Precipitation shaft structure for building construction of thermal power plant

Through the use of multiple cylinder structures and metal materials, the problem of high processing and installation costs of precipitation wellbores in thermal power plants is solved, the effect of reducing costs and simplifying installation is achieved, and the stability and reusability of the structure are improved.

CN222008970UActive Publication Date: 2024-11-15GANSU ELECTRIC INVESTMENT ZHANGYE POWER GENERATION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420657649.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-01
Publication Date
2024-11-15
Estimated Expiration
2034-04-01

AI Technical Summary

Technical Problem

The existing precipitation wellbore is expensive to process and install in thermal power plant construction, and is difficult to install, especially because the aluminum water pipes are long, which leads to installation difficulties and increased costs.

Method used

Multiple cylindrical structures are adopted, in which an annular connecting sleeve is connected to the upper end of the cylindrical body and an annular positioning sleeve is connected to the lower end. The sealing performance and convenient installation are achieved through the shell , inner shell and reinforcement rib design improve structural strength and stability, and metal materials are used to improve connection sealing and installation convenience.

Benefits of technology

The processing and installation costs of precipitation wellbores are reduced, sealing performance and stability are achieved, disassembly and reused as needed, simplifying the processing process, and improving installation convenience.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222008970U_ABST
    Figure CN222008970U_ABST
Patent Text Reader

Abstract

The utility model provides a dewatering shaft structure for building construction of a thermal power plant, and belongs to the technical field of dewatering shafts. The problem that an existing dewatering shaft is high in machining cost and installation cost is solved. The dewatering shaft structure for the building construction of the thermal power plant comprises a plurality of barrel bodies, the upper ends of the barrel bodies are fixedly connected with annular connecting sleeves, the lower ends of the barrel bodies are fixedly connected with annular positioning sleeves, the upper ends of the connecting sleeves protrude upwards to form annular connecting rings, and positioning ring grooves with downward openings are formed in the lower ends of the positioning sleeves; and the connecting ring of the barrel body is inserted into the positioning ring groove of the barrel body above the barrel body in a close fit manner. According to the structure, the cylinder body can be detached, repeated utilization of the dewatering shaft is achieved, the multi-unit structure is adopted, the cylinder body is easy to machine, the machining cost of the cylinder body is reduced, and the installation difficulty of the dewatering shaft is also reduced by adopting an up-down insertion connection mode.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of dewatering shafts, and relates to a dewatering shaft structure for construction of a thermal power plant. Background Art

[0002] At present, in thermal power plants equipped with million-megawatt units, it is usually necessary to set up many construction wells, for example, a dewatering structure for building construction in the foundation pit. Because the water in the foundation pit needs to be removed in time to ensure the construction quality, a dewatering structure for building construction needs to be set up in the foundation pit.

[0003] For example, Chinese patent application [Authorization Announcement No.: CN212175831U] discloses a dewatering structure for construction of a thermal power plant, including a foundation pit, a dewatering well vertically opened on the foundation pit, a ring pipe inserted into the inner cavity of the dewatering well, a concrete ring pad cast on the foundation pit at the upper end of the dewatering well, a fixed aluminum ring overlapped on the upper part of the concrete ring pad, an upper filter screen plate horizontally fixedly connected to the inner side of the fixed aluminum ring, an aluminum water pipe vertically and movably penetrates the middle of the upper filter screen plate, the upper end of the aluminum water pipe is fixedly connected to the head end of the pumping pipe, the tail end of the pumping pipe is fixedly connected to the pump, the aluminum water pipe penetrates the middle of the inner cavity of the ring pipe, a lower filter screen plate is horizontally fixedly sleeved in the lower middle part of the aluminum water pipe, fixed plates are fixedly connected to the lower parts of the left and right sides of the aluminum water pipe, and the lower ends of the two fixed plates are vertically fixedly connected to the bottom of the inner cavity of the same sludge collection net cylinder.

[0004] During the construction process, a vertical drainage well is usually set at the bottom of the foundation pit, which means that the drainage well is located at the deeper bottom of the foundation pit. Therefore, water is transported directly through aluminum water pipes, which requires the aluminum water pipes to be longer in size, making installation more difficult and inconvenient, and increasing the manufacturing and installation costs of the aluminum water pipes. Utility Model Content

[0005] The purpose of the utility model is to solve the above problems in the existing technology and propose a dewatering shaft structure for the construction of a thermal power plant. The technical problem to be solved by the utility model is: how to solve the problem of high processing cost and installation cost of the existing dewatering shaft.

[0006] The purpose of the utility model can be achieved through the following technical solutions:

[0007] A dewatering shaft structure for construction of a thermal power plant includes a plurality of cylinders, characterized in that an annular connecting sleeve is fixedly connected to the upper end of the cylinder, an annular positioning sleeve is fixedly connected to the lower end of the cylinder, the upper end of the connecting sleeve protrudes upward to form an annular connecting ring, the lower end of the positioning sleeve is provided with a positioning ring groove with an opening facing downward, and the connecting ring of the cylinder is tightly fitted and inserted into the positioning ring groove of the cylinder located above the cylinder.

[0008] Working principle: By adopting a structure of multiple cylinders, a connecting sleeve is fixedly connected to the upper end of the cylinder, and a positioning sleeve is fixedly connected to the lower end of the cylinder. A connecting ring is formed by an upward protrusion on the upper end of the connecting sleeve, and a positioning ring groove with an opening facing downward is opened at the lower end of the positioning sleeve. By inserting the connecting ring of the cylinder into the positioning ring groove of the cylinder located above the cylinder, a tight-fitting plug-in connection of multiple cylinders is achieved, which ensures the sealing performance of multiple cylinders after connection and realizes the connection of longer precipitation wellbore. When in use, the corresponding number of cylinder connections can be selected according to the height of the precipitation well, and after pumping water is completed, the cylinder can be disassembled to realize multiple reuse of the precipitation wellbore. The multi-unit structure makes the processing of the cylinder simple and reduces the processing cost of the cylinder. The upper and lower plug-in method is adopted, which also reduces the difficulty of installation of the precipitation wellbore.

[0009] In the above-mentioned dewatering shaft structure of the thermal power plant construction, the lower end surface of the positioning sleeve has two annular guide surfaces, which are inclined downward and outward from top to bottom, and are connected to the groove wall of the positioning ring groove.

[0010] Since the connecting ring and the positioning ring groove are tightly fitted, the required plug-in force during connection is relatively large. By setting a guide surface connected to the groove wall of the positioning ring groove, a guiding effect can be played, and the connecting ring can be quickly introduced into the positioning ring groove, thereby improving the installation convenience of the precipitation wellbore structure.

[0011] In the above-mentioned dewatering shaft structure for thermal power plant construction, the shaft body includes an outer shell and an inner shell both of which are annular, and the outer shell and the inner shell are connected by reinforcing ribs.

[0012] Through the arrangement of the outer shell, inner shell and reinforcing ribs, the entire cylinder is designed to be as lightweight as possible while ensuring high strength, thereby reducing the difficulty of installing multiple cylinders.

[0013] In the above-mentioned dewatering shaft structure of the thermal power plant construction, a plurality of reinforcing ribs are provided, and the plurality of reinforcing ribs are evenly distributed along the circumference of the shaft, and the width direction of the reinforcing ribs is distributed along the radial direction of the inner shell.

[0014] The arrangement of this structure ensures that the structural strength of each location between the outer shell and the inner shell is the same, thereby ensuring the stability of the multiple cylinders after connection.

[0015] In the above-mentioned dewatering shaft structure of the thermal power plant construction, a sealing gasket is embedded in the positioning ring groove, and the top of the connecting ring is embedded in the corresponding positioning ring groove and abuts against the sealing gasket.

[0016] The provision of sealing gaskets further improves the sealing performance of the connections between the multiple cylinders, ensuring that water does not flow out from the connections between the cylinders when pumping water, thereby ensuring the operational stability of the precipitation shaft structure.

[0017] In the above-mentioned dewatering shaft structure of the thermal power plant construction, the shaft body is made of plastic material, and the connecting sleeve and the positioning sleeve are both made of metal material.

[0018] By using metal materials for the connecting sleeve and the positioning sleeve, welding can be used to improve the connection sealing between the connecting sleeve and the positioning sleeve, and the metal material is heavier, so that the cylinder will not shake left and right during installation. The cylinder is made of plastic material, which can not only meet the performance of the overall weight of the cylinder being light and easy to install, but also make up for the problem of insufficient weight of the cylinder by using metal materials for the connecting sleeve and the positioning sleeve. While improving the convenience of installation, it can also ensure the normal use of the precipitation shaft structure.

[0019] Compared with the prior art, the utility model has the following advantages: the tight-fitting plug-in connection of multiple cylinders ensures the sealing performance after the multiple cylinders are connected, and realizes the connection of a longer precipitation wellbore. When in use, the corresponding number of cylinder connections can be selected according to the height of the precipitation well, and after the water pumping is completed, the cylinder can be disassembled, realizing the repeated use of the precipitation wellbore. The multi-unit structure makes the processing of the cylinder simple and reduces the processing cost of the cylinder. The upper and lower plug-in method is adopted, which also reduces the difficulty of installing the precipitation wellbore. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a structural schematic diagram of the utility model.

[0021] Figure 2 It is a partial top view of the utility model.

[0022] Figure 3 yes Figure 2 Section view along AA.

[0023] Figure 4 yes Figure 3 A partial enlarged view of point A in the middle.

[0024] Figure 5 It is a structural schematic diagram of the cylinder in the utility model.

[0025] In the figure, 1, cylinder; 11, outer shell; 12, inner shell; 13, reinforcing ribs; 2, connecting sleeve; 21, connecting ring; 3, positioning sleeve; 31, positioning ring groove; 31a, guide surface; 4, sealing gasket. DETAILED DESCRIPTION

[0026] The following are specific embodiments of the present invention and the accompanying drawings to further describe the technical solution of the present invention, but the present invention is not limited to these embodiments.

[0027] like Figure 1 As shown, the dewatering shaft structure of the thermal power plant construction includes a plurality of shafts 1.

[0028] Specifically, Figure 1-5 As shown, the upper end of the cylinder 1 is fixedly connected with an annular connecting sleeve 2, and the lower end of the cylinder 1 is fixedly connected with an annular positioning sleeve 3. The upper end of the connecting sleeve 2 protrudes upward to form an annular connecting ring 21, and the lower end of the positioning sleeve 3 is provided with a positioning ring groove 31 with an opening facing downward. The connecting ring 21 of the cylinder 1 is tightly fitted and inserted into the positioning ring groove 31 of the cylinder 1 located above the cylinder 1. The cylinder 1 is made of plastic material, and the connecting sleeve 2 and the positioning sleeve 3 are both made of metal material.

[0029] Working principle: By adopting a structure of multiple cylinders 1, a connecting sleeve 2 is fixedly connected to the upper end of the cylinder 1, and a positioning sleeve 3 is fixedly connected to the lower end of the cylinder 1. A connecting ring 21 is formed by an upward protrusion at the upper end of the connecting sleeve 2, and a positioning ring groove 31 with an opening facing downward is opened at the lower end of the positioning sleeve 3. By inserting the connecting ring 21 of the cylinder 1 into the positioning ring groove 31 of the cylinder 1 located above the cylinder 1, a tight-fitting plug-in connection of multiple cylinders 1 is achieved, and the sealing performance of multiple cylinders 1 after connection is ensured, and the connection of a longer precipitation wellbore is achieved. When in use, the corresponding number of cylinders 1 can be selected for connection according to the height of the precipitation well, and after pumping water is completed, the cylinder 1 can be disassembled, so that the precipitation wellbore can be reused many times. The multi-unit structure makes the processing of the cylinder 1 simple, reduces the processing cost of the cylinder 1, and the upper and lower plug-in method is adopted, which also reduces the difficulty of installing the precipitation wellbore.

[0030] like Figure 3 and Figure 5 As shown, the lower end surface of the positioning sleeve 3 is provided with two annular guide surfaces 31a, and the guide surfaces 31a are inclined downward and outward from top to bottom, and the guide surfaces 31a are connected to the groove wall of the positioning ring groove 31. The cylinder 1 includes an outer shell 11 and an inner shell 12, both of which are annular. The outer shell 11 and the inner shell 12 are connected by reinforcing ribs 13. There are multiple reinforcing ribs 13, and the multiple reinforcing ribs 13 are evenly distributed along the circumference of the cylinder 1. The width direction of the reinforcing ribs 13 is distributed radially along the inner shell 12.

[0031] like Figure 4 As shown, a sealing gasket 4 is embedded in the positioning ring groove 31 , and the top of the connecting ring 21 is embedded in the corresponding positioning ring groove 31 and abuts against the sealing gasket 4 .

[0032] The specific embodiments described herein are merely examples of the spirit of the present invention. Those skilled in the art may make various modifications or additions to the specific embodiments described or replace them in similar ways, but they will not deviate from the spirit of the present invention or exceed the scope defined by the appended claims.

Claims

1. A dewatering shaft structure for construction of a thermal power plant, comprising a plurality of shafts (1), It is characterized in that The upper end of the cylinder (1) is fixedly connected to an annular connecting sleeve (2), and the lower end of the cylinder (1) is fixedly connected to an annular positioning sleeve (3). The upper end of the connecting sleeve (2) protrudes upward to form an annular connecting ring (21), and the lower end of the positioning sleeve (3) is provided with a positioning ring groove (31) with an opening facing downward. The connecting ring (21) of the cylinder (1) is tightly fitted and inserted into the positioning ring groove (31) of the cylinder (1) located above the cylinder (1).

2. The dewatering shaft structure for thermal power plant construction according to claim 1, It is characterized in that The lower end surface of the positioning sleeve (3) is provided with two annular guide surfaces (31a), the guide surfaces (31a) are arranged to be inclined from top to bottom and outward, and the guide surfaces (31a) are both connected to the groove wall of the positioning ring groove (31).

3. The dewatering shaft structure for thermal power plant construction according to claim 1 or 2, It is characterized in that The cylinder (1) comprises an outer shell (11) and an inner shell (12) both of which are annular, and the outer shell (11) and the inner shell (12) are connected via reinforcing ribs (13).

4. The dewatering shaft structure for thermal power plant construction according to claim 3, It is characterized in that A plurality of the reinforcing ribs (13) are provided, and the plurality of reinforcing ribs (13) are evenly distributed along the circumference of the cylinder (1), and the width direction of the reinforcing ribs (13) is distributed along the radial direction of the inner shell (12).

5. The dewatering shaft structure for thermal power plant construction according to claim 1 or 2, It is characterized in that A sealing gasket (4) is embedded in the positioning ring groove (31), and the top of the connecting ring (21) is embedded in the corresponding positioning ring groove (31) and abuts against the sealing gasket (4).

6. The dewatering shaft structure for thermal power plant construction according to claim 1 or 2, It is characterized in that The cylinder (1) is made of plastic material, and the connecting sleeve (2) and the positioning sleeve (3) are both made of metal material.