Conductive heating pavement brick

By designing the combination of T-shaped card slots, card blocks and fixing parts, the electrode connection disconnection caused by misalignment during use of conductive heating pavement bricks is solved, and the connection stability of the conductive bricks and the overall structure are improved.

CN221988997UActive Publication Date: 2024-11-12CHENGDU CONSTR ENG PRE-CONSTR TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323593617.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-26
Publication Date
2024-11-12
Estimated Expiration
2033-12-26

AI Technical Summary

Technical Problem

In actual use, existing conductive heating pavement bricks are prone to misalignment of adjacent bricks due to ground area settlement and pedestrian trampling, resulting in disconnection of electrode connections and inability to conduct electricity and heat normally.

Method used

The card slots and blocks of the conductive bricks are designed to be T-shaped, and are equipped with fixing parts and arc-shaped limiting slots to ensure that the conductive bricks do not misalign in the horizontal and vertical directions. The card slots are fixed by springs and ball mechanisms. Improve connection stability.

Benefits of technology

It effectively avoids misalignment between conductive bricks and disconnection of electrodes, improves the connection tightness and stability of conductive bricks, and ensures the normal operation of the conductive heating road surface.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221988997U_ABST
    Figure CN221988997U_ABST
Patent Text Reader

Abstract

The utility model relates to a conductive heating pavement brick, and belongs to the technical field of road facilities. The conductive brick comprises a conductive brick body, the conductive brick body is a rectangular body, T-shaped clamping grooves are formed in the two adjacent side edges of the conductive brick body, T-shaped clamping blocks are arranged on the two side edges, opposite to the clamping grooves, of the conductive brick body, the clamping blocks are matched with the clamping grooves, and fixing pieces are further arranged on the conductive brick body and located at the clamping grooves. The fixing piece is used for fixing the clamping block inserted into the clamping groove, and electrodes are arranged on the inner wall of the clamping groove and the clamping block. The problem that a traditional conductive pavement brick is prone to dislocation and disconnection can be solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of road facility technology, and in particular to a conductive heating pavement brick. Background Art

[0002] Conductive concrete is a special type of concrete that uses conductive materials to partially or completely replace ordinary aggregates in concrete, and has electrical properties that meet the requirements and certain mechanical properties. Conductive concrete also has the ability to sense and convert hot spots. Under the action of an external AC or DC power supply, conductive concrete will generate heat due to its own resistance, raising the road surface temperature. It can be used in building floor heating, road deicing and snow melting, electromagnetic interference shielding, and anti-static fields.

[0003] The invention patent with the existing authorization publication number CN116876742A discloses a conductive heating concrete brick, which specifically discloses a conductive concrete brick body, compression spring electrodes for connection on both sides of the brick body, and multiple slots and protrusions for left and right, up and down auxiliary positioning arranged on both sides of the patent. The bricks are conveniently positioned during installation, which improves construction efficiency, and the electrodes are automatically connected, making construction convenient.

[0004] With regard to the above-mentioned related technologies, during the actual use of pavement bricks, the slots and protrusions on the brick body only serve to assist in positioning during installation. However, due to partial water accumulation and pedestrian trampling on the ground, adjacent conductive pavement bricks are prone to misalignment, resulting in disconnection of the electrodes between the brick bodies and inability to conduct electricity and generate heat normally. Summary of the invention

[0005] In order to improve the problem that traditional conductive pavement bricks are easily misplaced and disconnected, the present application provides a conductive heating pavement brick.

[0006] The conductive heating pavement brick provided in this application adopts the following technical solution:

[0007] A conductive heating pavement brick comprises a conductive brick, wherein the conductive brick is a rectangular body, and two adjacent sides of the conductive brick are provided with T-shaped slots, and two sides of the conductive brick opposite to the slots are provided with T-shaped card blocks, and the card blocks are adapted to the slots. A fixing piece is also provided on the conductive brick and located at the slot, and the fixing piece is used to fix the card block inserted into the slot, and electrodes are provided on the inner wall of the slot and the card block.

[0008] Optionally, the fixing member includes a first locking ball and a first spring. A first fixing groove with an inclined bottom wall is provided on the conductive brick and on the side wall of the locking groove. The depth of the lower end of the first fixing groove is greater than the depth of the upper end. The first locking ball is located in the first fixing groove. One end of the first spring is connected to the side wall of the first fixing groove, and the other end is connected to the first locking ball. The first spring makes the first locking ball always have a tendency to move upward.

[0009] Optionally, a second fixing groove is provided on the side wall of the locking groove opposite to the first fixing groove, and the bottom wall of the second fixing groove is inclined so that the depth of the upper end is greater than the depth of the lower end. A second locking ball and a second spring are provided on the conductive brick and in the second fixing groove, and the second spring makes the second locking ball always have a tendency to move toward the bottom of the second fixing groove.

[0010] Optionally, arc-shaped limiting grooves are provided on both sides of the block.

[0011] Optionally, the electrode is in the shape of a steel mesh.

[0012] Optionally, the electrode is raised away from the conductive brick.

[0013] Optionally, a drainage groove is provided on the upper surface of the conductive brick.

[0014] In summary, the present application includes at least one of the following beneficial technical effects:

[0015] 1. Set the blocks and slots of the conductive bricks to be T-shaped. When laying the conductive bricks, two adjacent conductive bricks cannot move relative to each other in the horizontal direction, so that the two adjacent conductive bricks are closely connected to avoid dislocation between adjacent conductive bricks;

[0016] 2. The fixing piece is used to fix the card block inserted into the card slot, thereby fixing two adjacent conductive bricks in the vertical direction, further improving the connection stability between the conductive bricks, and avoiding misalignment and disconnection between adjacent conductive bricks. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic diagram of the structure of an embodiment of the present application.

[0018] Figure 2 is along Figure 1 A sectional view with sectioning along line AA.

[0019] Description of reference numerals:

[0020] 1. Conductive brick; 11. Drain groove; 2. Card slot; 21. First fixed slot; 22. Second fixed slot; 3. Card block; 31. Limiting slot; 4. Fixing piece; 41. First card ball; 42. First spring; 43. Second card ball; 44. Second spring; 5. Electrode. DETAILED DESCRIPTION

[0021] The following is combined with Figure 1-2 This application is described in further detail.

[0022] The present application embodiment discloses a conductive heating pavement brick, referring to Figure 1 and Figure 2 A conductive heating pavement brick includes a conductive brick 1, which is prefabricated from conductive concrete. The conductive brick 1 is a rectangular body as a whole, and a card slot 2 with a T-shaped cross section is opened on the adjacent two sides of the conductive brick 1. The card slot 2 passes through the conductive brick 1 in the vertical direction. T-shaped card blocks 3 are arranged on the two sides of the conductive brick 1 opposite to the two card slots 2, and the card blocks 3 are adapted to the corresponding card slots 2. A fixing member 4 is also arranged on the conductive brick 1 and located at the card slot 2. When the card block 3 is inserted into the card slot 2, the fixing member 4 fixes the card block 3 in the card slot 2, thereby connecting and fixing the adjacent conductive bricks 1. Electrodes 5 are arranged on the inner wall of the card slot 2 and the outer wall of the card block 3. When the conductive brick 1 is laid, the electrodes 5 of the card slots 2 and the card blocks 3 on two adjacent conductive bricks 1 are connected.

[0023] The block 3 and the slot 2 of the conductive brick 1 are set to a T shape. When the conductive bricks 1 are laid, two adjacent conductive bricks 1 cannot move relative to each other in the horizontal direction, so that the two adjacent conductive bricks 1 are tightly connected; the fixing piece 4 is used to fix the block 3 inserted into the slot 2, thereby fixing the two adjacent conductive bricks 1 in the vertical direction, further improving the connection stability between the conductive bricks 1, and avoiding misalignment and disconnection between the adjacent conductive bricks 1.

[0024] Reference Figure 2 The fixing member 4 includes a first clamping ball 41 and a first spring 42. A first fixing groove 21 is provided on the conductive brick 1 and on one side wall of the clamping groove 2. The bottom wall of the first fixing groove 21 is inclined, and the depth of the lower end of the first fixing groove 21 is greater than the depth of the upper end, so that the cross-sectional shape of the first fixing groove 21 is a right-angled trapezoid. The first clamping ball 41 is movably arranged in the first fixing groove 21, and the diameter of the first clamping ball 41 is greater than the depth of the upper end of the first fixing groove 21, and the diameter of the first clamping ball 41 is less than the depth of the lower end of the first fixing groove 21. The first spring 42 is arranged on the conductive brick 1 and is located in the first fixing groove 21. One end of the first spring 42 is connected to the lower side wall of the first fixing groove 21, and the other end is fixedly connected to the first clamping ball 41. The first spring 42 makes the first clamping ball 41 always have a tendency to move upward along the first fixing groove 21.

[0025] When the conductive brick 1 is laid, the card block 3 is inserted into the card slot 2, and the card block 3 pushes the first card ball 41 to move downward until it completely enters the first fixed groove 21. When the conductive brick 1 is laid in place, one side of the first card ball 41 contacts the bottom wall of the first fixed groove 21, and the other side contacts the card block 3. At this time, when the conductive brick 1 where the card block 3 is located has a tendency to tilt and lift up under the action of external force, that is, the conductive brick 1 where the card block 3 is located has a tendency to move upward. At this time, the conductive brick 1 has a tendency to drive the first card ball 41 to move upward under the action of friction, and the upper end of the first fixed groove 21 is shallow, so that the card ball clamps the card block 3 in the card slot 2 at this time, thereby fixing the conductive brick 1 and preventing the conductive brick 1 from tilting and bulging upward.

[0026] Reference Figure 2 A second fixing groove 22 is also provided on the side wall of the card slot 2 opposite to the first fixing groove 21. The second fixing groove 22 has the same structure as the first fixing groove 21 and is in the opposite direction, that is, the cross-sectional shape of the second fixing groove 22 is also a right-angled trapezoid, and the depth of the upper end of the bottom wall of the second fixing groove 22 is greater than the depth of the lower end. A second clamping ball 43 and a second spring 44 are provided on the conductive brick 1 and located in the second fixing groove 22. The second clamping ball 43 has the same structure as the first clamping ball 41, and the second spring 44 has the same structure as the first spring 42. The second spring 44 makes the second clamping ball 43 always have a tendency to move toward the bottom of the second fixing groove 22.

[0027] When the ground subsides and the conductive brick 1 tends to move downward, the block 3, under the action of friction, tends to drive the second clamping ball 43 to move downward along the second fixing groove 22, and the lower end of the second fixing groove 22 is shallow, thereby fixing the conductive brick 1. Through the cooperation of the first fixing groove 21 and the second fixing groove 22, after the conductive brick 1 is laid, adjacent conductive bricks 1 cannot move relative to each other in the horizontal direction and the vertical direction, thereby improving the overall structural stability of the conductive brick 1 road surface.

[0028] It should be noted that when laying the conductive bricks 1, it is necessary to use a thin tool to fix the first clamping ball 41 into the first fixing groove 21 and the second clamping ball 43 into the second fixing groove 22. After the adjacent conductive bricks 1 are laid in place, the thin tool can be pulled out.

[0029] Reference Figure 1 Arc-shaped limiting grooves 31 are provided on both sides of the clamping block 3. The limiting grooves 31 on both sides of the clamping block 3 correspond to the first clamping ball 41 and the second clamping ball 43 respectively. When the conductive brick 1 is installed in place, the first clamping ball 41 and the second clamping ball 43 fall into the corresponding limiting grooves 31 respectively, further improving the clamping effect.

[0030] Reference Figure 1 The electrode 5 is in the shape of a steel mesh, and the electrode 5 is raised away from the conductive brick 1. The raised electrode 5 allows the adjacent conductive bricks 1 to be tightly connected when the conductive bricks 1 are laid.

[0031] Reference Figure 1 Furthermore, a drainage groove 11 is provided on the upper surface of the conductive brick 1. After the conductive heating snow melts, the drainage groove 11 facilitates the discharge of melted water from the conductive brick 1 to the roadside, thereby preventing a large amount of snow water from seeping into the roadbed and causing the roadbed to settle and turn over. At the same time, the drainage groove 11 can also play an anti-skid effect and improve the comfort of the road surface.

[0032] The implementation principle of a conductive heating pavement brick in an embodiment of the present application is as follows: the block 3 and the slot 2 of the conductive brick 1 are set to a T shape. When the conductive brick 1 is laid, two adjacent conductive bricks 1 cannot move relative to each other in the horizontal direction, so that the two adjacent conductive bricks 1 are tightly connected; the fixing member 4 is used to fix the block 3 inserted into the slot 2, thereby fixing the two adjacent conductive bricks 1 in the vertical direction, further improving the connection stability between the conductive bricks 1, and avoiding misalignment and disconnection between the adjacent conductive bricks 1.

[0033] Finally, it should be noted that in the description of this application, it should be noted that the terms "vertical", "up", "down", "horizontal", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings. They are only for the convenience of describing this application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation. Therefore, they cannot be understood as limitations on this application.

[0034] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A conductive heating pavement brick, comprising a conductive brick (1), characterized in that: The conductive brick (1) is a rectangular body. Two adjacent sides of the conductive brick (1) are provided with T-shaped card slots (2). Two sides of the conductive brick (1) opposite to the card slots (2) are provided with T-shaped card blocks (3). The card blocks (3) are adapted to the card slots (2). A fixing piece (4) is also provided on the conductive brick (1) and located at the card slots (2). The fixing piece (4) is used to fix the card block (3) inserted into the card slots (2). Electrodes (5) are provided on the inner wall of the card slots (2) and the card blocks (3).

2. The conductive heating pavement brick according to claim 1, characterized in that: The fixing member (4) comprises a first clamping ball (41) and a first spring (42). A first fixing groove (21) with an inclined bottom wall is provided on the conductive brick (1) and located on the side wall of the clamping groove (2). The depth of the lower end of the first fixing groove (21) is greater than the depth of the upper end. The first clamping ball (41) is located in the first fixing groove (21). One end of the first spring (42) is connected to the side wall of the first fixing groove (21) and the other end is connected to the first clamping ball (41). The first spring (42) enables the first clamping ball (41) to always have a tendency to move upward.

3. The conductive heating pavement brick according to claim 2, characterized in that: A second fixing groove (22) is provided on the side wall of the clamping groove (2) opposite to the first fixing groove (21); the bottom wall of the second fixing groove (22) is inclined so that the depth of the upper end is greater than the depth of the lower end; a second clamping ball (43) and a second spring (44) are provided on the conductive brick (1) and located in the second fixing groove (22); the second spring (44) enables the second clamping ball (43) to always have a tendency to move toward the lower side of the second fixing groove (22).

4. The conductive heating pavement brick according to claim 3, characterized in that: Arc-shaped limiting grooves (31) are provided on both sides of the clamping block (3).

5. The conductive heating pavement brick according to claim 1, characterized in that: The electrode (5) is in the shape of a steel mesh.

6. The conductive heating pavement brick according to claim 5, characterized in that: The electrode (5) is raised away from the conductive brick (1).

7. The conductive heating pavement brick according to claim 1, characterized in that: The upper surface of the conductive brick (1) is provided with a drainage groove (11).