Wall protection plate structure with drainage function
Through the joint structure of non-excavated foot protection wall and drainage ditch, the splicing and assembly of foot protection wall-mounted wall-mounted pile members and drainage ditch components is solved, and the high cost and resource consumption of traditional construction methods are achieved, low-carbon, environmental protection and rapid construction are achieved effect.
Patent Information
- Application Number
- CN202420271591.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-04
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2034-02-04
AI Technical Summary
The construction of traditional foot protection walls and drainage ditches requires excavation of foundation troughs, which are costly and costly, and are difficult to construct in adjacent water areas, which affects environmental protection and engineering efficiency.
A non-excavated joint structure of foot protection wall and drainage ditch is designed. Through the splicing of foot protection wall panel pile members and the combination of drainage ditch members, a connected drainage hole is formed to achieve rapid construction and save land.
It has achieved low carbon and environmental protection, rapid construction, land occupation and reduced project costs, simplified construction processes, and is suitable for a variety of terrain and slopes.
Smart Images

Figure CN221956780U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of roadbed drainage, in particular to a wall panel structure with drainage. Background Art
[0002] A retaining wall is a retaining wall located at the foot of the slope of the fill embankment. The function of the retaining wall is to shrink the slope foot or prevent water erosion. On the one hand, traditional retaining walls and drainage ditches require excavation of foundation trenches or site leveling, and they are often not directly constructed near ditches and ponds. On the other hand, traditional retaining walls and drainage ditches are often cast or prefabricated with concrete materials, which not only has many processes, high costs, and high carbon emissions, but also consumes a lot of resources and is not conducive to environmental protection. In addition, there is a berm between the traditional retaining wall and the drainage ditch, which requires land requisition and increases the cost of the project. Therefore, it is necessary to design a non-excavation, universal, economical and environmentally friendly combined structure of retaining walls and drainage ditches to solve the above problems. Utility Model Content
[0003] The utility model aims to provide a combined structure of a footing wall and a drainage ditch which is trenchless, low-carbon and environmentally friendly, saves land, has rapid construction, is simple in structure, and is stable and reliable.
[0004] In order to achieve the above-mentioned utility model purpose, the utility model adopts the following technical solutions:
[0005] A wall panel structure with drainage, with slope protection on the left and right sides of the roadbed, and a footing wall at the foot of the slope protection, the footing wall is driven into the foundation, and a drainage ditch is arranged outside the footing wall;
[0006] Specifically, the skirting wall is formed by splicing skirting wall sheet pile components, and the skirting wall sheet pile components include a first plate provided with a splicing groove, a second plate as a plug plate, and a third plate protruding outwardly between the first plate and the second plate, the second plate of the skirting wall sheet pile component is plugged and assembled with the splicing groove of the first plate of the adjacent skirting wall sheet pile component, the front of the third plate is provided with a skirting wall sheet pile component drainage hole, and the top is provided with a card slot;
[0007] The drainage ditch is formed by splicing drainage ditch components. The drainage ditch component is a water collecting trough, the bottom of the trough is a plane, and guard plates are arranged on both sides. A hanging plate is arranged on the guard plate on one side, and drainage holes of the drainage ditch component are arranged on the hanging plate. The hanging plate is buckled on the top of the third plate and clamped in the clamping groove. A drainage ditch component splicing protrusion protruding downward is arranged on one side of the drainage ditch component, and a drainage ditch component splicing slot is arranged on the other side. The drainage ditch component splicing protrusion of the drainage ditch component is plugged and assembled with the drainage ditch component splicing slot of the adjacent drainage ditch component.
[0008] The drainage holes formed by combining the drainage ditch component and the baseboard sheet pile component are interconnected.
[0009] Further technology of the utility model:
[0010] Preferably, the top surface of the hanging plate is flush with the top surface of the third plate.
[0011] Preferably, the drainage ditch component and the baseboard sheet pile component are vertical as a whole.
[0012] Preferably, both ends of the gutter component guard plate are provided with platforms extending outward, the gutter component splicing protrusion is arranged below one side platform, the gutter component splicing slot is arranged on the side of the other side platform, the two side platforms and the guard plate form a C-shaped groove, and the third plate is clamped in the C-shaped groove.
[0013] The beneficial effects of the utility model are:
[0014] The combined structure involved in the utility model is not only simple in structure and easy to construct, but also can reduce land acquisition, be economical and environmentally friendly. By driving footing wall sheet pile components into corresponding positions on the slope of the fill embankment to splice them into a footing wall, and then fixing drainage ditch components on the footing wall sheet pile components, it can be quickly assembled into a guard wall panel structure with drainage according to the actual situation of the project, which can achieve the effects of saving construction period, reducing the scope of land acquisition, etc., and has good economic and technical benefits. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0016] Figure 1 This is a rendering of a wainscoting structure with drainage;
[0017] Figure 2 This is the splicing diagram of the sheet pile components of the footing wall;
[0018] Figure 3 This is the splicing diagram of the drainage ditch components;
[0019] Figure 4 Combination drawing of drainage ditch components and toe wall sheet pile components
[0020] In the figure: 1. drainage ditch; 1-1. drainage ditch component; 1-1-1. splicing protrusion of drainage ditch component; 1-1-2. drainage hole of drainage ditch component; 1-1-3. hanging plate; 1-1-4. splicing slot of drainage ditch component; 1-2-1. guard plate; 1-2-2. platform; 2. foundation; 3. footing wall; 3-1. footing wall sheet pile component; 3-1-1. splicing groove; 3-1-2. drainage hole of footing wall sheet pile component; 3-2-1. first plate; 3-2-2. second plate; 3-2-3. third plate; 3-2-4. slot; 4. roadbed; 5. slope protection; 6. drainage hole. DETAILED DESCRIPTION
[0021] In order to make the purpose, technical solution and advantages of the embodiment of the utility model clearer, the technical solution in the embodiment of the utility model will be further described in detail below in conjunction with the drawings in the embodiment of the utility model. Obviously, the described embodiment is a part of the embodiment of the utility model but not all. Based on the embodiment of the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.
[0022] It should be noted that the words “left”, “right”, “upper” and “lower” used in the following description refer to directions in the drawings.
[0023] like Figure 1-4 Embodiment 1, a wall panel structure with drainage, comprises a roadbed 4, a toe wall 3 and a drainage ditch 1, the left and right sides of the roadbed 4 are provided with slope protection 5, and the toe wall 3 is provided at the foot of the slope protection 5.
[0024] The footing wall 3 is formed by splicing footing wall sheet pile components 3-1, and the footing wall sheet pile components include a first plate 3-2-1 with a splicing groove 3-1-1, a second plate 3-2-2 as a plug plate, and a third plate 3-2-3 protruding outwards between the first plate 3-2-1 and the second plate 3-2-2. The second plate 3-2-2 of the footing wall sheet pile component 3-1 is plugged and assembled with the splicing groove 3-1-1 of the first plate 3-2-1 of the adjacent footing wall sheet pile component 3-1. The third plate 3-2-3 is provided with a footing wall sheet pile component drainage hole 3-1-2 on the front side, and a card slot 3-2-4 on the top;
[0025] It should be noted that the third plate in the baseboard sheet pile component of this embodiment is located in the middle and protrudes outwards, and the overall shape is Compared with flat wall panels, it is more resistant to bending and has a better supporting effect on slope protection.
[0026] The drainage ditch 1 is formed by splicing drainage ditch components 1-1, and the drainage ditch component 1-1 is a water collecting trough with a flat bottom and guard plates 1-2-1 on both sides, wherein a hanging plate 1-1-3 is provided on the guard plate 1-2-1 on one side, and a drainage ditch component drainage hole 1-1-2 is provided on the hanging plate 1-1-3, and the hanging plate 1-1-3 is hooked on the top of the third plate 3-2-3 and stuck in the slot 3-2-4, and a downwardly protruding drainage ditch component splicing protrusion 1-1-1 is provided on one side of the drainage ditch component 1-1, and a drainage ditch component splicing slot 1-1-4 is provided on the other side, and the drainage ditch component splicing protrusion 1-1-1 of the drainage ditch component 1-1 is plugged and assembled with the drainage ditch component splicing slot 1-1-4 of the adjacent drainage ditch component 1-1.
[0027] In this embodiment, after the adjacent drainage ditch components are assembled, the bottom of the water collecting trough is flush, which does not affect the drainage.
[0028] The drainage holes 6 formed by combining the drainage ditch component 1-1 and the toe wall pile component 3-1 are interconnected.
[0029] The top surface of the hanging plate 1-1-3 is flush with the top surface of the third plate 3-2-3.
[0030] The drainage ditch component 1-1 and the toe wall sheet pile component 3-1 are vertical as a whole.
[0031] The gutter component 1-1 and the guard plate 1-2-1 are provided with outwardly extending platforms 1-2-2 at both ends, the gutter component splicing protrusion 1-1-1 is arranged below the platform 1-2-2 on one side, and the gutter component splicing slot 1-1-4 is arranged on the side of the platform 1-2-2 on the other side. The platforms on both sides and the guard plate form a C-shaped groove, and the third plate 3-2-3 is stuck in the C-shaped groove.
[0032] The above structure can achieve full fit between one side of the drainage ditch component 1-1 and the toe wall sheet pile component 3-1, with a tighter fit and a compact structure, and they can stabilize the structure.
[0033] The wall panel structure with drainage is not only suitable for embankment slopes, but also suitable for excavation section slopes, and the drainage ditch can be suspended in low-lying areas.
[0034] The utility model also provides a construction method of a wall panel structure with drainage, and the main steps of the construction method are as follows:
[0035] 1) According to the drainage system designed along the roadbed 4, determine the number of toe wall sheet pile components 3-1 and drainage ditch components 1-1 required for each section and the component installation elevation.
[0036] 2) Measure and lay out, construct the roadbed 4 according to the design requirements, fill and compact in layers to 1 meter above the design elevation of the top of the guardrail 3, drive the guardrail sheet pile components 3-1 into the designed positions of the slopes on both sides of the roadbed 4, and splice them into the guardrail 3 through the splicing grooves 3-1-1.
[0037] 3) Fill in layers and compact to the designed elevation of the top surface of roadbed 4.
[0038] 4) The drainage ditch component 1-1 is fixed to the footing sheet pile component 3-1 through the drainage ditch component hanging plate 1-1-3, and at the same time, it is ensured that the drainage hole 1-1-2 of the drainage ditch component is in a connected state after being combined with the drainage hole 3-1-2 of the footing sheet pile component. The drainage ditch components 1-1 are spliced into the drainage ditch 1 through the drainage ditch component splicing protrusion 1-1-1 and the drainage ditch component splicing slot 1-1-4. The spliced drainage ditch 1 can be directly placed on the leveled road surface, or it can be set to a suspended state according to the actual terrain conditions.
[0039] 5) Build slope protection 5 on the slopes on both sides of the roadbed 4, and the bottom of the slope protection 5 is connected to the top of the footing wall 3.
[0040] The above contents are merely examples and explanations of the structure of the utility model. The technicians in this technical field may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the structure of the utility model or exceed the scope defined in the claims, they should all fall within the protection scope of the utility model.
Claims
1. A wall panel structure with drainage, characterized in that: Retaining walls are provided on the slopes on the left and right sides of the roadbed, and a retaining wall is provided at the foot of the retaining wall. The retaining wall is driven into the foundation, and a drainage ditch is provided outside the retaining wall. Specifically, the skirting wall is formed by splicing skirting wall sheet pile components, and the skirting wall sheet pile components include a first plate provided with a splicing groove, a second plate as a plug plate, and a third plate protruding outwardly between the first plate and the second plate, the second plate of the skirting wall sheet pile component is plugged and assembled with the splicing groove of the first plate of the adjacent skirting wall sheet pile component, the front of the third plate is provided with a skirting wall sheet pile component drainage hole, and the top is provided with a card slot; The drainage ditch is formed by splicing drainage ditch components. The drainage ditch component is a water collecting trough, the bottom of the trough is a plane, and guard plates are arranged on both sides. A hanging plate is arranged on the guard plate on one side, and drainage holes of the drainage ditch component are arranged on the hanging plate. The hanging plate is buckled on the top of the third plate and clamped in the clamping groove. A drainage ditch component splicing protrusion protruding downward is arranged on one side of the drainage ditch component, and a drainage ditch component splicing slot is arranged on the other side. The drainage ditch component splicing protrusion of the drainage ditch component is plugged and assembled with the drainage ditch component splicing slot of the adjacent drainage ditch component. The drainage holes formed by combining the drainage ditch component and the baseboard sheet pile component are interconnected.
2. A wall panel structure with drainage according to claim 1, characterized in that: The top surface of the hanging plate is flush with the top surface of the third plate.
3. A wall panel structure with drainage according to claim 1, characterized in that: The drainage ditch component and the toe wall sheet pile component are vertical as a whole.
4. A wall panel structure with drainage according to claim 1, characterized in that: Both ends of the gutter component guard plate are provided with platforms extending outward, the gutter component splicing protrusion is arranged below one side platform, and the gutter component splicing slot is arranged on the side of the other side platform. The two side platforms and the guard plate form a C-shaped groove, and the third plate is clamped in the C-shaped groove.