Temporary scaffold device for large-size reinforcement cage

By designing a temporary scaffolding device for large-size steel cages composed of support components and scaffolding, the problems of safety hazards and low efficiency during the assembly of steel cages are solved, and higher construction safety and efficiency are achieved.

CN221989312UActive Publication Date: 2024-11-12天津港航工程有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420010213.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-03
Publication Date
2024-11-12
Estimated Expiration
2034-01-03

AI Technical Summary

Technical Problem

During the assembly process of large-size steel cages, there are problems of safety hazards and low efficiency, especially because the scaffolding needs to be erected and removed, which affects the construction efficiency.

Method used

A temporary scaffolding device for large-size reinforced cages composed of support components and scaffolding boards was designed. The assembly and disassembly process is simplified by threaded connections and U-shaped groove structure, making full use of the self-strength of the reinforced cages, and improving structural stability. .

Benefits of technology

It improves construction safety and efficiency, simplifies the assembly and disassembly process, reduces safety hazards, and improves assembly efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221989312U_ABST
    Figure CN221989312U_ABST
Patent Text Reader

Abstract

The utility model discloses a temporary scaffold device for a large-size reinforcement cage. The temporary scaffold device is composed of a plurality of supporting assemblies and a plurality of scaffold boards. The supporting assembly is composed of a scaffold transverse rod and two scaffold longitudinal rods. The scaffold cross rod comprises a cross rod, two cross rod supports and two cross rod mounting plates; the cross rod support is composed of a sleeve and a U-shaped clamping block, a U-shaped groove is formed in one end of the U-shaped clamping block, and the other end of the U-shaped clamping block is fixed to the sleeve. The two cross rod supports are respectively connected with the two sleeves; the two cross rod mounting plates are horizontally fixed at the two ends of the cross rod; the scaffold longitudinal rod comprises a longitudinal rod, a longitudinal rod support and a longitudinal rod nut; a nut is arranged on the top side of the longitudinal rod; one end of the longitudinal rod support is fixed at the bottom end of the longitudinal rod through a U-shaped groove; the multiple sets of supporting assemblies are fixed to a reinforcement cage at intervals in the horizontal direction, and the multiple scaffold boards are erected on the two sides of the top faces of the supporting assemblies correspondingly to form two horizontal supporting platforms. The device is simple in structure, convenient to disassemble and assemble and stable in structure, and the construction safety is greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to a temporary scaffolding device for a large-size steel cage. Background Art

[0002] The underground continuous wall is a foundation project, and its specific operation process is as follows: first, a trenching machine is used on the ground to dig a long and narrow deep trench along the peripheral axis of the deep excavation project and under the condition of mud wall protection; then, after the trench is cleaned, a steel cage is suspended in the trench; then, underwater concrete is poured using the conduit method to build a unit trench section; this process is repeated section by section to build a continuous reinforced concrete wall underground as a water-cutting, anti-seepage, load-bearing and water-retaining structure.

[0003] Because the ground-connected wall steel cage is usually high, it is usually processed on the steel cage platform and then hoisted into the construction area for construction. Since the steel cage assembly cycle is short and the shape of the steel cage needs to adapt to the shape of the ground-connected wall slot, for large-sized steel cages, especially those with irregular shapes, scaffolding needs to be set up for the assembly workers to climb up and install the top steel bars; then, if this assembly method is adopted, each steel cage needs to be equipped with scaffolding to assist the steel cage assembly, and the scaffolding needs to be removed after the assembly is completed, which greatly affects the assembly efficiency of the steel cage.

[0004] At present, when assembling the top steel bars of such large-sized steel bars, workers usually wear safety belts and then climb up the steel cage to install them. This not only poses a great safety hazard, but also leads to low work efficiency during the climbing process. Therefore, it is necessary to design a scaffolding structure that can be temporarily erected and assist in assembly for large-sized steel cages such as ground-connected wall steel cages. Utility Model Content

[0005] The utility model aims to provide a temporary scaffolding device for a large-size steel cage which solves the above-mentioned technical problems.

[0006] To this end, the technical solution of the utility model is as follows:

[0007] A temporary scaffolding device for a large-size steel cage is composed of several groups of support components and several scaffolding boards; each group of support components is composed of a scaffolding cross bar and two scaffolding longitudinal bars; wherein the scaffolding cross bar includes a cross bar, two cross bar supports and two cross bar mounting plates; two threaded connection sections are symmetrically arranged on the outer wall of the cross bar; the cross bar support is composed of a cylindrical sleeve and a U-shaped block, the U-shaped block is a block with a U-shaped groove at one end, and the other end is fixed on the outer wall of the cylindrical sleeve, and the width of the U-shaped groove is adapted to the diameter of the main reinforcement; the two cross bar supports are respectively sleeved by the cylindrical sleeve and threadedly connected at the two threaded connection sections; the two cross bar mounting plates are two rectangular plates with through holes in the center, and the two cross bar mounting plates are respectively sleeved by the cylindrical sleeve and threadedly connected at the two threaded connection sections. The scaffolding longitudinal rods are arranged horizontally and symmetrically fixed at both ends of the crossbar; the scaffolding longitudinal rods include longitudinal rods, longitudinal rod supports and longitudinal rod nuts; a threaded adjustment section is provided on the top outer wall of the longitudinal rod, and the longitudinal rod nut is sleeved and threadedly connected at the threaded adjustment section; the longitudinal rod support is a block with a U-shaped groove at one end, which is fixed to the bottom end of the longitudinal rod with the U-shaped groove opening facing downward; two arched limit blocks are symmetrically arranged on the groove walls on both sides of the U-shaped groove, so that the bottom of the U-shaped groove forms a cylindrical through hole that is adapted to the diameter of the stirrups, and the notch of the U-shaped groove forms a V-shaped opening; several groups of support components are fixed on the steel cage at intervals in the horizontal direction, and several scaffolding boards are respectively erected on both sides of the top surface of the support component to form two support platforms in the horizontal direction.

[0008] Furthermore, the length of the threaded connection section and the spacing between the two threaded connection sections are adapted to the width of the two main bars on the steel cage.

[0009] Furthermore, the through hole in the center of the crossbar mounting plate has a diameter larger than the diameter of the longitudinal bar and smaller than the outer diameter of the longitudinal bar nut.

[0010] Furthermore, the length of the longitudinal rod is greater than the distance from the stirrup fixed at the bottom end of the longitudinal rod to the main reinforcement fixed on the cross bar.

[0011] Furthermore, the setting length and setting position of the threaded adjustment section are adapted to the distance between the stirrups fixed at the bottom end of the longitudinal rod and the main reinforcement fixed on the transverse rod.

[0012] Furthermore, rubber pads are provided on the groove wall of the U-shaped groove supported by the horizontal rod and on the groove bottom wall surface of the U-shaped groove supported by the longitudinal rod.

[0013] Compared with the existing technology, the temporary scaffolding device for large-size steel cage has a simple structure and is easy to assemble and disassemble. During its assembly and disassembly process, it only needs to fine-tune the longitudinal rod nut, and the rest can be temporarily clamped on the main reinforcement and stirrups of the steel cage through the arc-shaped grooves at the bottom of the cross bar support and the longitudinal bar support for assembly and disassembly; in addition, since the device is constructed by fully utilizing the strength of the steel cage body itself, the structure is stable, which greatly improves construction safety. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a structural schematic diagram of a temporary scaffolding device for a large-size steel cage of the utility model;

[0015] Figure 2 It is a schematic diagram of the split structure of the temporary scaffolding device of a large-size steel cage of the utility model;

[0016] Figure 3 It is a structural schematic diagram of a scaffolding cross bar of a temporary scaffolding device of a large-size steel cage of the utility model;

[0017] Figure 4 It is a structural schematic diagram of a scaffolding longitudinal rod of a temporary scaffolding device of a large-size steel cage of the utility model;

[0018] Figure 5 It is a top view of a temporary scaffolding device of a large-size steel cage of the utility model erected on a steel cage;

[0019] Figure 6 The utility model is a three-dimensional structural schematic diagram of a temporary scaffolding device for a large-size steel cage erected on a steel cage. DETAILED DESCRIPTION

[0020] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments, but the following embodiments are by no means intended to limit the present invention in any way.

[0021] See also Figure 5 and Figure 6 The large-size steel cage temporary scaffolding device is used for the assembly of steel cages in the construction of ground-connected walls. Based on the T-shaped horizontal cross-section of the trough body of each construction section of the ground-connected wall, the steel cages arranged in the corresponding troughs also need to be assembled into cages with a T-shaped transverse cross-section. When assembling the steel cages, the construction workers first assemble part of the structure of the steel cages on the ground, and then assemble them vertically upward on the assembled structure. Since the height of the cage in the vertical upward direction is relatively high, it is necessary to set up a large-size steel cage temporary scaffolding device on the existing steel cage structure to assist in assembling the remaining structural parts of the steel cages.

[0022] The temporary scaffolding device for a large-size steel cage is specifically composed of several groups of support components and several scaffolding boards 4; wherein, several groups of support components are arranged horizontally on the top surface of the cage structure that has been erected at equal intervals, and are located at the position where the scaffolding needs to be assembled vertically upward, and the top is kept flush; several scaffolding boards 4 are respectively erected on both sides of the top surface of the support components to form two support platforms in the horizontal direction. Among them, the multiple scaffolding boards 4 on each side are laid in a spliced ​​manner in the horizontal direction, and each two adjacent scaffolding boards 4 are welded and fixed as a whole.

[0023] See also Figure 1 and Figure 2 Each support assembly consists of a scaffolding cross bar 2 and two scaffolding longitudinal bars 3. The two ends of the scaffolding cross bar 2 are connected to the top sides of the two scaffolding longitudinal bars 3. The two scaffolding longitudinal bars 3 are vertically arranged, and the bottom ends of the two are fixed on the designated stirrups 1-1 on the steel cage. The scaffolding cross bar 2 is horizontally arranged and fixed on the two main bars 1-2 located above the stirrups 1-1.

[0024] See also Figure 3 The scaffolding crossbar 2 includes a crossbar 2-1, two crossbar supports 2-3 and two crossbar mounting plates 2-4 arranged on the crossbar 2-1; wherein,

[0025] The crossbar 2-1 is a cylindrical long bar, and two threaded connection sections 2-2 are symmetrically arranged on the outer wall of the long bar; the setting length of the threaded connection section 2-2 and the spacing between the two threaded connection sections 2-2 are adapted to the width of the two main bars 1-2 on the steel cage 1;

[0026] The crossbar support 2-3 is composed of a cylindrical sleeve and a U-shaped clamping block; the inner diameter of the cylindrical sleeve is adapted to the diameter of the crossbar 2-1, and a connecting internal thread matching the threaded connection section 2-2 is provided on its inner wall, so that the crossbar support 2-3 can be passed through the cylindrical sleeve and threadedly connected and fixed at the threaded connection section 2-2 of the crossbar 2-1; the U-shaped clamping block is a block with a U-shaped groove at one end, and the other end is fixed on the outer wall of the cylindrical sleeve; wherein the groove width of the U-shaped groove is adapted to the diameter of the steel bar forming the stirrup 1-1, and preferably a rubber pad is provided on the groove wall of the U-shaped groove to increase the friction between the U-shaped groove and the steel bar clamped in the U-shaped groove;

[0027] The cylindrical sleeves of the two crossbar supports 2-3 are passed through the crossbar 2-1 and are respectively threadedly connected and fixed at the two threaded connection sections 2-2, and the U-shaped blocks of the two crossbar supports 2-3 are kept arranged in a manner that the openings face the same direction; the spacing between the two crossbar supports 2-3 is the same as the width of the two main bars 1-2 on the steel cage 1, so that the scaffolding crossbar 2 is temporarily connected and fixed to the steel cage 1 by clamping the U-shaped blocks of the two crossbar supports 2-3 on the outer walls of the two designated main bars 1-2;

[0028] The crossbar mounting plate 2-4 is a rectangular plate with a through hole in the center, and the diameter of the central through hole is adapted to the outer diameter of the scaffolding longitudinal bar 3, and is preferably slightly larger than the outer diameter of the scaffolding longitudinal bar 3; the two crossbar mounting plates 2-4 are horizontally arranged and fixed at both ends of the crossbar 2-1, and at this time, the U-shaped blocks of the two crossbar supports 2-3 are arranged with the opening facing downward.

[0029] See also Figure 4The scaffolding longitudinal rod 3 includes a longitudinal rod 3-1, a longitudinal rod support 3-2 and a longitudinal rod nut 3-4; wherein,

[0030] The longitudinal rod 3-1 is a cylindrical long rod, and the length of the rod body is greater than the distance between the stirrup 1-1 fixed at the bottom end of the longitudinal rod 3-1 and the main reinforcement 1-2 fixed on the cross bar 2-1, so that the top of the scaffolding longitudinal rod 3 is higher than the scaffolding cross bar 2, so that the top side of the scaffolding longitudinal rod 3 can be used as a stop bar to limit the scaffolding board 4 and prevent the scaffolding board 4 from being offset and sliding off;

[0031] A threaded adjustment section 3-3 is provided on the top outer wall of the longitudinal rod 3-1, and the length and position of the threaded adjustment section 3-3 are adapted to the distance between the stirrup 1-1 fixed at the bottom end of the longitudinal rod 3-1 and the main reinforcement 1-2 fixed on the crossbar 2-1;

[0032] The longitudinal rod nut 3-4 is sleeved on the outside of the longitudinal rod 3-1 and is adjustably threadedly connected to the threaded adjustment section 3-3; when in use, the connection position of the scaffolding cross bar 2 relative to the scaffolding longitudinal rod 3 can be adjusted by adjusting the fixed position of the longitudinal rod nut 3-4 on the threaded adjustment section 3-3; at the same time, the top surface of the longitudinal rod nut 3-4 is supported at both ends of the cross bar 2-1 to provide support force to prevent the cross bar from bending downward;

[0033] The longitudinal rod support 3-2 is a block with a U-shaped groove at one end, which is fixed to the bottom end of the longitudinal rod 3-1 with the U-shaped groove opening facing downward; two arched limit blocks are symmetrically arranged on the groove walls on both sides of the U-shaped groove, so that the bottom of the U-shaped groove forms a cylindrical through hole with an inner diameter adapted to the outer diameter of the steel bars of the steel cage, and the notch of the U-shaped groove forms a V-shaped opening; when in use, the longitudinal rod support 3-2 pushes the steel bars of the stirrup 1-1 into its V-shaped opening to open the U-shaped groove, and then the steel bars enter the cylindrical through hole at the bottom of the U-shaped groove, and the U-shaped groove returns to its original state. At this time, the scaffolding longitudinal rod 3 is connected to the steel bars through the longitudinal rod support 3-2; preferably, a rubber pad is provided on the bottom wall of the U-shaped groove to increase the friction between the U-shaped groove and the steel bars clamped in the U-shaped groove.

[0034] See also Figure 5 and Figure 6 The method of using the large-size steel cage temporary scaffolding device is as follows:

[0035] S1, the cross bar support 2-3 rotates 2-2 along the cross bar thread, and the spacing between the two cross bar supports 2-3 is adjusted to be compatible with the positions of the two main bars 1-2 on the steel cage 1;

[0036] S2, the scaffolding crossbar 2 passes through the steel cage 1 in the horizontal direction, and is clamped on the two main bars 1-2 of the steel cage 1 through two crossbar supports 2-3;

[0037] S3, the longitudinal rod nut 3-4 is adjusted up and down a distance on the thread adjustment section 3-3, and then the longitudinal rod 3-1 is inserted into the central through hole of the cross bar steel plate 2-4; at the same time, the longitudinal rod 3-1 is clamped on the designated stirrup 1-1 of the steel cage 1 through the longitudinal rod support 3-2 at the bottom; then, the longitudinal rod nut 3-4 is rotated upward on the thread adjustment section 3-3 until it rests on the bottom surface of the cross bar steel plate 2-4;

[0038] S4, using the same method as steps S1 to S3, equidistantly assemble other support components on the top surface of the cage along the horizontal direction;

[0039] S5, divide the plurality of scaffolding boards 3 into two groups, and lay them on both sides of the scaffolding crossbar 2 respectively; the plurality of scaffolding boards of each group are horizontally laid on the top surface of the crossbar 2-1 of the plurality of scaffolding crossbars 2 in the horizontal direction, and each two adjacent scaffolding boards are welded and fixed as one, thus completing the temporary scaffolding board assembly;

[0040] S6. After the steel cage 1 is assembled, the scaffolding planks 4, the scaffolding longitudinal bars 3, and the scaffolding cross bars 2 are removed in sequence, and the cycle continues to the next steel cage for assembly.

[0041] It should be noted that the parts of the utility model that are not disclosed in detail belong to the common knowledge in the field; in addition, although the above describes the illustrative specific implementation methods of the utility model to facilitate technical personnel in this technical field to understand the utility model, it should be clear that the utility model is not limited to the scope of the specific implementation methods. For ordinary technical personnel in this technical field, as long as various changes are within the spirit and scope of the utility model defined and determined by the attached claims, these changes are obvious, and all utility model creations using the concept of the utility model are protected.

Claims

1. A temporary scaffolding device for a large-size steel cage, characterized in that: The invention is composed of a plurality of support components and a plurality of scaffolding boards (4); each support component is composed of a scaffolding crossbar (2) and two scaffolding longitudinal bars (3); wherein the scaffolding crossbar (2) comprises a crossbar (2-1), two crossbar supports (2-3) and two crossbar mounting plates (2-4); two threaded connection sections (2-2) are symmetrically arranged on the outer wall of the crossbar (2-1); the crossbar support (2-3) is composed of a cylindrical sleeve and a U-shaped clamping block, wherein the U-shaped clamping block is a block with a U-shaped groove at one end and the other end is fixed on the outer wall of the cylindrical sleeve, and the width of the U-shaped groove is adapted to the diameter of the main rib (1-2); the two crossbar supports (2-3) are respectively sleeved by the cylindrical sleeve and threadedly connected to the two threaded connection sections (2-2); the two crossbar mounting plates (2-4) are two rectangular plates with through holes at the center, which are arranged horizontally and symmetrically fixed. The scaffolding longitudinal rod (3) comprises a longitudinal rod (3-1), a longitudinal rod support (3-2) and a longitudinal rod nut (3-4); a threaded adjustment section (3-3) is provided on the outer wall of the top side of the longitudinal rod (3-1), and the longitudinal rod nut (3-4) is sleeved and threadedly connected to the threaded adjustment section (3-3); the longitudinal rod support (3-2) is a block with a U-shaped groove at one end, and is fixed to the bottom end of the longitudinal rod (3-1) in a manner that the U-shaped groove opening faces downward; two arched limit blocks are symmetrically provided on the groove walls on both sides of the U-shaped groove, so that the bottom of the U-shaped groove forms a cylindrical through hole that is adapted to the diameter of the stirrup (1-1), and the notch of the U-shaped groove forms a V-shaped opening; a plurality of groups of support components are fixed on the steel cage (1) at intervals in the horizontal direction, and a plurality of scaffolding boards (4) are respectively erected on both sides of the top surface of the support component to form two support platforms in the horizontal direction.

2. The temporary scaffolding device for large-size steel cage according to claim 1 is characterized in that: The setting length of the threaded connection section (2-2) and the spacing between the two threaded connection sections (2-2) are adapted to the width of the two main bars (1-2) on the steel cage (1).

3. The temporary scaffolding device for large-size steel cage according to claim 1 is characterized in that: The through hole at the center of the crossbar mounting plate (2-4) has a diameter greater than the diameter of the longitudinal bar (3-1) and smaller than the outer diameter of the longitudinal bar nut (3-4).

4. The temporary scaffolding device for large-size steel cage according to claim 1 is characterized in that: The length of the longitudinal rod (3-1) is greater than the distance from the stirrup (1-1) fixed at the bottom end of the longitudinal rod (3-1) to the main reinforcement (1-2) fixed on the crossbar (2-1).

5. The temporary scaffolding device for large-size steel cage according to claim 1 is characterized in that: The setting length and setting position of the threaded adjustment section (3-3) are adapted to the distance between the stirrup (1-1) fixed at the bottom end of the longitudinal rod (3-1) and the main reinforcement (1-2) fixed on the transverse rod (2-1).

6. The temporary scaffolding device for large-size steel cage according to claim 1 is characterized in that: Rubber pads are arranged on the groove wall of the U-shaped groove of the horizontal rod support (2-3) and the groove bottom wall surface of the U-shaped groove of the longitudinal rod support (3-2).