Drilling sampler for building quality supervision
By designing a drilling sampler for building quality supervision, using components such as fences, rubber cushions and slurry pumps, the concrete deposition problem caused by the direct discharge of mud into the on-site drainage system is solved, and the drilling core quality and efficiency are achieved Improvement.
Patent Information
- Application Number
- CN202420468484.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-12
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2034-03-12
AI Technical Summary
The mud generated by the existing drilling sampler when drilling concrete is discharged directly into the on-site drainage system, resulting in large-grain concrete debris deposited near the drilling hole, affecting the quality and efficiency of the drill core.
A drilling sampler for construction quality supervision is designed, including device base, water storage tank, drive motor, trapezoidal screw, slider, slurry pump and corrugated pipe, to block overflowing through fences and rubber cushions The mixture is pumped to the filter chamber with a telescopic motor and slurry pump for processing to reduce debris deposition.
It effectively reduces the deposition of concrete debris near the drilling hole, improves the quality and efficiency of the drilling core, and ensures the clean and efficient drilling process.
Smart Images

Figure CN222010161U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of drilling samplers, in particular to a drilling sampler used for construction quality supervision. Background Art
[0002] A core sampler is a tool used to sample concrete during construction. It can extract cylindrical core samples of concrete for compressive strength testing or other related tests. When drilling concrete core samples, the drill bit rubs against the concrete, producing debris and powder. These substances mix with water to form mud. The mud lubricates the drill bit and reduces friction. It also helps to remove the drilled concrete debris from the drill hole, keeping it clean. The mud generated during the core drilling process needs to be cleaned up promptly to avoid affecting the quality and efficiency of the core. In some cases, the mud generated by the core drilling process can be discharged directly into the on-site drainage system. In some small or temporary core drilling operations, there may be no dedicated mud collection equipment. In this case, the mud generated during the core drilling process needs to be manually cleaned and transported to a designated disposal area.
[0003] Existing drainage systems that directly discharge into the site usually collect mud near the drill hole. This method easily causes large particles of concrete fragments to be deposited near the drill hole when the mud overflows the drill hole, and easily re-enter the drill hole, affecting the quality and efficiency of the drill core. Utility Model Content
[0004] In response to the above problems, the purpose of the present invention is to provide a drilling sampler for construction quality supervision, to solve the problem that the existing drainage system that directly discharges into the site usually collects mud near the drilling hole. This method easily causes large particles of concrete fragments to be deposited near the drilling hole when the mud overflows the drilling hole, and it is easy to re-enter the drilling hole and affect the quality and efficiency of the drill core.
[0005] In order to achieve the above purpose, the technical solution adopted by the utility model is as follows: a drilling sampler for construction quality supervision, including a device base and a water tank, threaded rods are installed at the four corners of the device base, and a baffle is rotatably connected to the bottom of the threaded rod, a rubber pad is bonded to the bottom of the baffle, a driving motor 1 is installed on the top of the device base, and a trapezoidal screw rod is connected to the bottom of the driving motor 1, a slider is installed on the trapezoidal screw rod, and a driving motor 2 is connected to the right side of the slider, and a drilling screw is connected to the bottom of the driving motor 2. Rod, the water tank is installed above the base of the device, and a sewage pipe is installed at the bottom of the water tank, a water storage chamber and a filter chamber are provided inside the water tank, a filter layer is installed at the bottom of the filter chamber, a water pump is installed inside the water storage chamber, and the output end of the water pump is connected to a ring pipe through a pipe, a water nozzle is installed below the ring pipe, the outside of the water tank near the filter chamber is connected to a slurry pump through a pipe, and a corrugated pipe is connected below the slurry pump, and a telescopic motor is connected below the corrugated pipe.
[0006] The beneficial effects of the utility model are as follows: during the drilling process, a mixture of concrete and water will overflow from the drill hole, and the overflowed mixture will be blocked by the baffle plate and the rubber pad. At this time, the telescopic motor pushes the corrugated pipe to descend close to the ground. At this time, the slurry pump pumps the mixture into the interior of the filter chamber through the corrugated pipe. In this way, the mixture will move toward the corrugated pipe, reducing the deposition of concrete fragments near the drill hole, thereby ensuring the quality and efficiency of the drill core.
[0007] In order to facilitate the lifting and lowering of the drive motor 2:
[0008] As a further improvement of the above technical solution: guide light rods are installed on both sides of the second driving motor.
[0009] The beneficial effects of this improvement are: drive motor 1 drives the slider and drive motor 2 downward through the trapezoidal screw, drive motor 2 can drive the drilling rod to rotate to drill and sample the building, and the guide light rod can guide and limit the descent of drive motor 2.
[0010] To facilitate the addition of water:
[0011] As a further improvement of the above technical solution: a liquid filling cover is installed above the water storage tank.
[0012] The beneficial effect of this improvement is that water can be easily added into the water storage tank through the liquid filling cap, and the water pump can cooperate with the annular pipe and the water nozzle to cool the drilling rod.
[0013] To facilitate cooling of the drilling rod:
[0014] As a further improvement of the above technical solution: the water spray ports are circumferentially distributed below the annular pipe, and the annular pipe and the drilling rod are arranged with their axes coincident.
[0015] The beneficial effect of this improvement is that the circumferentially distributed water nozzles can fully and reliably cool the drilling rod, and the axis overlap setting can enable the annular pipe to cooperate with the water nozzles to fully and reliably cool the drilling rod.
[0016] To facilitate the mixture to enter the interior of the filter chamber:
[0017] As a further improvement of the above technical solution: the bottom of the corrugated pipe adopts a hole expansion setting.
[0018] The beneficial effect of this improvement is that the slurry pump pumps the mixture into the interior of the filter chamber through the corrugated pipe, and the expansion hole setting can facilitate the mixture to be sucked into the interior of the filter chamber by the corrugated pipe.
[0019] To facilitate the expansion and contraction of the corrugated pipe:
[0020] As a further improvement of the above technical solution: the telescopic motor and the corrugated pipe are arranged parallel to each other.
[0021] The beneficial effect of this improvement is that the parallel arrangement can enable the telescopic motor to reliably and smoothly drive the corrugated pipe to extend and retract, thereby facilitating the insertion of the corrugated pipe into the mixture.
[0022] To facilitate the drainage of the device:
[0023] As a further improvement of the above technical solution: a solenoid valve is installed on the sewage pipe.
[0024] The beneficial effect of this improvement is that the solenoid valve can control the on-off of the sewage pipe, thereby facilitating sewage discharge of the device.
[0025] To shade the mixture:
[0026] As a further improvement of the above technical solution: the baffle is arranged in a rectangular frame.
[0027] The beneficial effect of this improvement is that the rectangular frame can facilitate the shielding of the mixture by the baffle plate, facilitate the gathering of the mixture, and further facilitate the cleaning of the mixture by the corrugated pipe in combination with the slurry pump. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a schematic diagram of the overall main structure.
[0029] Figure 2 It is a schematic diagram of the overall right view structure.
[0030] Figure 3It is a schematic diagram of the overall structure from a top view.
[0031] Figure 4 This is a schematic diagram of the axonometric structure of the water tank and the annular pipeline.
[0032] Figure 5 for Figure 1 Enlarged structural diagram at point A in the middle.
[0033] In the figure: 1. Device base; 11. Threaded rod; 12. Enclosure plate; 13. Rubber pad; 2. Drive motor 1; 21. Trapezoidal screw; 22. Slider; 3. Drive motor 2; 31. Drilling rod; 4. Water tank; 41. Sewage pipe; 42. Water storage chamber; 43. Filter chamber; 44. Filter layer; 5. Water pump; 51. Annular pipe; 52. Water nozzle; 6. Slurry pump; 61. Corrugated pipe; 62. Telescopic motor. DETAILED DESCRIPTION
[0034] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention is described in detail below with reference to the accompanying drawings. The description in this part is only exemplary and explanatory and should not have any limiting effect on the scope of protection of the present invention.
[0035] like Figure 1-5As shown, the drilling sampler for construction quality supervision includes a device base 1 and a water tank 4, threaded rods 11 are installed at the four corners of the device base 1, and a baffle plate 12 is rotatably connected to the bottom of the threaded rod 11, and a rubber pad 13 is bonded to the bottom of the baffle plate 12, a driving motor 2 is installed on the top of the device base 1, and a trapezoidal screw rod 21 is connected to the bottom of the driving motor 2, a slider 22 is installed on the trapezoidal screw rod 21, and a driving motor 2 3 is connected to the right side of the slider 22, and a drilling rod 31 is connected to the bottom of the driving motor 2 3, the water tank 4 is installed above the device base 1, and a sewage pipe 41 is installed at the bottom of the water tank 4, and a water storage chamber 42 and a filter chamber 43 are provided inside the water tank 4. A filter layer 44 is installed at the bottom of the filter chamber 43, a water pump 5 is installed inside the water storage chamber 42, and the output end of the water pump 5 is connected to an annular pipe 51 through a pipe, and a water nozzle 52 is installed below the annular pipe 51, and the outside of the water storage tank 4 near the filter chamber 43 is connected to a slurry pump 6 through a pipe, and a corrugated pipe 61 is connected below the slurry pump 6, and a telescopic motor 62 is connected below the corrugated pipe 61. During the drilling process, the mixture of concrete and water will overflow from the drill hole, and the overflowed mixture will be blocked by the baffle 12 and the rubber pad 13. At this time, the telescopic motor 62 pushes the corrugated pipe 61 down close to the ground. At this time, the slurry pump 6 pumps the mixture into the interior of the filter chamber 43 through the corrugated pipe 61. In this way, the mixture will move toward the corrugated pipe 61, reducing the deposition of concrete fragments near the drill hole and ensuring the quality and efficiency of the drill core. Guide light rods are installed on both sides of the drive motor 23. The drive motor 12 drives the slider 22 and the drive motor 23 to move downward through the trapezoidal screw 21. The drive motor 23 can drive the drilling rod 31 to rotate to drill and sample the building. The guide light rod can be used to guide and limit the descent of the drive motor 23. A liquid filling cap is installed above the water tank 4. The liquid filling cap can facilitate the addition of water into the water tank 4, making it convenient for the water pump 5 to cooperate with the annular pipe 51 and the water nozzle 52 to cool the drilling rod 31. The water nozzle 52 is circumferentially distributed below the annular pipe 51, and the annular pipe 51 and the drilling rod 31 are connected. The rods 31 are arranged with their axes overlapping, and the circumferentially distributed water nozzles 52 can fully and reliably cool the drilling rods 31. The axis overlap setting enables the annular pipe 51 to cooperate with the water nozzles 52 to fully and reliably cool the drilling rods 31. The bottom of the corrugated pipe 61 is arranged with a reaming hole. The slurry pump 6 pumps the mixture into the interior of the filter chamber 43 through the corrugated pipe 61. The reaming hole setting can facilitate the mixture to be sucked into the interior of the filter chamber 43 by the corrugated pipe 61. The telescopic motor 62 and the corrugated pipe 61 are arranged in parallel with each other. The parallel setting can enable the telescopic motor 62 to reliably and stably drive the corrugated pipe 61 to extend and retract, thereby facilitating the insertion of the corrugated pipe 61 into the mixture. A solenoid valve is installed on the sewage pipe 41.The solenoid valve can control the on / off of the sewage pipe 41, thereby facilitating the drainage of the device. The baffle 12 is set with a rectangular frame. The rectangular frame can facilitate the baffle 12 to block the mixture, facilitate the gathering of the mixture, and thus facilitate the cleaning of the mixture by the corrugated pipe 61 in conjunction with the slurry pump 6.
[0036] The working principle of the present invention is as follows: when using the device, after moving the device to the specified position, rotate the threaded rod 11 to push the baffle plate 12 and the rubber pad 13 to raise the device, and at this time, the driving motor 2 3 drives the drilling rod 31 to rotate, and the driving motor 1 2 drives the slider 22 and the driving motor 2 3 to move downward through the trapezoidal screw 21, and the driving motor 2 3 can drive the drilling rod 31 to rotate to drill and sample the building. During the drilling process, the water pump 5 transports the water inside the water storage chamber 42 to the inside of the annular pipe 51, and then the water is evenly sprayed on the outside of the drilling rod 31 through the water nozzle 52, drilling the drilling rod 31. During the drilling process, the mixture of concrete and water will overflow from the drill hole, and the overflowed mixture will be blocked by the baffle 12 and the rubber pad 13. At this time, the telescopic motor 62 pushes the corrugated pipe 61 down close to the ground. At this time, the slurry pump 6 pumps the mixture into the filter chamber 43 through the corrugated pipe 61. The mixture entering the filter chamber 43 is filtered by the filter layer 44 and enters the top of the filter chamber 43. After that, the mixture enters the water storage chamber 42. In this way, the mixture will move toward the corrugated pipe 61, reducing the deposition of concrete fragments near the drill hole and ensuring the quality and efficiency of the drill core.
[0037] It should be noted that, in this article, the terms "comprises", "includes" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or apparatus that includes a series of elements includes not only those elements, but also includes other elements not explicitly listed, or also includes elements that are inherent to such process, method, article or apparatus.
[0038] This article uses specific examples to illustrate the principles and implementation methods of the present invention. The above examples are only used to help understand the method and core ideas of the present invention. The above is only a preferred implementation method of the present invention. It should be pointed out that due to the limitations of textual expression, there are objectively infinite specific structures. For ordinary technicians in this technical field, without departing from the principles of the present invention, they can make several improvements, modifications or changes, and can also combine the above technical features in an appropriate manner; these improvements, modifications, changes or combinations, or the direct application of the concept and technical solution of the utility model to other occasions without improvement, should be regarded as the scope of protection of the present utility model.
Claims
1. A drilling sampler for building quality supervision, comprising a device base (1) and a water storage tank (4), Features: The four corners of the device base (1) are equipped with threaded rods (11), and the lower part of the threaded rods (11) is rotatably connected to a baffle plate (12), and the lower part of the baffle plate (12) is bonded with a rubber cushion layer (13). The top of the device base (1) is equipped with a driving motor (2), and the lower part of the driving motor (2) is connected to a trapezoidal screw rod (21), a slider (22) is installed on the trapezoidal screw rod (21), and the right side of the slider (22) is connected to a driving motor (3), and the lower part of the driving motor (3) is connected to a drilling rod (31). The water tank (4) is installed on the upper part of the device base (1), and the bottom of the water tank (4) is connected to the lower part of the driving motor (3). A sewage pipe (41) is installed, a water storage chamber (42) and a filter chamber (43) are arranged inside the water storage tank (4), a filter layer (44) is installed at the bottom of the filter chamber (43), a water pump (5) is installed inside the water storage chamber (42), and the output end of the water pump (5) is connected to an annular pipe (51) through a pipe, and a water spray port (52) is installed below the annular pipe (51), and a slurry pump (6) is connected to the outside of the water storage tank (4) near the filter chamber (43) through a pipe, and a corrugated pipe (61) is connected below the slurry pump (6), and a telescopic motor (62) is connected below the corrugated pipe (61).
2. The drilling sampler for construction quality supervision according to claim 1, Features: Guide light rods are installed on both sides of the second driving motor (3).
3. The drilling sampler for construction quality supervision according to claim 1, Features: A liquid filling cap is installed above the water storage tank (4).
4. The drilling sampler for construction quality supervision according to claim 1, Features: The water spray ports (52) are circumferentially distributed below the annular pipe (51), and the annular pipe (51) and the drilling rod (31) are arranged so that their axes coincide with each other.
5. The drilling sampler for construction quality supervision according to claim 1, Features: The bottom of the corrugated pipe (61) is provided with a hole expansion.
6. The drilling sampler for construction quality supervision according to claim 1, Features: The telescopic motor (62) and the corrugated pipe (61) are arranged parallel to each other.
7. The drilling sampler for construction quality supervision according to claim 1, Features: A solenoid valve is installed on the sewage discharge pipe (41).
8. The drilling sampler for construction quality supervision according to claim 1, Features: The baffle plate (12) is arranged in a rectangular frame.