rod (105) is fixedly connected to the slider (107); and the buffer spring (108) is fixedly mounted on the left and right ends of the outer end of the fixed rod (106).

2. A formwork installation device for one-time pouring of pier columns and tie beams between piers according to claim 1, characterized in that: The support mechanism (2) comprises a roller (201) and a hydraulic cylinder (202); the roller (201) is fixedly mounted on the lower end of the device body (101); and the hydraulic cylinder (202) is fixedly mounted on the left and right ends of the device body (101).

3. A formwork installation device for one-time casting of pier columns and tie beams between piers according to claim 2, characterized in that: The support mechanism (2) further comprises an adjusting rod (203) and a counterweight plate (204); the adjusting rod (203) is fixedly mounted on the transmission end at the lower end of the hydraulic cylinder (202); and the counterweight plate (204) is fixedly mounted on the lower end of the adjusting rod (203).

4. A formwork installation device for one-time pouring of pier columns and tie beams between piers according to claim 3, characterized in that: The support mechanism (2) further comprises a support frame (205) and a transmission motor (206); the support frame (205) is fixedly mounted at the middle of the left and right ends of the upper end of the carrier plate (102); and the transmission motor (206) is fixedly mounted at the upper end of the inner end of the support frame (205).

5. A formwork installation device for one-time pouring of pier columns and tie beams between piers according to claim 4, characterized in that: The support mechanism (2) further comprises a threaded rod (207) and a movable disk (208), wherein the threaded rod (207) is fixedly mounted on the transmission end at the lower end of the transmission motor (206), and the movable disk (208) is fixedly mounted on the lower end of the inner end of the support frame (205), and the lower end of the threaded rod (207) is rotatably connected to the movable disk (208).

6. A formwork installation device for one-time casting of pier columns and tie beams between piers according to claim 5, characterized in that: The support mechanism (2) further comprises a movable nut (209), a support plate (210) and a support column (211); the movable nut (209) is threadedly connected to the outer end of the threaded rod (207); the support plate (210) is fixedly mounted on the inner end of the movable nut (209); the support column (211) is fixedly mounted on the upper end of the support plate (210); and the mounting support platform (103) is located at the upper end of the support column (211).