Application Number
CN202420582864.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-25
Publication Date
2024-11-15
Estimated Expiration
2034-03-25

AI Technical Summary

Technical Problem

Existing material hoists cannot realize automatic unloading, resulting in inefficient construction and increased labor costs.

Method used

A lifting machine for construction is designed, using a lifting frame, storage box, support plate, rotating shaft, electric cylinder, rack and gear structure. The gear is driven forward and reversely to rotate and incline the storage box and passes through the gear. The material plate and pull block realize automatic unloading.

Benefits of technology

The automatic unloading of materials inside the storage box is realized, reducing labor cost investment and improving construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222007132U_ABST
    Figure CN222007132U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of building construction, and discloses a building construction hoister which comprises a hoisting frame, a winch and a hoisting frame, the winch is fixedly arranged at the top of the hoisting frame, a lifting rope is wound on the winch, the tail end of the lifting rope extends into the hoisting frame and is fixedly connected with the hoisting frame, and the hoisting frame is fixedly connected with the hoisting frame. Sliding mechanisms are arranged between the two sides of the lifting frame and the two sides of the lifting frame. A material storage box is arranged in the lifting frame, supporting plates are fixedly arranged on the two sides of the bottom of the lifting frame, the two sides of the material storage box are rotationally connected with the two supporting plates through rotating shafts, and a rotating driving mechanism connected with the rotating shafts is arranged on one side of the bottom of the lifting frame; the rotary driving mechanism comprises an electric cylinder, a rack and a gear, and a fixing base is fixedly arranged on one side of the bottom of the lifting frame. By adopting a structure for driving the storage box to rotate, materials in the storage box can be automatically discharged, so that the investment of labor cost is reduced, and the construction efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to a hoist for building construction. Background Art

[0002] At present, when carrying out construction work, it is often necessary to use material hoists to automatically transfer construction materials to higher points to reduce the burden of transportation for personnel.

[0003] The existing material hoist lifts the material storage box to a specified height, and then manually unloads the material inside the material storage box. At this time, the material needs to be unloaded manually through unloading tools, and the automatic unloading function cannot be realized, which reduces the efficiency of construction and increases the cost of labor. Therefore, a hoist for construction is proposed. Utility Model Content

[0004] The utility model aims to solve the problem that the material hoist in the prior art cannot realize automatic unloading, and proposes a hoist for construction.

[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0006] A hoist for construction construction comprises a lifting frame, a winch and a lifting frame, the winch is fixedly arranged on the top of the lifting frame, a lifting rope is wound on the winch, and the end of the lifting rope extends to the inside of the lifting frame and is fixedly connected to the lifting frame, and a sliding mechanism is provided between the two sides of the lifting frame and the two sides of the lifting frame; a material storage box is provided inside the lifting frame, support plates are fixedly provided on both sides of the bottom of the lifting frame, and both sides of the storage box are rotatably connected to two support plates through a rotating shaft, and a rotating drive mechanism connected to the rotating shaft is provided on one side of the bottom of the lifting frame; the rotating drive mechanism comprises an electric cylinder, a rack and a gear, a fixed seat is fixedly provided on one side of the bottom of the lifting frame, the bottom of the electric cylinder is fixedly connected to the fixed seat, and the moving end of the electric cylinder is fixedly connected to the rack, the gear is fixedly provided on the shaft wall of the rotating shaft, and the gear is meshed with the rack.

[0007] Preferably, the sliding mechanism comprises a sliding rod and a sliding seat, the sliding rod is arranged on the inner side wall of the lifting frame, the sliding seat is fixedly arranged on the side wall of the lifting frame, and the sliding seat is slidably connected to the sliding rod.

[0008] Preferably, discharge ports are provided on both sides of the material storage box, and baffle plates are inserted inside the discharge ports.

[0009] Preferably, a pulling block is fixedly provided on the top of the side wall of the baffle plate.

[0010] Preferably, a loading port is provided at the top of the lifting frame and on one side of the lifting rope.

[0011] Preferably, the lifting frame is an inverted U-shaped frame.

[0012] Compared with the prior art, the utility model provides a hoist for construction, which has the following beneficial effects:

[0013] 1. The construction hoist is provided with a lifting frame, a storage box, a support plate, a rotating shaft, an electric cylinder, a rack and a gear. When the electric cylinder extends, the rack can move left and right, and the rack can drive the gear to rotate forward and reverse, so that the storage box can be tilted by rotating the rotating shaft, and the material inside the storage box can be automatically unloaded.

[0014] 2. The hoist for construction has baffle plates on both sides of the storage box. When the storage box is in an inclined state, the discharge ports on both sides of the storage box can be exposed by pulling the baffle plates on both sides, and the materials inside the storage box can be quickly discharged.

[0015] 3. The construction hoist is arranged between the lifting frame and the lifting rack.

[0016] The parts not involved in the device are the same as the existing technology or can be implemented by using the existing technology. The utility model adopts a structure for rotating and driving the storage box, which can automatically unload the materials inside the storage box, reduce the investment of labor costs, and improve construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 This is a structural schematic diagram of a hoist for construction proposed by the utility model;

[0018] Figure 2 for Figure 1 Side view of the middle lifting frame and storage box;

[0019] Figure 3 for Figure 1 Top view of the storage box.

[0020] In the figure: 1. lifting frame; 2. winch; 3. lifting frame; 4. lifting rope; 5. storage box; 6. support plate; 7. rotating shaft; 8. electric cylinder; 9. rack; 10. gear; 11. fixed seat; 12. sliding rod; 13. sliding seat; 14. material blocking plate; 15. pulling block; 16. loading port. DETAILED DESCRIPTION

[0021] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.

[0022] In the description of the present invention, it should be understood that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", etc., indicating directions or positional relationships, are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as a limitation on the present invention.

[0023] Reference Figure 1-3 A hoist for construction includes a lifting frame 1, a winch 2 and a lifting frame 3. The lifting frame 1 adopts an inverted U-shaped frame. The winch 2 is fixedly arranged on the top of the lifting frame 1. A lifting rope 4 is wound on the winch 2, and the end of the lifting rope 4 extends to the inside of the lifting frame 1 and is fixedly connected to the lifting frame 3. A sliding mechanism is provided between the two sides of the lifting frame 3 and the two sides of the lifting frame 1. The sliding mechanism includes a slide bar 12 and a slide seat 13. The slide bar 12 is arranged on the inner side wall of the lifting frame 1, and the slide seat 13 is fixedly arranged on the side wall of the lifting frame 3, and the slide seat 13 is slidably connected to the slide bar 12. The winch 2 can wind or release the lifting rope 4 when working, so that the lifting frame 3 moves up or down. In the process of the lifting frame 3 moving up and down, the slide seat 13 moves on the slide bar 12, which can make the lifting frame 3 stable in loading and unloading.

[0024] Among them, a storage box 5 is provided inside the lifting frame 3, and a loading port 16 is opened at the top of the lifting frame 3 and on one side of the lifting rope 4, through which the material can be poured into the storage box 5, and support plates 6 are fixedly provided on both sides of the bottom of the lifting frame 3, and both sides of the storage box 5 are rotatably connected to the two support plates 6 through a rotating shaft 7, and a rotating drive mechanism connected to the rotating shaft 7 is provided on one side of the bottom of the lifting frame 3, and the rotating drive mechanism includes an electric cylinder 8, a rack 9 and a gear 10, and a fixed seat 11 is fixedly provided on one side of the bottom of the lifting frame 3, the bottom of the electric cylinder 8 is fixedly connected to the fixed seat 11, and the moving end of the electric cylinder 8 is fixedly connected to the rack 9, and the gear 10 is fixedly set on the shaft wall of the rotating shaft 7, and the gear 10 is meshed with the rack 9. When the electric cylinder 8 extends, it can make the rack 9 move left and right, and the rack 9 can drive the gear 10 to rotate forward and reverse, so that the storage box 5 can be rotated through the rotating shaft 6 to be in an inclined state, and the material inside the storage box 5 can be automatically unloaded.

[0025] At the same time, discharge ports are provided on both sides of the material storage box 5, and a baffle plate 14 is inserted inside the discharge port, and a pulling block 15 is fixedly provided on the top of the side wall of the baffle plate 14. After the material storage box 5 is tilted, the material storage box 5 can be pulled out from the inside of the discharge port by holding the pulling block 15, so that the material inside the material storage box 5 can be unloaded.

[0026] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A hoist for construction, comprising a hoisting frame (1), a winch (2) and a hoisting frame (3), characterized in that: The hoist (2) is fixedly arranged on the top of the lifting frame (1), a lifting rope (4) is wound on the hoist (2), and the end of the lifting rope (4) extends to the inside of the lifting frame (1) and is fixedly connected to the lifting frame (3), and a sliding mechanism is provided between the two sides of the lifting frame (3) and the two sides of the lifting frame (1); A material storage box (5) is provided inside the lifting frame (3), support plates (6) are fixedly provided on both sides of the bottom of the lifting frame (3), both sides of the material storage box (5) are rotatably connected to the two support plates (6) via a rotating shaft (7), and a rotating drive mechanism connected to the rotating shaft (7) is provided on one side of the bottom of the lifting frame (3); The rotary drive mechanism comprises an electric cylinder (8), a rack (9) and a gear (10); a fixed seat (11) is fixedly provided on one side of the bottom of the lifting frame (3); the bottom of the electric cylinder (8) is fixedly connected to the fixed seat (11), and the movable end of the electric cylinder (8) is fixedly connected to the rack (9); the gear (10) is fixedly arranged on the shaft wall of the rotating shaft (7), and the gear (10) is meshed with the rack (9).

2. A construction hoist according to claim 1, characterized in that: The sliding mechanism comprises a sliding rod (12) and a sliding seat (13); the sliding rod (12) is arranged on the inner side wall of the lifting frame (1); the sliding seat (13) is fixedly arranged on the side wall of the lifting frame (3); and the sliding seat (13) is slidably connected to the sliding rod (12).

3. A construction hoist according to claim 1, characterized in that: Discharge openings are provided on both sides of the material storage box (5), and baffle plates (14) are inserted into the discharge openings.

4. A construction hoist according to claim 3, characterized in that: A pulling block (15) is fixedly provided on the top of the side wall of the material blocking plate (14).

5. A construction hoist according to claim 1, characterized in that: A loading port (16) is provided at the top of the lifting frame (3) and on one side of the lifting rope (4).