Sidewalk road structure using permeable concrete

By introducing diversion and decompression mechanisms into permeable concrete pedestrian roads, the problem of rainwater accumulation is solved, effective rainwater discharge and sewage cleaning are achieved, and the permeability and safety of the road are improved.

CN222008529UActive Publication Date: 2024-11-15JIANGSU ZHONGDA CONSTRUCT ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420577996.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-25
Publication Date
2024-11-15
Estimated Expiration
2034-03-25

AI Technical Summary

Technical Problem

The existing permeable concrete pedestrian roads cannot effectively store rainwater when the rainwater is too heavy, resulting in rainwater on the road area and affecting pedestrians' walking.

Method used

A permeable concrete pedestrian road structure including a flow guide mechanism and a debris removal mechanism is designed. The debris removal mechanism guides rainwater to the drainage well through multiple layers of permeable concrete and drainage pipelines to avoid rainwater accumulation; the debris removal mechanism is cleaned through manhole covers and dustproof nets. Debris to ensure that sewage does not flow into the ground.

Benefits of technology

It effectively avoids the accumulation of rainwater on the road surface, ensures the safety of pedestrians, and guides rainwater into the urban drainage system through the drainage system, reducing pollution and improving the water permeability and durability of the road.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222008529U_ABST
    Figure CN222008529U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of road building materials, in particular to a sidewalk road structure utilizing permeable concrete, which comprises a concrete roadbed, a flow guide mechanism used for preventing rainwater accumulation is arranged on the upper surface of the concrete roadbed, and a drainage well located on the right side of the flow guide mechanism is arranged on the upper surface of the concrete roadbed. An impurity removal mechanism for conveniently cleaning impurities is arranged in the drainage well, and the flow guide mechanism comprises a drainage assembly, a curbstone, a first drainage layer, a second drainage layer, a reinforcing layer and a permeable layer. According to the sidewalk road structure utilizing the permeable concrete, the flow guide mechanism absorbs rainwater and releases the rainwater into the drainage well through cooperation of the first drainage layer, the second drainage layer, the reinforcing layer and the permeable layer, and the situation that rainwater is accumulated on the road surface to hinder walking of pedestrians is avoided; and meanwhile, through the cooperation of the drainage pipeline and the drainage pipeline, the rainwater which is not absorbed temporarily is guided out and directly conveyed to the drainage well when the rainwater is too large, and temporary accumulation of the rainwater is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of road building materials, in particular to a pedestrian road structure using permeable concrete. Background Art

[0002] Usually when urban traffic planning is constructed, motor vehicle lanes will be built on the one hand, and corresponding sidewalks will also need to be built on the other hand. During the construction of conventional sidewalks, cement will be used as the roadbed, stone bricks will be laid on the cement roadbed, and the gaps between the stone bricks will be filled with concrete. Over time, the concrete on some road surfaces will crack, causing the stone bricks to loosen. When it rains, this kind of road surface can easily cause pedestrians to splash mud and water when walking. Therefore, permeable concrete is currently used as the road surface to reduce road surface water accumulation.

[0003] During the conventional use of permeable concrete, due to the limited water storage capacity of the permeable concrete and the roadbed beneath the permeable concrete, when the rainfall is too heavy, the water storage capacity of the permeable concrete and the roadbed beneath the permeable concrete will quickly reach saturation, making it impossible to continue to store rainwater, causing subsequent rainwater to remain on the road surface and form water accumulation on the road surface. Utility Model Content

[0004] In view of the deficiencies in the prior art, the utility model provides a pedestrian road structure using permeable concrete, which has the advantages of guiding rainwater to flow out and prevent accumulation, thereby solving the problem of subsequent rainwater staying on the road surface and forming water accumulation on the road surface.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a pedestrian road structure using permeable concrete, comprising a concrete roadbed, the upper surface of the concrete roadbed is provided with a diversion mechanism for preventing rainwater accumulation, the upper surface of the concrete roadbed is provided with a drainage well located on the right side of the diversion mechanism, and the interior of the drainage well is provided with a debris removal mechanism for conveniently cleaning debris;

[0006] The diversion mechanism includes a drainage component, a curb, a first drainage layer, a second drainage layer, a reinforcement layer and a permeable layer. The first drainage layer is laid on the upper surface of the concrete roadbed, the second drainage layer is laid on the upper surface of the first drainage layer, the reinforcement layer is laid on the upper surface of the second drainage layer, and the permeable layer is laid on the upper surface of the reinforcement layer.

[0007] By adopting this technical solution, rainwater is absorbed and released into the drainage well, preventing rainwater from accumulating on the road surface and obstructing pedestrians.

[0008] Furthermore, the drainage component includes a drainage pipe and a drainage pipe, at least two of the drainage pipes are opened on the upper surface of the curb, the drainage pipe is opened on the right side of the curb and the drainage pipe is connected to at least two of the drainage pipes.

[0009] By adopting this technical solution, when the rainwater is too heavy, the rainwater that has not been absorbed temporarily can be discharged and directly transported to the drainage well, avoiding the temporary accumulation of rainwater.

[0010] Furthermore, the first drainage layer and the second drainage layer are both permeable concrete layers, and the cross-sectional shape of the first drainage layer is a triangle.

[0011] By adopting this technical solution, water in the permeable concrete layer can enter the drainage ditch along the inclined concrete roadbed and be discharged along the urban drainage system.

[0012] Furthermore, the reinforcement layer is a crushed stone layer, and the permeable layer is a water-permeable brick layer.

[0013] By adopting this technical solution, the permeable bricks can allow rainwater to penetrate and enter the gravel layer, and at the same time can play a preliminary filtering effect to reduce the penetration of impurities such as dust into the permeable concrete layer.

[0014] Furthermore, the debris removal mechanism includes a positioning block, a positioning spring, a manhole cover, a connecting block, a connecting frame and a dustproof net, the dustproof net is slidably connected to the inside of the drainage well, the connecting frame is fixed to the upper surface of the dustproof net, the two connecting blocks are fixed to the upper surface of the connecting frame, the manhole cover is plugged into the outside of the two connecting blocks and is slidably connected to the inside of the concrete roadbed, no less than two positioning springs are fixed to the inside of the manhole cover, and the two positioning blocks are respectively fixed on the opposite sides of the left and right positioning springs.

[0015] By adopting this technical solution, when sewage flows into the drainage well, the debris carried by the sewage will not flow into the underground river in the drainage well.

[0016] Furthermore, one side opposite to the two connection blocks is provided with a positioning groove for the positioning block to be inserted into, and the shape of the opposite sides of the two positioning blocks is semicircular.

[0017] By adopting this technical solution, the positioning block can initially restrict the connecting block and prevent the connecting block from being stuck and unable to be removed.

[0018] Furthermore, the upper surface of the manhole cover is provided with no less than two drainage holes, and the dustproof net is in the shape of a rectangular parallelepiped with a hollow interior and a missing upper surface.

[0019] By adopting this technical solution, it is convenient for sewage on the road to flow into the drainage well, and it is also convenient for the dust net to collect debris.

[0020] Compared with the prior art, the technical solution of this application has the following beneficial effects:

[0021] 1. The pedestrian road structure using permeable concrete, the diversion mechanism absorbs rainwater through the cooperation of the first drainage layer, the second drainage layer, the reinforcement layer and the permeable layer and releases it into the drainage well, to avoid rainwater accumulation on the road surface to hinder pedestrians. At the same time, through the cooperation of the drainage pipe and the drainage pipe, when the rainwater is too heavy, the rainwater that has not been absorbed temporarily is discharged and directly transported to the drainage well, to avoid the temporary accumulation of rainwater.

[0022] 2. The pedestrian road structure utilizes permeable concrete. The debris removal mechanism allows sewage to flow into the drainage well through the setting of manhole covers and dustproof nets. At the same time, the debris carried by the sewage will not flow into the underground river in the drainage well. The positioning block, positioning spring, connecting block and connecting frame are coordinated to facilitate the staff to disassemble the manhole cover and dustproof net to deal with the debris accumulated in the dustproof net. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a schematic diagram of the structure of the utility model;

[0024] Figure 2 This is a schematic diagram of the flow guide mechanism of the utility model;

[0025] Figure 3 This is a schematic diagram of the impurity removal mechanism of the utility model;

[0026] Figure 4 It is a three-dimensional schematic diagram of the impurity removal mechanism of the utility model.

[0027] In the figure: 1. concrete roadbed; 2. diversion mechanism; 201. drainage pipe; 202. curb; 203. drainage pipe; 204. first drainage layer; 205. second drainage layer; 206. reinforcement layer; 207. permeable layer; 3. debris removal mechanism; 301. positioning block; 302. positioning spring; 303. manhole cover; 304. connection block; 305. connection frame; 306. dustproof net; 4. drainage well. DETAILED DESCRIPTION

[0028] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0029] See also Figure 1A pedestrian road structure using permeable concrete in this embodiment includes a concrete roadbed 1, the upper surface of the concrete roadbed 1 is provided with a diversion mechanism 2 for preventing rainwater accumulation, the upper surface of the concrete roadbed 1 is provided with a drainage well 4 located on the right side of the diversion mechanism 2, and the interior of the drainage well 4 is provided with a debris removal mechanism 3 for conveniently cleaning debris.

[0030] See also Figure 2 In order to prevent rainwater accumulation, the guide mechanism 2 in this embodiment includes a drainage component, a curb 202, a first drainage layer 204, a second drainage layer 205, a reinforcement layer 206 and a permeable layer 207. The first drainage layer 204 is laid on the upper surface of the concrete roadbed 1, the second drainage layer 205 is laid on the upper surface of the first drainage layer 204, the reinforcement layer 206 is laid on the upper surface of the second drainage layer 205, and the permeable layer 207 is laid on the upper surface of the reinforcement layer 206.

[0031] The first drainage layer 204 and the second drainage layer 205 are both permeable concrete layers. The cross-sectional shape of the first drainage layer 204 is a triangle. The right side of the first drainage layer 204 is the left side wall of the inner cavity of the drainage well 4. The height of the left side wall of the inner cavity of the drainage well 4 is twice that of the right side of the first drainage layer 204. An inclined surface matched with the first drainage layer 204 is provided inside the concrete roadbed 1, so that rainwater can flow along the inclined surface of the concrete roadbed 1 to the inside of the drainage well 4. The reinforcement layer 206 is a gravel layer, and the permeable layer 207 is a permeable brick layer. The permeable brick can allow rainwater to penetrate into the gravel layer, and at the same time can play a preliminary filtering effect to reduce the penetration of impurities such as dust into the permeable concrete layer.

[0032] In this embodiment, the drainage component includes a drainage pipe 201 and a drainage pipe 203. No less than two drainage pipes 201 are opened on the upper surface of the curb 202, and the drainage pipe 203 is opened on the right side of the curb 202 and is connected to no less than two drainage pipes 201.

[0033] It should be noted that the diversion mechanism 2 absorbs rainwater and releases it into the drainage well 4 through the cooperation of the first drainage layer 204, the second drainage layer 205, the reinforcement layer 206 and the permeable layer 207, so as to prevent rainwater from accumulating on the road surface and obstructing pedestrians. At the same time, through the cooperation of the drainage pipe 201 and the drainage pipe 203, when the rainwater is too heavy, the rainwater that has not been absorbed temporarily is discharged and directly transported to the drainage well 4, so as to prevent rainwater from temporarily accumulating.

[0034] See also Figure 3-4In order to facilitate the cleaning of debris in the drainage well 4, the debris removal mechanism 3 in this embodiment includes a positioning block 301, a positioning spring 302, a manhole cover 303, a connecting block 304, a connecting frame 305 and a dustproof net 306. The dustproof net 306 is slidably connected to the inside of the drainage well 4, the connecting frame 305 is fixed to the upper surface of the dustproof net 306, the two connecting blocks 304 are fixed to the upper surface of the connecting frame 305, the manhole cover 303 is plugged into the outside of the two connecting blocks 304 and is slidably connected to the inside of the concrete roadbed 1, and the number of positioning springs 302 of not less than two is fixed to Inside the manhole cover 303, two positioning blocks 301 are respectively fixed on the opposite sides of the positioning springs 302 on the left and right sides. When the connecting block 304 moves, the positioning block 301 is pressed back to the inside of the manhole cover 303, and the positioning spring 302 is compressed by the positioning block 301. When the connecting block 304 is fully inserted into the manhole cover 303, the positioning spring 302 pushes the positioning block 301 into the connecting block 304 through the rebound force to restrict the connecting block 304. When the connecting block 304 is completely separated from the manhole cover 303, the positioning spring 302 pushes the positioning block 301 back to the initial position through the rebound force.

[0035] In this embodiment, the two connecting blocks 304 are provided with positioning grooves on the opposite sides for the positioning blocks 301 to be plugged in. The shapes of the opposite sides of the two positioning blocks 301 are both semicircular, so that the positioning blocks 301 can initially restrict the connecting blocks 304 while preventing the connecting blocks 304 from being stuck and unable to be removed. The upper surface of the manhole cover 303 is provided with no less than two drainage holes, and the dustproof net 306 is shaped like a rectangular parallelepiped with a hollow interior and a missing upper surface, which facilitates the sewage on the road surface to flow into the drainage well 4, and also facilitates the dustproof net 306 to collect debris.

[0036] It should be noted that the debris removal mechanism 3, through the setting of the manhole cover 303 and the dustproof net 306, allows sewage to flow into the drainage well 4 while the debris carried by the sewage will not flow into the underground river in the drainage well 4, and the cooperation of the positioning block 301, the positioning spring 302, the connecting block 304 and the connecting frame 305 makes it convenient for the staff to disassemble the manhole cover 303 and the dustproof net 306 to deal with the debris accumulated in the dustproof net 306.

[0037] The working principle of the above embodiment is:

[0038] (1) The first drainage layer 204 and the second drainage layer 205 are both permeable concrete layers, which can reduce the burden of the road drainage system during the rainy season. The reinforcement layer 206 is a gravel layer, and the permeable layer 207 is a permeable brick layer. The permeable brick has good wear resistance and is suitable for a higher load-bearing environment; it has good permeability and strong anti-skid function; it has a long service life; it has a smooth surface, high anti-freeze performance and salt-alkali resistance; it is not easy to break, and its compressive and flexural strengths are higher than those of similar products, making it safe for driving; it has low maintenance costs and is easy to replace, which significantly reduces the pollution of urban water bodies caused by heavy rains. After rainwater falls on the permeable layer 207, it penetrates into the interior of the permeable layer 207 and penetrates into the reinforcement layer 206 through the permeable layer 207. The rainwater continues to penetrate downward through the gap between the reinforcement layer 206 and the second drainage layer 205, and then enters the second drainage layer 205. 05 penetrates into the interior of the first drainage layer 204, and flows into the drainage well 4 along the slope of the first drainage layer 204. At the same time, due to the limited penetration capacity of the permeable bricks, when the rainwater is too heavy, the rainwater that does not have time to penetrate into the interior enters the interior of the curb 202 through the drainage pipe 201, and the drained rainwater is introduced into the drainage well 4 through the drainage pipe 203, accelerating the discharge of rainwater. The diversion mechanism 2 absorbs rainwater and releases it into the drainage well 4 through the cooperation of the first drainage layer 204, the second drainage layer 205, the reinforcement layer 206 and the permeable layer 207, avoiding rainwater accumulation on the road surface that hinders pedestrians. At the same time, through the cooperation of the drainage pipe 201 and the drainage pipe 203, when the rainwater is too heavy, the rainwater that is temporarily not absorbed is discharged and directly transported to the drainage well 4, avoiding temporary accumulation of rainwater.

[0039] (2) When it is necessary to clean the debris in the drainage well 4, lift the manhole cover 303 upwards. The manhole cover 303 drives the connecting frame 305 to move through the connecting block 304, and drives the dust net 306 to gradually detach from the interior of the drainage well 4 through the connecting frame 305. After the dust net 306 is completely detached from the interior of the drainage well 4, grab the manhole cover 303 and pull the dust net 306 away from the manhole cover 303. The dust net 306 drives the connecting block 304 to move together through the connecting frame 305 and gradually detach from the manhole cover 303. When the connecting block After 304 is completely separated from the manhole cover 303, the dustproof net 306 can be opened to deal with the debris inside the processor. The debris removal mechanism 3 allows the sewage to flow into the drainage well 4 through the setting of the manhole cover 303 and the dustproof net 306. At the same time, the debris carried by the sewage will not flow into the underground river in the drainage well 4. The positioning block 301, the positioning spring 302, the connecting block 304 and the connecting frame 305 cooperate to facilitate the staff to disassemble the manhole cover 303 and the dustproof net 306 to deal with the debris accumulated in the dustproof net 306.

Claims

1. A pedestrian road structure using permeable concrete, comprising a concrete roadbed (1), characterized in that: The upper surface of the concrete roadbed (1) is provided with a diversion mechanism (2) for preventing rainwater accumulation, the upper surface of the concrete roadbed (1) is provided with a drainage well (4) located on the right side of the diversion mechanism (2), and the interior of the drainage well (4) is provided with a debris removal mechanism (3) for conveniently cleaning debris; The diversion mechanism (2) comprises a drainage component, a curb (202), a first drainage layer (204), a second drainage layer (205), a reinforcement layer (206) and a permeable layer (207), wherein the first drainage layer (204) is laid on the upper surface of the concrete roadbed (1), the second drainage layer (205) is laid on the upper surface of the first drainage layer (204), the reinforcement layer (205) is laid on the upper surface of the second drainage layer (205), and the permeable layer (207) is laid on the upper surface of the reinforcement layer (205).

2. A pedestrian road structure using permeable concrete according to claim 1, characterized in that: The drainage assembly comprises a drainage pipe (201) and a drainage pipe (203), wherein at least two of the drainage pipes (201) are opened on the upper surface of the curb (202), and the drainage pipe (203) is opened on the right side of the curb (202), and the drainage pipe (203) is communicated with at least two of the drainage pipes (201).

3. The pedestrian road structure using permeable concrete according to claim 1, characterized in that: The first drainage layer (204) and the second drainage layer (205) are both permeable concrete layers, and the cross-sectional shape of the first drainage layer (204) is triangular.

4. The pedestrian road structure using permeable concrete according to claim 1, characterized in that: The reinforcement layer (206) is a crushed stone layer, and the permeable layer (207) is a permeable brick layer.

5. The pedestrian road structure using permeable concrete according to claim 1, characterized in that: The impurity removal mechanism (3) comprises a positioning block (301), a positioning spring (302), a manhole cover (303), a connecting block (304), a connecting frame (305) and a dustproof net (306); the dustproof net (306) is slidably connected to the inside of the drainage well (4); the connecting frame (305) is fixed to the upper surface of the dustproof net (306); two connecting blocks (304) are fixed to the upper surface of the connecting frame (305); the manhole cover (303) is plugged into the outside of the two connecting blocks (304) and slidably connected to the inside of the concrete roadbed (1); at least two positioning springs (302) are fixed to the inside of the manhole cover (303); and the two positioning blocks (301) are respectively fixed to the opposite sides of the positioning springs (302) on the left and right sides.

6. The pedestrian road structure using permeable concrete according to claim 5, characterized in that: The two connecting blocks (304) are each provided with a positioning groove on one side opposite to the other for the positioning block (301) to be inserted into. The shapes of the two positioning blocks (301) on the opposite sides are both semicircular.

7. The pedestrian road structure using permeable concrete according to claim 5, characterized in that: The upper surface of the manhole cover (303) is provided with no less than two drainage holes, and the dustproof net (306) is in the shape of a rectangular parallelepiped with a hollow interior and a missing upper surface.