Foundation pit supporting device for rock and soil construction

By designing drainage and support devices in the foundation pit support device, the problem of difficulty in draining water accumulation in rainy weather in foundation pits is solved, construction efficiency and stability are improved, and workers' safety is ensured.

CN221972418UActive Publication Date: 2024-11-08SHANDONG ZHENGYUAN GEOLOGY RESOURCE KANCHA CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420538439.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-20
Publication Date
2024-11-08
Estimated Expiration
2034-03-20

AI Technical Summary

Technical Problem

In the continuous rainy weather of existing foundation pit support devices, there is too much water accumulation inside the foundation pit and poor water seepage, resulting in difficulty in drainage and affecting construction time and soil layer stability.

Method used

A foundation pit support device for geotechnical construction is designed, including multiple foundation piles and hollow first and second layer plates, equipped with drainage devices and support devices. The drainage device uses the dynamic effects of floating plates and water blocking plates to achieve effective discharge of water accumulation through components such as water discharging pipes, water collection pipes, overflow chambers, and water tanks. The support device adjusts the stability of the foundation pit through the reset spring and telescopic rod.

Benefits of technology

The drainage capacity of the foundation pit is improved, the construction time is shortened, the construction date is started early, the construction efficiency is improved, and the stability and worker safety of the foundation pit are enhanced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221972418U_ABST
    Figure CN221972418U_ABST
Patent Text Reader

Abstract

The utility model belongs to the field of capital construction equipment, and discloses a foundation pit supporting device for rock and soil construction, which comprises a plurality of foundation piles, the opposite sides of every two adjacent foundation piles are connected with the same first layer plate through bolts, a water outlet is formed in the position, close to the bottom, of one first layer plate, and a water outlet is formed in the position, close to the bottom, of the other first layer plate. A drainage device is arranged in the drainage opening, a supporting device is arranged on one side of one first layer plate, the opposite sides of every two adjacent foundation piles are connected with the same second layer plate through bolts, the second layer plates are located under the first layer plates, and the first layer plates and the second layer plates are all in a hollow state. Grouting openings are formed in the tops of the first layer plates and the tops of the second layer plates, the drainage device comprises a water flowing pipe, and the water flowing pipe is fixedly connected to one side of one first layer plate. The foundation pit supporting device for rock and soil construction has the technical effects that the drainage effect of the foundation pit is improved, the construction time is shortened, and the safety of workers is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of foundation pit support, in particular to a foundation pit support device for rock and soil construction. Background Art

[0002] Geotechnical engineering is a branch of civil engineering. It is a science that uses engineering geology, soil mechanics, and rock mechanics to solve engineering and technical problems related to rock and soil in various projects. The foundation pit is a soil pit excavated at the foundation design location according to the base elevation and foundation plane dimensions. It is mainly used for the construction of piers, bridge abutments, and expanded foundations. The foundation pit is generally divided into two types: unsupported and supported. When the foundation pit is excavated deeper and there are buildings nearby, temporary support projects such as support, reinforcement, protection, and groundwater control will be used to protect the safety of the underground main structure construction and the surrounding environment of the foundation pit.

[0003] Existing foundation pit support devices generally support the foundation pit by drilling holes and pouring cement. This type of foundation pit support device may cause excessive water accumulation inside the foundation pit during continuous rainy weather. In addition, since the foundation pit is surrounded by cement, the water permeability of the foundation pit is relatively poor, making it difficult to drain the accumulated water, seriously affecting the construction time and may even affect the stability of the soil layer inside the foundation pit. Utility Model Content

[0004] The utility model discloses a foundation pit supporting device for rock and soil construction, aiming to solve the technical problem that the existing foundation pit supporting device generally supports the foundation pit by drilling holes and pouring cement, such foundation pit supporting device may cause excessive water accumulation inside the foundation pit during continuous rainy weather, and because the foundation pit is surrounded by cement on all sides, the water permeability of the foundation pit is relatively poor, so it is difficult to drain the accumulated water, which seriously affects the construction time and may even affect the stability of the soil layer inside the foundation pit.

[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0006] A foundation pit support device for geotechnical construction includes a plurality of foundation piles, wherein the opposite sides of every two adjacent foundation piles are connected to a same first layer plate by bolts, wherein one of the first layer plates is provided with a drainage outlet near the bottom, and a drainage device is arranged inside the drainage outlet, wherein a supporting device is arranged on one side of one of the first layer plates, wherein the opposite sides of every two adjacent foundation piles are connected to a same second layer plate by bolts, and the second layer plate is located directly below the first layer plate, wherein the plurality of first layer plates and the second layer plates are both in a hollow state, and wherein the tops of the plurality of first layer plates and the second layer plates are provided with grouting outlets.

[0007] In a preferred embodiment, the drainage device includes a water pipe, which is fixedly connected to one side of one of the first layer plates, one end of the water pipe is fixedly connected to a water receiving pipe, the interior of the water receiving pipe is fixedly connected to a filter screen, the inner wall of the water pipe close to the water receiving pipe is connected to a rotating shaft through a bearing, and the outer wall of the rotating shaft is fixedly connected to fan blades at equal distances.

[0008] In a preferred solution, the top of the water pipe is fixedly connected to the overflow chamber, and the overflow chamber is communicated with the water pipe, a plurality of water outlets are provided on the side wall of the overflow chamber near the top, a round rod is fixedly connected to the top inner wall of the overflow chamber, a floating plate is slidably connected to the outer wall of the round rod, a plurality of overflow outlets are provided on the top of the floating plate, and a limiting plate is fixedly connected to the bottom of the round rod.

[0009] In a preferred solution, the other end of the water pipe is fixedly connected to a water tank, the water tank is communicated with the water pipe, and an air cavity is fixedly connected to the top of the water tank, the water tank is communicated with the air cavity, the water tank is connected to a shaft rod through a bearing at the top inner wall near the water pipe, the other end of the shaft rod is connected to the bottom inner wall of the water tank through a bearing, the outer wall of the shaft rod is fixedly connected to a water blocking plate, the side of the water tank away from the water pipe is fixedly connected to a water outlet pipe, the end of the water outlet pipe away from the water tank is fixedly connected to a protection box, and one side of the protection box is connected to a door panel through a hinge.

[0010] By providing a water runoff pipe, a water outlet pipe and an air cavity, during the geotechnical engineering construction process, if there is heavy rain, a large amount of water will accumulate in the foundation pit. When the water in the foundation pit covers the water collecting pipe, the accumulated water will enter the water runoff pipe through the water collecting pipe. First, the accumulated water enters the water runoff pipe and moves toward the overflow cavity. In the process of the accumulated water entering the overflow cavity, the floating plate will be pushed upward. In the process of pushing upward, part of the water will enter the position above the floating plate through the overflow port, and then flow out through the water outlet of the overflow cavity. However, after the floating plate is pushed to the top position by the action of water, the water outlet will be blocked by the floating plate. , then the accumulated water will give an impulse to the water-blocking plate, causing the water-blocking plate to rotate. At this time, the accumulated water will enter the water tank. Since the accumulated water enters the water tank, the buoyancy of the floating plate is insufficient and it will fall down. The kinetic energy circulates back and forth in this way. When the accumulated water inside the water tank reaches a certain level, it will squeeze the air inside the air cavity. When it is squeezed to a certain level, the air inside the air cavity will give a reaction force to the accumulated water inside the water tank, and the accumulated water will be discharged from the foundation pit through the outlet pipe, thereby improving the drainage capacity of the foundation pit in response to heavy rain weather, which is conducive to advancing the start date, improving construction efficiency, shortening the entire construction period, and improving the practicability of the device.

[0011] In a preferred solution, the supporting device includes a fixed seat, which is fixedly connected to one side of one of the first layer plates, a return spring is fixedly connected to an inner wall of one side of the fixed seat, and one end of the return spring is fixedly connected to a spring seat, the same first layer plate is located on the same side of the fixed seat and is fixedly connected to a connecting seat, one side of the connecting seat is movably connected to a connector, one end of the connector is fixedly connected to a telescopic rod, one end of the telescopic rod is fixedly connected to an extrusion block, the extrusion block is located inside the fixed seat, one end of the extrusion block is in contact with the spring seat, and the other end of the extrusion block is in contact with an inner wall of one side of the fixed seat.

[0012] In a preferred solution, one side of each of the first and second panels is fixedly connected with a grouting column, and the grouting column is in a hollow state, and a plurality of grouting outlets are provided on the outer wall of the grouting column, and the top of each of the first and second panels is fixedly connected with a fixing rod, and the same connecting rod is fixedly connected between every two adjacent fixing rods.

[0013] By providing a supporting device, when a foundation pit support device is used in geotechnical construction, a plurality of foundation piles are first driven into the underground area to be constructed, and then construction is started. When it reaches a certain depth, the first layer of plates is first fixed by a spiral, and then cement slurry is injected into the first layer of plates through the grouting port. Then the grouting column is also filled with cement, and the cement slurry spreads into the surrounding soil through the slurry outlet, further improving the stability of the entire foundation pit installation device. Then, after waiting for the grouting to be completed, each fixing rod is connected to the connecting rod, further improving the stability of the entire foundation pit device. Then, through the supporting device, the appropriate position is adjusted by the reset spring, and the extrusion block is placed in the fixed seat. When the digging continues to go down to a certain extent, the second layer of plates is installed, wherein the second layer of plates is also fixedly connected with a fixed seat. The above operation is repeated, and then the telescopic rod of the supporting device is adjusted, and the extrusion block is placed on the fixed seat of the second layer of plates, which is beneficial to improving the stability of the entire foundation pit, and the same device can be reused, reducing the construction cost, and the number of layers can be determined according to the depth of the foundation pit to be excavated.

[0014] In a preferred solution, the tops of the plurality of foundation piles are fixedly connected with connecting plates, the ends of the plurality of connecting plates away from the foundation piles are fixedly connected with fixed piles, and the opposite sides of every two adjacent fixed piles are fixedly connected with the same baffle.

[0015] By setting up baffles and installing the foundation piles, the fixed piles are driven into the surrounding soil. During the construction process, the baffles can reduce the possibility of foreign objects outside the pit falling into the pit, which can effectively ensure the safety of the workers.

[0016] It can be seen from the above that the foundation pit support device for rock and soil construction provided by the utility model has the technical effects of improving the drainage effect of the foundation pit, shortening the construction time and ensuring the safety of workers. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 The utility model is a schematic structural diagram of a foundation pit supporting device for rock and soil construction proposed by the utility model.

[0018] Figure 2 The utility model provides a schematic structural diagram of foundation piles and a first layer of a foundation pit support device for geotechnical construction.

[0019] Figure 3 The utility model provides a schematic diagram of the water pipe and water tank structure of a foundation pit support device for geotechnical construction.

[0020] Figure 4 The utility model is a cross-sectional view of a drainage device of a foundation pit supporting device for rock and soil construction.

[0021] Figure 5 The utility model is a schematic diagram of the support device structure of a foundation pit support device for rock and soil construction proposed by the utility model.

[0022] In the attached drawings: 1, foundation pile; 2, first layer; 3, fixed pile; 4, baffle; 5, second layer; 6, drainage device; 601, water pipe; 602, water collection pipe; 603, overflow chamber; 604, water tank; 605, protection box; 606, door panel; 607, filter screen; 608, rotating shaft; 609, fan blade; 610, floating plate; 611, limit plate; 612, water blocking plate; 613, outlet Water pipe; 614, air cavity; 615, shaft; 616, round rod; 617, overflow port; 7, grouting column; 8, slurry outlet; 9, grouting port; 10, fixing rod; 11, connecting rod; 12, supporting device; 1201, fixing seat; 1202, spring seat; 1203, extrusion block; 1204, reset spring; 1205, telescopic rod; 1206, connecting seat; 1207, connector. DETAILED DESCRIPTION

[0023] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.

[0024] The utility model discloses a foundation pit supporting device for rock and soil construction which is mainly applied to existing foundation pit supporting devices. Generally, the foundation pit is supported by drilling holes and pouring cement. This kind of foundation pit supporting device may cause excessive water accumulation inside the foundation pit during continuous rainy weather. In addition, since the foundation pit is surrounded by cement on all sides, the water permeability of the foundation pit is relatively poor, so it is difficult to drain the accumulated water, which seriously affects the construction time and may even affect the stability of the soil layer inside the foundation pit.

[0025] Reference Figure 1-Figure 5 A foundation pit support device for geotechnical construction includes a plurality of foundation piles 1, one opposite side of every two adjacent foundation piles 1 is connected with a same first layer plate 2 by bolts, one of the first layer plates 2 is provided with a drainage port near the bottom, and a drainage device 6 is provided inside the drainage port, one side of one of the first layer plates 2 is provided with a supporting device 12, one opposite side of every two adjacent foundation piles 1 is connected with a same second layer plate 5 by bolts, and the second layer plate 5 is located directly below the first layer plate 2, the plurality of first layer plates 2 and the second layer plates 5 are both in a hollow state, and the tops of the plurality of first layer plates 2 and the second layer plates 5 are provided with grouting ports 9.

[0026] In a preferred embodiment, the drainage device 6 includes a water pipe 601, which is fixedly connected to one side of one of the first layer plates 2, one end of the water pipe 601 is fixedly connected to a water collecting pipe 602, the interior of the water collecting pipe 602 is fixedly connected to a filter screen 607, the inner wall of the water pipe 601 near the water collecting pipe 602 is connected to a rotating shaft 608 through a bearing, and the outer wall of the rotating shaft 608 is fixedly connected to fan blades 609 at equal distances.

[0027] In a preferred embodiment, the top of the water pipe 601 is fixedly connected to the overflow chamber 603, and the overflow chamber 603 is communicated with the water pipe 601. The side wall of the overflow chamber 603 near the top is provided with multiple water outlets. The top inner wall of the overflow chamber 603 is fixedly connected with a round rod 616. The outer wall of the round rod 616 is slidably connected with a floating plate 610. The top of the floating plate 610 is provided with multiple overflow outlets 617. The bottom of the round rod 616 is fixedly connected with a limiting plate 611.

[0028] In a preferred embodiment, the other end of the water pipe 601 is fixedly connected to a water tank 604, the water tank 604 is connected to the water pipe 601, and the top of the water tank 604 is fixedly connected to an air cavity 614, the water tank 604 is connected to the air cavity 614, the water tank 604 is connected to the air cavity 614, the water tank 604 is connected to the top inner wall of the water pipe 601 through a bearing, the other end of the shaft 615 is connected to the bottom inner wall of the water tank 604 through a bearing, the outer wall of the shaft 615 is fixedly connected to a water blocking plate 612, the side of the water tank 604 away from the water pipe 601 is fixedly connected to a water outlet pipe 613, and the end of the water outlet pipe 613 away from the water tank 604 is fixedly connected to a protective Box 605, one side of the protection box 605 is connected with a door panel 606 through a hinge. During the geotechnical engineering construction, if there is heavy rain, there will be a lot of water in the foundation pit. When the water in the foundation pit submerges the water collecting pipe 602, the water will enter the water pipe 601 through the water collecting pipe 602. First, the water enters the water pipe 601 and moves toward the overflow chamber 603. In the process of the water entering the overflow chamber 603, the floating plate 610 will be pushed upward. In the process of pushing upward, part of the water will enter the position above the floating plate 610 through the overflow port 617, and then rush out through the water outlet of the overflow chamber 603. After the floating plate 610 is pushed to the top position, the water outlet will be blocked by the floating plate 610, and then the accumulated water will give an impulse to the water blocking plate 612, causing the water blocking plate 612 to rotate. At this time, the accumulated water will enter the water tank 604. Since the accumulated water enters the water tank 604, the buoyancy of the floating plate 610 is insufficient and it will fall down. This cycle is repeated again and again. When the accumulated water in the water tank 604 reaches a certain level, it will squeeze the air in the air cavity 614. When squeezed to a certain level, the air in the air cavity 614 will give a reaction force to the accumulated water in the water tank 604, and the accumulated water will be discharged from the foundation pit through the outlet pipe 613, thereby improving the foundation pit's ability to cope with floods. The drainage capacity in rainy weather is conducive to advancing the start date, improving construction efficiency, shortening the entire construction period, and improving the practicality of the device. At the same time, a rotating shaft 608 and a fan blade 609 are arranged inside the water pipe 601, which can effectively prevent the sediment carried by the accumulated water from accumulating inside the pipe and causing pipe blockage. The protection box 605 and door panel 606 arranged on the drainage pipe can effectively protect the water outlet from being blocked by surface debris. Due to the hinge connection, the accumulated water can flush the door panel 606 from the inside, while external debris cannot enter the drainage device 6 through the outlet pipe 613. The drainage device 6 can adjust in real time which layer of the board it is installed on according to the construction period and progress.

[0029] Reference Figure 1 , Figure 2 and Figure 5In a preferred embodiment, the supporting device 12 includes a fixed seat 1201, which is fixedly connected to one side of one of the first layer plates 2, a return spring 1204 is fixedly connected to the inner wall of one side of the fixed seat 1201, and one end of the return spring 1204 is fixedly connected to the spring seat 1202, and the same first layer plate 2 is located on the same side of the fixed seat 1201 and is fixedly connected to a connecting seat 1206, one side of the connecting seat 1206 is movably connected to a connector 1207, one end of the connector 1207 is fixedly connected to a telescopic rod 1205, one end of the telescopic rod 1205 is fixedly connected to an extrusion block 1203, the extrusion block 1203 is located inside the fixed seat 1201, one end of the extrusion block 1203 is in contact with the spring seat 1202, and the other end of the extrusion block 1203 is in contact with the inner wall of one side of the fixed seat 1201.

[0030] In a preferred embodiment, a grouting column 7 is fixedly connected to one side of the first plate 2 and the second plate 5, and the grouting column 7 is in a hollow state. A plurality of slurry outlets 8 are provided on the outer wall of the grouting column 7. A fixing rod 10 is fixedly connected to the top of each of the first plate 2 and the second plate 5, and a same connecting rod 11 is fixedly connected between every two adjacent fixing rods 10. When a foundation pit support device is used in geotechnical construction, a plurality of foundation piles 1 are first driven into the underground area to be constructed, and then construction is started. When the foundation pit support device is used to a certain depth, the first plate 2 is first fixed by bolts, and then cement slurry is injected into the first plate 2 through the grouting port 9. Then the grouting column 7 is also filled with cement, and the cement slurry spreads into the surrounding soil through the slurry outlet 8, further improving the installation of the entire foundation pit. The stability of the device is improved. After waiting for the grouting to be completed, each fixing rod 10 is connected to the connecting rod 11 to further improve the stability of the entire foundation pit device. Then, through the support device 12, the reset spring 1204 is used to adjust the appropriate position, and the extrusion block 1203 is placed in the fixed seat 1201. When digging down to a certain extent, the second layer of plate 5 is installed, and the second layer of plate 5 is also fixedly connected with the fixed seat 1201. Repeat the above operation, and then adjust the telescopic rod 1205 of the support device 12, and place the extrusion block 1203 on the fixed seat 1201 of the second layer of plate 5, which is beneficial to improve the stability of the entire foundation pit, and the same device can be reused to reduce the construction cost. The number of layers can be determined according to the depth of the foundation pit to be excavated.

[0031] Reference Figure 1 In a preferred embodiment, the tops of the multiple foundation piles 1 are fixedly connected with connecting plates, the ends of the multiple connecting plates away from the foundation piles 1 are fixedly connected with fixed piles 3, and the opposite sides of every two adjacent fixed piles 3 are fixedly connected with the same baffle 4. The fixed piles 3 are driven into the surrounding soil. During the construction process of the workers, the baffle 4 can reduce the possibility of foreign objects outside the pit falling into the pit, which can effectively ensure the safety of the workers during construction.

[0032] Working principle: First, drive multiple foundation piles 1 into the underground area where construction is required, and then start construction. When it reaches a certain depth, first fix the first layer 2 with bolts, and then inject cement slurry into the first layer 2 through the grouting port 9, and then the grouting column 7 is also filled with cement, and the cement slurry spreads into the surrounding soil through the slurry outlet 8, and then wait for the grouting to be completed before connecting each fixing rod 10 to the connecting rod 11, and then through the support device 12, adjust the appropriate position through the reset spring 1204, and put the extrusion block 1203 into the fixed seat 1201. If there is heavy rain, there will be a lot of water in the foundation pit. When the water in the foundation pit submerges the water collecting pipe 602, the accumulated water will enter the water pipe 601 through the water collecting pipe 602. First, the accumulated water enters the water pipe 601 and will move towards the overflow chamber 603. When the accumulated water enters the overflow chamber 6 03, the floating plate 610 will be pushed upward. During the upward pushing process, part of the water will enter the position above the floating plate 610 through the overflow port 617, and then flow out through the water outlet of the overflow chamber 603. After the floating plate 610 is pushed to the top position by the action of water, the water outlet will be blocked by the floating plate 610, and then the accumulated water will give an impulse to the water blocking plate 612, causing the water blocking plate 612 to rotate. At this time, the accumulated water will enter the water tank 604. Since the accumulated water enters the inside of the water tank 604, the buoyancy of the floating plate 610 is insufficient and it will fall down. This cycle is repeated. When the accumulated water in the water tank 604 reaches a certain level, it will squeeze the air in the air cavity 614. When squeezed to a certain level, the air in the air cavity 614 will give a reaction force to the accumulated water in the water tank 604, so that the accumulated water is discharged from the foundation pit through the outlet pipe 613.

[0033] The above is only a preferred specific implementation of the utility model, but the protection scope of the utility model is not limited to this. The replacement can be a replacement of part of the structure, device, method step, or a complete technical solution. Equivalent replacement or change based on the technical solution of the utility model and its utility model concept should be included in the protection scope of the utility model.

Claims

1. A foundation pit support device for geotechnical construction, comprising a plurality of foundation piles (1), characterized in that: The opposite sides of every two adjacent foundation piles (1) are connected to the same first layer plate (2) by bolts, one of the first layer plates (2) is provided with a drainage port near the bottom, and a drainage device (6) is arranged inside the drainage port, one side of the first layer plates (2) is provided with a supporting device (12), the opposite sides of every two adjacent foundation piles (1) are connected to the same second layer plate (5) by bolts, and the second layer plate (5) is located directly below the first layer plate (2), the plurality of first layer plates (2) and the second layer plates (5) are all in a hollow state, and the tops of the plurality of first layer plates (2) and the second layer plates (5) are all provided with grouting ports (9).

2. A foundation pit support device for geotechnical construction according to claim 1, characterized in that: The drainage device (6) comprises a water pipe (601), the water pipe (601) being fixedly connected to one side of one of the first layer plates (2), one end of the water pipe (601) being fixedly connected to a water receiving pipe (602), the interior of the water receiving pipe (602) being fixedly connected to a filter screen (607), an inner wall of the water pipe (601) close to the water receiving pipe (602) being connected to a rotating shaft (608) via a bearing, and an outer wall of the rotating shaft (608) being fixedly connected to fan blades (609) at equal distances.

3. A foundation pit support device for geotechnical construction according to claim 2, characterized in that: The top of the water pipe (601) is fixedly connected to the overflow chamber (603), and the overflow chamber (603) is in communication with the water pipe (601); a plurality of water outlets are provided on a side wall of the overflow chamber (603) close to the top; a round rod (616) is fixedly connected to the inner wall of the top of the overflow chamber (603); a floating plate (610) is slidably connected to the outer wall of the round rod (616); a plurality of overflow outlets (617) are provided on the top of the floating plate (610); and a limiting plate (611) is fixedly connected to the bottom of the round rod (616).

4. A foundation pit support device for geotechnical construction according to claim 3, characterized in that: The other end of the water pipe (601) is fixedly connected to a water tank (604), the water tank (604) is in communication with the water pipe (601), and the top of the water tank (604) is fixedly connected to an air cavity (614), the water tank (604) is in communication with the air cavity (614), the top inner wall of the water tank (604) close to the water pipe (601) is connected to a shaft (615) via a bearing, the other end of the shaft (615) is connected to the bottom inner wall of the water tank (604) via a bearing, the outer wall of the shaft (615) is fixedly connected to a water blocking plate (612), the side of the water tank (604) away from the water pipe (601) is fixedly connected to a water outlet pipe (613), the end of the water outlet pipe (613) away from the water tank (604) is fixedly connected to a protection box (605), and one side of the protection box (605) is connected to a door panel (606) via a hinge.

5. A foundation pit support device for geotechnical construction according to any one of claims 1 to 4, characterized in that: The support device (12) comprises a fixed seat (1201), wherein the fixed seat (1201) is fixedly connected to one side of one of the first layer plates (2), a return spring (1204) is fixedly connected to an inner wall of one side of the fixed seat (1201), and one end of the return spring (1204) is fixedly connected to a spring seat (1202), and the same first layer plate (2) is located on the same side of the fixed seat (1201) and is fixedly connected to a connecting seat (1206), and one side of the connecting seat (1206) is movably connected to a connector (1207), one end of the connector (1207) is fixedly connected to a telescopic rod (1205), and one end of the telescopic rod (1205) is fixedly connected to an extrusion block (1203), the extrusion block (1203) is located inside the fixed seat (1201), one end of the extrusion block (1203) is in contact with the spring seat (1202), and the other end of the extrusion block (1203) is in contact with an inner wall of one side of the fixed seat (1201).

6. A foundation pit support device for geotechnical construction according to claim 5, characterized in that: A grouting column (7) is fixedly connected to one side of each of the first and second panels (2) and (5), and the grouting column (7) is in a hollow state. A plurality of grouting outlets (8) are provided on the outer wall of the grouting column (7). A fixing rod (10) is fixedly connected to the top of each of the first and second panels (2) and (5), and a same connecting rod (11) is fixedly connected between every two adjacent fixing rods (10).

7. A foundation pit support device for geotechnical construction according to claim 1, characterized in that: The tops of the plurality of foundation piles (1) are fixedly connected to connecting plates, one end of the plurality of connecting plates away from the foundation piles (1) is fixedly connected to a fixing pile (3), and the opposite sides of every two adjacent fixing piles (3) are fixedly connected to the same baffle (4).