Shaping wellhead frame for cast-in-place pile concrete pouring construction

By designing a detachable, fixed wellhead frame, the problems of instability of the wellhead frame and difficulty in hoisting the steel cage in the existing technology have been solved, thus simplifying the construction process and improving safety.

CN221972389UActive Publication Date: 2024-11-08中建五局第三建设有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420225630.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-30
Publication Date
2024-11-08
Estimated Expiration
2034-01-30

AI Technical Summary

Technical Problem

In existing technologies, during the construction of bored piles, the directly erected I-beams are prone to slippage, and the overall unfixed wellhead frame is heavy and affects the hoisting of the reinforcing cage, increasing construction procedures and bringing safety risks.

Method used

Design a detachable fixed wellhead frame, including a base and a grouting pipe positioning plate. The base is provided with a through hole and a steel cage positioning device. The grouting pipe positioning plate is detachable to facilitate the hoisting of the steel cage. After the grouting pipe positioning plate is fixed to the base, a grouting hole is formed. The support plate is composed of a support frame and a grid plate to improve stability and reduce weight.

Benefits of technology

Simplify construction procedures, improve construction safety, ensure the stability of the wellhead frame, facilitate the hoisting of the steel cage and the movement of the grouting pipe, reduce operational difficulty, and minimize safety risks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221972389U_ABST
    Figure CN221972389U_ABST
Patent Text Reader

Abstract

A shaping wellhead frame for cast-in-place pile concrete pouring construction comprises a base and a grouting pipe positioning plate detachably installed on the base, and a through hole matched with a cast-in-place pile in size is formed in the middle of the base to form a pile hole. A plurality of reinforcement cage positioning devices used for pre-locking the axial installation position of a reinforcement cage in a pile hole are evenly fixed to the base with the pile hole as the center, the grouting pipe positioning plate is formed by splicing two supporting plates which are in mirror symmetry, and the length of the supporting plates is matched with the width of the base. Semicircular openings are formed in the middles of the splicing sides of the bearing plates, after the splicing sides of the two bearing plates are connected, the two ends of the bearing plates are fixed to the bottom plate through locking devices, the semicircular openings in the two bearing plates are communicated to form a grouting hole matched with a grouting pipe, and the grouting hole is formed in the range of a pile hole. According to the utility model, the problem that the whole wellhead frame needs to be moved for lowering the reinforcement cage in the prior art is solved, the construction process is simplified, and the construction safety is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the field of civil engineering pile foundation engineering, in particular to a shaped wellhead frame used for cast-in-place pile concrete pouring construction. Background Art

[0002] The requirements for foundation bearing capacity in existing engineering construction are gradually increasing. As a major method to improve foundation bearing capacity, bored pile construction accounts for an increasingly important proportion in pile foundation construction. However, during the construction of bored piles, a safe working surface is required for operations at the hole mouth. The existing technology generally adopts the method of directly erecting I-beams on the base or using an integrally unfixed wellhead frame to provide a working surface. However, the directly erected I-beams are prone to sliding, and the integrally unfixed wellhead frame is heavy and needs to be moved when the steel cage is hoisted, which not only increases the construction process, but also brings safety risks to the construction. Utility Model Content

[0003] The utility model solves the shortcomings of the prior art and provides a shaped wellhead frame for pouring cast-in-place pile concrete, which simplifies the construction process and improves the construction safety.

[0004] To achieve the above-mentioned purpose, the utility model first proposes a shaped wellhead frame for bored pile concrete pouring construction, including a base and a grouting pipe positioning plate detachably mounted on the base, a through hole matching the size of the bored pile is arranged in the middle of the base to form a pile hole, a plurality of steel cage positioning devices for pre-locking the axial installation position of the steel cage in the pile hole are evenly fixed on the base with the pile hole as the center, the grouting pipe positioning plate is composed of two mirror-symmetrical support plates spliced ​​together, the length of the support plate matches the width of the base, and a semicircular opening is arranged in the middle of the splicing side of the support plate. After the splicing sides of the two support plates are connected, the two ends of the support plates are fixed to the bottom plate by a locking device, so that the semicircular openings on the two support plates are connected to form a grouting hole matching the grouting pipe, and the grouting hole is placed within the range of the pile hole.

[0005] By adopting the above structure, the grouting pipe positioning plate and the base can be detachably installed. In this way, the base is heavy and can be well supported on the wellhead of the bored pile, effectively ensuring the stability and anti-overturning property of the entire device, and the grouting pipe positioning plate is lighter than the base and can be easily disassembled. In this way, when it is necessary to hoist the steel cage, only the grouting pipe positioning plate needs to be removed, which will not affect the hoisting of the steel cage. After the hoisting of the steel cage is completed, the grouting pipe positioning plate is reinstalled on the base. The grouting holes on the grouting pipe positioning plate can be used to facilitate the insertion of the grouting pipe into the pile hole. The grouting pipe positioning plate is composed of two supporting plates spliced ​​together, which can facilitate the disassembly of the grouting pipe positioning plate, so that when grouting is needed, the grouting pipe can move faster in the pile hole, which can improve the efficiency of the grouting pipe movement and reduce the difficulty of operation during use.

[0006] In this embodiment, the steel cage positioning device includes a plurality of connecting plates fixed on the base, evenly arranged with the pile hole as the center, and arranged perpendicular to the base. The connecting plates are provided with through holes to form a slide groove, and the slide groove of the connecting plates is inserted with a steel cage support rod matching the size of the slide groove. The steel cage support rod is arranged along the radial direction of the pile hole and is slidably connected to the slide groove. When in working state, the front end and tail end of the steel cage support rod are respectively placed on both sides of the connecting plate, and the front end of the steel cage support rod extends into the range of the pile hole. A limiting device is installed on the tail end of the steel cage support rod to prevent the steel cage support rod from escaping from the slide groove. The limiting device is preferably a pin here.

[0007] By adopting the above simple structure, the support rods of the steel cage can be freely extended and retracted. In this way, when the steel cage is hoisted, the support rods of the steel cage are retracted within the range of the base. After the steel cage is hoisted into the pile hole, the support rods of the steel cage are extended into the pile hole and connected with the positioning pieces on the steel cage, thereby ensuring the simplicity and smoothness of the entire construction.

[0008] In this embodiment, the support plate includes a support frame, a middle plate and a grid plate, a grid plate is welded to both ends of the middle plate, and reinforcing ribs are fixed to the outside of the middle plate and the grid plates on both sides to form a support frame, and the semicircular opening is arranged on the middle plate. The support frame can improve the strength of the support plate, and the grid plate can reduce the weight of the support plate and reduce the cost on the one hand, and even if concrete falls on the grid plate, it can fall into the pile hole through the gap on the grid plate to prevent the concrete from solidifying on the support plate.

[0009] In this embodiment, a through hole is provided on the support frame at the position of the middle plate to form a fixing hole. By arranging a wire or a binding in the fixing hole, the grouting pipe can be fixed to the support plate when the grouting pipe needs to be fixed.

[0010] In this embodiment, the locking device includes male lock buckles fixed on both sides of the base and female lock buckles matched with the male lock buckles fixed on both ends of the support plate. After the female lock buckles are connected to the male lock buckles, the support plate and the base are fixed.

[0011] In this embodiment, a lifting lug is fixed on the base, and the installation and removal of the base are facilitated by the lifting lug.

[0012] To sum up, the utility model simplifies the wellhead frame into a detachably connected base and a grouting pipe positioning plate, so that the weight of the base can be increased, ensuring the stability of the entire device. When the steel cage is lowered, there is no need to move the entire device, and only the grouting pipe positioning plate needs to be removed. This solves the problem in the prior art that the entire wellhead frame needs to be moved in order to lower the steel cage. The device simplifies the construction process and improves the safety of construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a schematic diagram of the structure of the utility model;

[0014] Figure 2 It is a structural schematic diagram of the front side of the base of the utility model;

[0015] Figure 3 It is a structural schematic diagram of the side surface of the base of the utility model.

[0016] Figure 4 It is a structural schematic diagram of the front side of the grouting pipe positioning plate of the utility model.

[0017] Figure 5 It is a structural schematic diagram of the side surface of the grouting pipe positioning plate of the utility model.

[0018] In the attached figure: 1. Base; 11. Lifting ear; 12. Male locking buckle; 13. Steel cage support rod; 14. Connecting plate; 15. Pile hole; 2. Grouting pipe positioning plate; 21. Support plate; 22. Middle plate; 23. Grille plate; 24. Female locking buckle; 25. Fixing hole; 26. Grouting hole. DETAILED DESCRIPTION

[0019] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0020] In addition, the technical solutions between the various embodiments of the present invention can be combined with each other, but it must be based on the fact that ordinary technicians in the field can implement it. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such combination of technical solutions does not exist and is not within the scope of protection required by the present invention.

[0021] like Figure 1-5As shown, the utility model is a shaped wellhead frame for bored pile concrete pouring construction, comprising a base 1 and a grouting pipe positioning plate 2 detachably mounted on the base 1, a through hole matching the size of the bored pile is arranged in the middle of the base 1 to form a pile hole 15, a lifting lug 11 is also fixed on the base 1, a plurality of steel cage positioning devices for pre-locking the axial installation position of the steel cage in the pile hole 15 are evenly fixed on the base 1 with the pile hole 15 as the center, the steel cage positioning device comprises a plurality of fixed on the base 1, evenly arranged with the pile hole 15 as the center and perpendicular to the base 1 A connecting plate 14 is arranged, and a through hole is opened on the connecting plate 14 to form a slide groove. A steel cage support rod 13 matching the size of the slide groove is inserted in the slide groove of the connecting plate 14. The steel cage support rod 13 is arranged radially along the pile hole 15 and is slidably connected with the slide groove. In the working state, the front end and the tail end of the steel cage support rod 13 are respectively placed on both sides of the connecting plate 14, and the front end of the steel cage support rod 13 extends into the range of the pile hole 15. A limiting device is installed on the tail end of the steel cage support rod 13 to prevent the steel cage support rod 13 from escaping from the slide groove. The limiting device is preferably a latch.

[0022] The grouting pipe positioning plate 2 is composed of two mirror-symmetrical supporting plates spliced ​​together, the length of the supporting plate matches the width of the base 1, and a semicircular opening is provided in the middle of the splicing side of the supporting plate. After the splicing sides of the two supporting plates are connected, the two ends of the supporting plates are fixed to the base plate by a locking device, so that the semicircular openings on the two supporting plates are connected to form a grouting hole 26 matching the grouting pipe, and the grouting hole 26 is placed within the range of the pile hole 15.

[0023] In this embodiment, the support plate includes a support frame, a middle plate 22 and a grid plate 23, both ends of the middle plate 22 are welded with a grid plate 23, the outside of the middle plate 22 and the grid plates 23 on both sides are fixed with reinforcing ribs to form a support frame, and the semicircular opening is provided on the middle plate 22. The support frame can improve the strength of the support plate, and the grid plate 23 can reduce the weight of the support plate and reduce the cost on the one hand, and even if concrete falls on the grid plate 23, it can fall into the pile hole 15 through the gap on the grid plate 23 to prevent the concrete from solidifying on the support plate. The support frame is provided with through holes at the location of the middle plate 22 to form fixing holes 25. By arranging iron wire or binding tape in the fixing hole 25, the grouting pipe can be fixed to the support plate 21 when the grouting pipe needs to be fixed. The locking device includes male locking buckles 12 fixed on both sides of the base 1 and female locking buckles 24 matched with the male locking buckles 12 fixed on both ends of the support plate. After the female locking buckle 24 is connected to the male locking buckle 12, the support plate is fixed to the base 1.

[0024] The above are only preferred embodiments of the present invention, and do not limit the patent scope of the present invention. All equivalent structural changes made by using the contents of the present invention specification and drawings under the concept of the present invention, or directly / indirectly applied in other related technical fields are included in the patent protection scope of the present invention.

Claims

1. A shaped wellhead frame for pouring concrete of bored piles, characterized in that: It includes a base and a grouting pipe positioning plate detachably mounted on the base, a through hole matching the size of the bored pile is arranged in the middle of the base to form a pile hole, a plurality of steel cage positioning devices for pre-locking the axial installation position of the steel cage in the pile hole are evenly fixed on the base with the pile hole as the center, the grouting pipe positioning plate is composed of two mirror-symmetrical support plates spliced ​​together, the length of the support plates matches the width of the base, a semicircular opening is arranged in the middle of the splicing side of the support plates, after the splicing sides of the two support plates are connected, the two ends of the support plates are fixed to the bottom plate by a locking device, so that the semicircular openings on the two support plates are connected to form a grouting hole matching the grouting pipe, and the grouting hole is placed within the range of the pile hole.

2. The shaped wellhead frame for pouring concrete of bored piles according to claim 1 is characterized in that: The steel cage positioning device includes a plurality of connecting plates fixed on the base and evenly arranged with the pile hole as the center and arranged perpendicular to the base. The connecting plates are provided with through holes to form slide grooves. The slide grooves of the connecting plates are inserted with steel cage support rods matching the size of the slide grooves. The steel cage support rods are arranged radially along the pile hole and are slidably connected to the slide grooves. In the working state, the front end and the tail end of the steel cage support rods are respectively placed on both sides of the connecting plates, the front end of the steel cage support rods extends into the range of the pile hole, and the tail end of the steel cage support rods is installed with a limiting device to prevent the steel cage support rods from escaping from the slide grooves.

3. The shaped wellhead frame for pouring concrete of bored piles according to claim 1 is characterized in that: The support plate includes a support frame, a middle plate and a grid plate. A grid plate is welded to both ends of the middle plate. Reinforcing ribs are fixed to the outside of the middle plate and the grid plates on both sides to form a support frame. The semicircular opening is arranged on the middle plate.

4. The shaped wellhead frame for pouring concrete of bored piles according to claim 3 is characterized in that: The support frame is provided with through holes at the position of the middle plate to form fixing holes.

5. The shaped wellhead frame for pouring concrete of bored piles according to claim 1 is characterized in that: The locking device includes male lock buckles fixed on both sides of the base and female lock buckles matched with the male lock buckles fixed on both ends of the support plate. After the female lock buckles are connected to the male lock buckles, the support plate and the base are fixed.

6. The shaped wellhead frame for pouring concrete of bored piles according to claim 1 is characterized in that: A lifting lug is also fixed on the base.