Conveying platform for steel drum production

By designing a conveying platform with convex rails, racks and hydraulic cylinders, the problems of pickling and phosphating and drying unevenness caused by the non-rotation of the conveying steel barrels in the prior art are solved, and the rotation and rotation of the steel barrels during transmission are realized. The uniform action reduces the length and energy consumption of the production line and optimizes the site space.

CN221970610UActive Publication Date: 2024-11-08XINJIANG QIANCANG BUSINESS MANAGEMENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420120517.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-18
Publication Date
2024-11-08
Estimated Expiration
2034-01-18

AI Technical Summary

Technical Problem

The conveying platform in the existing steel drum production adopts chain or roller method, which causes the steel drum to fail to fully act in certain parts during pickling, phosphating or drying, resulting in a long production line, high energy consumption and excessive site space.

Method used

A conveying platform including a shell, a walking rotating platform, a lifting platform and a pushing platform is designed. Through the combination of convex rails, racks, guide rails and hydraulic cylinders, the rotation and movement of the steel barrel during transportation is realized, ensuring that all parts are in Pickling and phosphating or drying can be fully applied, reducing energy consumption and space consumption.

Benefits of technology

The rotation of the steel barrel during transmission is realized, ensuring that all parts can be fully applied in time during pickling, phosphating or drying, reducing the length and energy consumption of the production line, and optimizing the use of the site space.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221970610U_ABST
    Figure CN221970610U_ABST
Patent Text Reader

Abstract

The conveying platform for steel drum production comprises a shell, a walking rotating platform, a lifting platform, a first pushing platform and a second pushing platform, the shell is of a hollow structure with the two ends open, a protruding rail is arranged on the central axis of the upper end of the shell, racks are fixedly installed on the two sides of the protruding rail respectively, and the first pushing platform and the second pushing platform are arranged on the shell. A first guide rail base is fixedly installed on a bottom plate of an inner cavity of the shell, paired first guide rails are fixedly installed on the two sides of the first guide rail base respectively, the paired first guide rails correspond to the two sides of the protruding rail, and the walking rotating platform comprises a base, a gear and a rotating table; the lifting platform has the advantages that the paired first guide rails are fixedly mounted on the two sides of the first guide rail seat respectively, the lifting platforms are mounted at the front end and the rear end of the shell respectively, and the second guide rails on the lifting platforms correspond to the first guide rails; the lifting platform organically integrates the upper end of the shell and the walking rotating platform on the bottom plate of the inner cavity of the shell into a circulation system, and circulation of the walking rotating platform on the shell is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of oil drum production, in particular to the technical field of a conveying platform for steel drum production. Background Art

[0002] With the development of society, people's demand for various oil products continues to increase, resulting in the need for a large number of barrels to assist in the production, storage and transportation of various oil products. The production of oil barrels requires multiple processes such as stamping, welding, pickling and phosphating, drying and painting. Among them, the barrel body and barrel cover are stamped out of steel coils.

[0003] Usually, steel drums are transported by chains or rollers during production. During this type of transportation, the steel drums are stationary relative to the chains or rollers. This may result in some parts of the steel drums not being fully affected during pickling, phosphating or drying. Therefore, the production lines for pickling, phosphating and drying processes are generally longer, consume more energy, and occupy too much site space. Utility Model Content

[0004] In order to solve the above technical problems, the utility model provides a conveying platform for steel drum production, which realizes that the steel drum itself rotates during conveying, so that all parts of the steel drum can be fully acted on in time during pickling, phosphating or drying, and reduces energy consumption and site space.

[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0006] The conveying platform for steel drum production includes a shell, a walking and rotating platform, a lifting platform, a first pushing platform and a second pushing platform. The shell is a hollow structure with openings at both ends. A convex rail is arranged on the central axis of the upper end of the shell, and racks are fixedly installed on both sides of the convex rail. A first guide rail seat is fixedly installed on the bottom plate of the inner cavity of the shell, and a pair of first guide rails are fixedly installed on both sides of the first guide rail seat, and the pair of first guide rails correspond to the two sides of the convex rail. The walking and rotating platform includes a base, a gear and a rotating table. A step protrusion corresponding to the convex rail is arranged in the middle of the base, and a pair of through grooves are opened on the two side walls of the step protrusion. A pair of first walking wheels are respectively arranged on both sides of the lower end of the base, and the first walking wheels correspond to the first guide rails. The paired gears are rotatably installed on the bases on both sides of the step protrusion, and the rotating table is fixedly installed on the upper end surface of the gear via a rotating shaft.

[0007] The walking rotating platforms are arranged in rows on the upper end of the shell and the bottom plate of the inner cavity of the shell, respectively. The gears of the walking rotating platforms on the upper end of the shell respectively pass through the through slots and mesh with the rack transmission. The first walking wheel of the walking rotating platform on the bottom plate of the inner cavity of the shell rolls on the first guide rail.

[0008] The lifting platform includes a bottom plate, a second guide rail seat and a first hydraulic cylinder. A pair of telescopic guide columns are fixedly mounted on the bottom plate. The second guide rail seat is fixedly mounted on the pair of telescopic guide columns. A pair of second guide rails are fixedly mounted on the second guide rail seat. The first hydraulic cylinder is fixedly mounted on the bottom plate. The telescopic rod of the first hydraulic cylinder is fixedly connected to the second guide rail seat. The pair of lifting platforms are respectively mounted on the front and rear ends of the shell. The second guide rail corresponds to the first guide rail.

[0009] The first pushing platform includes a first base, a push rod and a second hydraulic cylinder. A pair of third guide rails are fixedly installed on the first base, and the third guide rails correspond to the second guide rails. The push rod is movably installed on the third guide rails via the second walking wheel. The second hydraulic cylinder is fixedly installed on the right end of the first base. The telescopic rod of the second hydraulic cylinder is fixedly connected to the push rod. The first pushing platform is fixedly installed on the right end of the lifting platform on the right side, and the third guide rails correspond to the top plate of the shell.

[0010] The second pushing platform includes a third hydraulic cylinder, a second base and a fourth guide rail. The third hydraulic cylinder is fixedly installed on the left end of the second base. A second push rod is fixedly installed on the telescopic rod of the third hydraulic cylinder. A third walking wheel corresponding to the fourth guide rail is provided at the lower end of the second push rod. The fourth guide rail is fixedly installed on the second base and corresponds to the first guide rail. The second push rod is movably installed on the fourth guide rail via the third walking wheel. The second pushing platform is fixedly installed on the left end of the lifting platform on the left side.

[0011] Preferably, a push head is provided at the front end of the push rod, and the push head corresponds to the base.

[0012] Preferably, the rotating platform is located above the raised rail.

[0013] The beneficial effects that can be achieved by the utility model using the above technical solution are:

[0014] 1. Racks are fixedly installed on both sides of the convex rail, and the walking rotating platform is movably installed on the shell through the first walking wheel, and the gears at the lower end of the rotating table pass through the through grooves and mesh with the rack transmission. When the walking rotating platform moves on the shell, the gears at the lower end of the rotating table rotate under the action of the racks on both sides of the convex rail, thereby driving the rotating table to rotate on the base. The steel drum is placed on the rotating table, so that the steel drum itself rotates during transportation, and all parts of the steel drum can be fully affected in time during pickling, phosphating or drying.

[0015] 2. By fixing a pair of first guide rails on both sides of the first guide rail seat, the lifting platform is respectively installed at the front and rear ends of the shell, and the second guide rail on the lifting platform corresponds to the first guide rail. The lifting platform organically integrates the walking and rotating platform on the upper end of the shell and the bottom plate of the shell inner cavity into a circulation system, realizing the circulation of the walking and rotating platform on the shell.

[0016] 3. By fixing the first pushing platform on the right end of the lifting platform on the right side, and the third guide rail corresponding to the top plate of the shell, and the second pushing platform fixedly installed on the left end of the lifting platform on the left side and corresponding to the first guide rail, power is provided to the walking and rotating platforms on the upper end of the shell and the bottom plate of the inner cavity of the shell respectively, thereby realizing the movement of the walking and rotating platforms on the upper end of the shell and the bottom plate of the inner cavity of the shell. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic diagram of the structure of the utility model;

[0018] Figure 2 This is a schematic diagram of the structure of the shell part in the utility model;

[0019] Figure 3 This is a schematic diagram of the structure of the walking rotating platform in the utility model;

[0020] Figure 4 This is a structural schematic diagram of the lifting platform in the utility model;

[0021] Figure 5 It is a structural schematic diagram of the first pushing platform in the utility model.

[0022] 1. Shell; 2. Convex rail; 3. Rack; 4. First guide rail seat; 5. First guide rail; 6. Traveling and rotating platform; 7. Base; 8. Step protrusion; 9. Through groove; 10. First travel wheel; 11. Gear; 12. Rotating table; 13. Rotating shaft; 14. Lifting platform; 15. Bottom plate; 16. Telescopic guide column; 17. Second guide rail seat; 18. Second guide rail; 19. First hydraulic cylinder; 20. First pushing platform; 21. First base; 22. Third guide rail; 23. Push rod; 24. Second travel wheel; 25. Second hydraulic cylinder; 26. Second pushing platform; 27. Third hydraulic cylinder; 28. Second base; 29. ​​Fourth guide rail; 30. Push head; 31. Second push rod. DETAILED DESCRIPTION

[0023] Example reference Figure 1-5As shown, the utility model provides a conveying platform for steel drum production, including a shell 1, a walking and rotating platform 6, a lifting platform 14, a first pushing platform 20 and a second pushing platform 26. The shell 1 is a hollow structure with openings at both ends. A convex rail 2 is arranged on the central axis of the upper end of the shell 1. Racks 3 are fixedly installed on both sides of the convex rail 2. A first guide rail seat 4 is fixedly installed on the bottom plate of the inner cavity of the shell 1. A pair of first guide rails 5 are fixedly installed on both sides of the first guide rail seat 4. The pair of first guide rails 5 correspond to the two sides of the convex rail 2. The walking rotating platform 6 includes a base 7, a gear 11 and a rotating table 12. A step protrusion 8 corresponding to the convex rail 2 is provided in the middle of the base 7. A pair of through grooves 9 are provided on the two side walls of the step protrusion 8. A pair of first walking wheels 10 are respectively provided on both sides of the lower end of the base 7. The first walking wheels 10 correspond to the first guide rail 5. The paired gears 11 are rotatably mounted on the base 7 on both sides of the step protrusion 8. The rotating table 12 is fixedly mounted on the upper end surface of the gear 11 via a rotating shaft 13. The rotating table 12 is located above the convex rail 2.

[0024] The walking rotating platform 6 is arranged in a row on the upper end of the shell 1 and the bottom plate of the inner cavity of the shell 1. The gears 11 of the walking rotating platform 6 at the upper end of the shell 1 pass through the through slots 9 and are meshed with the rack 3. The first walking wheel 10 of the walking rotating platform 6 located on the bottom plate of the inner cavity of the shell 1 is rolled on the first guide rail 5.

[0025] The lifting platform 14 includes a bottom plate 15, a second guide rail seat 17 and a first hydraulic cylinder 19. A pair of telescopic guide columns 16 are fixedly mounted on the bottom plate 15. The second guide rail seat 17 is fixedly mounted on the pair of telescopic guide columns 16. A pair of second guide rails 18 are fixedly mounted on the second guide rail seat 17. The first hydraulic cylinder 19 is fixedly mounted on the bottom plate 15. The telescopic rod of the first hydraulic cylinder 19 is fixedly connected to the second guide rail seat 17. The pair of lifting platforms 14 are respectively mounted at the front and rear ends of the housing 1. The second guide rail 18 corresponds to the first guide rail 5.

[0026] The first pushing platform 20 includes a first base 21, a push rod 23 and a second hydraulic cylinder 25. A pair of third guide rails 22 are fixedly installed on the first base 21, and the third guide rails 22 correspond to the second guide rails 18. The push rod 23 is movably installed on the third guide rails 22 via the second walking wheel 24. The second hydraulic cylinder 25 is fixedly installed on the right end of the first base 21. The telescopic rod of the second hydraulic cylinder 25 is fixedly connected to the push rod 23. The first pushing platform 20 is fixedly installed on the right end of the lifting platform 14 on the right side, and the third guide rail 22 corresponds to the top plate of the shell 1. A push head 30 is provided at the front end of the push rod 23, and the push head 30 corresponds to the base 7.

[0027] The second pushing platform 26 includes a third hydraulic cylinder 27, a second base 28 and a fourth guide rail 29. The third hydraulic cylinder 27 is fixedly mounted on the left end of the second base 28. A second push rod 31 is fixedly mounted on the telescopic rod of the third hydraulic cylinder 27. A third walking wheel corresponding to the fourth guide rail 29 is provided at the lower end of the second push rod 31. The fourth guide rail 29 is fixedly mounted on the second base 28 and corresponds to the first guide rail 5. The second push rod 31 is movably mounted on the fourth guide rail 29 via the third walking wheel. The second pushing platform 26 is fixedly mounted on the left end of the lifting platform 14 on the left side.

[0028] Working principle: The upper end of the shell 1 and the first guide rail 5 inside the shell 1 are covered with walking and rotating platforms 6, and a walking and rotating platform 6 is placed on the lifting platform 14 on the right. The lifting platforms 14 on the left and the lifting platforms 14 on the right rise to correspond to the convex rail 2 on the upper end of the shell 1. When starting work, the oil barrels are placed on the rotating table 12 respectively, and the second hydraulic cylinder 25 pushes the walking and rotating platform 6 on the lifting platform 14 on the right to move slowly to the left. At this time, the leftmost walking and rotating platform 6 on the upper end of the shell 1 is synchronously moved to the lifting platform 14 on the left. When the travel of one walking and rotating platform 6 ends, the leftmost walking and rotating platform 6 is moved to the left side. The oil barrel on the side is taken down, the second hydraulic cylinder 25 retreats, the lifting platform 14 on the left and the lifting platform 14 on the right descend at the same time, the third hydraulic cylinder 27 slowly pushes the walking and rotating platform 6 on the left lifting platform 14 after taking the barrel to the left, and the rightmost walking and rotating platform 6 on the first guide rail 5 is moved to the lifting platform 14 on the right, and the lifting platform 14 on the left and the lifting platform 14 on the right rise and return to the initial position synchronously, so that the steel barrel is also rotating during transportation, and all parts of the steel barrel can be fully acted on in time during pickling, phosphating and drying, and energy consumption and site space are reduced.

Claims

1. The conveying platform for steel drum production is characterized by: The invention comprises a shell (1), a walking and rotating platform (6), a lifting platform (14), a first pushing platform (20) and a second pushing platform (26); the shell (1) is a hollow structure with openings at both ends; a convex rail (2) is arranged on the central axis of the upper end of the shell (1); racks (3) are fixedly mounted on both sides of the convex rail (2); a first guide rail seat (4) is fixedly mounted on the bottom plate of the inner cavity of the shell (1); a pair of first guide rails (5) are fixedly mounted on both sides of the first guide rail seat (4); the pair of first guide rails (5) correspond to both sides of the convex rail (2); the walking and rotating platform ( 6) comprises a base (7), a gear (11) and a rotating table (12), wherein a step protrusion (8) corresponding to the convex rail (2) is provided in the middle of the base (7), and a pair of through grooves (9) are provided on the two side walls of the step protrusion (8), and a pair of first running wheels (10) are respectively provided on the two sides of the lower end of the base (7), and the first running wheels (10) correspond to the first guide rail (5), and the paired gears (11) are respectively rotatably mounted on the base (7) on both sides of the step protrusion (8), and the rotating table (12) is fixedly mounted on the upper end surface of the gear (11) via a rotating shaft (13). The walking rotating platforms (6) are arranged in a row on the upper end of the shell (1) and on the bottom plate of the inner cavity of the shell (1), respectively; the gears (11) of the walking rotating platforms (6) located on the upper end of the shell (1) respectively pass through the through slots (9) and are meshed with the racks (3) for transmission; the first walking wheels (10) of the walking rotating platforms (6) located on the bottom plate of the inner cavity of the shell (1) are rolled and placed on the first guide rail (5); The lifting platform (14) comprises a base plate (15), a second guide rail seat (17) and a first hydraulic cylinder (19); a pair of telescopic guide columns (16) are fixedly mounted on the base plate (15); the second guide rail seat (17) is fixedly mounted on the pair of telescopic guide columns (16); a pair of second guide rails (18) are fixedly mounted on the second guide rail seat (17); the first hydraulic cylinder (19) is fixedly mounted on the base plate (15); a telescopic rod of the first hydraulic cylinder (19) is fixedly connected to the second guide rail seat (17); the pair of lifting platforms (14) are respectively mounted at the front and rear ends of the housing (1); the second guide rail (18) corresponds to the first guide rail (5); The first pushing platform (20) comprises a first base (21), a push rod (23) and a second hydraulic cylinder (25); a pair of third guide rails (22) are fixedly mounted on the first base (21); the third guide rails (22) correspond to the second guide rails (18); the push rod (23) is movably mounted on the third guide rails (22) via second walking wheels (24); the second hydraulic cylinder (25) is fixedly mounted on the right end of the first base (21); the telescopic rod of the second hydraulic cylinder (25) is fixedly connected to the push rod (23); the first pushing platform (20) is fixedly mounted on the right end of the lifting platform (14) on the right side; and the third guide rails (22) correspond to the top plate of the housing (1); The second pushing platform (26) comprises a third hydraulic cylinder (27), a second base (28) and a fourth guide rail (29); the third hydraulic cylinder (27) is fixedly mounted on the left end of the second base (28); a second push rod (31) is fixedly mounted on the telescopic rod of the third hydraulic cylinder (27); a third travel wheel corresponding to the fourth guide rail (29) is arranged at the lower end of the second push rod (31); the fourth guide rail (29) is fixedly mounted on the second base (28) and corresponds to the first guide rail (5); the second push rod (31) is movably mounted on the fourth guide rail (29) via the third travel wheel; and the second pushing platform (26) is fixedly mounted on the left end of the lifting platform (14) on the left side.

2. The conveying platform for steel drum production according to claim 1 is characterized in that: A push head (30) is provided at the front end of the push rod (23), and the push head (30) corresponds to the base (7).

3. The conveying platform for steel drum production according to claim 1 or 2, characterized in that: The rotating platform (12) is located above the convex rail (2).