Breaking hammer for cleaning electrolyte

By designing a detachable hitting part assembly and an electrolyte breaker with a shock cushioning spring, the problem of frequent replacement of the entire drill rod in the prior art is solved, and resource saving and stability of the hitting part are achieved, reducing the Manufacturing costs and increased connection strength.

CN221999985UActive Publication Date: 2024-11-15SHANDONG QDKS M&E EQUIP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420496817.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-14
Publication Date
2024-11-15
Estimated Expiration
2034-03-14

AI Technical Summary

Technical Problem

When the existing electrolyte breaker cleans the anode steel claws, the hitting part needs to be frequently repaired or replaced by the entire drill rod, resulting in wasted resources.

Method used

A broken hammer for electrolyte cleaning is designed, including a drill rod, a drill shoulder and a mounting brazing sleeve. It is convenient to replace the hitting part component by disassemblying the hitting part, and a mirrored opposing connection and cushioning spring are used to ensure the stability of the hitting part. And reduce manufacturing costs and improve connection strength through integrated die-casting.

Benefits of technology

The easy replacement of the strike part component is achieved, the resource waste of replacement of the entire drill rod is avoided, and the stability of the strike part is improved through the shock-cushioning spring, reducing manufacturing costs and improving connection strength.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221999985U_ABST
    Figure CN221999985U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of electrolyte cleaning equipment, and discloses a breaking hammer for electrolyte cleaning, which comprises a drill rod, a drill shoulder and a mounting drill sleeve, the drill rod is a main body, and the drill shoulder is fixedly connected to the position close to the front side of the middle of the outer side wall of the drill rod through a bolt. The installation drill sleeve is welded to the position, close to the front side, of the middle of the outer side wall of the drill rod and located on the rear side of the drill shoulder, clamping parts are clamped to the middles of the two side walls of the installation drill sleeve, connecting parts are fixedly installed on one side wall and the other side wall of each clamping part respectively, and the two connecting parts are oppositely distributed in a mirror image mode. According to the drill rod, the cross section of the drill rod shoulder is in the isosceles trapezoid shape and can be in any form such as a rectangle and a circle theoretically, it is only needed to ensure that the width between the two beating parts is larger than the longest diameter of the drill rod shoulder, the beating part assemblies are convenient to replace by disassembling the beating parts and other assemblies, and the situation that the whole drill rod needs to be replaced when the beating parts are replaced is avoided; therefore, unnecessary resource consumption is caused.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of electrolyte cleaning equipment, in particular to a breaking hammer for electrolyte cleaning. Background Art

[0002] In the production of electrolytic aluminum, after the guide rod has been used for a period of time, the aluminum slag and electrolyte remaining on the guide rod need to be cleaned off. The hydraulic breaker is one of the commonly used electrolyte cleaning devices. When working, the piston reciprocates in the cylinder body, and the piston uses its counterattack force to hit the drill rod, which impacts the stone to break it. The structure of the drill rod affects the impact and crushing effect.

[0003] However, the existing equipment has the following shortcomings: when cleaning the anode steel claws, the striking part of the existing electrolyte breaker hammer needs to continuously collide with the residual surface, so the striking part needs to be repaired or maintained regularly. Most of the existing ones are integrally formed, and the entire drill rod needs to be replaced during replacement, which causes a waste of resources. Therefore, the technical personnel in this field provide a breaker hammer for electrolyte cleaning to solve the above-mentioned problems. Utility Model Content

[0004] The utility model aims to solve the shortcomings in the prior art and proposes a breaker hammer for electrolyte cleaning.

[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0006] A breaker hammer for electrolyte cleaning, comprising a drill rod, a drill shoulder and a mounting drill sleeve, wherein the drill rod is the main body, the drill shoulder is fixedly connected to the front middle of the outer wall of the drill rod by bolts, the mounting drill sleeve is welded to the front middle of the outer wall of the drill rod and is located at the rear side of the drill shoulder, the middle positions of both side walls of the mounting drill sleeve are clamped with a clamping part, one side wall and the other side wall of the two clamping parts are respectively fixedly installed with a connecting part, the two connecting parts are distributed in mirror image opposition, the middle position of the front side wall of the two connecting parts is respectively fixedly welded with a striking part on one side and the middle position of the front side wall is respectively fixedly welded on the other side, and the two striking parts are distributed in mirror image opposition;

[0007] Through the above technical solution, the cross-section of the drill shoulder is an isosceles trapezoid, which can theoretically be any form such as a rectangle, a circle, etc., as long as the width between the two striking parts is greater than the longest diameter of the drill shoulder. By disassembling the striking part and other components, the striking part components can be easily replaced, avoiding the need to replace the entire drill rod when replacing the striking component, thereby causing unnecessary resource consumption.

[0008] Furthermore, a second locking screw hole is respectively provided at the middle position of one side wall and the other side wall of the two connecting parts, and a second locking bolt is respectively passed through and threadedly connected to the middle position of the inner side walls of the two second locking screw holes;

[0009] Through the above technical solution, the striking part is fixed and installed by respectively threading it with two matching second locking bolts.

[0010] Furthermore, damping springs are installed at the middle of the top of the inner wall of the installation sleeve and at the middle of the bottom of the inner wall, and the four damping springs are distributed in a rectangular array, and the upper side walls and lower side walls of the four damping springs are respectively in contact with the middle of the upper side walls and the middle of the lower side walls of the two clamping parts;

[0011] Through the above technical solution, crushing and cleaning are carried out through two striking parts, and the forces exerted on the two striking parts are respectively transmitted to the two clamping parts through the two connecting parts, and the four shock-absorbing springs respectively play a shock-absorbing effect to ensure the stability of the striking parts.

[0012] Further, a first locking screw hole is provided in the middle of the front side of the upper side wall of the drill rod, a mounting hole is provided in the middle of the front side wall of the drill shoulder, the drill rod passes through the mounting hole, a first locking bolt passes through and is threadedly connected to the middle of the upper side wall of the drill shoulder, and the lower side wall of the first locking bolt is threadedly connected to the middle front side of the bottom of the inner side wall of the drill rod;

[0013] Through the above technical solution, the first locking bolt shoulder is installed and disassembled.

[0014] Furthermore, a head portion is installed at the middle position of the front side wall of the drill rod, and a tail portion is installed at the middle position of the rear side wall of the drill rod;

[0015] Through the above technical solution, the head part, the tail part and the drill rod are integrally formed by die-casting.

[0016] Furthermore, a mounting groove connected to the cylinder body is provided at the rear end of the outer wall of the drill rod;

[0017] Through the above technical solution, the drill rod is connected to the output end of the cylinder body through the installation groove, and the cylinder body serves as a driver to drive the breaker hammer to operate as a whole.

[0018] Furthermore, the two clamping parts and the two connecting parts are respectively formed integrally with the two striking parts;

[0019] Through the above technical solution, the clamping part, the connecting part and the striking part are integrally die-cast. By adopting the integral die-casting method, the manufacturing cost of the striking component is lower during production and processing, and the connection strength between the components is higher.

[0020] The utility model has the following beneficial effects:

[0021] 1. In the utility model, the cross-section of the drill shoulder is an isosceles trapezoid. Theoretically, it can be any form such as a rectangle, a circle, etc., as long as the width between the two striking parts is greater than the longest diameter of the drill shoulder. By disassembling the striking part and other components, the striking part components can be easily replaced, avoiding the need to replace the entire drill rod when replacing the striking component, thereby causing unnecessary resource consumption.

[0022] 2. In the utility model, two striking parts are used for crushing and cleaning, and the forces acting on the two striking parts are respectively transmitted to the two clamping parts through the two connecting parts, and the four shock-absorbing springs respectively play a shock-absorbing effect to ensure the stability of the striking parts. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 This is a schematic diagram of a partial explosion of a breaker hammer for electrolyte cleaning proposed by the utility model;

[0024] Figure 2 This is a three-dimensional schematic diagram of a breaker hammer for electrolyte cleaning proposed by the utility model;

[0025] Figure 3 It is a partial front cross-sectional view of a breaker hammer for electrolyte cleaning proposed by the utility model;

[0026] Figure 4 for Figure 3 The enlarged schematic diagram of point A in the middle;

[0027] Figure 5 It is a partial three-dimensional schematic diagram of the front end of the drill rod;

[0028] Figure 6 It is a three-dimensional schematic diagram of the drill shoulder.

[0029] Legend:

[0030] 1. Drill rod; 2. Tail; 3. Head; 4. Drill shoulder; 5. First locking bolt; 6. Connecting part; 7. Second locking bolt; 8. Install drill sleeve; 9. Striking part; 10. First locking screw hole; 11. Clamping part; 12. Second locking screw hole; 13. Shock-absorbing spring; 14. Mounting hole. DETAILED DESCRIPTION

[0031] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0032] Reference Figure 1-6The utility model provides an embodiment: a breaker hammer for electrolyte cleaning, comprising a drill rod 1, a drill shoulder 4 and a mounting drill sleeve 8, wherein the drill rod 1 is the main body, the drill shoulder 4 is fixedly connected to the middle front side of the outer wall of the drill rod 1 by bolts, the mounting drill sleeve 8 is welded to the middle front side of the outer wall of the drill rod 1 and is located at the rear side of the drill shoulder 4, the middle positions of both side walls of the mounting drill sleeve 8 are clamped with a clamping portion 11, one side wall and the other side wall of the two clamping portions 11 are respectively fixedly installed with a connecting portion 6, and the two connecting portions 6 are distributed in mirror image opposition A striking part 9 is fixedly welded to the middle of the front side wall of the two connecting parts 6 on one side and the middle of the front side wall on the other side. The two striking parts 9 are distributed in mirror-image relation. The cross section of the drill shoulder 4 is an isosceles trapezoid. Theoretically, it can be in any form such as a rectangle, a circle, etc., as long as the width between the two striking parts 9 is greater than the longest diameter of the drill shoulder 4. By disassembling the striking part 9 and other components, the striking part 9 components can be easily replaced, avoiding the need to replace the entire drill rod when replacing the striking components, thereby causing unnecessary resource consumption.

[0033] A second locking screw hole 12 is respectively provided in the middle position of one side wall and the other side wall of the two connecting parts 6, and a second locking bolt 7 is respectively penetrated and threadedly connected to the middle position of the inner wall of the two second locking screw holes 12, and two matching second locking bolts 7 are used to thread them respectively, so as to complete the fixing and installation of the striking part 9, and damping springs 13 are installed in the middle position of the top of the inner wall of the installation drill sleeve 8 on both sides and the middle position of the bottom of the inner wall on both sides, and the four damping springs 13 are distributed in a rectangular array, and the upper side wall and the lower side wall of the four damping springs 13 are respectively fitted with the middle position of the upper side wall and the middle position of the lower side wall of the two clamping parts 11, and the two striking parts 9 are used for crushing and cleaning, and the forces acting on the two striking parts 9 are respectively transmitted to the two clamping parts 11 through the two connecting parts 6, and the four damping springs 13 have a damping effect to ensure the stability of the striking part 9.

[0034] A first locking screw hole 10 is provided in the middle of the upper side wall of the drill rod 1, and a mounting hole 14 is provided in the middle of the front side wall of the drill shoulder 4. The drill rod 1 passes through the mounting hole 14, and a first locking bolt 5 passes through and is threadedly connected to the middle position of the upper side wall of the drill shoulder 4. The lower side wall of the first locking bolt 5 is threadedly connected to the middle front position of the bottom of the inner side wall of the drill rod 1. The first locking bolt 5 is installed and disassembled to the drill shoulder 4. A head 3 is installed in the middle of the front side wall of the drill rod 1, and a tail 2 is installed in the middle of the rear side wall of the drill rod 1. A mounting groove connected to the cylinder body is provided at the rear end of the outer side wall of the drill rod 1. The drill rod 1 is connected to the output end of the cylinder body through the mounting groove, and the cylinder body acts as a driver to drive the breaker as a whole to operate.

[0035] The two clamping parts 11 and the two connecting parts 6 are respectively integrally formed with the two striking parts 9, and the clamping parts 11, the connecting parts 6 and the striking parts 9 are integrally die-cast. By adopting the integral die-casting molding, the manufacturing cost of the striking component is lower during production and processing, and the connection strength between the components is higher.

[0036] Working principle: The cross section of the drill shoulder 4 is an isosceles trapezoid. Theoretically, it can be in any form such as a rectangle, a circle, etc., as long as the width between the two striking portions 9 is greater than the longest diameter of the drill shoulder 4. The two clamping portions 11 are respectively inserted into the two installation grooves respectively opened on one side wall and the other side wall of the installation drill sleeve 8. During installation, the lower side wall and the upper side wall of the four damping springs 13 need to be respectively fitted with the top middle position and the bottom middle position of the two clamping portions 11, and then two second locking bolts 7 that match them are respectively threadedly connected, so as to After the fixing and installation of the striking part 9 are completed, when the striking part processes the residual electrolyte of the anode steel claw, the two striking parts 9 are used to crush and clean it. The forces acting on the two striking parts 9 are respectively transmitted to the two clamping parts 11 through the two connecting parts 6, and the four shock-absorbing springs 13 are used to provide a shock-absorbing effect to ensure the stability of the striking part 9. By rotating the two second locking bolts 7 counterclockwise, the striking part 9 and other components are disassembled, so that the striking part 9 components can be easily replaced, avoiding the need to replace the entire drill rod when replacing the striking components, thereby causing unnecessary resource consumption.

[0037] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A breaker hammer for electrolyte cleaning, comprising a drill rod (1), a drill shoulder (4) and a mounting drill sleeve (8), characterized in that: The drill rod (1) is a main body, the drill shoulder (4) is fixedly connected to the middle front side of the outer wall of the drill rod (1) by bolts, the mounting drill sleeve (8) is welded to the middle front side of the outer wall of the drill rod (1) and is located at the rear side of the drill shoulder (4), the mounting drill sleeve (8) is clamped with a clamping portion (11) at the middle position of both side walls, one side wall and the other side wall of the two clamping portions (11) are respectively fixedly mounted with connecting portions (6), the two connecting portions (6) are distributed in a mirror image, and the middle position of the front side wall of the two connecting portions (6) is respectively fixedly welded with a striking portion (9) at one side and the middle position of the front side wall, the two striking portions (9) are distributed in a mirror image.

2. The electrolyte cleaning breaker according to claim 1, characterized in that: A second locking screw hole (12) is respectively provided at the middle position of one side wall and the other side wall of the two connecting parts (6), and a second locking bolt (7) is respectively penetrated and threadedly connected at the middle position of the inner side walls of the two second locking screw holes (12).

3. The electrolyte cleaning breaker according to claim 1, characterized in that: Shock-absorbing springs (13) are installed at the middle of the top of the inner wall of the installation bushing (8) and at the middle of the bottom of the inner wall. Four of the shock-absorbing springs (13) are distributed in a rectangular array. The upper side walls and lower side walls of the four shock-absorbing springs (13) are respectively fitted with the middle of the upper side walls and the middle of the lower side walls of the two clamping parts (11).

4. The electrolyte cleaning breaker according to claim 1, characterized in that: A first locking screw hole (10) is provided in the middle of the upper side wall of the drill rod (1), a mounting hole (14) is provided in the middle of the front side wall of the drill shoulder (4), the drill rod (1) passes through the mounting hole (14), a first locking bolt (5) passes through and is threadedly connected to the middle of the upper side wall of the drill shoulder (4), and the lower side wall of the first locking bolt (5) is threadedly connected to the middle of the bottom of the inner side wall of the drill rod (1).

5. The electrolyte cleaning breaker according to claim 1, characterized in that: A head portion (3) is installed at the middle position of the front side wall of the drill rod (1), and a tail portion (2) is installed at the middle position of the rear side wall of the drill rod (1).

6. The electrolyte cleaning breaker according to claim 1, characterized in that: An installation groove connected to the cylinder body is provided on the outer side wall of the drill rod (1) at the rear end.

7. The electrolyte cleaning breaker according to claim 1, characterized in that: The two clamping parts (11), the two connecting parts (6) and the two striking parts (9) are respectively formed in one piece.