Foundation pit engineering secant pile water seepage prevention structure
By designing a multi-layer anti-seepage structure in the foundation pit project, using the fixing groove and adhesive groove combined with anti-seepage adhesive strips and bolts, the problem of single seepage and waterproofing measures between the bite piles is solved, and the problem of single water seepage and waterproofing measures between the bite piles is achieved. Effective water protection effect.
Patent Information
- Application Number
- CN202420497826.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-14
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2034-03-14
AI Technical Summary
In the waterproof structure of the existing foundation pit project bite pile, water seepage often occurs between the bite piles, and the waterproofing measures are single, which is prone to failure and lead to water seepage.
A multi-layer anti-seepage structure is designed, including setting fitting grooves and adhesive grooves on both sides of the biting pile and pile foundation, and fixing the anti-seepage adhesive strips inside, and fixing the structure with bolts and nuts to ensure multiple The effectiveness of anti-seepage measures.
Effectively prevent water infiltration, avoid water infiltration problems caused by the failure of a single waterproofing measure, and enhance the waterproof performance of the structure.
Smart Images

Figure CN221956765U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of interlocking piles, in particular to an interlocking pile water seepage prevention structure for foundation pit engineering. Background Art
[0002] With the continuous development of cities in my country and the improvement of construction technology, the use of underground space is becoming more and more common, the excavation depth of foundation pits is increasing, and the distance between the side walls of foundation pits and surrounding buildings and structures is getting smaller and smaller. The difficulty of foundation pit construction is increasing, and the problems that need to be solved are also increasing. Interlocking piles are widely used in foundation pit construction because they have both support and water-stopping functions and are cheaper than underground continuous walls. However, due to the weak quality awareness of some construction companies during the construction process, the process control is not strict, or because of the complexity of the site geological conditions, the foundation pit interlocking piles have not played the role of a water-stopping curtain, and water seepage often occurs between the interlocking piles.
[0003] However, in the prior art, it has been found that in the currently used foundation pit engineering interlocking pile anti-seepage structures, some foundation pit interlocking piles do not function as a water-stop curtain, and water seepage often occurs between the interlocking piles. At the same time, some foundation pit engineering interlocking pile anti-seepage structures have only one waterproofing measure, and this anti-seepage measure may fail, thereby causing water infiltration. Utility Model Content
[0004] The purpose of the utility model is to solve the problems existing in the prior art.
[0005] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: an anti-water seepage structure of an interlocking pile in a foundation pit project, comprising: a plurality of interlocking piles, both sides of the plurality of interlocking piles are provided with a fitting groove one, the interiors of the plurality of fitting grooves one are provided with a plurality of adhesive grooves one, the plurality of adhesive grooves one are evenly divided into a plurality of groups, the interiors of the plurality of groups of adhesive grooves one are fixedly connected with an anti-water seepage rubber strip one, and the surfaces of the plurality of anti-water seepage rubber strips one are all in contact with the pile foundation.
[0006] As a preferred embodiment, the surfaces of the multiple bite piles are fixedly connected with four fixing plates one, the surfaces of the multiple fixing plates one are evenly spaced with movable bolt grooves, the interiors of the multiple movable bolt grooves are movably embedded with bolts, and the surfaces of the multiple bolts are threadedly connected with nuts.
[0007] As a preferred embodiment, multiple adhesion grooves 2 are opened on the surfaces of both sides of the multiple pile foundations, and the multiple adhesion grooves 2 are evenly divided into multiple groups, and the interiors of the multiple groups of adhesion grooves 2 are fixedly connected with anti-seepage rubber strips 2.
[0008] As a preferred embodiment, four fixing plates 2 are fixedly connected to the surfaces of the plurality of pile foundations, and a plurality of through holes are equidistantly formed on the surfaces of the plurality of fixing plates 2.
[0009] As a preferred implementation, the surfaces of the plurality of second water-proof rubber strips are attached to one side of the plurality of first water-proof rubber strips.
[0010] As a preferred implementation, the surfaces of the movable bolt grooves are movably embedded in the interiors of the plurality of through holes.
[0011] Compared with the prior art, the advantages and positive effects of the utility model are:
[0012] The utility model reserves a skeleton of the second adhesive groove in advance during the pile foundation construction and pre-buries the second fixing plate before pouring the pile foundation, uses waterproof glue to stick the second water-seepage adhesive strip inside the second adhesive groove, opens a plurality of adhesive grooves on the surfaces of both sides of the bite pile at the same height as the pile foundation, and sticks the first water-seepage adhesive strip with waterproof glue, waits for the pile foundation and the bite pile to be constructed, uses a crane to suspend the bite pile between the two pile foundations, then inserts a plurality of bolts into a plurality of movable bolt grooves and through holes, and installs nuts to fix the bite pile and the pile foundation, after the installation is completed, the surfaces of the first water-seepage adhesive strip and the second water-seepage adhesive strip fit together, which can effectively prevent water from seeping in, and at the same time, the first water-seepage adhesive strip is designed with a plurality of waterproof strips, and the plurality of waterproof strips fit together with the second water-seepage adhesive strip, so that the structure has a plurality of water-seepage anti-measures to avoid water seepage due to failure of a certain measure. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 An overview schematic diagram of the anti-seepage structure of the interlocking piles for foundation pit engineering provided by the utility model;
[0014] Figure 2 A side view of the installation of the interlocking pile water seepage prevention structure for the foundation pit project provided by the utility model;
[0015] Figure 3 A schematic diagram of the interlocking piles of the interlocking pile water seepage prevention structure of the foundation pit engineering provided by the utility model;
[0016] Figure 4 A schematic diagram of the pile foundation of the interlocking pile water seepage prevention structure for the foundation pit engineering provided by the utility model;
[0017] Figure 5 The utility model is a top view of the installation of the interlocking pile anti-seepage structure of the foundation pit engineering provided by the utility model.
[0018] Legend:
[0019] 1. Interlocking pile; 101. One fitting groove; 102. One bonding groove; 103. One waterproof rubber strip; 104. One fixing plate; 105. Movable bolt groove; 106. Bolt; 107. Nut; 2. Pile foundation; 201. Two bonding grooves; 202. Two waterproof rubber strips; 203. Two fixing plates; 204. Through hole. DETAILED DESCRIPTION
[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0021] See also Figure 1-5 The utility model provides a technical solution: an anti-seepage structure of an interlocking pile for foundation pit engineering, comprising: a plurality of interlocking piles 1, both sides of the plurality of interlocking piles 1 are provided with a fitting groove 101, the interiors of the plurality of fitting grooves 101 are provided with a plurality of adhesive grooves 102, the plurality of adhesive grooves 102 are evenly divided into a plurality of groups, the interiors of the plurality of groups of adhesive grooves 102 are fixedly connected with an anti-seepage rubber strip 103, and the surfaces of the plurality of anti-seepage rubber strips 103 are all bonded with pile foundations 2.
[0022] Specifically: waterproof glue is used to stick an anti-seepage strip 202 inside the adhesive groove 201, multiple adhesive grooves 102 are opened on the surfaces of both sides of the bite pile 1 at the same height as the pile foundation 2, and waterproof glue is used to stick an anti-seepage strip 103, the bite pile 1 is suspended between the two pile foundations 2 by a crane, and then multiple bolts 106 are inserted into multiple movable bolt grooves 105 and the inside of the through hole 204, and nuts 107 are installed to fix the bite pile 1 and the pile foundation 2. After the installation is completed, the surface of the anti-seepage strip 103 and the anti-seepage strip 202 are fitted together, which can effectively prevent water infiltration. At the same time, the anti-seepage strip 103 is designed with multiple waterproof strips, and the multiple waterproof strips are fitted with the anti-seepage strip 202. This design enables this structure to have multiple anti-seepage measures to avoid water infiltration due to failure of a certain measure.
[0023] In one embodiment, the surfaces of the multiple bite piles 1 are fixedly connected with four fixing plates 104, the surfaces of the multiple fixing plates 104 are evenly spaced with movable bolt grooves 105, the interiors of the multiple movable bolt grooves 105 are movably embedded with bolts 106, and the surfaces of the multiple bolts 106 are threadedly connected with nuts 107.
[0024] Specifically, the design of the movable bolt groove 105 facilitates the bolt 106 to be inserted into the movable bolt groove 105 , so that the bolt 106 inserted into the movable bolt groove 105 can slide inside the movable bolt groove 105 to the installation position.
[0025] In one embodiment, multiple adhesive grooves 201 are provided on the surfaces of both sides of the multiple pile foundations 2. The multiple adhesive grooves 201 are evenly divided into multiple groups. The interiors of the multiple groups of adhesive grooves 201 are fixedly connected with waterproof rubber strips 202.
[0026] Specifically, waterproof glue is used to stick the second adhesive groove 201 and the second water-proof adhesive strip 202 together. The design of multiple second adhesive grooves 201 provides multiple measures to prevent water from entering, thereby preventing the failure of a certain measure and causing water to enter.
[0027] In one embodiment, four second fixing plates 203 are fixedly connected to the surfaces of the plurality of pile foundations 2 , and a plurality of through holes 204 are equidistantly formed on the surfaces of the plurality of second fixing plates 203 .
[0028] Specifically, the bolt 106 is movably embedded in the through hole 204 and the movable bolt groove 105 and cooperates with the nut 107 to fix the bite pile 1 between the pile foundations 2 to prevent the accidental shaking of the bite pile 1 from affecting the anti-seepage effect of the structure.
[0029] In one embodiment, the surface of the plurality of second water-proof rubber strips 202 is attached to one side of the plurality of first water-proof rubber strips 103 .
[0030] Specific: It can effectively prevent water from penetrating.
[0031] In one embodiment, the surfaces of the movable bolt slots 105 are movably embedded in the interior of the plurality of through holes 204 .
[0032] Specifically: the interlocking pile 1 and the pile foundation 2 are fixed to prevent the accidental shaking of the interlocking pile 1 from affecting the anti-seepage effect of the structure.
[0033] Working principle: When constructing the pile foundation 2, a skeleton of the bonding groove 201 is reserved in advance and a fixing plate 203 is embedded in advance, and then the pile foundation 2 is poured. The waterproof glue is used to stick the anti-seepage adhesive strip 202 inside the bonding groove 201. A plurality of bonding grooves 102 are opened on the surface of both sides of the bite pile 1 at the same height as the pile foundation 2, and the waterproof glue is used to stick the anti-seepage adhesive strip 103. After the construction of the pile foundation 2 and the bite pile 1 is completed, the bite pile 1 is suspended between the two pile foundations 2 by a crane, and then A plurality of bolts 106 extend into a plurality of movable bolt grooves 105 and the interior of the through hole 204, and nuts 107 are installed to fix the interlocking pile 1 and the pile foundation 2. After installation, the surfaces of the anti-seepage rubber strip 103 and the anti-seepage rubber strip 202 fit together, which can effectively prevent water infiltration. At the same time, the anti-seepage rubber strip 103 is designed with a plurality of waterproof strips, and the plurality of waterproof strips fit together with the anti-seepage rubber strip 202. This design enables the structure to have a plurality of anti-seepage measures to avoid water infiltration due to failure of a certain measure.
[0034] The above description is only a preferred embodiment of the present invention and does not limit the present invention in other forms. Any technician familiar with the profession may use the technical content disclosed above to change or modify it into an equivalent embodiment with equivalent changes and apply it to other fields. However, any simple modification, equivalent change and modification made to the above embodiment based on the technical essence of the present invention without departing from the content of the technical solution of the present invention still falls within the protection scope of the technical solution of the present invention.
Claims
1. The anti-seepage structure of the interlocking pile in foundation pit engineering is characterized by: include: A plurality of interlocking piles (1), both sides of the plurality of interlocking piles (1) are provided with a fitting groove (101), the interior of the plurality of fitting grooves (101) is provided with a plurality of adhesive grooves (102), the plurality of adhesive grooves (102) are evenly divided into a plurality of groups, the interior of the plurality of groups of adhesive grooves (102) are fixedly connected with an anti-seepage rubber strip (103), and the surfaces of the plurality of anti-seepage rubber strips (103) are all in contact with the pile foundation (2).
2. The anti-seepage structure of the interlocking piles for foundation pit engineering according to claim 1 is characterized by: The surfaces of the plurality of engaging piles (1) are fixedly connected with four fixing plates (104), the surfaces of the plurality of fixing plates (104) are evenly spaced with movable bolt grooves (105), the interiors of the plurality of movable bolt grooves (105) are movably embedded with bolts (106), and the surfaces of the plurality of bolts (106) are threadedly connected with nuts (107).
3. The anti-seepage structure of the interlocking piles for foundation pit engineering according to claim 1 is characterized by: A plurality of adhesive grooves 2 (201) are provided on the surfaces of both sides of the plurality of pile foundations (2), and the plurality of adhesive grooves 2 (201) are evenly divided into a plurality of groups, and the interiors of the plurality of groups of adhesive grooves 2 (201) are fixedly connected with waterproof rubber strips 2 (202).
4. The anti-seepage structure of the interlocking piles for foundation pit engineering according to claim 1 is characterized by: Four fixing plates (203) are fixedly connected to the surfaces of the plurality of pile foundations (2), and a plurality of through holes (204) are equidistantly provided on the surfaces of the plurality of fixing plates (203).
5. The anti-seepage structure of the interlocking piles in foundation pit engineering according to claim 3 is characterized by: The surfaces of the plurality of water-proof rubber strips 2 (202) are attached to one side of the plurality of water-proof rubber strips 1 (103).
6. The anti-seepage structure of the interlocking piles in foundation pit engineering according to claim 2 is characterized by: The surfaces of the movable bolt grooves (105) are movably embedded in the interior of the plurality of through holes (204).