Waste gas circulating device for high titanium slag production

By introducing waste heat recovery components and spiral pipe structure into the high-titanium slag production waste gas circulation device, the problem of waste gas heat not being recycled is solved, the waste gas circulation and heat efficient utilization is achieved, and the thermal energy utilization rate and environmental protection effect are improved.

CN221975837UActive Publication Date: 2024-11-08WUDING WUXING TITANIUM IND CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420608458.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-27
Publication Date
2024-11-08
Estimated Expiration
2034-03-27

AI Technical Summary

Technical Problem

When the waste gas produced during the production of high titanium slag is recycled, the heat is not effectively recycled, resulting in waste of resources and environmental pollution.

Method used

A waste gas circulation device including an electrostatic dust collector and waste heat recovery assembly is designed, and heat recovery and heating is used to ensure the temperature increase and utilization of the waste gas during the circulation process.

Benefits of technology

The heat recovery and utilization in the exhaust gas is realized, the thermal energy utilization rate is improved, and the purification and treatment of high-temperature gas is supplied to high-titanium slag production equipment for use, reducing environmental pollution.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221975837U_ABST
    Figure CN221975837U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of high titanium slag production waste gas treatment devices, in particular to a high titanium slag production waste gas circulating device which comprises an electrostatic dust collector, a gas inlet pipe is installed at the gas inlet end of the electrostatic dust collector, a gas outlet pipe is installed at the gas outlet end of the electrostatic dust collector, and a waste heat recovery assembly is arranged on the electrostatic dust collector. The waste heat recovery assembly comprises a heat preservation box and a booster pump, a water inlet pipe is installed at the water inlet end of the booster pump, a first spiral pipe is installed at the tail end of the water inlet pipe, a water outlet pipe is installed at the tail end of the first spiral pipe, a conveying pipe is installed at the water outlet end of the booster pump, a second spiral pipe is installed at the tail end of the conveying pipe, and a heat preservation pipe is installed at the tail end of the second spiral pipe. A third spiral pipe is installed at the tail end of the heat preservation pipe, a backflow pipe is installed at the tail end of the third spiral pipe, and the first spiral pipe and the third spiral pipe are located in the air inlet pipe and the air outlet pipe respectively. The waste gas treatment device is convenient for waste gas treatment and recycling operation, and has a heat recycling function.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of waste gas treatment devices for high-titanium slag production, in particular to a waste gas circulation device for high-titanium slag production. Background Art

[0002] When producing and preparing high-titanium slag, since the preparation needs to be completed through combustion operations, a large amount of waste gas will be generated during the combustion process. These waste gases contain a large amount of harmful particulate matter, which has a serious impact on the environment and human health. The traditional waste gas treatment method is mainly to discharge it into the atmosphere, which not only causes a waste of resources, but also aggravates environmental pollution. At present, in order to achieve the effect of environmentally friendly production, the waste gas generated in the production process of high-titanium slag is usually recycled. When recycling, the corresponding circulation device is usually used. This type of circulation device can usually remove impurities in the waste gas, and then continue to transport the purified gas to the high-titanium slag production equipment for use.

[0003] However, this type of waste gas circulation device can only complete the waste gas purification operation when in use. Since the discharged waste gas usually has a certain temperature, this part of the heat is not recycled, which will cause this part of the heat to be wasted, which is not conducive to improving the utilization rate of thermal energy. In view of this, we proposed a waste gas circulation device for high titanium slag production. Utility Model Content

[0004] The purpose of the utility model is to provide a waste gas circulation device for high-titanium slag production to solve the defects mentioned in the above background technology.

[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0006] The waste gas circulation device for high-titanium slag production includes an electrostatic precipitator, an air inlet pipe is fixedly installed at the air inlet end of the electrostatic precipitator, an air outlet pipe is fixedly installed at the air outlet end of the electrostatic precipitator, a waste heat recovery component is arranged on the electrostatic precipitator, and the waste heat recovery component includes an insulation box and a booster pump arranged on one side of the electrostatic precipitator, an inlet pipe is fixedly installed at the water inlet end of the booster pump, a first spiral pipe is fixedly installed at the end of the water inlet pipe, a water outlet pipe is fixedly installed at the end of the first spiral pipe, a delivery pipe is fixedly installed at the water outlet end of the booster pump, a second spiral pipe is fixedly installed at the end of the delivery pipe, an insulation pipe is fixedly installed at the end of the second spiral pipe, a third spiral pipe is fixedly installed at the end of the insulation pipe, a return pipe is fixedly installed at the end of the third spiral pipe, the ends of the water outlet pipe and the return pipe are both fixedly installed on the insulation box, and the first spiral pipe and the third spiral pipe are respectively located in the inlet pipe and the outlet pipe.

[0007] Preferably, the air inlet pipe is connected to the air outlet end of the high-titanium slag preparation furnace, and the air outlet pipe is connected to the air inlet end of the high-titanium slag preparation furnace, so as to facilitate the waste gas circulation operation.

[0008] Preferably, a box cover is hingedly connected to the top surface of the thermal insulation box, and the box cover is closed to reduce heat loss.

[0009] Preferably, the first spiral tube, the second spiral tube and the third spiral tube are all spiral-shaped and are used for heat exchange operations.

[0010] Preferably, an insulation box is fixedly installed on the outside of the second spiral tube, and an insulation cover is fixedly installed on the top surface of the insulation box by a plurality of fastening screws, which has the effect of insulating the second spiral tube and reducing heat loss.

[0011] Preferably, a heat-insulating layer is fixedly mounted on the inner wall of the heat-insulating box, and the heat-insulating layer is used for heat-insulating operation.

[0012] Preferably, an electric heater is fixedly mounted on the bottom surface of the heat-insulating cover, and the electric heater is used for heating operation.

[0013] Preferably, the first spiral tube is used to recover heat in the exhaust gas, and the third spiral tube is used to heat the cold air in the exhaust pipe.

[0014] Compared with the prior art, the beneficial effects of the utility model are:

[0015] 1. The utility model sets up a waste heat recovery component to ensure that when in use, water can be introduced into the first spiral tube to achieve heat exchange with the hot exhaust gas in the intake pipe. After the heat exchange, the water temperature rises, and the cold exhaust gas continues to be transported to the electrostatic precipitator for purification. The purified exhaust gas is discharged from the exhaust pipe. At this time, the hot water in the third spiral tube can continue to perform heat exchange with the air in the exhaust pipe to increase the temperature of the gas. The gas after the temperature is increased can continue to be transported to the high-titanium slag production equipment for use, thereby achieving the effect of exhaust gas circulation and recycling the heat in the exhaust gas.

[0016] 2. The utility model can perform heat preservation operation on the second spiral tube part by means of the heat preservation box, and can also realize heating operation inside the second spiral tube by means of the electric heater, so as to ensure that the gas in the exhaust pipe is heated more fully later. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0018] Figure 2 It is a schematic diagram of the explosion structure of the utility model;

[0019] Figure 3 This is a schematic diagram of the structure of the waste heat recovery component of the utility model;

[0020] Figure 4 It is a schematic diagram of the explosion structure of the waste heat recovery component of the utility model;

[0021] Figure 5 It is a partial structural schematic diagram of the utility model.

[0022] The meaning of each number in the figure is:

[0023] 1. Electrostatic precipitator; 10. Air inlet pipe; 11. Air outlet pipe;

[0024] 2. Waste heat recovery component; 20. Insulation box; 201. Box cover; 21. Water outlet pipe; 22. First spiral pipe; 23. Water inlet pipe; 24. Booster pump; 25. Delivery pipe; 26. Second spiral pipe; 261. Insulation pipe; 27. Third spiral pipe; 271. Return pipe; 28. Insulation box; 281. Insulation layer; 29. ​​Insulation cover; 291. Electric heater. DETAILED DESCRIPTION

[0025] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0026] See also Figure 1-Figure 5 The utility model provides a technical solution: a waste gas circulation device for high-titanium slag production, comprising an electrostatic precipitator 1, an air inlet pipe 10 is fixedly installed at the air inlet end of the electrostatic precipitator 1, and an air outlet pipe 11 is fixedly installed at the air outlet end of the electrostatic precipitator 1, the air inlet pipe 10 is connected to the air outlet end of the high-titanium slag preparation furnace, and the air outlet pipe 11 is connected to the air inlet end of the high-titanium slag preparation furnace, so as to facilitate the waste gas circulation operation;

[0027] Specifically, the electrostatic precipitator 1 is provided with a waste heat recovery component 2, and the waste heat recovery component 2 includes an insulation box 20 and a booster pump 24 arranged on one side of the electrostatic precipitator 1. The water inlet end of the booster pump 24 is fixedly installed with a water inlet pipe 23, the end of the water inlet pipe 23 is fixedly installed with a first spiral tube 22, the end of the first spiral tube 22 is fixedly installed with a water outlet pipe 21, the water outlet end of the booster pump 24 is fixedly installed with a delivery pipe 25, the end of the delivery pipe 25 is fixedly installed with a second spiral tube 26, and the end of the second spiral tube 26 is fixedly installed. An insulation pipe 261 is installed, and a third spiral tube 27 is fixedly installed at the end of the insulation pipe 261. A return pipe 271 is fixedly installed at the end of the third spiral tube 27. The ends of the outlet pipe 21 and the return pipe 271 are fixedly installed on the insulation box 20. The first spiral tube 22 and the third spiral tube 27 are respectively located in the intake pipe 10 and the outlet pipe 11, which is convenient for heat exchange operation of the high-temperature exhaust gas in the intake pipe 10. After heat exchange, the hot water in the third spiral tube 27 is used to heat the cold air in the outlet pipe 11.

[0028] In this embodiment, a box cover 201 is hinged on the top surface of the heat preservation box 20 via a hinge, and the box cover 201 is closed to reduce heat loss.

[0029] Specifically, the first spiral tube 22, the second spiral tube 26 and the third spiral tube 27 are all spiral-shaped and are used for heat exchange operation.

[0030] Furthermore, an insulation box 28 is fixedly installed on the outside of the second spiral tube 26, and an insulation cover 29 is fixedly installed on the top surface of the insulation box 28 by a plurality of fastening screws, which has the effect of insulating the second spiral tube 26 and reducing heat loss.

[0031] In addition, a heat-insulating layer 281 is fixedly installed on the inner wall of the heat-insulating box 28. The heat-insulating layer 281 can be made of a heat-insulating board material. The heat-insulating layer 281 is used for heat-insulating operation to reduce heat loss.

[0032] It is worth noting that an electric heater 291 is fixedly installed on the bottom surface of the heat-insulating cover 29, and the electric heater 291 is used for heating operation.

[0033] It is worth noting that the first spiral tube 22 is used to recover the heat in the exhaust gas, and the third spiral tube 27 is used to heat the cold air in the exhaust pipe 11.

[0034] When the waste gas circulation device for high-titanium slag production of the utility model is used, after the waste gas is introduced along the inlet pipe 10, the waste gas will enter the electrostatic precipitator 1 for dust removal operation, and the dust-removed gas will continue to be introduced into the high-titanium slag production equipment along the outlet pipe 11 for use;

[0035] In addition, the boost pump 24 is connected to an external power source and is put into operation. When the boost pump 24 is in operation, the cold water in the insulation box 20 is transported to the first spiral tube 22 for heat exchange with the high-temperature exhaust gas in the intake pipe 10. After the heat exchange, the high-temperature exhaust gas is converted into low-temperature exhaust gas and introduced into the electrostatic precipitator 1. The water temperature in the first spiral tube 22 increases. As the hot water in the first spiral tube 22 is introduced into the second spiral tube 26, the electric heater 291 can be used to continue to heat the water in the second spiral tube 26. After the heated water is transported to the third spiral tube 27, heat exchange is carried out with the air in the exhaust pipe 11, and the air in the exhaust pipe 11 is heated. The heated and purified gas continues to be transported to the high-titanium slag production equipment.

[0036] The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only preferred examples of the utility model and are not used to limit the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection of the utility model is defined by the attached claims and their equivalents.

Claims

1. A waste gas circulation device for the production of high-titanium slag, including an electrostatic precipitator (1), Features: An air inlet pipe (10) is fixedly mounted on the air inlet end of the electrostatic precipitator (1), an air outlet pipe (11) is fixedly mounted on the air outlet end of the electrostatic precipitator (1), a waste heat recovery component (2) is arranged on the electrostatic precipitator (1), the waste heat recovery component (2) comprises a heat preservation box (20) and a booster pump (24) arranged on one side of the electrostatic precipitator (1), a water inlet pipe (23) is fixedly mounted on the water inlet end of the booster pump (24), a first spiral tube (22) is fixedly mounted on the end of the water inlet pipe (23), a water outlet pipe (21) is fixedly mounted on the end of the first spiral tube (22), and a water outlet pipe (21) is fixedly mounted on the outlet end of the booster pump (24). A delivery pipe (25) is fixedly installed at the water end, a second spiral pipe (26) is fixedly installed at the end of the delivery pipe (25), a heat preservation pipe (261) is fixedly installed at the end of the second spiral pipe (26), a third spiral pipe (27) is fixedly installed at the end of the heat preservation pipe (261), a return pipe (271) is fixedly installed at the end of the third spiral pipe (27), the ends of the water outlet pipe (21) and the return pipe (271) are fixedly installed on the heat preservation box (20), and the first spiral pipe (22) and the third spiral pipe (27) are respectively located in the air inlet pipe (10) and the air outlet pipe (11).

2. The waste gas circulation device for high titanium slag production according to claim 1, Features: The air inlet pipe (10) is connected to the air outlet end of the high-titanium slag preparation furnace, and the air outlet pipe (11) is connected to the air inlet end of the high-titanium slag preparation furnace.

3. The waste gas circulation device for high titanium slag production according to claim 1, Features: A box cover (201) is hingedly connected to the top surface of the heat preservation box (20) via a hinge, and the box cover (201) is closed to reduce heat loss.

4. The waste gas circulation device for high titanium slag production according to claim 1, Features: The first spiral tube (22), the second spiral tube (26) and the third spiral tube (27) are all spiral-shaped and are used for heat exchange operations.

5. The waste gas circulation device for high titanium slag production according to claim 1, Features: A heat preservation box (28) is fixedly mounted on the outside of the second spiral tube (26), and a heat preservation cover (29) is fixedly mounted on the top surface of the heat preservation box (28) by means of a plurality of fastening screws.

6. The waste gas circulation device for high titanium slag production according to claim 5, Features: A heat-insulating layer (281) is fixedly mounted on the inner wall of the heat-insulating box (28), and the heat-insulating layer (281) is used for heat-insulating operation.

7. The waste gas circulation device for producing high titanium slag according to claim 5, Features: An electric heater (291) is fixedly mounted on the bottom surface of the heat-insulating cover (29), and the electric heater (291) is used for heating operation.

8. The waste gas circulation device for producing high titanium slag according to claim 5, Features: The first spiral tube (22) is used to recover the heat in the exhaust gas, and the third spiral tube (27) is used to heat the cold air in the exhaust pipe (11).