Sewage intercepting pipeline connecting assembly

By using a quick-connect mechanism and a support adjustment mechanism, the problem of inconvenient connection between interceptor sewer pipes and urban drainage networks is solved, enabling convenient alignment and stable connection of the pipes.

CN221989495UActive Publication Date: 2024-11-12FUJIAN DEQIAN GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420097574.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-16
Publication Date
2024-11-12
Estimated Expiration
2034-01-16

AI Technical Summary

Technical Problem

In existing technologies, when connecting sewage interception pipes to urban drainage networks, flange docking is inconvenient and fixing is difficult, requiring attention to alignment and tightening of bolts, which leads to inconvenient connections.

Method used

It adopts a quick-connect mechanism and a support adjustment mechanism, including a docking groove, a snap-fit ​​assembly, a support base, and an adjustment assembly, to achieve quick docking and stable connection of pipelines through snap-fit ​​teeth and support brackets.

Benefits of technology

It enables convenient alignment and stable fixation of pipe connections, reduces the operational difficulty during the docking process, and improves the stability and efficiency of the connection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221989495U_ABST
    Figure CN221989495U_ABST
Patent Text Reader

Abstract

The utility model discloses a sewage interception pipeline connecting assembly, and relates to the field of sewage disposal, the sewage interception pipeline connecting assembly comprises a sewer well, a first pipeline is fixed on one side of the sewer well, a second pipeline is arranged at one end, far away from the sewer well, of the first pipeline, a quick connecting mechanism is arranged between the first pipeline and the second pipeline, and a support adjusting mechanism is arranged on the quick connecting mechanism. When the first pipeline and the second pipeline are connected, firstly, the supporting and adjusting mechanism is erected in an excavated construction pit, the supporting and adjusting mechanism supports the quick connecting mechanism, the height of the quick connecting mechanism is adjusted through the supporting and adjusting mechanism, and the quick connecting mechanism and the first pipeline are connected together; and then the end, needing to be connected, of the second pipeline is placed on the supporting and adjusting mechanism, the supporting and adjusting mechanism enables the second pipeline to be aligned with the quick connecting mechanism, and therefore connection between the first pipeline and the second pipeline can be more convenient, meanwhile, alignment can be more easily achieved when the pipelines are connected, and connection is convenient.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of sewage discharge, and in particular to a sewage interception pipe connection assembly. Background Art

[0002] In the urban drainage network, rainwater and domestic production water entering the urban network may carry a large amount of debris and dirt when flowing into the network. In order to prevent the urban drainage network from being blocked, sewage interception operations are required. The common method is to use the sedimentation characteristics of debris and dirt to allow the water carrying debris and dirt to flow into the sewage interception well for sedimentation, and then the sewage flows directly from the sewage interception pipe into the urban drainage network.

[0003] In order not to occupy ground space resources, urban pipelines and sewage interception pipelines are generally buried underground. The sewage that has settled in the sewage interception pipeline flows directly into the drainage network, and the settled debris and dirt are centrally treated.

[0004] When the sewage interception pipe is connected to the pipe in the urban drainage network, a flange is generally fixed on the pipe, and then the two pipes are butt-jointed together, the flanges on the two pipes are butt-jointed together, and then the two flanges are fixed together with fixing bolts. When fixing, it is necessary to pay attention to whether the flanges are aligned while turning the fixing bolts, which is inconvenient. Utility Model Content

[0005] The purpose of the present application is to solve the problem proposed in the above-mentioned background technology that the flanges on the two pipes are butt-jointed together and then fixed together with fixing bolts. When fixing, it is necessary to pay attention to whether the flanges are aligned while turning the fixing bolts, which is inconvenient. The present application provides a sewage interception pipe connection assembly.

[0006] In order to achieve the above-mentioned purpose, this application specifically adopts the following technical solutions:

[0007] A sewage interception pipe connection assembly comprises a sewer, a pipe 1 is fixed on one side of the sewer, a pipe 2 is arranged at one end of the pipe 1 away from the sewer, a quick connection mechanism is arranged between the pipe 1 and the pipe 2, and a support and adjustment mechanism is arranged on the quick connection mechanism;

[0008] The quick connection mechanism includes a butt joint pipe arranged between pipe one and pipe two, the butt joint pipe is provided with two symmetrical butt joint grooves, the two symmetrical butt joint grooves respectively correspond to pipe one and pipe two, a resisting sealing ring is arranged in the butt joint groove, and a snap-on assembly is arranged in the butt joint groove.

[0009] By adopting the above technical solution, pipe 1 or pipe 2 is inserted into the corresponding docking groove in the docking pipe. When pipe 1 is inserted into the docking groove, pipe 1 squeezes and contacts the sealing ring, and the clamping assembly fixes pipe 1, so that it is convenient to splice pipe 1 and pipe 2, and to fix pipe 1 and pipe 2. The quick connection mechanism is connected to pipe 1, and then the end of pipe 2 to be connected is placed on the support and adjustment mechanism. The support and adjustment mechanism allows pipe 2 to align with the quick connection mechanism, and then pipe 2 is connected to the quick connection mechanism, so that the connection between pipe 1 and pipe 2 is more convenient, and it is easier to align the pipes when connecting, so that the connection is convenient.

[0010] Furthermore, the clamping assembly includes four clamping blocks arranged in the docking groove, the four clamping blocks are distributed in a circle, the inner wall of the docking groove is provided with a sliding groove corresponding to the clamping block, the clamping block is slidably connected to the docking tube, a support spring is provided between the clamping block and the docking tube, both ends of the support spring are fixedly connected to the clamping block and the docking tube, a clamping tooth 1 is provided on the clamping block, and a clamping tooth 2 corresponding to the clamping tooth 1 is provided on the pipe 1 and the pipe 2.

[0011] By adopting the above technical solution, when pipe one or pipe two is inserted into the docking groove of the butt-jointed pipe, the first engaging tooth on the engaging block is engaged with the second engaging tooth under the push of the supporting spring, thereby completing the fixation of pipe one or pipe two, thereby facilitating the fixation between pipe one or pipe two and the butt-jointed pipe.

[0012] Furthermore, an insertion slope is provided at the open end of the docking groove, and the insertion slope corresponds to the first pipe and the second pipe.

[0013] By adopting the above technical solution, pipe one or pipe two hits the insertion slope and enters the docking groove under the restriction of the insertion slope, so that pipe one and pipe two can be more conveniently inserted into the docking groove.

[0014] Furthermore, the support adjustment mechanism includes a support seat arranged below the butt joint tube, a support frame is fixed on the support seat, the butt joint tube passes through the support frame, an adjustment component is arranged between the support frame and the butt joint tube, support plates are fixed at both ends of the butt joint tube, and support brackets are fixed on the support plates.

[0015] By adopting the above technical solution, pipe one is placed in the butt joint pipe for fixation, and then the adjustment component is used for adjustment to move the support frame on the butt joint pipe, move the support frame to the bottom of the construction pit, and support the support seat on the support frame at the bottom of the construction pit. When connecting pipe two to the butt joint pipe, pipe two is first placed on the corresponding support bracket, and with the support of the support bracket, pipe two is connected to the butt joint pipe, so that the connection between pipe one and pipe two and the butt joint pipe can be more conveniently aligned, while improving the stability of the butt joint pipe and the stability of the butt joint pipe connecting pipe one and pipe two.

[0016] Furthermore, the adjustment assembly includes two adjustment blocks symmetrically fixed on the outer wall of the butt tube, one of the adjustment blocks is slidably connected to a sliding rod, both ends of the sliding rod are fixedly connected to the support frame, and the other adjustment block is threadedly connected to an adjustment threaded rod, both ends of the adjustment threaded rod are rotatably connected to the support frame.

[0017] By adopting the above technical solution, the adjusting threaded rod is rotated, the adjusting threaded rod rotates on the support frame, and then the adjusting block drives the butt joint pipe, so that the support seat and the support frame can easily support the butt joint pipe.

[0018] Furthermore, evenly distributed ground spikes are fixed to a side of the support seat away from the support frame, and the tips of the ground spikes are away from the support seat.

[0019] By adopting the above technical solution, when the support base is allowed to contact the bottom of the construction pit, the ground nails on the support base are inserted into the soil layer, thereby enhancing the stability of the support base and reducing the possibility of the support base being deflected due to pressure.

[0020] Furthermore, a side of the support bracket away from the support plate is in the form of an arc-shaped groove, and the arc shape of the support bracket corresponds to the first pipeline and the second pipeline.

[0021] By adopting the above technical solution, under the restriction of the arc groove of the arc support bracket and the arc of the pipeline, the support bracket and pipeline one or pipeline two can move relative to each other, thereby further reducing the deviation of pipeline one and pipeline two.

[0022] In summary, the present application includes at least one of the following beneficial effects:

[0023] 1. The present application allows pipe 1 to be inserted into the corresponding docking groove in the docking pipe. When pipe 1 is inserted into the docking groove, pipe 1 squeezes and contacts the sealing ring, and the engaging tooth 2 on pipe 1 squeezes the engaging tooth 1 on the engaging block. The inclined surface of the engaging tooth 1 and the inclined surface of the engaging tooth 2 slide in contact with each other, and at the same time, the engaging block squeezes the supporting spring. When the inclined surface of the engaging tooth 1 passes the inclined surface of the engaging tooth 2, the engaging tooth 1 on the engaging block is clamped on the engaging tooth 2 under the push of the supporting spring, so that pipe 1 is fixed. Then, pipe 2 is fixed to the docking pipe in the same way, so that pipe 1 and pipe 2 are fixed, thereby achieving the purpose of making the connection between pipe 1 and pipe 2 more convenient and making it easier to align the pipes when connecting them, thereby facilitating the connection.

[0024] 2. In the present application, pipe 1 is fixed in the butt joint pipe, and then the adjusting assembly is used for adjustment to move the support frame on the butt joint pipe, move the support frame toward the bottom of the construction pit, and support the support seat on the support frame at the bottom of the construction pit. When connecting pipe 2 to the butt joint pipe, pipe 2 is first placed on the corresponding support bracket, and with the support of the support bracket, pipe 2 is connected to the butt joint pipe, and then the support seat and the support frame cooperate with the adjusting assembly to support the butt joint pipe, thereby achieving the purpose of making it easier to align pipes 1 and 2 with the butt joint pipe, while improving the stability of the butt joint pipe, and improving the stability of the butt joint pipe connecting pipes 1 and 2. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a first three-dimensional structural schematic diagram of the sewage interception pipe connection assembly in the present application;

[0026] Figure 2 It is a second three-dimensional structural schematic diagram of the sewage interception pipe connection assembly in the present application;

[0027] Figure 3 is a cross-sectional view of a sewage interception pipe connection assembly in the present application;

[0028] Figure 4 This application Figure 3 Enlarged schematic diagram at point A in the middle.

[0029] Description of reference numerals:

[0030] 1. Sewer; 2. Pipeline 1; 3. Pipeline 2; 4. Quick connection mechanism; 41. Butt pipe; 42. Butt groove; 43. Resistance sealing ring; 44. Snap-on assembly; 441. Snap-on block; 442. Snap-on tooth 1; 443. Snap-on tooth 2; 444. Support spring; 45. Insertion ramp; 5. Support adjustment mechanism; 51. Support seat; 52. Support frame; 53. Support plate; 54. Support bracket; 55. Adjustment assembly; 551. Adjustment block; 552. Adjustment threaded rod; 553. Sliding rod; 56. Ground nail. DETAILED DESCRIPTION

[0031] The following is combined with Figure 1 —4 Provide further details of this application.

[0032] An embodiment of the present application discloses a sewage interception pipe connection assembly.

[0033] Reference Figure 1 , Figure 2 and Figure 3 A sewage interception pipe connection assembly includes a sewer well 1, a pipe 2 is fixed to one side of the sewer well 1, a pipe 2 3 is arranged at the end of the pipe 1 2 away from the sewer well 1, a quick connection mechanism 4 is arranged between the pipe 1 2 and the pipe 2 3, and a support and adjustment mechanism 5 is arranged on the quick connection mechanism 4.

[0034] When connecting pipe 1 2 and pipe 2 3, firstly, the support and adjustment mechanism 5 is erected in the excavated construction pit, the support and adjustment mechanism 5 supports the quick connection mechanism 4, and the support and adjustment mechanism 5 is used to adjust the height of the quick connection mechanism 4 so that the quick connection mechanism 4 is connected to pipe 1 2, and then the end of pipe 2 3 to be connected is placed on the support and adjustment mechanism 5, and the support and adjustment mechanism 5 aligns pipe 2 3 with the quick connection mechanism 4, and then pipe 2 3 is connected with the quick connection mechanism 4 to complete the connection between pipe 1 2 and pipe 2 3. At the same time, the support and adjustment mechanism 5 further supports the quick connection mechanism 4, and by connecting pipe 1 2 and pipe 2 3 using the quick connection mechanism 4 supported by the support and adjustment mechanism 5, the connection between pipe 1 2 and pipe 2 3 can be made more convenient, and at the same time, the pipes can be easier to align when connected, which is convenient for connection.

[0035] Reference Figure 2 , Figure 3 and Figure 3 The quick connection mechanism 4 includes a butt joint pipe 41 arranged between pipe 1 2 and pipe 2 3, and two symmetrical butt joint grooves 42 are provided on the butt joint pipe 41. The two symmetrical butt joint grooves 42 correspond to pipe 1 2 and pipe 2 3 respectively, and a resisting sealing ring 43 is arranged in the butt joint groove 42, and a snap-on assembly 44 is arranged in the butt joint groove 42.

[0036] First, put the butt joint pipe 41 into the construction pit with the support of the supporting and adjusting mechanism 5, and then insert pipe 12 into the corresponding butt joint groove 42 in the butt joint pipe 41. When pipe 12 is inserted into the butt joint groove 42, pipe 12 squeezes and contacts the sealing ring 43, and at the same time, the clamping assembly 44 fixes pipe 12 to complete the connection and fixation between pipe 12 and butt joint pipe 41. Then, with the support of the supporting and adjusting mechanism 5, pipe 23 is inserted into another butt joint groove 42 on the butt joint pipe 41, and then squeezes and contacts the sealing ring 43, and at the same time, the clamping assembly 44 fixes pipe 23 to complete the butt joint of pipe 12 and pipe 23. By respectively inserting pipe 12 and pipe 23 into the butt joint groove 42 in the butt joint pipe 41, and then fixing pipe 12 and pipe 23 with the clamping assembly 44, it is convenient to splice pipe 12 and pipe 23, and to fix pipe 12 and pipe 23.

[0037] Reference Figure 2 , Figure 3 and Figure 4 The clamping assembly 44 includes four clamping blocks 441 arranged in the docking groove 42, and the four clamping blocks 441 are distributed in a circle. The inner wall of the docking groove 42 is provided with a sliding groove corresponding to the clamping block 441. The clamping block 441 is slidably connected with the docking tube 41. A support spring 444 is provided between the clamping block 441 and the docking tube 41. Both ends of the support spring 444 are fixedly connected with the clamping block 441 and the docking tube 41. A clamping tooth 1 442 is provided on the clamping block 441, and a clamping tooth 2 443 corresponding to the clamping tooth 1 442 is provided on the pipe 1 2 and the pipe 2 3.

[0038] When pipe 1 or pipe 2 or 2 or 3 is inserted into the docking groove 42 of the docking pipe 41, the engaging tooth 2 443 on pipe 1 or pipe 2 or 3 squeezes the engaging tooth 1 442 on the engaging block 441, and the inclined surface of the engaging tooth 1 442 and the inclined surface of the engaging tooth 2 443 slide against each other, and at the same time, the engaging block 441 squeezes the supporting spring 444. When the inclined surface of the engaging tooth 1 442 passes the inclined surface of the engaging tooth 2 443, the engaging tooth 1 442 on the engaging block 441 is pushed by the supporting spring 444 to be stuck on the engaging tooth 2 443, thereby completing the fixation of pipe 1 or pipe 2 or 3. By utilizing the engaging tooth 1 442 on the engaging block 441 to restrict the engaging tooth 2 443 on pipe 1 or pipe 2 or 3, pipe 1 or pipe 2 or 3 can only be inserted into the docking groove 42 and cannot be pulled out, thereby facilitating the fixation between pipe 1 or pipe 2 or 3 and the docking pipe 41.

[0039] Reference Figure 2 , Figure 3 and Figure 4The opening end of the docking groove 42 is provided with an insertion slope 45, which corresponds to the pipe 1 2 and the pipe 2 3. When the pipe 1 2 or the pipe 2 3 is inserted into the docking groove 42, when the pipe 1 2 or the pipe 2 3 is slightly offset, the pipe 1 2 or the pipe 2 3 hits the insertion slope 45, and enters the docking groove 42 under the restriction of the insertion slope 45. By using the insertion slope 45 to restrict the pipe 1 2 and the pipe 2 3, the pipe 1 2 and the pipe 2 3 can be inserted into the docking groove 42 more conveniently.

[0040] Reference Figure 1 , Figure 2 and Figure 3 The support and adjustment mechanism 5 includes a support seat 51 arranged below the butt joint tube 41, a support frame 52 is fixed on the support seat 51, the butt joint tube 41 passes through the support frame 52, an adjustment component 55 is arranged between the support frame 52 and the butt joint tube 41, support plates 53 are fixed at both ends of the butt joint tube 41, and support brackets 54 are fixed on the support plates 53.

[0041] First, use the adjustment component 55 to make the butt joint pipe 41 be located at the bottom of the inner wall of the support frame 52, then let the support bracket 54 on the butt joint pipe 41 hold the pipe 1 2, and then let the pipe 1 2 enter the butt joint pipe 41 for fixation, and then use the adjustment component 55 to adjust, let the support frame 52 move on the butt joint pipe 41, let the support frame 52 move to the bottom of the construction pit, let the support seat 51 on the support frame 52 support the bottom of the construction pit, and when the pipe 2 3 is connected to the butt joint pipe 41, let the pipe 2 3 be placed on the corresponding support bracket 54 first, and then put the pipe 2 3 on the support bracket 54. Under the support of 54, pipe 2 3 is connected to the butt joint pipe 41, and then the support seat 51 and the support frame 52 cooperate with the adjustment component 55 to support the butt joint pipe 41. The support bracket 54 on the support plate 53 fixed on the butt joint pipe 41 supports pipe 1 2 or pipe 2 3, and the support frame 52 and the support seat 51 support the support frame 52, so that the connection between pipe 1 2 and pipe 2 3 and the butt joint pipe 41 can be more convenient to align, and at the same time, the stability of the butt joint pipe 41 is improved, and the stability of the butt joint pipe 41 connecting pipe 1 2 and pipe 2 3 is improved.

[0042] Reference Figure 1 , Figure 2 and Figure 3 The adjustment assembly 55 includes two adjustment blocks 551 symmetrically fixed on the outer wall of the butt tube 41, one of the adjustment blocks 551 is slidably connected to a sliding rod 553, both ends of the sliding rod 553 are fixedly connected to the support frame 52, and the other adjustment block 551 is threadedly connected to an adjustment threaded rod 552, both ends of the adjustment threaded rod 552 are rotatably connected to the support frame 52.

[0043] The adjusting threaded rod 552 is rotated, and the adjusting threaded rod 552 is rotated on the support frame 52. Then the adjusting block 551 drives the docking tube 41. Another adjusting block 551 on the docking tube 41 slides on the sliding rod 553, and the docking tube 41 moves up and down in the support frame 52. By using the adjusting threaded rod 552 to drive the adjusting block 551, the docking tube 41 and the support frame 52 can move relative to each other, so that the support seat 51 and the support frame 52 can easily support the docking tube 41.

[0044] Reference Figure 1 , Figure 2 and Figure 3 The support seat 51 is fixed with evenly distributed ground nails 56 on one side away from the support frame 52, and the tips of the ground nails 56 are away from the support seat 51. When the support seat 51 is in contact with the bottom of the construction pit, the ground nails 56 on the support seat 51 are inserted into the soil layer, making the support seat 51 more stable when in contact with the bottom of the construction pit. When the support seat 51 is in contact with the bottom of the construction pit, the ground nails 56 are inserted into the soil layer, thereby enhancing the stability of the support seat 51 and reducing the possibility of the support seat 51 being deflected by pressure.

[0045] Reference Figure 1 , Figure 2 and Figure 3 The side of the support bracket 54 away from the support plate 53 is an arc-shaped groove, and the arc of the support bracket 54 corresponds to the pipeline 1 2 and the pipeline 2 3. When the support bracket 54 supports the pipeline 1 2 or the pipeline 2 3, under the restriction of the arc-shaped groove of the arc-shaped support bracket 54 and the restriction of the pipeline arc, the support bracket 54 and the pipeline 1 2 or the pipeline 2 3 can move relative to each other. By allowing the support bracket 54 to support the pipeline 1 2 or the pipeline 2 3, the arc-shaped groove restricts the pipeline 1 2 and the pipeline 2 3, thereby further reducing the deviation of the pipeline 1 2 and the pipeline 2 3.

[0046] Working principle: First, put the sewer well 1 and pipe 1 2 into the construction pit, first use the adjustment component 55 to make the butt joint pipe 41 located at the bottom of the inner wall of the support frame 52, then let the support bracket 54 on the butt joint pipe 41 hold the pipe 1 2, and then let the pipe 1 2 enter the butt joint groove 42 on the butt joint pipe 41, the second engaging tooth 443 on the pipe 1 2 contacts the first engaging tooth 442 on the engaging block 441 in the butt joint groove 42, and at the same time, the engaging block 441 squeezes the supporting spring 444, and when the inclined surface of the engaging tooth 1 442 passes the inclined surface of the engaging tooth 2 443, the butt joint is fixed on the butt joint groove 42. Pushed by the spring 444, the engaging tooth 1 442 on the engaging block 441 is engaged with the engaging tooth 2 443 to complete the fixation of the pipe 1 2, and then the adjusting assembly 55 is used for adjustment to allow the support frame 52 to move on the butt joint pipe 41, and the support frame 52 is moved to the bottom of the construction pit, so that the support seat 51 on the support frame 52 is supported at the bottom of the construction pit, and then the pipe 2 3 is placed on the corresponding support bracket 54, and then the pipe 2 3 is supported by the support bracket 54 to enter the docking groove 42 in the butt joint pipe 41 to complete the connection between the pipe 1 2 and the pipe 2 3.

Claims

1. A sewage interception pipe connection assembly, comprising a sewer (1), characterized in that: A pipe 1 (2) is fixed on one side of the sewer well (1); a pipe 2 (3) is arranged at one end of the pipe 1 (2) away from the sewer well (1); a quick connection mechanism (4) is arranged between the pipe 1 (2) and the pipe 2 (3); and a support adjustment mechanism (5) is arranged on the quick connection mechanism (4); The quick connection mechanism (4) comprises a butt joint pipe (41) arranged between pipe one (2) and pipe two (3), the butt joint pipe (41) being provided with two symmetrical butt joint grooves (42), the two symmetrical butt joint grooves (42) respectively corresponding to pipe one (2) and pipe two (3), a resisting sealing ring (43) being arranged in the butt joint groove (42), and a clamping assembly (44) being arranged in the butt joint groove (42).

2. A sewage interception pipe connection assembly according to claim 1, characterized in that: The clamping assembly (44) comprises four clamping blocks (441) arranged in the docking groove (42), the four clamping blocks (441) being distributed in a circumference, the inner wall of the docking groove (42) being provided with a sliding groove corresponding to the clamping block (441), the clamping block (441) being slidably connected to the docking tube (41), a supporting spring (444) being provided between the clamping block (441) and the docking tube (41), both ends of the supporting spring (444) being fixedly connected to the clamping block (441) and the docking tube (41), the clamping block (441) being provided with a first clamping tooth (442), and the first pipe (2) and the second pipe (3) being provided with a second clamping tooth (443) corresponding to the first clamping tooth (442).

3. A sewage interception pipe connection assembly according to claim 1, characterized in that: An insertion slope (45) is provided at the open end of the docking groove (42), and the insertion slope (45) corresponds to the first pipe (2) and the second pipe (3).

4. A sewage interception pipe connection assembly according to claim 1, characterized in that: The support adjustment mechanism (5) comprises a support seat (51) arranged below the butt joint pipe (41); a support frame (52) is fixed on the support seat (51); the butt joint pipe (41) passes through the support frame (52); an adjustment component (55) is arranged between the support frame (52) and the butt joint pipe (41); support plates (53) are fixed at both ends of the butt joint pipe (41); and support brackets (54) are fixed on the support plates (53).

5. A sewage interception pipe connection assembly according to claim 4, characterized in that: The adjustment assembly (55) comprises two adjustment blocks (551) symmetrically fixed on the outer wall of the butt tube (41), one of the adjustment blocks (551) being slidably connected to a sliding rod (553), both ends of which are fixedly connected to the support frame (52), and the other adjustment block (551) being threadedly connected to an adjustment threaded rod (552), both ends of which are rotatably connected to the support frame (52).

6. A sewage interception pipe connection assembly according to claim 5, characterized in that: Evenly distributed ground spikes (56) are fixed to a surface of the support seat (51) away from the support frame (52), and the tips of the ground spikes (56) are away from the support seat (51).

7. A sewage interception pipe connection assembly according to claim 4, characterized in that: A side of the support bracket (54) away from the support plate (53) is in the form of an arc-shaped groove, and the arc shape of the support bracket (54) corresponds to the first pipe (2) and the second pipe (3).