Fence for water conservancy project
By designing a hydraulic engineering fence with a collection box, sensors, and controllers, the problem of excessive stress on the fence caused by the accumulation of floating debris was solved, enabling timely cleaning and improved stability.
Patent Information
- Application Number
- CN202420587173.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-25
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2034-03-25
AI Technical Summary
Existing water conservancy project fences are prone to excessive stress when floating debris and garbage accumulate, which may lead to damage, and there is a lack of effective warning mechanisms for timely cleaning.
A hydraulic engineering fence was designed, comprising first and second frames, a collection frame, a tension spring, a guide plate, a displacement sensor, and a controller. The fence uses sensors and a controller to alert workers to clean up the garbage by detecting the rotation caused by the accumulation of floating debris and the descent of the collection frame, thus preventing excessive stress on the frame.
This effectively prevents the fence from being subjected to excessive stress due to too much floating debris, reducing the risk of damage. The timely cleaning mechanism also improves the stability and service life of the fence.
Smart Images

Figure CN221972299U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of water conservancy projects, in particular to a water conservancy project fence. Background Art
[0002] Water conservancy projects are projects built to control and allocate natural surface water and groundwater to achieve the purpose of eliminating harm and promoting benefits. Fences are devices used to intercept waste in water in water conservancy projects. They are more common in rivers. Fences can intercept large amounts of floating garbage and prevent it from flowing downstream and causing pollution. Water conservancy project fences are also an important part of water project management.
[0003] Most of the current fences are fixed. When one side of the fence intercepts too much floating garbage, the fence's resistance to water increases. At this time, the force applied to the fence gradually increases. If the floating garbage in front of the fence cannot be discovered and cleaned up in time, the fence may be damaged by excessive force. Utility Model Content
[0004] The technical problem to be solved by the utility model is to overcome the deficiencies of the prior art and provide a water conservancy project fence which can overcome the above problems or at least partially solve the above problems.
[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0006] A water conservancy project fence includes: a first frame, and also includes: a first fence fixed in the first frame; a second fence rotated on the upper side of the first fence; a second frame arranged on one side of the first frame; a slide symmetrically opened in the second frame; a collection frame sliding in the second frame, and a limit block matching the slide is fixedly connected to the collection frame; multiple groups of first drainage holes are arranged on one side of the collection frame; a second tension spring is symmetrically fixed between the collection frame and the second frame; a guide plate fixed to one end of the second fence away from the first fence, and the guide plate is arranged in the collection frame; a displacement sensor fixed on the second frame; a controller fixed on the top of the second frame.
[0007] In order to facilitate reminding the staff, preferably, an alarm is fixedly connected to the top of the second frame.
[0008] In order to improve the stability of the second fence, further, a first connecting plate is fixedly connected to the first frame, a second connecting plate matching the first connecting plate is fixedly connected to the second fence, and a first tension spring is symmetrically fixedly connected between the first connecting plate and the second connecting plate.
[0009] In order to facilitate the support of the collection frame, further, a floating block is fixedly connected to the lower end of the collection frame.
[0010] In order to facilitate the drainage of water in the collection frame and prevent the collection frame from being subjected to excessive force, preferably, the floating block is provided with an inclined groove, and a plurality of groups of second drainage holes matching the inclined groove are provided on one side of the collection frame close to the inclined groove.
[0011] In order to facilitate the floating garbage to enter the collection frame, preferably, the second fence is arranged in an arc shape.
[0012] Compared with the prior art, the utility model provides a water conservancy project fence with the following beneficial effects:
[0013] 1. The water conservancy project fence supports the guide plate through the collection frame and the second tension spring, so as to support the second fence. When the floating garbage accumulates to a certain extent, the upper edge of the second fence is lower than the horizontal plane. At this time, the floating garbage flows into the collection frame for collection. At this time, the collection frame drops to a certain position, and the displacement sensor is used to detect the descending distance of the collection frame. When it drops to a certain distance, the controller sends a signal to the microcomputer or mobile phone of the staff to remind the staff to clean up the garbage in time, thereby effectively preventing too much floating garbage from causing excessive force on the first frame, and then effectively preventing the first frame from being damaged by excessive water resistance.
[0014] 2. The water conservancy project fence supports the second fence through two first tension springs, thereby effectively improving the stability of the second fence.
[0015] 3. The water conservancy project fence facilitates floating garbage to enter the collection frame through the arc-shaped second fence, and a part of the floating garbage is collected by the collection frame, which can effectively alleviate the water resistance of the first frame and the second fence.
[0016] The parts not involved in the device are the same as the existing technology or can be implemented by the existing technology. The utility model reminds the staff to clean up the garbage in time, effectively preventing the excessive force on the first frame caused by excessive floating garbage, thereby effectively preventing the first frame from being damaged by excessive water resistance. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 This is a structural schematic diagram of a water conservancy project fence proposed by the utility model;
[0018] Figure 2 This is a cross-sectional schematic diagram of a water conservancy project fence proposed by the utility model;
[0019] Figure 3 This is a schematic diagram of the unfolded structure of a water conservancy project fence proposed by the utility model;
[0020] Figure 4A water conservancy project fence proposed by the utility model Figure 3 A magnified schematic diagram of center A.
[0021] In the figure: 1. first frame; 101. first fence; 102. second fence; 103. first connecting plate; 104. second connecting plate; 105. first tension spring; 106. guide plate; 2. second frame; 201. slide slot; 202. collection frame; 203. limit block; 204. first drainage hole; 205. second drainage hole; 206. floating block; 207. inclined slot; 208. second tension spring; 209. displacement sensor; 210. controller; 211. alarm. DETAILED DESCRIPTION
[0022] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.
[0023] Example 1: Reference Figure 1-Figure 4 A water conservancy project fence includes: a first frame 1, and also includes: a first fence 101, fixed in the first frame 1; a second fence 102, rotating on the upper side of the first fence 101; a second frame 2, arranged on one side of the first frame 1; a slide 201, symmetrically opened in the second frame 2; a collection frame 202, sliding in the second frame 2, and a limit block 203 matching the slide 201 is fixedly connected to the collection frame 202; multiple groups of first drainage holes 204, arranged on one side of the collection frame 202; a second tension spring 208, symmetrically fixed between the collection frame 202 and the second frame 2; a guide plate 106, fixed on one end of the second fence 102 away from the first fence 101, and the guide plate 106 is arranged in the collection frame 202; a displacement sensor 209, fixed on the second frame 2; a controller 210, fixed on the top of the second frame 2.
[0024] When intercepting pollution in a river channel, the first frame 1 and the second frame 2 are placed in the river channel, so that the water in the river channel flows through the first fence 101 and the second fence 102. When the floating garbage at the second fence 102 accumulates more, the resistance of the second fence 102 to the water becomes larger. At this time, the second fence 102 rotates along the connection between the second fence 102 and the first fence 101, so that the upper edge of the second fence 102 moves downward, and the guide plate 106 is supported by the collecting frame 202 and the second tension spring 208, so as to support the second fence 102. When the floating garbage accumulates to a certain extent, the upper edge of the second fence 102 is lower than the horizontal plane. At this time, the floating garbage flows into the collecting frame 202 for collection. At this time, the collecting frame 202 drops to a certain position, and the displacement sensor 209 is used to detect the descending distance of the collecting frame 202. When it drops to a certain distance, the controller 210 sends a signal to the microcomputer or mobile phone of the staff, and the staff cleans up the garbage, thereby effectively preventing too much floating garbage from causing excessive force on the first frame 1, and further effectively preventing the first frame 1 from being damaged by excessive water resistance.
[0025] And when it comes to a river with a low water level, after the second fence 102 is tilted at a certain angle, the collecting frame 202 is pressed downward by the guide plate 106, so that it can be applied to rivers of different depths.
[0026] Example 2: Reference Figure 1-Figure 4 , a water conservancy project fence, is basically the same as Example 1, and further, an alarm 211 is fixedly connected to the top of the second frame 2.
[0027] When the controller 210 receives a signal that the collection frame 202 moves to a set distance, the controller 210 controls the alarm 211 to sound an alarm, so that the staff can observe in time.
[0028] A first connecting plate 103 is fixedly connected to the first frame 1 , a second connecting plate 104 matching the first connecting plate 103 is fixedly connected to the second fence 102 , and a first tension spring 105 is symmetrically fixedly connected between the first connecting plate 103 and the second connecting plate 104 .
[0029] The second fence 102 is supported by two first tension springs 105 , thereby effectively improving the stability of the second fence 102 .
[0030] A floating block 206 is fixedly connected to the lower end of the collecting frame 202 .
[0031] The floating block 206 is provided with an inclined groove 207 , and a side of the collecting frame 202 close to the inclined groove 207 is provided with a plurality of groups of second drainage holes 205 matching the inclined groove 207 .
[0032] The second fence 102 is arranged in an arc shape.
[0033] When the collecting frame 202 moves downward a certain distance, the buoyancy of the floating block 206 due to the water gradually increases, thereby providing better support for the guide plate 106 .
[0034] The arc-shaped second fence 102 facilitates the entry of floating garbage into the collection frame 202 , and a portion of the floating garbage is collected by the collection frame 202 , which can effectively alleviate the water resistance of the first frame 1 and the second fence 102 .
[0035] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A water conservancy project fence, comprising: The first frame (1) is characterized by further comprising: A first fence (101) fixed in the first frame (1); A second fence (102) is rotated on the upper side of the first fence (101); A second frame (2) is arranged on one side of the first frame (1); A slide groove (201) is symmetrically arranged in the second frame (2); A collection frame (202) is slidably mounted in the second frame (2), and a limit block (203) matching the slide groove (201) is fixedly connected to the collection frame (202); A plurality of groups of first drainage holes (204) are arranged on one side of the collection frame (202); A second tension spring (208) is symmetrically fixed between the collecting frame (202) and the second frame (2); A guide plate (106) is fixed to an end of the second fence (102) away from the first fence (101), and the guide plate (106) is arranged in the collection frame (202); A displacement sensor (209) fixed on the second frame (2); A controller (210) is fixed on the top of the second frame (2).
2. A water conservancy project fence according to claim 1, characterized in that: An alarm (211) is fixedly connected to the top of the second frame (2).
3. A water conservancy project fence according to claim 1, characterized in that: A first connecting plate (103) is fixedly connected to the first frame (1), a second connecting plate (104) matching the first connecting plate (103) is fixedly connected to the second fence (102), and a first tension spring (105) is symmetrically fixedly connected between the first connecting plate (103) and the second connecting plate (104).
4. A water conservancy project fence according to claim 1, characterized in that: A floating block (206) is fixedly connected to the lower end of the collection frame (202).
5. A water conservancy project fence according to claim 4, characterized in that: The floating block (206) is provided with an inclined groove (207), and a plurality of groups of second drainage holes (205) matching the inclined groove (207) are provided on one side of the collecting frame (202) close to the inclined groove (207).
6. A water conservancy project fence according to claim 1, characterized in that: The second fence (102) is arranged in an arc shape.
