Novel precast beam slab structure

By setting non-prestressed steel bars and shear bonds in prefabricated beams and using concrete pouring to achieve anchor connection with cast-in-place main beams, the problem of unstable connection between prefabricated components and cast-in-place main beams is solved, and the structural stability is improved and equipped Standardized design has great promotional value.

CN221989705UActive Publication Date: 2024-11-12SHANGHAI CONCRETE QIAN CONSTR TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420403131.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-03
Publication Date
2024-11-12
Estimated Expiration
2034-03-03

AI Technical Summary

Technical Problem

In the prior art, the connection method between the prefabricated components and the cast-in-place main beam is not stable enough, and the integrated anchoring method is lacking, resulting in insufficient connection performance.

Method used

Prefabricated beam and slab structure is adopted, and non-prestressed steel bars and shear bonds are set in the beam body, and anchor connection is achieved through concrete casting, and connection stability is improved by using joints and leak-proof hanging molds. .

Benefits of technology

It achieves a better connection effect between prefabricated beams and cast-in-place main beams, improves the stability of the overall structure, avoids the shortcomings of fixing methods such as ear picking, and has standardized design and promotion value.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221989705U_ABST
    Figure CN221989705U_ABST
Patent Text Reader

Abstract

The utility model discloses a novel precast beam-slab structure which comprises a beam-slab structure (1) which comprises a beam body extending in the length direction and assembly end faces located at the two ends of the length direction. The first non-prestressed reinforcing steel bar (2) and the second non-prestressed reinforcing steel bar (3) are respectively arranged in the beam body close to the assembly end surface and extend outwards from the assembly end surface; and the at least one prestressed reinforcement (4) is embedded in the beam body. The integrated beam plate concept is put forward for the first time, the traditional design concept is met, and the structural concept is clear. After the cast-in-place girder is utilized, the cast-in-place girder does not need to be provided with lifting lugs, the appearance is attractive, an anchoring connection mode is adopted after the ribs are exposed, the overall structure of the girder slab is firm, and technical popularization is facilitated. All components are designed and produced in a standardized mode, and great popularization value is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of assembled buildings, and in particular relates to a novel prefabricated beam and slab structure. Background Art

[0002] According to domestic building standards, when using prefabricated components such as double T or prefabricated hollow slabs to act as beam structures, a stepped erection method (including ears and corbels) and a fixed structure are used to fix the beam structure. For example, Chinese patent CN206873618U discloses a stepped structural structure at the end of a double T plate rib beam, which specifically includes a double T plate and a support beam located on the outside of the end of the double T plate, a step is provided at the bottom of the end of the double T plate, a steel pad is embedded on the surface of the step, a support is welded under the steel pad, the support is connected to the cantilever plate, and the outer end of the cantilever plate is connected to the support beam. Although this connection method can achieve a good fixing effect, its connection performance is not as good as anchoring it into an integrated whole with the cast-in-place main beam.

[0003] At present, there is no method to connect prefabricated components and cast-in-place main beams by anchoring them in an integrated manner. This application aims to first propose to reinforce the prefabricated components, and to fix the reinforced parts and the cast-in-place main beams by casting concrete as a whole, so as to improve their stability. Utility Model Content

[0004] In view of the various deficiencies in the prior art, the purpose of this application is to propose a new type of prefabricated beam-slab structure for the first time. The prefabricated beam-slab structure can act as a beam structure and is connected to the cast-in-place main beam by anchoring, which is superior to existing connectors and other forms. This application conforms to the traditional design concept, has a clear structural concept, and adopts standardized design for components, which has great promotion value.

[0005] The present application proposes a novel prefabricated beam-slab structure, comprising: a beam-slab structure, which includes a beam body extending along the length direction, and assembly end faces located at both ends of the length direction; a first non-prestressed steel bar and a second non-prestressed steel bar, which are respectively arranged in the beam body near the assembly end faces and extend outward from the assembly end faces; at least one prestressed steel bar, which is buried in the beam body.

[0006] The non-prestressed steel bars extending outward from the assembly end surface are extended into the steel bar structure of the cast-in-place main beam. By pouring concrete into the cast-in-place main beam, the prefabricated beam-slab structure is anchored to the cast-in-place main beam, thereby achieving a better connection effect.

[0007] According to any one of the embodiments provided in the present application, it further includes: at least one shear key, which is respectively arranged in the beam body close to the assembly end surface and extends outward from the assembly end surface.

[0008] The shear key also extends into the steel structure of the cast-in-place main beam. By pouring concrete into the cast-in-place main beam, the precast beam-slab structure is anchored to the cast-in-place main beam, thereby achieving a better connection effect.

[0009] According to any one of the embodiments provided in the present application, the extended portion of the first non-prestressed steel bar is staggered in height direction from the second non-prestressed steel bar.

[0010] In actual use, the prefabricated beam-slab structures on both sides of the cast-in-place main beam will extend into the steel bar structure of the cast-in-place main beam, the first non-prestressed steel bar and the second non-prestressed steel bar on the other side are staggered in height, and the first non-prestressed steel bar can be overlapped on the second non-prestressed steel bar on the other side.

[0011] According to any one of the embodiments provided in the present application, joints are left between the multiple beam-slab structures arranged side by side, and the spacing between the joints is 50 to 150 mm.

[0012] The function of the joint is to provide deformation space for the adjacent beam-slab structures.

[0013] According to any embodiment provided in the present application, a leak-proof hanging formwork is provided at the bottom of the joint. The leak-proof hanging formwork is used for pouring concrete later to form a cast-in-place concrete floor slab, and the double T-slab provided with the leak-proof hanging formwork does not require later grouting, which can prevent the floor slab from cracking later.

[0014] According to any one of the embodiments provided in the present application, the beam-slab structure adopts a double T-plate, which is composed of a plate surface and two vertical ribs located below the plate surface, and a plurality of stirrups are provided inside the vertical ribs along the length direction.

[0015] According to any one of the embodiments provided in the present application, the panel surface includes: cantilever panels located on both sides of the vertical ribs, and the cantilever panels are flat plate structures.

[0016] According to any one of the embodiments provided in the present application, the thickness of the cantilever plate is greater than the middle portion of the plate surface.

[0017] According to any one of the embodiments provided in the present application, the beam-slab structure adopts a prestressed hollow slab, and steel shear keys are provided at both ends of the circular hole of the prestressed hollow slab close to the assembly end surface.

[0018] According to any one of the embodiments provided in the present application, the steel shear key includes: the steel used in the steel shear key includes one or more of U-shaped steel, rectangular steel, circular steel and I-shaped steel.

[0019] Beneficial effects of the utility model:

[0020] The utility model proposes the concept of integrated beam and slab for the first time, which conforms to the traditional design concept and has a clear structural concept. After using the utility model, the cast-in-place main beam does not need to be provided with ears, and the appearance is beautiful. The anchor connection method is adopted after the reinforcement is produced, so that the overall structure of the beam and slab is firm, which is conducive to the promotion of technology. All components are designed and produced in a standardized manner, which has great promotion value. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0022] Figure 1 It is a cross-sectional view of the novel prefabricated beam-slab structure of Example 1;

[0023] Figure 2 It is a cross-sectional view of a double T-plate;

[0024] Figure 3 It is a schematic diagram of the cantilevered plate of the flat plate structure;

[0025] Figure 4 This is a schematic diagram of a cantilever slab with increased thickness;

[0026] Figure 5 It is a schematic diagram of the small joint between the double T-plates;

[0027] Figure 6 This is a schematic diagram of small joints and cast-in-place layers after pouring concrete.

[0028] Figure 7 It is a cross-sectional view of the novel prefabricated beam-slab structure of Example 2;

[0029] Figure 8 This is a cross-sectional view of a prefabricated hollow-core slab;

[0030] Fig. 9 This is a schematic diagram of small joints between prefabricated hollow slabs;

[0031] Fig.10 This is a schematic diagram of small joints and cast-in-place layers after pouring concrete. DETAILED DESCRIPTION

[0032] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0033] In the description of the present invention, it should be noted that the terms "upper", "lower", "left", "right", "center", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", "third", etc., are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.

[0034] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "setting", "connection", "connection" and the like should be understood in a broad sense. For example, "connection" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or an indirect connection through an intermediate medium, or the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0035] Exemplary Embodiments

[0036] This exemplary embodiment proposes a novel prefabricated beam-slab structure, comprising: a beam-slab structure 1, which includes a beam body extending along the length direction, and assembly end faces located at both ends of the length direction; a first non-prestressed steel bar 2 and a second non-prestressed steel bar 3, which are respectively arranged in the beam body near the assembly end faces and extend outward from the assembly end faces; at least one prestressed steel bar 4, which is buried in the beam body.

[0037] The non-prestressed steel bars 4 extending outward from the assembly end surface are extended into the steel bar structure of the cast-in-place main beam, and concrete is poured into the cast-in-place main beam to anchor the prefabricated beam-slab structure 1 to the cast-in-place main beam, thereby achieving a better connection effect.

[0038] In this exemplary embodiment, it further comprises: at least one shear key 5, which is respectively arranged in the beam body near the assembly end surface and protrudes outward from the assembly end surface.

[0039] The shear key 5 also extends into the steel structure of the cast-in-place main beam, and by pouring concrete into the cast-in-place main beam, the prefabricated beam-slab structure 1 is anchored to the cast-in-place main beam, thereby achieving a better connection effect.

[0040] In this exemplary embodiment, the protruding portion of the first non-prestressed steel bar 2 is staggered from the second non-prestressed steel bar 3 in the height direction.

[0041] In actual use, the prefabricated beam-slab structures 1 located on both sides of the cast-in-place main beam will extend into the steel bar structure of the cast-in-place main beam, the first non-prestressed steel bar 2 and the second non-prestressed steel bar 3 on the other side are staggered in height, and the first non-prestressed steel bar 2 can be overlapped on the second non-prestressed steel bar 3 on the other side.

[0042] In this exemplary embodiment, joints 30 are left between the multiple beam-slab structures 1 arranged side by side, and the spacing between the joints 30 is 50 to 150 mm.

[0043] The function of the joint 30 is to provide deformation space for the adjacent beam-slab structures 1 .

[0044] In this exemplary embodiment, a leak-proof hanging formwork 40 is provided at the bottom of the joint 30. The leak-proof hanging formwork 40 is used for pouring concrete later to form a cast-in-place layer 50 concrete floor slab, and the double T-slab provided with the leak-proof hanging formwork 40 does not require later grouting, which can prevent the later floor slab from cracking.

[0045] In this exemplary embodiment, the beam-slab structure 1 adopts a double T-slab, which is composed of a slab surface 10 and two vertical ribs 20 located below the slab surface 10 , and a plurality of stirrups 21 are provided inside the vertical rib 20 along the length direction.

[0046] In this exemplary embodiment, the panel 10 includes: cantilever panels 11 located on both sides of the vertical ribs 20 , and the cantilever panels 11 are flat plate structures.

[0047] In this exemplary embodiment, the thickness of the cantilever plate 11 is greater than the middle portion of the plate surface 10 .

[0048] In this exemplary embodiment, the beam-slab structure 1 adopts a prestressed hollow slab 60 , and steel shear keys 7 are provided at both ends of the circular hole of the prestressed hollow slab 60 near the assembly end surface.

[0049] In this exemplary embodiment, the steel shear key 7 includes: the steel used by the steel shear key 7 includes one or more of U-shaped steel, rectangular steel, circular steel and I-shaped steel. Specific embodiment 1

[0051] like Figure 1As shown, the novel prefabricated beam-slab structure provided in this embodiment includes: a beam-slab structure 1, a first non-prestressed steel bar 2, a second non-prestressed steel bar 3, a plurality of prestressed steel bars 4 and a shear key 5.

[0052] Among them, Figure 2 As shown, the beam-slab structure 1 is composed of a double T-plate, which is composed of a plate surface 10 and two vertical ribs 20 located below the plate surface 10. A plurality of stirrups 21 are arranged inside the vertical ribs 20 along the length direction. The plate surface 10 and the vertical ribs 20 together constitute a beam body extending in the elongation direction, and assembly end surfaces at both ends in the length direction. The first non-prestressed steel bar 2 and the second non-prestressed steel bar 3 are respectively arranged in the vertical rib 20 near the assembly end surface, and extend outward from the assembly end surface. The prestressed steel bar 4 is buried in the vertical rib 20. The shear key 5 is also installed in the vertical rib 20 and extends outward from the assembly end surface.

[0053] In this embodiment, the first non-prestressed steel bar 2 and the second non-prestressed steel bar 3 extending outward from the assembly end surface are extended into the steel bar structure of the cast-in-place main beam, and concrete is poured into the cast-in-place main beam to anchor the precast beam-slab structure 1 to the cast-in-place main beam, thereby achieving a better connection effect. The shear key 5 also extends into the steel bar structure of the cast-in-place main beam, and concrete is poured into the cast-in-place main beam to anchor the precast beam-slab structure 1 to the cast-in-place main beam, thereby achieving a better connection effect.

[0054] like Figure 1 As shown, the extended portion of the first non-prestressed steel bar 2 is staggered in height from the second non-prestressed steel bar 3. The first non-prestressed steel bar 2 is staggered in height from the second non-prestressed steel bar 3 on the other side, and the first non-prestressed steel bar 2 can be overlapped on the second non-prestressed steel bar 3 on the other side.

[0055] The panel 10 includes cantilever panels 11 located on both sides of the vertical ribs 20 and a middle portion located between the vertical ribs 20. Figure 2 As shown, the cantilever plate 11 in the double T plate has slopes at both ends. More preferably, as Figure 3 As shown, the cantilever plate 11 is changed into a flat plate structure. More preferably, as Figure 4 As shown, the thickness of the cantilevered plate 11 is greater than the middle portion of the plate surface 10, thereby increasing the thickness of the prefabricated floor layer.

[0056] When conventional double T-plates are arranged side by side, adjacent double T-plates have a close joint 30. Figure 5As shown, in this embodiment, there are joints 30 left between multiple beam-slab structures 1 arranged side by side. The spacing of the joints 30 is 50 to 150 millimeters. A leak-proof suspended form 40 is provided at the bottom of the joint 30. The function of the joint 30 is to provide space for the deformation of adjacent beam-slab structures 1. In this exemplary embodiment, the leak-proof suspended form 40 is used for pouring concrete later to form a cast-in-place layer 50 of the concrete floor slab, and the double-T slab provided with the leak-proof suspended form 40 does not require grouting later, which can prevent the floor slab from cracking later.

[0057] As Figure 6 shown, the slab surface 10 of the double-T slab serves as the precast layer of the floor slab. By pouring concrete on the slab surface 10 and the splicing joint, a new cast-in-place layer 50 is formed, and a new floor slab is formed after the concrete solidifies. At this time, the vertical ribs 20 anchored to the cast-in-place main beam and the stirrups 21 inside can serve as the beam structure of the floor slab. Specific Embodiment 2

[0059] As Figure 7 shown, the new precast beam-slab structure provided in this embodiment includes: a beam-slab structure 1, a first non-prestressed steel bar 2, a second non-prestressed steel bar 3, multiple prestressed steel bars 4, and a profiled steel shear key 7.

[0060] Among them, as Figure 8 shown, the beam-slab structure 1 is selected to be composed of precast hollow slabs. Profiled steel shear keys 7 are provided at both ends of the circular holes of the prestressed hollow slab 60 close to the assembly end face. In this exemplary embodiment, the profiled steel shear key 7 includes: the profiled steel used for the profiled steel shear key 7 includes one or more of channel steel, rectangular steel, circular steel, and I-shaped steel. The first non-prestressed steel bar 2 and the second non-prestressed steel bar 3 are respectively arranged inside the precast hollow slab close to the assembly end face and extend outwards from the assembly end face. The prestressed steel bar 4 is buried inside the precast hollow slab. The profiled steel shear key 7 is also installed inside the precast hollow slab and extends outwards from the assembly end face.

[0061] In this embodiment, the first non-prestressed steel bar 2 and the second non-prestressed steel bar 3 extending outwards from the assembly end face are inserted into the steel bar structure of the cast-in-place main beam, and by pouring concrete into the cast-in-place main beam, the precast beam-slab structure 1 is anchored to the cast-in-place main beam, playing a better connection role. The profiled steel shear key 7 also extends into the steel bar structure of the cast-in-place main beam, and by pouring concrete into the cast-in-place main beam, the precast beam-slab structure 1 is anchored to the cast-in-place main beam, playing a better connection role.

[0062] As Figure 7 shown, the extended part of the first non-prestressed steel bar 2 is staggered with the second non-prestressed steel bar 3 in the height direction. The first non-prestressed steel bar 2 is staggered with the second non-prestressed steel bar 3 on the other side in height, and the first non-prestressed steel bar 2 can overlap on the second non-prestressed steel bar 3 on the other side.

[0063] When conventional prefabricated hollow slabs are arranged side by side, adjacent prefabricated hollow slabs have close joints 30. Fig. 9 As shown, in this embodiment, a plurality of beam-slab structures 1 arranged side by side are provided with joints 30, and the spacing of the joints 30 is 50 to 150 mm. A leak-proof hanging formwork 40 is provided at the bottom of the joints 30. The function of the joints 30 is to provide a deformation space for the adjacent beam-slab structures 1. In this exemplary embodiment, the leak-proof hanging formwork 40 is used for pouring concrete later to form a cast-in-place layer 50 concrete floor slab, and the prefabricated hollow slab provided with the leak-proof hanging formwork 40 does not require later grouting, which can prevent the floor slab from cracking later.

[0064] like Fig.10 As shown, the prefabricated hollow slab is used as the prefabricated layer of the floor slab, and a new cast-in-place layer 50 is formed by pouring concrete on the slab surface 10 and the joints, and a new floor slab is formed after the concrete solidifies. At this time, the vertical ribs 20 anchored to the cast-in-place main beam and the internal stirrups 21 can be used as the beam structure of the floor slab.

[0065] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, improvements, equivalent substitutions, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A new type of prefabricated beam-slab structure, characterized in that: Comprising: A beam-slab structure (1), which includes a beam body extending along the length direction and assembly end faces at both ends in the length direction; A first non-prestressed steel bar (2) and a second non-prestressed steel bar (3), which are respectively arranged near the assembly end faces in the beam body and extend outward from the assembly end faces; At least one prestressed steel bar (4), which is embedded in the beam body.

2. The novel prefabricated beam-slab structure according to claim 1 is characterized in that: Further comprising: At least one shear key (5), which is respectively arranged near the assembly end faces in the beam body and extends outward from the assembly end faces.

3. The novel prefabricated beam-slab structure according to claim 1 is characterized in that: The extending parts of the first non-prestressed steel bar (2) and the second non-prestressed steel bar (3) are staggered in the height direction.

4. The novel prefabricated beam-slab structure according to claim 1 is characterized in that: There is a joint (30) left between multiple beam-slab structures (1) arranged side by side, and the spacing of the joint (30) is 50 to 150 millimeters.

5. The novel prefabricated beam-slab structure according to claim 4 is characterized in that: A leak-proof suspended formwork (40) is provided at the bottom of the joint (30).

6. The novel prefabricated beam-slab structure according to any one of claims 1 to 5, characterized in that: The beam-slab structure (1) adopts a double-T plate, and the double-T plate is composed of a plate surface (10) and two vertical ribs (20) located below the plate surface (10). A plurality of stirrups (21) are arranged along the length direction inside the vertical ribs (20).

7. The novel prefabricated beam-slab structure according to claim 6 is characterized in that: The plate surface (10) includes: cantilever slabs (11) located on both sides of the vertical ribs (20), and the cantilever slabs (11) are of flat plate structure.

8. The novel prefabricated beam-slab structure according to claim 7 is characterized in that: The thickness of the cantilever slab (11) is greater than the middle part of the plate surface (10).

9. The novel prefabricated beam-slab structure according to any one of claims 1 to 5, characterized in that: The beam-slab structure (1) adopts a prestressed hollow slab (60), and steel section shear keys (7) are provided at both ends near the assembly end faces in the circular holes of the prestressed hollow slab (60).

10. The novel prefabricated beam-slab structure according to claim 9 is characterized in that: The steel section shear key (7) includes: the steel section adopted by the steel section shear key (7) includes one or more of channel steel, rectangular steel, circular steel and I-shaped steel.