Water storage structure

By treating the bonding surface of the PE flexible sheet with surface energy and using adhesive to enhance the bond with the stainless steel fixing mesh, the problem of gaps between the PE flexible sheet and the concrete wall surface is solved, achieving seamless connection and efficient cleaning, and reducing construction costs.

CN222009769UActive Publication Date: 2024-11-15SHANGHAI OYAS NANO TECH
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420362397.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-27
Publication Date
2024-11-15
Estimated Expiration
2034-02-27

AI Technical Summary

Technical Problem

The existing PE flexible boards have gaps when bonded to concrete walls, resulting in water penetration and low cleaning efficiency, as well as high construction costs, making it difficult to solve effectively.

Method used

The bonding surface of the PE flexible sheet is treated with surface energy enhancement to achieve a dyne value of 45mN/m or higher. The PE flexible sheet is then bonded to the concrete wall using adhesive, and stainless steel fixing mesh is installed on the concrete wall to enhance the bonding effect.

Benefits of technology

This achieves a seamless connection between PE flexible boards and concrete walls, preventing water penetration and contamination, improving cleaning efficiency, and reducing construction costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222009769U_ABST
    Figure CN222009769U_ABST
Patent Text Reader

Abstract

The utility model discloses a water storage structure which comprises an inner wall surface, a bottom surface and a top surface, and is characterized in that PE (Poly Ethylene) soft plates are adhered on the inner wall surface, the bottom surface and the top surface through an adhesive. According to the utility model, the bonding surface of the PE soft plate belt is subjected to surface energy strengthening treatment, and then the PE soft plate is bonded on the concrete wall by using the adhesive, so that the problem of bonding the PE soft plate and the concrete wall in the industry is solved. According to the water storage structure transformed through the method, no gap exists between the PE soft plate and the concrete wall, water seepage and water storage are avoided, and the possibility that water in the water storage structure is polluted, and underground water pollution is caused by water leakage generated after the concrete wall face of a sewage pool is corroded is eradicated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of water storage structure treatment, in particular to a water storage structure. Background Art

[0002] As a widely used water supply method, water storage structures now have the functions of "water supply", "peak regulation" and "emergency preparation". Most of the water storage structures are "black, big and bulky" brick-concrete, steel-concrete or concrete structures.

[0003] At present, the inner surface of these brick-concrete, steel-concrete or concrete water storage structures is basically concrete walls, which are easy to breed bacteria and cause water pollution, and need to be cleaned regularly. In addition, for sewage treatment pools, due to the high acidity and alkalinity of sewage, it is easy to corrode the concrete wall surface and cause leakage, leading to groundwater pollution, so these water storage structures need regular maintenance and cleaning.

[0004] At present, there are mainly the following methods for the transformation of water storage structures:

[0005] 1. The renovation was carried out by tiling the inner walls of the water storage structure, but the tiles were easy to fall off and needed to be repaired every year.

[0006] 2. Install a stainless steel liner in the water storage structure, but such a modification is expensive and creates financial pressure.

[0007] 3. Apply protective paint on the inner wall of the water storage structure, but the protection time is short and generally needs to be sprayed again every 2 to 3 years.

[0008] To this end, the applicant submitted a utility model application entitled "A method for modifying a roof water tank and the resulting roof sanitary water tank" to the State Intellectual Property Office of China on November 14, 2013. It has now been authorized with the patent number ZL201310563866.9. The method for modifying a roof water tank can also be used to modify other water storage structures, and is composed of the following steps: 1) driving a number of expansion bolts into the top intervals of the inner surface of the water storage structure (roof water tank); 2) installing a number of hot-melt connection fixing blocks on the inner surface of the water storage structure (roof water tank) using expansion bolts; 3) cutting a PE soft strip according to the size of the water storage structure (roof water tank); 4) providing a number of holes at one end of the cut PE soft strip that are aligned with the water storage structure (roof water tank); Through holes corresponding to the positions of several expansion bolts on the top of the inner surface around; 5) Install PE soft board strips; 6) Use a hot melt gun to hot-melt two adjacent overlapping PE soft board strips together; 7) Install water inlet and outlet pipes; 8) Overlap the hot-melt PE soft board strips; 9) Connect and fix the PE soft board strips to the hot-melt connection fixing blocks; The water storage structure (roof water tank) obtained by the above-mentioned transformation method has the advantages of short construction period and low cost. The water quality of the roof water tank after the transformation will not cause secondary pollution, which meets the requirements of green environmental protection.

[0009] However, it was found in practice that there was a gap between the PE soft plate and the concrete wall at the position where the PE soft plate was not connected to the hot-melt connection fixing block, and these gaps were interconnected. Once the PE soft plate was broken or there was a gap at the overlap, the water in the water tank would penetrate into the gap between the PE soft plate and the concrete wall, which would cause water pollution in the water storage structure. Secondly, when the interior of the water storage structure needs to be cleaned, the water in the water storage structure needs to be discharged before cleaning. The water in the water storage structure is generally discharged directly by opening the drain valve, and the discharge speed is fast, but First, the water in the gap between the PE soft board and the concrete wall needs to slowly seep out of the water storage structure, which slows down the speed of draining the water in the water storage structure and affects the cleaning efficiency of the water storage structure; third, once the water in the water storage structure is drained, the water in the gap between the PE soft board and the concrete wall will form a huge pressure difference, bulging the PE soft board, causing the PE soft board to separate from the hot-melt connection fixing block to form bubbles or even tear, requiring the PE soft board to be re-connected and fixed to the hot-melt connection fixing block or the PE soft board to be re-laid, resulting in increased construction costs and extended construction period.

[0010] In addition, the bonding of PE soft boards to concrete walls has always been a difficult problem in the industry and has not been well solved. Utility Model Content

[0011] The technical problem to be solved by the utility model is to provide a water storage structure in view of the industry difficulty of bonding the existing PE soft board with the concrete wall.

[0012] The technical problem to be solved by the utility model can be achieved through the following technical solutions:

[0013] A water storage structure comprises an inner wall surface, a bottom surface and a top surface, and is characterized in that PE soft boards are adhered to the inner wall surface, the bottom surface and the top surface by adhesive.

[0014] In a preferred embodiment of the present invention, the PE soft board is a PE soft board tape.

[0015] In a preferred embodiment of the present invention, the PE soft plate strip has a width of 1500 mm and a thickness of 0.8 mm.

[0016] In a preferred embodiment of the present invention, the order of sticking the PE soft board is: inner wall surface → top surface → bottom surface → corner → beam.

[0017] In a preferred embodiment of the utility model, when a PE soft board is pasted on the inner wall surface, fixing screws are used to initially fix the PE soft board at the top near the inner wall surface to prevent the PE soft board from sliding off.

[0018] In a preferred embodiment of the present invention, the PE soft board pasted on the inner wall surface has 110mm folded edges at the top and bottom, so that it can be pasted on the folded edges of the PE soft board on the top and bottom surfaces.

[0019] In a preferred embodiment of the present invention, a 20 mm overlap is reserved at the corner for bonding adjacent PE soft boards.

[0020] In a preferred embodiment of the present invention, PE soft board is used for reinforcement at the corners.

[0021] In a preferred embodiment of the present invention, before the PE soft board is pasted, the bonding surface of the PE soft board is first subjected to surface energy enhancement treatment so that the dyne value of the bonding surface of the PE soft board tape reaches 45 mN / m or above.

[0022] In a preferred embodiment of the present invention, the surface energy enhancement treatment of the bonding surface of the PE soft plate is performed by one of corona treatment, plasma treatment, and flame treatment or a combination of any two or more thereof.

[0023] In a preferred embodiment of the utility model, a plurality of stainless steel fixing meshes are installed on the inner wall, bottom and top surfaces of the water storage structure, adhesive is applied on the stainless steel fixing meshes, the PE soft plate belt is bonded to the adhesive on the stainless steel fixing meshes and part of the adhesive is pressed into the back of the stainless steel fixing meshes through the mesh holes on the stainless steel fixing meshes.

[0024] In a preferred embodiment of the present invention, the stainless steel fixing meshes are installed at intervals of 800 mm.

[0025] Due to the adoption of the above technical solution, the utility model performs surface energy enhancement treatment on the bonding surface of the PE soft board, and then uses adhesive to stick the PE soft board to the concrete wall, solving the problem of bonding PE soft board to concrete wall in the industry. The water storage structure transformed by this method has no gap between the PE soft board and the concrete wall, and no water seepage and water storage, which eliminates the possibility of water pollution in the water storage structure and leakage caused by corrosion of the concrete wall of the sewage pool, leading to groundwater pollution. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 This is a schematic diagram of the structure of the water storage structure modified by using PE soft plate strips.

[0027] Figure 2 This is a performance picture of the PE soft plate belt used in this utility model.

[0028] Figure 3 It is a front view schematic diagram of the stainless steel fixed mesh of the utility model.

[0029] Figure 4 for Figure 3 AA section view.

[0030] Figure 5 It is a three-dimensional schematic diagram of the stainless steel fixed mesh of the utility model. DETAILED DESCRIPTION

[0031] The present invention is further described below in conjunction with the accompanying drawings and specific implementations.

[0032] The performance of the PE soft strip used in the following examples is shown in Figure 3 .

[0033] The method of bonding a PE sheet to a concrete wall surface of the utility model comprises the following steps:

[0034] Step 1: Perform surface energy enhancement treatment on the bonding surface of the PE soft plate and tape, so that the dyne value of the bonding surface of the PE soft plate and tape reaches 45mN / m or above;

[0035] Step 2: Spray adhesive on the inner wall, bottom and top surfaces of the water storage structure;

[0036] Step 3: Glue the bonding surface of the PE soft board processed in step 1 onto the concrete wall and press it for curing. After curing, the bonding strength between the bonding surface of the PE soft board and the concrete wall exceeds 1.1 MPa.

[0037] In step 1, the bonding surface of the PE soft plate is subjected to surface energy enhancement treatment by one of corona treatment, plasma treatment, and flame treatment or a combination of any two or more thereof.

[0038] Several stainless steel fixed meshes are installed on the inner wall, bottom and top of the water storage structure (see Figures 3 to 5 ), apply adhesive on the stainless steel fixed mesh, the PE soft plate is bonded to the adhesive on the stainless steel fixed mesh, and part of the adhesive is pressed into the back of the stainless steel fixed mesh through the mesh holes on the stainless steel fixed mesh. One stainless steel fixed mesh is installed every 800mm.

[0039] The above adhesive is a two-component composite silicone rubber model YB8692 produced by Shanghai Yibang New Materials Technology Co., Ltd. or a one-component silicone structural adhesive GSA-3000 produced by Sanke Tree. Of course, it is not limited to the above two adhesives.

[0040] See also Figure 1 The water storage structure shown in the figure can be a sanitary water tank, a sewage tank, etc., which includes a bottom surface 10, an inner wall surface 20 and a top surface 30. The bottom surface 10, the inner wall surface 20 and the top surface 30 can be directly cast with concrete, or a brick-concrete structure can be used, and then cement is applied on the surface of the brick-concrete structure.

[0041] The utility model water storage structure is characterized in that a PE soft board 40 is attached to the inner wall surface 20, the bottom surface 10 and the top surface 30 by an adhesive. The PE soft board 40 can be a PE soft board strip, and the PE soft board strip has a width of 1500mm and a thickness of 0.8mm (of course, it can also be thick or thin).

[0042] The order of pasting the PE soft board 40 is: inner wall surface → top surface → bottom surface → corner → beam.

[0043] When the PE soft board 40 is pasted on the inner wall surface 20, the PE soft board 40 is initially fixed with fixing screws 60 near the top of the inner wall surface 20 to prevent the PE soft board 40 from sliding off. The PE soft board 40 pasted on the inner wall surface 20 has 110mm folding edges on the upper and lower sides, so that it can be pasted on the folding edges of the PE soft board 40 on the top surface 30 and the bottom surface 10. A 20mm overlap is reserved at the corners for bonding adjacent PE soft boards 40. PE soft boards 70 are used for reinforcement at the corners.

[0044] In addition, before the PE soft board of the present invention is pasted, the bonding surface of the PE soft board 40 is first subjected to surface energy enhancement treatment, so that the dyne value of the bonding surface of the PE soft board tape reaches 45mN / m or above. The surface energy enhancement treatment of the bonding surface of the PE soft board tape is performed by one of corona treatment, plasma treatment, and flame treatment, or a combination of any two or more thereof.

[0045] The utility model water storage structure can also be improved as follows: a plurality of stainless steel fixed meshes 80 are installed on the inner wall surface 20, the bottom surface 10 and the top surface 30 of the water storage structure (see Figures 3 to 5 ), stainless steel fixed mesh 80 is installed every 800mm.

[0046] When pasting, the adhesive is applied on the stainless steel fixed mesh 80 , the PE soft board tape 40 is bonded to the adhesive on the stainless steel fixed mesh 80 and part of the adhesive is pressed into the back of the stainless steel fixed mesh through the mesh holes 81 on the stainless steel fixed mesh 80 .

[0047] The stainless steel fixing mesh 80 can be fixed by driving expansion bolts 50 into the inner wall surface 20, the bottom surface 10 and the top surface 30 in advance, and then putting the hole 82 in the center of the stainless steel fixing mesh 80 on the expansion bolts and fixing them with nuts.

Claims

1. A water storage structure, comprising an inner wall surface, a bottom surface and a top surface, characterized in that: PE soft boards are adhered to the inner wall surface, the bottom surface and the top surface by adhesive.

2. The water storage structure according to claim 1, characterized in that: The PE soft board is a PE soft board strip.

3. The water storage structure according to claim 2, characterized in that: The PE soft plate strip has a width of 1500 mm and a thickness of 0.8 mm.

4. The water storage structure according to claim 1, characterized in that: When the PE soft board is pasted on the inner wall, the PE soft board is initially fixed with fixing screws at the top of the PE soft board near the inner wall to prevent the PE soft board from slipping.

5. The water storage structure according to claim 1, characterized in that: Leave 110mm folded edges on the upper and lower parts of the PE soft board pasted on the inner wall so that it can be pasted on the folded edges of the PE soft board on the top and bottom surfaces.

6. The water storage structure according to claim 5, characterized in that: A 20mm overlap is reserved at the corners for bonding adjacent PE soft boards.

7. The water storage structure according to claim 6, characterized in that: PE soft board is used for reinforcement at the corners.

8. The water storage structure according to claim 1, characterized in that: A plurality of stainless steel fixed meshes are installed on the inner wall, bottom and top of the water storage structure, adhesive is applied on the stainless steel fixed meshes, the PE soft plate is bonded to the adhesive on the stainless steel fixed meshes and part of the adhesive is pressed into the back of the stainless steel fixed meshes through the mesh holes on the stainless steel fixed meshes.

9. The water storage structure according to claim 8, characterized in that: The stainless steel fixed mesh is installed at intervals of 800 mm.