Cable saddle mounting structure for sub-wire pipe of extradosed cable-stayed bridge
By designing structures such as cable towers, stiffen skeletons and lifting components in the low tower cable-stayed bridge, the problem of deviation in the installation position of the wire-dividing pipe is solved, and the accurate installation and construction efficiency of the wire-dividing pipe saddle is achieved.
Patent Information
- Application Number
- CN202420587317.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-25
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2034-03-25
AI Technical Summary
During the installation of the wire split pipe of the low tower cable-stayed bridge, it is difficult to control the displacement of the wire split pipe, resulting in a slight deviation in the installation position, affecting the subsequent stress of the cable-stayed bridge.
A cable saddle installation structure of a cable tower, a rigid frame, a wire tube body, a lifting assembly, a positioning angle steel, a positioning member and an auxiliary conduit was designed. Through the welding of the auxiliary conduit and a positioning angle steel and the cooperation of the positioning member , to ensure the accurate position and orientation of the wire split tube, the lifting assembly is used to lift and fix the wire split tube.
The accurate installation of the wire-pipe saddle is achieved, the construction efficiency and quality is improved, and the overall construction of the bridge is completed in a short time.
Smart Images

Figure CN221989095U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of bridge construction, in particular to a cable saddle installation structure for a short-tower cable-stayed bridge. Background Art
[0002] The low-tower cable-stayed bridge is a cable-stayed composite system bridge between the continuous beam and the cable-stayed bridge, with the characteristics of low tower, rigid beam and concentrated cable. Compared with the continuous beam, the low-tower cable-stayed bridge has the advantages of novel structure, large span capacity, simple construction and economy; compared with the cable-stayed bridge, it has the advantages of convenient construction, material saving and high main beam rigidity. This makes the low-tower cable-stayed bridge have a broad development space.
[0003] Before installing the split wire pipe, a rigid frame needs to be set up on the cable tower, and then the split wire pipe is hoisted into the rigid frame by hoisting equipment, and the split wire pipe is fixed, and then the cable tower is cast to fix the split wire pipe on the cable tower. However, the displacement of the split wire pipe is very difficult to control, and a slight deviation in the position of the split wire pipe installation will greatly affect the stress of the subsequent cable-stayed bridge. For this reason, this application document provides a cable saddle installation structure for the split wire pipe of a low-tower cable-stayed bridge. Utility Model Content
[0004] The purpose of the utility model is to solve the problems raised in the above background technology, and provide a cable saddle installation structure for a wire pipe of a low-tower cable-stayed bridge.
[0005] In order to achieve the above-mentioned purpose, the utility model specifically adopts the following technical solutions:
[0006] A cable saddle installation structure for a low-tower cable-stayed bridge includes a cable tower, a rigid frame, a cable tube body and a lifting assembly. The rigid frame is fixedly installed on the top of the cable tower, and the two ends of the cable tube body are respectively located on opposite sides of the rigid frame. Both ends of the cable tube body are fixedly sleeved with cable tube anchor pads, and auxiliary guide tubes are installed on both ends of the cable tube body. Mounting platforms are fixed on opposite sides of the rigid frame, positioning angle steels are installed on the mounting platforms, and positioning pieces are installed on the positioning angle steels. The bottoms of the two cable tube anchor pads correspond to the two positioning pieces respectively, and the lifting assembly is installed on the rigid frame.
[0007] Preferably, the positioning member comprises two positioning blocks both fixed on the top of the positioning angle steel, and opposite sides of the two positioning blocks are both constructed as inclined surfaces, and the angle between the two inclined surfaces is ninety degrees.
[0008] Preferably, the number of the lifting assemblies is two and they are symmetrically arranged. The lifting assembly includes a hand chain hoist installed on the rigid frame. A lifting ring is fixedly installed on the free end of the chain in the hand chain hoist, and the lifting ring is sleeved on the wire distribution tube body.
[0009] Preferably, the auxiliary conduit is rigidly connected to the wire distribution tube body.
[0010] Preferably, two adjacent side edges of the bottom of the wire dividing tube anchor plate are respectively welded to the side edges of the two positioning blocks.
[0011] Preferably, the positioning angle steel is welded to the mounting platform.
[0012] Preferably, bolts are connected between the positioning angle steel and the mounting platform.
[0013] Beneficial effects:
[0014] During operation, the utility model calculates the coordinates at the outlet of the wire branching tube by utilizing geometrical relationship according to the spatial coordinates of the top end of the wire branching tube body provided in the design drawings; the auxiliary guide tube can ensure that the surveyor controls the outlet coordinates of the wire branching tube; the positioning angle steels are welded at corresponding positions through the layout of the level and the total station; finally, the two branch test tube anchor pads are welded to the two positioning parts; the accuracy of the installation of the wire branching tube saddle can be ensured; the construction and installation of the entire bridge can be completed in a relatively short time, thereby improving the construction efficiency and the quality. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0016] Figure 1 It is a three-dimensional structural schematic diagram of the utility model;
[0017] Figure 2 For this utility model Figure 1 A three-dimensional cross-sectional view of
[0018] Figure 3 For this utility model Figure 1 Schematic diagram of the three-dimensional structure of the middle part.
[0019] Figure 1-Figure 3 middle:
[0020] 1. Cable tower; 2. Rigid frame; 3. Wire distribution pipe body; 4. Lifting assembly; 21. Mounting platform; 22. Positioning angle steel; 23. Positioning piece; 24. Bolt; 31. Wire distribution pipe anchor plate; 32. Auxiliary guide tube; 41. Hand hoist; 42. Lifting ring; 231. Positioning block. DETAILED DESCRIPTION
[0021] In order to make the purpose, technical solution and advantages of the embodiments of the present utility model clearer, the technical solution in the embodiments of the present utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the present utility model.
[0022] The present application provides a cable saddle installation structure for a low-tower cable-stayed bridge, which is mainly used to solve the problem that a slight deviation in the installation position of the cable saddle will greatly affect the stress condition of the subsequent cable-stayed bridge, and provides the following technical solutions. Figure 1-Figure 3 Make a detailed description:
[0023] A cable saddle installation structure for a low-tower cable-stayed bridge mainly includes a cable tower 1, a rigid frame 2, a cable saddle body 3 and a lifting assembly 4. The cable tower 1 is an important load-bearing structure of a low-tower cable-stayed bridge, which plays a role in supporting the entire bridge and is built of concrete and steel structure. The rigid frame 2 is fixedly installed on the top of the cable tower 1. The two ends of the cable saddle body 3 are respectively located on the opposite sides of the rigid frame 2. The two ends of the cable saddle body 3 are fixedly sleeved with cable saddle anchor plates 31. The rigid frame 2 is a rigid bridge deck structure, which is fixed on the top of the cable tower 1, and the cable saddle body 3 is connected to the rigid frame 2 through the cable saddle anchor plate 31. The function of the rigid skeleton 2 is to provide rigid support to prevent excessive deformation or vibration of the bridge deck. The rigid skeleton 2 is constructed with a steel structure. Auxiliary guide tubes 32 are installed on both ends of the wire-dividing pipe body 3. The auxiliary guide tube 32 is rigidly connected to the wire-dividing pipe body 3. The function of the auxiliary guide tube 32 is to ensure that the surveyor can control the coordinates of the outlet of the wire-dividing pipe body 3. The diameter of the auxiliary guide tube 32 is slightly smaller than the diameter of the wire-dividing pipe body 3, and the length is set to the end of the auxiliary guide tube 32 that the surveyor can see at the riverbank observation point. The auxiliary guide tube 32 has the characteristics of strong rigidity and light material to prevent the auxiliary guide tube 32 from being damaged during installation. The positioning accuracy is reduced due to the deadweight or wind force of the auxiliary guide tube 32. The auxiliary guide tube 32 is rigidly connected to the wire-dividing tube body 3 to ensure the accurate positioning of the wire-dividing tube body 3, so as to control the whole body from one end and install it to the designed position without exceeding the error limit. The wire-dividing tube body 3 is a key component of the wire-dividing tube saddle installation structure. It is connected to the rigid frame 2 through the wire-dividing tube anchor plate 31. The wire-dividing tube body 3 is made of steel pipe. The two opposite sides of the rigid frame 2 are fixed with mounting platforms 21. The mounting platforms 21 are installed with positioning angle steels 22. The positioning angle steels 22 are welded to the mounting platforms 21. The positioning angle steels 22 are installed with positioning parts 2 3. The bottoms of the two branch wire pipe anchor pads 31 correspond to the two positioning pieces 23 respectively. The positioning angle steel 22 is an important component connecting the branch wire pipe anchor pad 31 and the positioning piece 23. Its function is to ensure the accurate position and direction of the branch wire pipe body 3 during the installation process. The lifting assembly 4 is installed on the rigid frame 2. The lifting assembly 4 is an auxiliary equipment installed on the rigid frame 2, which is used to lift the branch wire pipe body 3 into place. This solution can ensure the accuracy of the installation of the branch wire pipe saddle, and can complete the construction and installation of the entire bridge in a short time, thereby improving the construction efficiency and construction quality. The operation steps of this solution during specific operation are:
[0024] Step 1: According to the drawing, check the size and angle of each tube in the wire distribution tube body 3 to ensure that the wire distribution tube is completely consistent with the drawing;
[0025] Step 2: Install the auxiliary conduit 32 at the outlet center of the tube body, and rigidly connect the auxiliary conduit 32 to the wire distribution tube to ensure accurate positioning of the wire distribution tube body 3;
[0026] Step 3: When tying the steel bars of the first pouring section of the cable tower 1, weld and fix the rigid embedded parts on the vertical main reinforcement to ensure that the embedded parts are accurately positioned when fixed;
[0027] Step 4: After the first pouring section of the cable tower 1 is poured and the concrete strength reaches the required level, the rigid frame 2 is installed starting from the embedded parts;
[0028] Step 5: Use a steel tape measure to guide the elevation to the cable tower 1, and use a level to release the elevation of the bottom edge of the wire pipe anchor plate 31 on the left and right sides of the rigid frame 2, and weld the positioning angle steel 22;
[0029] Step 6: Use a total station to lay out the two corner points of the bottom edge of the wire pipe anchor plate 31 on the positioning angle steel 22 welded in the previous step;
[0030] Step seven, make the corner points of the bottom edge 31 of the wire branching tube anchor plate correspond to the placed points, and then connect the bottom edge of the wire branching tube anchor plate 31 with the positioning piece 23 on the positioning angle steel 22. In this way, the elevation and the position of the lower bottom edge of the wire branching tube body 3 are guaranteed to be correct. However, in order to ensure the verticality of the installation of the wire branching tube body 3, use the total station to place the position of the corner points of the upper edge of the wire branching tube body 3. After checking and confirming that there are no errors, the wire branching tube body 3 is welded and fixed to the rigid frame 2.
[0031] For details, please refer to Figure 2 and Figure 3 The positioning member 23 includes two positioning blocks 231 fixed on the top of the positioning angle steel 22. The opposite sides of the two positioning blocks 231 are constructed as inclined surfaces and the angle between the two inclined surfaces is ninety degrees. The two positioning blocks 231 can accurately position the bottom of the wire branching tube anchor plate 31; the two adjacent side edges at the bottom of the wire branching tube anchor plate 31 are respectively welded to the side edges of the two positioning blocks 231, and the connection has high stability.
[0032] In this example, see Figure 2 There are two lifting assemblies 4 which are symmetrically arranged. The lifting assemblies 4 include a hand chain hoist 41 installed on the rigid frame 2. A lifting ring 42 is fixedly installed on the free end of the chain in the hand chain hoist 41. The lifting ring 42 is sleeved on the wire dividing tube body 3. The implementation method of the lifting assembly 4 is to use the hand chain hoist 41 to hang the chain on the lifting ring 42 of the wire dividing tube body 3, and perform manual operation to make the wire dividing tube body 3 reach a predetermined position. This method can effectively ensure safety and accuracy.
[0033] For further information, see Figure 3 Bolts 24 are connected between the positioning angle steel 22 and the mounting platform 21 , and the stability between the positioning angle steel 22 and the mounting platform 21 can be enhanced by the connection of the bolts 24 .
[0034] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A cable saddle installation structure for a low-tower cable-stayed bridge, characterized in that: The invention comprises a cable tower (1), a rigid frame (2), a wire-dividing tube body (3) and a lifting assembly (4); the rigid frame (2) is fixedly mounted on the top of the cable tower (1); the two ends of the wire-dividing tube body (3) are respectively located on opposite sides of the rigid frame (2); the two ends of the wire-dividing tube body (3) are fixedly sleeved with wire-dividing tube anchor pads (31); the two ends of the wire-dividing tube body (3) are respectively installed with auxiliary guide tubes (32); the two opposite sides of the rigid frame (2) are fixed with mounting platforms (21); the mounting platforms (21) are installed with positioning angle steels (22); the positioning angle steels (22) are installed with positioning members (23); the bottoms of the two wire-dividing tube anchor pads (31) correspond to the two positioning members (23) respectively; the lifting assembly (4) is installed on the rigid frame (2).
2. The cable saddle installation structure for a low-tower cable-stayed bridge according to claim 1, characterized in that: The positioning member (23) comprises two positioning blocks (231) both fixed on the top of the positioning angle steel (22); opposite sides of the two positioning blocks (231) are both constructed as inclined surfaces, and the angle between the two inclined surfaces is ninety degrees.
3. The cable saddle installation structure for a low-tower cable-stayed bridge according to claim 1, characterized in that: The lifting components (4) are two in number and are symmetrically arranged. The lifting components (4) include a hand chain hoist (41) installed on the rigid frame (2). A lifting ring (42) is fixedly installed on the free end of the chain in the hand chain hoist (41). The lifting ring (42) is sleeved on the wire distribution tube body (3).
4. The cable saddle installation structure for a low-tower cable-stayed bridge according to claim 1, characterized in that: The auxiliary guide tube (32) is rigidly connected to the wire distribution tube body (3).
5. The cable saddle installation structure of a low-tower cable-stayed bridge according to claim 2, characterized in that: Two adjacent side edges at the bottom of the wire distribution tube anchor pad (31) are respectively welded to the side edges of the two positioning blocks (231).
6. The cable saddle installation structure for a low-tower cable-stayed bridge according to claim 1, characterized in that: The positioning angle steel (22) is welded to the mounting platform (21).
7. The cable saddle installation structure for a low-tower cable-stayed bridge according to claim 1, characterized in that: Bolts (24) are connected between the positioning angle steel (22) and the mounting platform (21).
