Seam slurry discharging mechanism for floor support plate

By setting up slits and snaps on the floor bearing plate, splicing the drainage plate to form a drainage chamber groove, the problem of slurry overflow during concrete pouring is solved, and the rapid collection and discharge of slurry is achieved, and construction safety is improved. efficiency.

CN221972704UActive Publication Date: 2024-11-08WUXI HANXING TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323600619.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-28
Publication Date
2024-11-08
Estimated Expiration
2033-12-28

AI Technical Summary

Technical Problem

During the concrete pouring process, a large amount of slurry will overflow from the gap between the floor bearing plates. If not processed in time, the slurry will penetrate to the bottom of the floor bearing plate and drip down, affecting the safety of the construction space.

Method used

A slurry discharge mechanism is designed for the joints of the floor bearing plate. By setting a slit and snap buckle on the floor bearing plate, the liquid discharge plate is spliced ​​to form a liquid discharge chamber, collect and discharge slurry, and the liquid discharge plate is used. The inclined structure and strip-shaped rib plate disperses the slurry flow, achieving effective discharge.

Benefits of technology

The mechanism is simple in structure, easy to process, and quickly builds the drainage chamber, which reduces the impact of slurry drop on the lower space before pouring, improves construction safety, and can effectively collect and discharge the slurry, avoiding blockage caused by slurry solidification.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221972704U_ABST
    Figure CN221972704U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of floor support plates, in particular to a slurry discharge mechanism for a joint of floor support plates, which comprises a first floor support plate and a second floor support plate which are spliced with each other, the first floor support plate comprises a first splicing edge, and the second floor support plate comprises a second splicing edge; a first clamping groove is formed in the position adjacent to the first splicing edge, and correspondingly, a second clamping groove is formed in the position adjacent to the second splicing edge. A first clamping buckle and a second clamping buckle are arranged on the two sides of the liquid discharging plate respectively; the first clamping buckle is connected with the first clamping groove in a clamped mode, the second clamping buckle is connected with the second clamping groove in a clamped mode, and therefore the liquid discharging plate is connected with the first floor bearing plate and the second floor bearing plate, and a liquid discharging cavity groove used for discharging slurry is formed. The mechanism not only is simple in structure, but also is easy to process, and can effectively reduce the influence on the lower space caused by the falling of slurry before the concrete is poured and solidified.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of floor decking plates, in particular to a slurry discharge mechanism used for joints of floor decking plates. Background Art

[0002] Floor decking, also known as corrugated steel sheet, steel decking, steel floor decking. The earliest name was corrugated steel sheet, a general term for all steel sheets that are pressed and formed by a press machine. Floor decking is made of galvanized steel sheet that is cold-bent by roller pressing. Its cross-section is V-shaped, U-shaped, trapezoidal or similar waveforms. It is mainly used as a permanent formwork, but can also be selected for other purposes. The earliest corrugated steel sheet was mainly used for the roof panels of factory roofs. Later, corrugated steel sheets used for floors were gradually classified as floor decking.

[0003] During the concrete pouring process, the floor decking lines are laid flat on the top of the building frame in advance, and then concrete is injected on the top of the floor decking for pouring. The concrete will gradually spread on the upper surface of the floor decking. Since the concrete does not solidify quickly during the pouring process, in order to ensure the quality of pouring before solidification, operations such as beating and stirring are also involved. In this process, a large amount of slurry will overflow along the gaps between the floor decking. If not handled in time, the slurry will penetrate into the bottom surface of the floor decking as the accumulation increases, and may even drip downwards if the amount is large, thereby affecting the construction of personnel in the space below the floor decking.

[0004] Therefore, a new technical solution is needed to solve the above technical problems. Utility Model Content

[0005] The purpose of the utility model is to overcome the problems of the above-mentioned prior art and provide a slurry discharge mechanism for the joints of floor decking plates to solve the technical problem that slurry overflows along the gaps between the floor decking plates and falls into the construction space below the floor decking plates during concrete pouring on the floor decking plates, thereby affecting the construction of personnel below.

[0006] The above objectives are achieved through the following technical solutions:

[0007] A slurry discharge mechanism for a joint of a floor deck, comprising a first floor deck and a second floor deck that are spliced ​​together, wherein the first floor deck comprises a first splicing edge, and the second floor deck comprises a second splicing edge, and after splicing, the first splicing edge and the second splicing edge are close to each other;

[0008] A first card slot is provided on the first floor decking plate adjacent to the first splicing edge, and correspondingly, a second card slot is provided on the second floor decking plate adjacent to the second splicing edge;

[0009] It also includes a drainage plate, and both sides of the drainage plate are respectively provided with a first buckle matching the first slot and a second buckle matching the second slot; through the clamping connection between the first buckle and the first slot, and the clamping connection between the second buckle and the second slot, the drainage plate is respectively connected to the first floor deck and the second floor deck to form a drainage cavity for slurry discharge.

[0010] Furthermore, the first card slot and the second card slot have the same specifications and are parallel to each other;

[0011] Correspondingly, the first buckle and the second buckle have the same specifications and are parallel to each other.

[0012] Furthermore, the cross section of the liquid drainage plate is in an arc shape.

[0013] Furthermore, the thickness of the drainage plate is not less than the thickness of the first floor decking plate or the second floor decking plate.

[0014] Furthermore, the first clamping groove and the second clamping groove are both ribs with openings facing downwards and arranged on the first floor decking plate and the second floor decking plate, and the ribs are integrally processed with the first floor decking plate or the second floor decking plate.

[0015] Furthermore, the cross-sections of the first card slot and the second card slot are in the shape of an inverted triangle, and correspondingly, the first clip and the second clip are both in the shape of an inverted triangle; the first clip and the second clip are respectively slidably connected along the same end of the first card slot and the second card slot.

[0016] Furthermore, the first buckle and the second buckle are respectively formed integrally with the drainage plate.

[0017] Furthermore, a plurality of strip ribs are provided on the inner wall of the drainage plate, and the strip ribs can separate the inner wall of the drainage plate into a plurality of drainage grooves.

[0018] Furthermore, there are five strip-shaped rib plates, which are arranged at equal intervals on the inner wall of the drainage plate.

[0019] Furthermore, a first folded edge is provided on the first splicing edge, and correspondingly, a second folded edge with a sleeve is provided on the second splicing edge, and the first splicing edge and the second splicing edge are spliced ​​with each other by sleeve-jointing the first folded edge with the sleeve.

[0020] Beneficial Effects

[0021] The slurry discharge mechanism for the joints of floor decks provided by the utility model can quickly form a drainage cavity for discharging slurry by processing floor decks with slots, splicing several floor decks, and then snapping them together with drainage plates with buckles. The mechanism is not only simple in structure but also easy to process. It will not affect the efficiency of splicing floor decks, and drainage plates can be installed as needed to achieve the purpose of collecting and discharging slurry, which can effectively reduce the impact of slurry falling on the space below before concrete pouring and solidification. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 This is a first perspective view of the slurry discharge mechanism for the joint of the floor decking plate according to the utility model;

[0023] Figure 2 This is a first perspective view of the slurry discharge mechanism for the joint of the floor decking plate according to the utility model;

[0024] Figure 3 It is an assembly diagram of the slurry discharge mechanism for the joint of the floor decking plate described in the utility model;

[0025] Figure 4 It is a first-view structural schematic diagram of a drainage plate with a strip rib plate in a slurry drainage mechanism for a joint of a floor deck according to the utility model;

[0026] Figure 5 This is a second perspective structural schematic diagram of the drainage plate with strip ribs in the slurry discharge mechanism for the joints of the floor decking described in the utility model.

[0027] Graphic marking:

[0028] 1-first floor decking plate, 2-second floor decking plate, 3-first splicing edge, 4-second splicing edge, 5-first card slot, 6-second card slot, 7-drainage plate, 8-first buckle, 9-second buckle, 10-drainage cavity, 11-strip rib plate, 12-drainage groove, 13-first folding edge, 14-second folding edge, 15-shell. DETAILED DESCRIPTION

[0029] The utility model is further described in detail below based on the accompanying drawings and embodiments. The described embodiments are only part of the embodiments of the utility model, not all of them. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0030] like Figures 1 to 3As shown, a slurry discharge mechanism for joints of floor decking plates comprises a first floor decking plate 1 and a second floor decking plate 2 which are spliced ​​to each other, wherein the first floor decking plate 1 comprises a first splicing edge 3, and the second floor decking plate 2 comprises a second splicing edge 4, and after splicing, the first splicing edge 3 and the second splicing edge 4 are close to each other;

[0031] A first card slot 5 is provided on the first floor decking plate 1 adjacent to the first splicing edge 3, and correspondingly, a second card slot 6 is provided on the second floor decking plate 2 adjacent to the second splicing edge 4;

[0032] It also includes a drainage plate 7, and the two sides of the drainage plate 7 are respectively provided with a first buckle 8 matching the first clamping groove 5 and a second buckle 9 matching the second clamping groove 6; through the clamping of the first buckle 8 with the first clamping groove 5, and the clamping of the second buckle 9 with the second clamping groove 6, the drainage plate 7 is connected to the first floor deck 1 and the second floor deck 2 respectively, forming a drainage cavity 10 for slurry discharge;

[0033] It should be noted here that, depending on the conditions of the construction site, a lot of floor decking plates may be actually used. In this embodiment, the first floor decking plate 1 and the second floor decking plate 2 are only used to represent any two adjacent floor decking plates during the splicing process.

[0034] Working principle:

[0035] In practical applications, this mechanism needs to pre-join the first floor decking plate 1 and the second floor decking plate 2. After the joining is completed, the first clip 8 and the second clip 9 on the drainage plate are respectively joined with the first slot 5 and the second slot 6. The final state is that the drainage plate 7 is located below the gap formed after the first floor decking plate 1 and the second floor decking plate 2 are joined.

[0036] When the concrete grouting begins, the slurry in the concrete will be affected by gravity. When it encounters the gap of the floor decking, it will penetrate into the bottom gap of the floor decking as the accumulation increases. In the case of a large amount, it will even drip downward. The dripping slurry will fall into the drainage plate 7, and as the amount increases, it will be transported to one end or both ends of the drainage plate 7 by the drainage plate 7, ultimately achieving the continuous discharge of the dripping slurry before the concrete solidifies.

[0037] As an optimization of the present solution, in order to enable the slurry entering the drainage cavity 10 to flow to one end of the drainage plate 7 by itself, in the present embodiment, the first buckle 8 and the second buckle 9 are respectively arranged obliquely on the sides of the drainage plate 7, that is, one end is high and the other end is low. When the drainage plate 7 is connected to the first floor deck 1 and the second floor deck 2, the drainage plate 7 is inclined relative to the plane formed by the first floor deck 1 and the second floor deck 2, and the lower end serves as the slurry discharge end.

[0038] As an optimization of this solution, the first card slot 5 and the second card slot 6 have the same specifications and are parallel to each other; correspondingly, the first clip 8 and the second clip 9 have the same specifications and are parallel to each other.

[0039] As a specific embodiment of the drainage plate 7 in this solution, the cross section of the drainage plate 7 is in an arc shape.

[0040] The thickness of the drainage plate 7 is not less than the thickness of the first floor decking plate 1 or the second floor decking plate 2, and can be made of plastic or metal material.

[0041] like Figure 3 As shown, the first card slot 5 and the second card slot 6 are both ribs with openings facing downwards arranged on the first floor decking plate 1 and the second floor decking plate 2, and the ribs are integrally processed with the first floor decking plate 1 or the second floor decking plate 2.

[0042] The cross-sections of the first card slot 5 and the second card slot 6 are inverted triangles, and correspondingly, the first clip 8 and the second clip 9 are both inverted triangles; the first clip 8 and the second clip 9 are respectively slidably connected along the same end of the first card slot 5 and the second card slot 6; that is, in this embodiment, the drainage plate 7 is connected to the first floor decking plate 1 and the second floor decking plate 2 by sliding from the end.

[0043] In this embodiment, the first clip 8 and the second clip 9 are respectively integrally processed with the drainage plate 7 and can be completed by using the side bending technology. In this embodiment, the first clip 8 and the second clip 9 are bent into an inverted triangle shape by a bending machine.

[0044] like Figure 4 and 5As shown, as an optimization of the drainage plate 7 described in this embodiment, a plurality of strip ribs 11 are arranged on the inner wall of the drainage plate 7, and the strip ribs 11 can isolate the inner wall of the drainage plate 7 into a plurality of drainage grooves 12, each of which can collect and discharge the slurry that falls into its own groove. This structure can further disperse the fallen slurry and perform multi-path diversion and discharge, which can effectively prevent the blockage caused by slurry solidification due to only one drainage groove.

[0045] like Figure 5 As shown, as a specific embodiment of the structure, there are five strip ribs 11 which are arranged on the inner wall of the drainage plate 7 at equal intervals.

[0046] like Figure 2 and 3 As shown, in order to facilitate the quick splicing of the first floor decking plate 1 and the second floor decking plate 2, the present embodiment is provided with a first folded edge 13 on the first splicing edge 3, and correspondingly, a second folded edge 14 with a sleeve 15 is provided on the second splicing edge 4. The first splicing edge 3 and the second splicing edge 4 are spliced ​​together by the sleeve 15 on the first folded edge 13.

[0047] It should be noted that although this structure can facilitate the splicing of the first floor decking 1 and the second floor decking 2, and can further reduce the penetration of slurry, due to problems with installation accuracy or human operation, there is also a gap at the connection between the first folded edge 13 and the second folded edge 14, and this analysis extends to between the two spliced ​​edges. When there is enough slurry, it can still fall into the drainage cavity through the gap.

[0048] Therefore, under the dual effect of the drainage plate 7, the optimization of slurry drainage can be achieved.

[0049] The above is only a preferred specific implementation of the utility model, but the protection scope of the utility model is not limited thereto. Any changes or substitutions that can be thought of by anyone familiar with the technology within the technical scope disclosed by the utility model are included in the protection scope of the utility model. Therefore, the protection scope of the utility model should be based on the scope of the claims.

Claims

1. A slurry discharge mechanism for joints of floor decking, characterized in that: It comprises a first floor decking plate (1) and a second floor decking plate (2) which are spliced ​​to each other, wherein the first floor decking plate (1) comprises a first splicing edge (3), and the second floor decking plate (2) comprises a second splicing edge (4), and after splicing, the first splicing edge (3) and the second splicing edge (4) are close to each other; A first card slot (5) is provided on the first floor decking plate (1) adjacent to the first splicing edge (3), and correspondingly, a second card slot (6) is provided on the second floor decking plate (2) adjacent to the second splicing edge (4); The invention also comprises a drainage plate (7), wherein two sides of the drainage plate (7) are respectively provided with a first buckle (8) matching the first clamping groove (5), and a second buckle (9) matching the second clamping groove (6); by the clamping connection between the first buckle (8) and the first clamping groove (5), and the clamping connection between the second buckle (9) and the second clamping groove (6), the drainage plate (7) is respectively connected to the first floor deck (1) and the second floor deck (2), so as to form a drainage cavity (10) for discharging slurry.

2. The slurry discharge mechanism for joints of floor decking according to claim 1, characterized in that: The first card slot (5) and the second card slot (6) have the same specifications and are parallel to each other; Correspondingly, the first buckle (8) and the second buckle (9) have the same specifications and are parallel to each other.

3. The slurry discharge mechanism for joints of floor decking according to claim 1 or 2, characterized in that: The cross section of the liquid drainage plate (7) is in the shape of an arc.

4. The slurry discharge mechanism for joints of floor decking according to claim 3 is characterized in that: The thickness of the drainage plate (7) is not less than the thickness of the first floor decking plate (1) or the second floor decking plate (2).

5. The slurry discharge mechanism for joints of floor decking according to claim 1, characterized in that: The first clamping groove (5) and the second clamping groove (6) are both ribs with openings facing downwards and arranged on the first floor decking plate (1) and the second floor decking plate (2); the ribs are integrally processed with the first floor decking plate (1) or the second floor decking plate (2).

6. The slurry discharge mechanism for joints of floor decking according to claim 5, characterized in that: The cross-sections of the first card slot (5) and the second card slot (6) are in the shape of an inverted triangle, and correspondingly, the first clip (8) and the second clip (9) are both in the shape of an inverted triangle; the first clip (8) and the second clip (9) are slidably connected along the same end of the first card slot (5) and the second card slot (6), respectively.

7. The slurry discharge mechanism for joints of floor decking according to claim 1 or 6, characterized in that: The first buckle (8) and the second buckle (9) are respectively formed integrally with the liquid drainage plate (7).

8. The slurry discharge mechanism for joints of floor decking according to claim 3, characterized in that: A plurality of strip ribs (11) are arranged on the inner wall of the liquid drainage plate (7), and the strip ribs (11) can separate the inner wall of the liquid drainage plate (7) into a plurality of liquid drainage grooves (12).

9. The slurry discharge mechanism for joints of floor decking according to claim 8, characterized in that: There are five strip-shaped rib plates (11) arranged at equal intervals on the inner wall of the drainage plate (7).

10. The slurry discharge mechanism for joints of floor decking according to claim 1, characterized in that: A first folded edge (13) is provided on the first splicing edge (3), and correspondingly, a second folded edge (14) with a sleeve (15) is provided on the second splicing edge (4). The first splicing edge (3) and the second splicing edge (4) are spliced ​​together by the sleeve (15) being sleeved on the first folded edge (13).