Catalytic cracking flue gas integrated dust removal and desulfurization tower
Through the hierarchical treatment structure of the integrated dust removal and desulfurization tower of catalytic cracked flue gas, the problem of insufficient removal efficiency of SOX and particulate matter in flue gas in the prior art is solved, and efficient flue gas treatment and equipment durability are improved.
Patent Information
- Application Number
- CN202420434773.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-06
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2034-03-06
AI Technical Summary
The existing integrated catalytic cracking flue gas wet dust removal and desulfurization equipment has insufficient SOX and particulate matter removal efficiency, especially when the working conditions fluctuate greatly, it is difficult to effectively deal with fine particles, and it is difficult to completely mist droplets in the flue gas after desulfurization and dust removal. Remove.
A catalytic cracking flue gas integrated dust removal and desulfurization tower was designed, and the first-stage spray quenching section, second-stage spray absorption section, third-stage spray multi-tube line tube dust collector and high-efficiency dust removal and drip remover are used to classify the first-stage spray quenching section, second-stage spray multi-tube line tube dust collector and high-efficiency dust removal and drip remover Structure: Through special structures such as quench nozzles, absorption section nozzles and venturi pipes, quench cooling of flue gas, multi-layer flat cone-shaped rapid water curtain and rotary centrifugal separation, ensuring efficient removal of SOX and particles of different particle sizes.
It realizes efficient grading treatment of SOX and particles in flue gas, improves desulfurization efficiency and stable long-term compliance of particulate dust, enhances the impact resistance of the equipment, extends the service life, and eliminates the phenomenon of raining on chimneys. .
Smart Images

Figure CN222019266U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of catalytic cracking flue gas treatment, and specifically relates to an integrated dust removal and desulfurization tower for catalytic cracking flue gas. Background Art
[0002] The feedstock of the catalytic cracking unit (FCCU) usually contains sulfur compounds such as mercaptans, sulfides, cyclic sulfides, thiophenols, and thiophenes. During the catalytic cracking reaction, some of the sulfur compounds are converted into hydrogen sulfide (H2S) and thiophene, which exist in the reaction oil gas and oil products, while some of the sulfur compounds are converted into condensates with complex structures and large relative molecular weights, which exist in oil slurry and coke. The sulfur in the coke is burned to form sulfur oxides (SO X ), the concentration of which is related to the sulfur content of the raw materials, the source of the raw materials, the coke yield and the regeneration method. If the flue gas generated by the oxidation reaction of these sulfur-containing cokes in the regenerator is directly discharged, it will pollute the atmosphere. In addition, since the catalytic cracking regeneration flue gas has the characteristics of high exhaust temperature, large fluctuation of dust content, and rich in fine and hard catalytic cracking agent particles, it is one of the main pollutant emission sources of the refinery.
[0003] Catalytic cracking regeneration flue gas usually has the following characteristics: (1) NOx and SO X The content fluctuates greatly, SO X The concentration is generally 700~4500mg / Nm 3 , NOx concentration is generally 50~400mg / Nm 3 (2) The temperature of the regenerated flue gas is relatively high, with a normal temperature of 180℃~230℃, while the maximum temperature can reach 350℃~500℃ when the catalytic waste heat boiler or CO boiler fails; (3) The concentration of particulate matter in the flue gas fluctuates greatly. Under normal operating conditions, after passing through the third and fourth stage cyclone separators, the concentration of particulate matter is generally 150~300mg / Nm 3 When soot is blown to waste heat boilers or CO boilers regularly, the maximum concentration can reach 3000-4000 mg / Nm 3 (4) Most of the particulate matter in the flue gas is catalyst, with a small particle size distribution, with a particle size of 0-5μm accounting for more than 70%, and high hardness. (5) The flue gas dust removal and desulfurization device is usually installed at the end of the FCCU process and operates synchronously with the FCCU. The pressure drop of the dust removal and desulfurization device will affect the upstream operation and directly affect the operating cost and economic benefits of the FCCU. (6) Most existing FCCU designs do not reserve space for flue gas dust removal and desulfurization facilities. At the same time, the distance between the catalytic waste heat boiler or CO boiler and the chimney is short, and the plane and space are limited. Due to the above-mentioned characteristics of catalytic cracking regeneration flue gas, the technical requirements for dust removal and desulfurization are relatively stringent.
[0004] Due to the characteristics of catalytic cracking flue gas, in order to meet increasingly stringent emission standards, wet dust removal has become the main choice for removing catalyst dust from catalytic flue gas. In addition, since wet desulfurization has a higher desulfurization efficiency, wet scrubbing integrated technology has currently become the mainstream of catalytic cracking flue gas dust removal and desulfurization.
[0005] However, there are still some deficiencies and room for improvement in the current wet dust removal and desulfurization integrated equipment, such as SO X The removal efficiency of the flue gas and particulate matter needs to be further improved, especially when the flue gas operating conditions fluctuate greatly, and for the removal of fine particles in the particulate matter. At the same time, the removal of a large number of droplets contained in the flue gas after desulfurization and dust removal also needs to be further improved and improved. Therefore, it is of great significance to develop an integrated equipment for wet dust removal and desulfurization of catalytic cracking flue gas that meets the current industry needs. Utility Model Content
[0006] The purpose of the utility model is to overcome the shortcomings of the prior art and provide a catalytic cracking flue gas integrated dust removal and desulfurization tower to meet the needs of efficient dust removal and desulfurization operation and efficiently remove SO in the flue gas. X and particles of different sizes.
[0007] The technical solution provided by the utility model is as follows:
[0008] A catalytic cracking flue gas integrated dust removal and desulfurization tower, the integrated dust removal and desulfurization tower comprises a tower body, on which a tower top chimney, a diameter reducing section, a high-efficiency dust removal and mist removal device, a three-stage spray multi-tube tube dust collector, a two-stage spray absorption section, a first-stage spray quenching section and a tower bottom slurry oxidation section are sequentially arranged from top to bottom, a purified flue gas outlet is arranged at the top of the tower top chimney, and a flue gas inlet is arranged at the first-stage spray quenching section, wherein:
[0009] A plurality of quench nozzles are arranged on the tower wall of the first-stage spray quenching section or on the flue gas inlet. The inlet of the quench nozzle is connected to a quench nozzle for supplying the quench nozzle with circulating absorption slurry from the bottom of the tower, and the slurry is sprayed through the quench nozzle to cover the entire cross section of the flue gas inlet, so that the flue gas is rapidly cooled and SO is removed. X ;
[0010] The secondary spray absorption section includes several layers of absorption section spray from bottom to top, and each layer of absorption section spray is provided with several absorption section nozzles. The absorption section nozzle connected to the inlet of the absorption section nozzle is connected to the tower wall of the secondary spray absorption section, which is used to supply the absorption section nozzle with circulating absorption slurry from the bottom of the tower, and spray the slurry through the absorption section nozzle to cover the entire cross section of the tower, so that the flue gas is scrubbed and dusted and SO is removed. X ;
[0011] The three-stage spray multi-tube tube-in-tube dust collector comprises a dust collector sump connected to the inner wall of the tower body at the periphery of the bottom plate, a plurality of parallel venturi tubes fixedly installed through the bottom plate of the dust collector sump, and a three-stage spray pipe arranged above the venturi tube, which is used to remove fine particles entrained in the rising flue gas by using the venturi structure, gather them into large particles, intercept and wash the large particles of dust under the action of spraying, and remove SO3 entrained in the droplets at the same time;
[0012] The high-efficiency dust and mist removal device includes a plurality of parallel cyclone tube bundles and a plurality of water spray flushing pipes arranged above the cyclone tube bundles. The cyclone tube bundle includes a plurality of cyclones stacked in series in the vertical direction, and a cyclone plate is arranged in the cyclone tube to rotate and centrifuge the rising flue gas in the cyclone tube to separate the tiny particles into large droplets that collide with the cyclone tube wall wetted by the water spray and are captured and absorbed by the liquid film to achieve dust and mist removal.
[0013] The tower bottom slurry oxidation section comprises a tower bottom liquid collecting tank connected to the inner wall of the tower body at the periphery of the bottom plate and an oxidation air distributor arranged above the tower bottom liquid collecting tank, which are respectively used to store the tower bottom slurry and oxidize the tower bottom slurry;
[0014] The diameter-changing section is in the shape of a cone that gradually expands downward, and the bottom of the chimney on the top of the tower is connected to the high-efficiency dust and mist removal device through the diameter-changing section.
[0015] The utility model is further configured that the operating temperature of the integrated dust removal and desulfurization tower is 50-65°C, and the operating pressure is about 3500-5000Pa(G). The tower body is made of acid-resistant and wear-resistant metal material (such as 304L), carbon steel lining acid-resistant and wear-resistant metal material (such as carbon steel lining 304L) or carbon steel lining non-metallic material (such as carbon steel lining PTU), and the flue gas inlet is made of high temperature resistant and acid corrosion resistant alloy material.
[0016] The utility model is further configured such that the flue gas inlet is connected to the tower wall of the first-stage spray quenching section, and the connection angle with the tower wall is 30° to 90°, preferably 60° to 90°, and more preferably 90°, that is, the flue gas inlet is vertically connected to the tower wall of the first-stage spray quenching section.
[0017] The utility model is further configured such that the quenching nozzle is arranged on the tower wall of the first-level spray quenching section and is connected to the tower wall at a certain angle; wherein some of the quenching nozzles are arranged on the upper and lower sides of the flue gas inlet and are arranged perpendicularly at 90° to the direction of the flue gas inlet, and some of the quenching nozzles are arranged on the left and right sides of the flue gas inlet and are arranged at an angle of 15° to 90° to the direction of the flue gas inlet, preferably 15° to 30°.
[0018] The utility model is further configured that the secondary spray absorption section is provided with 1 to 5 layers of absorption section spray, and each layer of absorption section spray is provided with 3 to 5 absorption section nozzles. The absorption section nozzles of each layer are evenly arranged on the same plane, and the angle between the absorption section nozzle and the horizontal direction is 1° to 10°, preferably 3° to 6°, and is preferably arranged downward in the horizontal direction. The absorption section sprays of each adjacent layer are staggered at a certain angle, and the angle between the absorption section sprays of each two layers is 10° to 50°, preferably 15° to 30°.
[0019] The utility model is further configured such that the bottom plate of the dust collector liquid collecting tank is welded to the inner wall of the tower body at an inclination angle of 10° to 30° with the horizontal direction; a liquid storage area of a certain volume is arranged at the slope bottom of the dust collector liquid collecting tank, the liquid storage height of the liquid storage area is 0.5 to 1.2m, and the dust collector liquid collecting tank outlet is opened in the liquid storage area toward the outer side of the tower body wall.
[0020] The utility model is further configured such that the lower part of the venturi tube is fixed to the bottom plate of the dust collector sump by welding or flange connection; a plurality of venturi tubes are connected and fixed by rib plates. The lower end of each venturi tube is connected to a guide vane segment, which is provided with a guide vane so that the rising flue gas rotates and rises in the venturi tube. A dust collector overflow pipe is also fixedly provided through the bottom plate of the dust collector sump, and the bottom end of the dust collector overflow pipe passes through the wall of the tower body, and an overflow liquid outlet is provided, and the overflow liquid outlet is connected to the slurry oxidation section at the bottom of the tower.
[0021] The utility model is further configured that the three-stage spray pipe is provided with 1 to 50 pieces, preferably arranged at 0.5 to 1.5 m above the upper end of the venturi tube. The three-stage spray pipe is connected downwardly to a plurality of spray nozzles, each of which corresponds to a venturi tube. The inlet of the three-stage spray pipe is provided with a plurality of three-stage spray pipe liquid inlets, which are located on the wall of the tower body and are connected to the outlet of the dust collector sump through a circulating pump, so as to circulate and spray the slurry collected in the dust collector sump in the three-stage spray multi-tube tube-in-tube dust collector.
[0022] The utility model is further configured such that, in the high-efficiency dust and mist removal device, each of the water spray flushing pipes is connected to a plurality of water spray hoses, a plurality of flushing nozzles are arranged in each of the cyclone cylinders, and each of the flushing nozzles is connected to the water spray flushing pipe through the water spray hose, so that the spray flushing water moistens the cylinder wall of each cyclone cylinder.
[0023] The utility model is further configured that 2 to 3 cyclones are arranged in each cyclone tube bundle, and 2 to 4 flushing nozzles are arranged in each cyclone tube bundle, and the water spray flushing pipe is arranged 0.5 to 1.2 m above the cyclone tube bundle.
[0024] The utility model is further configured that the bottom plate of the tower bottom collecting tank is welded to the inner wall of the tower body at an angle of 15° to 60° with the horizontal direction, preferably 15° to 30°. The bottom of the slope of the tower bottom collecting tank is provided with a tower bottom slurry outlet toward the outside of the tower body wall, and the tower bottom slurry outlet is connected to the quenching nozzle and the absorption section nozzle through a circulation pump to provide circulating slurry for the spraying in the first-level spray quenching section and the second-level spray absorption section.
[0025] The utility model is further configured that the inlet of the oxidation wind distributor is provided with a plurality of oxidation wind inlets, which are located on the wall of the tower body and connected to the external oxidation fan. The oxidation wind distributor includes a plurality of oxidation wind main pipes and a plurality of oxidation wind branch pipes, and a plurality of air outlet holes are opened at equal distances on the oxidation wind branch pipes, the diameter of the air outlet holes is 50-150 mm, and the distance between adjacent air outlet holes is 0.5-800 mm. The relative distance between the oxidation wind distributor and the bottom plate of the tower body is determined according to the liquid level height of the liquid stored in the slurry oxidation section at the bottom of the tower. The distance between the oxidation wind distributor and the bottom plate of the tower body is generally 0.5-2.0 m; the distance from the liquid level height of the stored liquid is 5-10 m, preferably 6-8 m.
[0026] The utility model is further configured as follows: a tower bottom oxidation liquid reflux pipe is arranged above the bottom plate of the tower bottom liquid collecting tank near the bottom plate, the oxidation liquid reflux pipe is arc-shaped and is arranged along the wall of the tower body, and a plurality of liquid outlet holes are opened on the tower bottom oxidation liquid reflux pipe at equal distances for slurry reflux to flush the bottom plate of the tower bottom liquid collecting tank; the diameter of the liquid outlet hole is 50 to 200 mm, and the spacing between adjacent liquid outlet holes is 0.56 to 1.2 m.
[0027] The utility model is further configured that a plurality of temperature detection instrument interfaces are arranged on the tower wall of the first-stage spray quenching section, and are arranged at the tower wall position directly opposite to the flue gas inlet. The connection angle between the temperature detection instrument interface and the tower wall is 90°, and the temperature detection instrument interfaces are arranged up and down, and the distance between each interface is 0.5 to 2.0m.
[0028] The utility model is further configured such that pressure detection instrument interfaces are arranged on the upper tower wall of the secondary spray absorption section, the upper tower wall of the tertiary spray multi-tube shell-and-tube dust collector, and the upper tower wall of the high-efficiency dust removal and mist remover, and a CEMS detection instrument interface is arranged on the lower tower wall of the tower top chimney; the angle between the above-mentioned instrument interface and the tower wall is 15° to 60°, preferably 30° to 45°, and in order to avoid clogging of the interface, it is preferably arranged upward in the horizontal direction.
[0029] Compared with the prior art, the beneficial effects of the present invention are:
[0030] (1) The utility model integrates dust removal and desulfurization, with a short process flow in the tower, small resistance drop and high efficiency. It also adopts hierarchical treatment, by setting up a first-stage spray quenching section, a second-stage spray absorption section, a third-stage spray multi-tube tube dust collector and a high-efficiency dust removal and mist removal device, to reduce the SO X And the particulate dust with different particle sizes is treated in a graded manner to ensure the desulfurization efficiency and the long-term stable compliance of the particulate dust with the standards.
[0031] (2) The integrated dust removal and desulfurization tower adopts a special structural design, including the arrangement of the quenching nozzle in the main tower, the absorption section nozzle, the multi-tube tube-in-tube dust collector and its spray nozzle, the high-efficiency dust removal and mist removal device and its flushing nozzle, etc., so as to achieve the effect of rapid cooling of flue gas and high-efficiency desulfurization and dust removal in the integrated dust removal and desulfurization tower. Moreover, the utility model has a strong impact load resistance. The quenching nozzle and the absorption section nozzle both adopt large-caliber non-atomizing nozzles. The multi-layer flat cone curtain-shaped torrent water curtain formed by multiple large-caliber nozzles can wash large particles and high-concentration particulate matter while reducing the flue gas temperature to saturation. Even when the catalytic cracking unit is operating and the agent is running, the dust removal and desulfurization effects can be guaranteed.
[0032] (3) The first-stage spray quenching section of the utility model adopts a quenching nozzle with a special structural design. Several quenching nozzles are arranged at a special angle at the flue gas inlet, so that the flat cone-shaped rapid water curtain sprayed by each nozzle overlaps at multiple angles, fully covering the flue gas inlet cross-section. The high-temperature flue gas is rapidly cooled, absorbs SO2 and removes large particles while passing through the rapid water curtain.
[0033] Since the quenching nozzle is arranged on the tower wall or the flue gas inlet, a torrent of water curtain is formed to continuously flush the tower wall, and the acidic and particle-containing liquid formed by the contact between the flue gas and the slurry on the tower wall is flushed into the liquid collecting tank at the bottom of the tower, which effectively avoids the corrosion and abrasion of the dry and wet interface of the inlet section of the integrated dust removal and desulfurization tower, and effectively prevents the high-temperature damage of the inlet section of the washing tower by the high-temperature flue gas, which greatly improves the service life and stability of the washing tower.
[0034] (4) The secondary spray absorption section of the utility model adopts a special structural design. The absorption section is arranged at different heights from bottom to top according to the amount of flue gas to be treated, with 1 to 5 layers of absorption section spraying. The absorption section nozzles and nozzles are connected to the tower wall at a certain angle. Multiple annular nozzles on each layer spray slurry to form a flat cone-shaped torrent water curtain to fully cover the cross-section inside the tower. The nozzles between layers are staggered at a certain angle to fully cover the cylinder of the secondary spray absorption section. The special structural design enables the flue gas to quickly collide violently and closely contact with the droplets in the torrent water curtain, thereby effectively removing coarse particles and quickly causing chemical reaction desulfurization.
[0035] Moreover, the torrent water curtain formed by spraying can continuously flush the tower wall, flushing the acidic and particle-containing liquid formed on the tower wall by the contact between the flue gas and the slurry and causing it to fall into the slurry pool at the bottom of the tower, thereby effectively preventing corrosion and abrasion of the integrated dust removal and desulfurization tower wall.
[0036] (5) The three-stage multi-tube shell-and-tube dust collector of the utility model adopts a special structural design. The liquid collecting tank in the three-stage multi-tube shell-and-tube dust collector is welded on the main tower at a certain angle. A plurality of Venturi tubes are arranged on the tank plate. A guide vane is arranged on the inlet of each Venturi tube to make the flue gas rotate and rise. The flue gas is initially centrifuged to remove fine particles and water droplets. Then, by using the Venturi principle, the relative flow rate between the gas and liquid phases in the contraction tube and the throat is very large, the gas is saturated with water, and the air film attached to the surface of the dust particles is broken, so that the dust particles are wetted by water. Therefore, fierce collision and condensation occur between the dust particles and the liquid droplets or between the dust particles. In the diffusion tube, the reduction of the air flow velocity and the increase of the pressure make the condensation with the dust particles as the condensation nuclei occur faster, and condense into dust-containing droplets of larger particle size.
[0037] A non-atomizing spray nozzle is set at a certain height above the Venturi tube. Each spray nozzle corresponds to a Venturi tube. The high-density conical water film sprayed by the nozzle is used to intercept and wash the large-particle fine dust gathered in the Venturi tube, achieving the effect of efficient fine dust removal, and at the same time, it can remove SO3 entrained in the droplets and trace heavy metals entrained in the flue gas. The high-density conical water film sprayed by the spray nozzle has the advantages of stable shape, strong impact resistance, and the water curtain is not easy to scatter.
[0038] (6) The utility model adopts a high-efficiency dust removal and mist removal device to eliminate the phenomenon of raining in the chimney; the structure is composed of a plurality of cyclone tube bundles, each of which is equipped with a multi-stage cyclone tube, and a cyclone plate is provided in the cyclone to make the desulfurized clean flue gas rotate in the cyclone tube. By utilizing the principle of centrifugal separation, a violent rotation and disturbance of the gas-liquid two phases are formed above the cyclone, so that the fine droplets, fine dust particles, aerosols and other tiny particles in the clean flue gas collide with each other and agglomerate into large droplets. Then, under the action of the outward rotation structure of the cyclone plate, the dust-removed and desulfurized clean flue gas moves outward centrifugally, and the large droplets formed by aggregation collide with the cyclone tube wall and are captured and absorbed by the liquid film formed by the flushing water on the cyclone tube wall, thereby achieving high-efficiency mist removal and dust removal.
[0039] (7) The slurry oxidation section at the bottom of the tower of the utility model is provided with an oxidizing air distributor to perform primary oxidation on the circulating absorption slurry in the tower to meet the COD discharge standard of the discharged wastewater. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] Figure 1 This is a structural schematic diagram of a catalytic cracking flue gas integrated dust removal and desulfurization tower of the utility model;
[0041] Figure 2AIt is a schematic diagram (top view) of the arrangement of some nozzles in the first-stage spray quenching section of the utility model;
[0042] Figure 2B It is a schematic diagram (top view) of the arrangement of some nozzles in the first-stage spray quenching section of the utility model;
[0043] Figure 2C It is a schematic elevation diagram of the primary spray quenching section of the utility model;
[0044] Figure 3A It is a schematic elevation view of the absorption section spraying in the secondary spray absorption section of the utility model;
[0045] Figure 3B It is a top view of the absorption section spraying in the two-stage spraying absorption section of the utility model;
[0046] Figure 4A It is a schematic elevation view of a three-stage spray multi-tube tube-type dust collector of the utility model;
[0047] Figure 4B It is a top view of the Venturi tube in the three-stage spray multi-tube tube-in-tube dust collector of the utility model;
[0048] Figure 4C It is a top view of the three-stage spray pipe in the three-stage spray multi-tube tube-in-tube dust collector of the utility model;
[0049] Figure 5A It is a top view of the water spray flushing pipe in the high-efficiency dust and mist removal device of the utility model;
[0050] Figure 5B It is a schematic elevation view of a high-efficiency dust and mist remover of the utility model;
[0051] Figure 5C It is a top view of the cyclone tube bundle in the high-efficiency dust and mist removal device of the utility model;
[0052] Fig. 6A It is a top view of the oxidation air distributor in the slurry oxidation section at the bottom of the tower of the utility model;
[0053] Figure 6B It is a top view of the oxidizing liquid reflux pipe at the bottom of the tower in the slurry oxidation section at the bottom of the tower of the utility model.
[0054] Among them, 1. tower body; 2. chimney on the top of the tower; 3. variable diameter section; 4. high-efficiency dust removal and mist removal device; 5. three-stage spray multi-tube tube dust collector; 6. two-stage spray absorption section; 7. one-stage spray quenching section; 8. bottom slurry oxidation section; 11-16, inspection manhole; 21. purified flue gas outlet; 22. CEMS detection instrument interface; 41. cyclone tube bundle; 42. water spray flushing pipe; 43. spray flushing water inlet; 45. water spray hose; 46. flushing nozzle; 47. third pressure detection instrument interface; 51. dust collector sump; 52. venturi tube; 53. guide vane segment; 54. dust collector overflow pipe; 55. overflow Liquid outlet; 56, dust collector collection tank outlet; 57, three-stage spray pipe; 58, three-stage spray pipe liquid inlet; 59, spray nozzle; 60, second pressure detection instrument interface; 61-65, absorption section spray (absorption section nozzle and absorption section nozzle); 67, first pressure detection instrument interface; 71, flue gas inlet; 72, quench nozzle; 73, temperature detection instrument interface; 74, quench nozzle; 81, tower bottom collection tank; 82, tower bottom slurry outlet; 83, oxidation air distributor; 84, oxidation air inlet; 85, return tower slurry inlet; 86, tower bottom oxidation liquid reflux pipe; 87, air outlet; 88, overflow; 89, liquid outlet. DETAILED DESCRIPTION
[0055] The technical solution of the utility model is described clearly and completely with specific embodiments below. It should be understood that the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of the utility model. Unless otherwise defined, all professional and scientific terms used in the text have the same meanings as those familiar to those skilled in the art.
[0056] The utility model provides a catalytic cracking flue gas integrated dust removal and desulfurization tower, such as Figure 1 As shown, the integrated dust removal and desulfurization tower comprises a tower body 1, on which are arranged, from top to bottom, a tower top chimney 2, a diameter reducing section 3, a high-efficiency dust removal and mist removal device 4, a three-stage spray multi-tube tube dust collector 5, a two-stage spray absorption section 6, a first-stage spray quenching section 7 and a tower bottom slurry oxidation section 8, a purified flue gas outlet 21 is arranged at the top of the tower top chimney 2, and a flue gas inlet 71 is arranged at the first-stage spray quenching section 7, wherein:
[0057] A plurality of quenching nozzles 72 are arranged on the tower wall of the first-stage spray quenching section 7 or on the cylinder of the flue gas inlet 71. Figure 2A-2CAs shown, the inlet of the quench nozzle 72 is connected to the quench nozzle 74, which is used to supply the quench nozzle 72 with circulating absorption slurry from the bottom of the tower, and the slurry is sprayed through the quench nozzle 72 to fully cover the entire cross-section of the flue gas inlet 71, so that the flue gas is rapidly cooled and SO is removed. X ;
[0058] The secondary spray absorption section 6 includes several layers of absorption section spray from bottom to top, and each layer of absorption section spray is provided with several absorption section nozzles. The absorption section nozzle connected to the inlet of the absorption section nozzle is connected to the tower wall of the secondary spray absorption section 6, which is used to supply the absorption section nozzle with circulating absorption slurry from the bottom of the tower, and spray the slurry through the absorption section nozzle to fully cover the entire cross section of the tower, so that the flue gas is scrubbed and dusted and SO is removed. X ;
[0059] The three-stage spray multi-tube tube-in-tube dust collector 5 comprises a dust collector sump 51 connected to the inner wall of the tower body 1 at the periphery of the bottom plate, a plurality of parallel venturi tubes 52 fixedly installed through the bottom plate of the dust collector sump 51, and a three-stage spray pipe 57 arranged above the venturi tube 52, which is used to remove fine particles entrained in the rising flue gas by using the venturi structure, gather them into large particles, intercept and wash the large particles of dust under the action of spraying, and remove SO3 entrained in the droplets at the same time;
[0060] The high-efficiency dust and mist remover 4 includes a plurality of parallel cyclone tube bundles 41 and a plurality of water spray flushing pipes 42 arranged above the cyclone tube bundles 41. The cyclone tube bundles 41 include a plurality of cyclones stacked in series in the vertical direction, and a cyclone plate (not shown in the figure) is arranged in the cyclone tube to rotate and centrifuge the rising flue gas in the cyclone tube to separate the tiny particles into large droplets that collide with the cyclone tube wall wetted by water spray and are captured and absorbed by the liquid film to achieve dust and mist removal.
[0061] The bottom slurry oxidation section 8 includes a bottom liquid collecting tank 81 connected to the inner wall of the tower body 1 at the periphery of the bottom plate and an oxidation air distributor 83 arranged above the bottom liquid collecting tank 81, which are respectively used to store the bottom slurry and force oxidation of the bottom slurry.
[0062] Furthermore, the operating temperature of the integrated dust removal and desulfurization tower is 50-65°C, and the operating pressure is about 3500-5000 Pa(G).
[0063] Furthermore, a plurality of inspection manholes 11, 12, 13, 14, 15, 16 are provided on the wall surface of the tower body 1 from bottom to top for inspection and maintenance of components in the tower.
[0064] Furthermore, the tower body 1 is made of acid-resistant and wear-resistant metal material (such as 304L), carbon steel lined acid-resistant and wear-resistant metal material (such as carbon steel lined 304L) or carbon steel lined non-metallic material (such as carbon steel lined PTU), and the flue gas inlet 71 is made of high temperature resistant and acid corrosion resistant alloy material.
[0065] Furthermore, the bottom of the tower top chimney 2 is connected to the high-efficiency dust and mist remover 4 through the reducing section 3, and the reducing section 3 is in the shape of a cone that gradually expands downward.
[0066] Furthermore, a CEMS detection instrument interface 22 is provided on the lower tower wall of the tower top chimney 2, and the distance d between the CEMS detection instrument interface 22 and the variable diameter section 3 is determined according to the outlet net flue gas flow and the chimney diameter. The angle between the CEMS detection instrument interface 22 and the tower wall is 15° to 60°, preferably 30° to 45°, and is preferably arranged upward in the horizontal direction to avoid interface blockage.
[0067] Furthermore, the flue gas inlet 71 is connected to the tower wall of the first-stage spray quenching section 7, and the connection angle with the tower wall is 30° to 90°, preferably 60° to 90°, and more preferably 90°, that is, the flue gas inlet 71 is vertically connected to the tower wall of the first-stage spray quenching section 7.
[0068] Furthermore, the quenching nozzle 72 is preferably provided on the tower wall of the first-stage spray quenching section 7 and connected to the tower wall at a certain angle; wherein some of the quenching nozzles 72 are arranged on the upper and lower sides of the flue gas inlet 71 and are arranged perpendicularly at 90° to the direction of the flue gas inlet 71, and some of the quenching nozzles 72 are arranged on the left and right sides of the flue gas inlet 71 and are arranged at an angle of 15° to 90° to the direction of the flue gas inlet 71, preferably 15° to 30°. The quenching nozzle 72 is used to spray the circulating absorption slurry from the bottom of the tower to form a number of flat cone-shaped rapid water curtains, which fully cover the entire cross-section of the flue gas inlet, quench the flue gas entering the flue gas inlet, and make it reach the saturation temperature. The quenching nozzle 72 is preferably set to 1 to 4, such as Figure 2A-2C As shown in , four quench nozzles 72A, B, C, and D are provided, wherein two quench nozzles 72A and B are provided on the upper and lower sides of the flue gas inlet 71 , and two quench nozzles 72C and D are provided on the left and right sides of the flue gas inlet 71 .
[0069] Furthermore, the quenching nozzle 72 can be selected from a quenching nozzle disclosed in the prior art CN104138812A to spray slurry to form a torrent water curtain in the shape of a flat cone curtain.
[0070] Furthermore, a plurality of temperature detection instrument interfaces 73 are provided on the tower wall of the first-stage spray quenching section 7, preferably 2 to 3, and are provided at the tower wall position directly opposite to the flue gas inlet 71. The connection angle between the temperature detection instrument interface 73 and the tower wall is 90°, and the plurality of temperature detection instrument interfaces 73 are arranged up and down, with a spacing of 0.5 to 2.0 m between the interfaces.
[0071] Furthermore, the secondary spray absorption section 6 is preferably provided with 1 to 5 layers of absorption section spraying, and each layer of absorption section spraying is provided with 3 to 5 absorption section nozzles. The absorption section nozzles are large-caliber spray nozzles, and the absorption section nozzles of each layer of absorption section spraying are evenly arranged on the same plane, and the angle between the absorption section nozzle and the horizontal direction is 1° to 10°, preferably 3° to 6°, and is preferably arranged downward in the horizontal direction. Each layer of absorption section nozzles sprays slurry to form a flat cone-shaped torrent water curtain to cover the entire cross-section of the tower. Figure 3A-3B As shown in FIG. 5 , five layers of absorption section sprays 61, 62, 63, 64, and 65 are provided, and each layer is provided with four absorption section nozzles and absorption section nozzles connected thereto, such as 61A, B, C, and D.
[0072] Furthermore, the spraying of the absorption sections of each two adjacent layers is staggered at a certain angle, so that the sprayed slurry forms a flat cone-shaped torrent water curtain to fully cover the cylinder of the secondary absorption section. Specifically, the angle between the spraying of the absorption sections of each two layers is 10° to 50°, preferably 15° to 30°. Figure 3B As shown in , the angle between the sprays of the absorption section between each two layers is 22.5°.
[0073] Furthermore, the absorption section nozzle may also be selected from a quenching nozzle disclosed in the prior art CN104138812A to spray slurry to form a torrent water curtain in the shape of a flat cone curtain.
[0074] Furthermore, a first pressure detection instrument interface 67 is provided on the upper tower wall of the secondary spray absorption section 6, and the angle between the first pressure detection instrument interface 67 and the tower wall is 15° to 60°, preferably 30° to 45°, and is preferably provided upward in the horizontal direction.
[0075] Further, combined with Figures 4A-4C As shown, the bottom plate of the dust collector liquid collecting tank 51 is welded to the inner wall of the tower body 1 at a certain inclination angle, preferably at an angle of 10° to 30° with the horizontal direction; a liquid storage area of a certain volume is arranged at the bottom of the slope of the dust collector liquid collecting tank 51, and the liquid storage height of the liquid storage area is 0.5 to 1.2 m, and a dust collector liquid collecting tank outlet 56 is opened in the liquid storage area toward the outside of the wall of the tower body 1.
[0076] Furthermore, the lower part of the venturi tube 52 is fixed to the bottom plate of the dust collector sump 51 by welding or flange connection; a plurality of venturi tubes 52 are connected and fixed by rib plates. The lower end of each venturi tube 52 is connected to a guide vane segment 53, which is provided with a guide vane to make the rising flue gas rotate and rise in the venturi tube.
[0077] Furthermore, a dust collector overflow pipe 54 is fixedly arranged through the bottom plate of the dust collector liquid collecting tank 51, and the bottom end of the dust collector overflow pipe 54 passes through the wall of the tower body 1, and an overflow liquid outlet 55 is arranged.
[0078] Furthermore, the number of the tertiary spray pipes 57 is 1 to 50, preferably 0.5 to 1.5 m above the upper end of the venturi tube 52. A plurality of tertiary spray pipe liquid inlets 58 are provided at the inlet of the tertiary spray pipe 57, which are located on the wall of the tower body 1 and are connected to the outlet 56 of the dust collector sump through a circulating pump (not shown in the figure), for circulating and spraying the slurry collected in the dust collector sump 51 in the three-stage spray multi-tube tube-in-tube dust collector 5. The tertiary spray pipe 57 is downwardly connected to a plurality of spray nozzles 59, each spray nozzle 59 corresponds to a venturi tube 52, and the number of the venturi tubes 52 and the number of spray nozzles 59 are determined according to the flue gas flow rate and flue gas components entering the tower. Figure 4C As shown in FIG, a total of 4 three-stage spray pipes 57 and 4 three-stage spray pipe liquid inlets 58A, B, C, and D are provided.
[0079] Furthermore, a second pressure detection instrument interface 60 is provided on the upper tower wall of the three-stage spray multi-tube shell-and-tube dust collector 5, and the angle between the second pressure detection instrument interface 60 and the tower wall is 15° to 60°, preferably 30° to 45°, and is preferably arranged upward in the horizontal direction.
[0080] Furthermore, in the high-efficiency dust and mist remover 4, the inlet of the water spray flushing pipe 42 is a spray flushing water inlet 43, which is located on the wall of the tower body 1 and is connected to external process water (not shown in the figure) for supplying spray flushing water to the water spray flushing pipe 42. Figures 5A-5C As shown, each of the water spray flushing pipes 42 is connected to a plurality of water spray hoses 45, and a plurality of flushing nozzles 46 are arranged in each of the cyclone cylinders. Each of the flushing nozzles 46 is connected to the water spray flushing pipe 42 through the water spray hose 45, so that the spray flushing water moistens the cylinder wall of each cyclone cylinder.
[0081] Preferably, 2 to 3 cyclones are arranged in each cyclone tube bundle 41 , and 2 to 4 flushing nozzles 46 are arranged in each cyclone tube. The water spray flushing pipe 42 is arranged 0.5 to 1.2 m above the cyclone tube bundle 41 .
[0082] Furthermore, the number of the cyclone tube bundles 41, the amount of spray flushing water, and the spray flushing frequency are determined according to the flue gas flow rate and flue gas composition entering the tower.
[0083] Furthermore, a third pressure detection instrument interface 47 is provided on the tower wall at the upper part of the high-efficiency dust and mist remover 4, and the angle between the third pressure detection instrument interface 47 and the tower wall is 15° to 60°, preferably 30° to 45°, and is preferably arranged upward in the horizontal direction.
[0084] Further, combined with Figure 6A-6B As shown, the bottom plate of the tower bottom sump 81 is welded to the inner wall of the tower body 1 at a certain tilt angle, preferably 15° to 60° with the horizontal direction, more preferably 15° to 30°. The bottom of the slope of the tower bottom sump 81 is provided with a tower bottom slurry outlet 82 toward the outside of the wall of the tower body 1, and the tower bottom slurry outlet 82 is connected to the quenching nozzle 74 and the absorption section nozzle through a circulation pump (not shown in the figure), providing circulating slurry for the spraying in the first spray quenching section 7 and the second spray absorption section 6.
[0085] Furthermore, the inlet of the oxidation wind distributor 83 is provided with a plurality of oxidation wind inlets 84, which are located on the wall of the tower body 1 and connected to an external oxidation fan (not shown in the figure). The relative distance between the oxidation wind distributor 83 and the bottom plate of the tower body 1 is determined according to the liquid level height of the liquid stored in the slurry oxidation section 8 at the bottom of the tower. The distance between the oxidation wind distributor 83 and the bottom plate of the tower body 1 is generally 0.5 to 2.0 m; the distance from the liquid level height of the stored liquid is 5 to 10 m, preferably 6 to 8 m.
[0086] Furthermore, the oxidation air distributor 83 includes a plurality of oxidation air main pipes and a plurality of oxidation air branch pipes, and the oxidation air branch pipes are provided with a plurality of air outlet holes 87 at equal distances, the diameter of the air outlet holes 87 is 50 to 150 mm, and the distance between adjacent air outlet holes 87 is 0.5 to 800 mm. The number of the oxidation air main pipes and oxidation air branch pipes is determined according to the flue gas components in the tower and the concentration of sulfite contained in the absorption slurry.
[0087] Furthermore, a bottom oxidation liquid reflux pipe 86 is arranged above the bottom plate of the tower bottom liquid collecting tank 81 near the bottom plate. The oxidation liquid reflux pipe 86 is arc-shaped and arranged along the wall of the tower body 1. A plurality of liquid outlet holes 89 are opened at equal distances on the bottom oxidation liquid reflux pipe 86 for slurry reflux to flush the bottom plate of the tower bottom liquid collecting tank 81; the diameter of the liquid outlet hole 89 is 50 to 200 mm, and the spacing between adjacent liquid outlet holes 89 is 0.56 to 1.2 m.
[0088] Furthermore, an overflow port 88 and a return slurry inlet 85 are provided on the tower wall of the bottom slurry oxidation section 8. The return slurry inlet 85 is connected to the overflow liquid outlet 55 (not shown in the figure), so that the circulating slurry in the three-stage spray multi-tube tube-in-tube dust collector 5 can flow into the bottom slurry oxidation section 8 through overflow.
[0089] This application is described in detail for the purpose of enabling those skilled in the art to understand the contents of this application and implement them. This is not intended to limit the scope of protection of this application. Any equivalent changes or modifications made according to the spirit of this application should be included in the scope of protection of this application.
Claims
1. A catalytic cracking flue gas integrated dust removal and desulfurization tower, characterized in that: The integrated dust removal and desulfurization tower comprises a tower body, on which a tower top chimney, a diameter reducing section, a high-efficiency dust removal and mist removal device, a three-stage spray multi-tube tube dust collector, a two-stage spray absorption section, a first-stage spray quenching section and a tower bottom slurry oxidation section are sequentially arranged from top to bottom, a purified flue gas outlet is arranged at the top of the tower top chimney, and a flue gas inlet is arranged at the first-stage spray quenching section, wherein: A plurality of quenching nozzles are arranged on the tower wall of the first-stage spraying quenching section or on the flue gas inlet; The secondary spray absorption section includes several layers of absorption section spray from bottom to top, and each layer of absorption section spray is provided with several absorption section nozzles; The three-stage spray multi-tube tube-in-tube dust collector comprises a dust collector sump connected to the inner wall of the tower body at the periphery of the bottom plate, a plurality of parallel venturi tubes fixedly installed through the bottom plate of the dust collector sump, and a three-stage spray pipe arranged above the venturi tube; The high-efficiency dust and mist removal device includes a plurality of parallel cyclone tube bundles and a plurality of water spray flushing pipes arranged above the cyclone tube bundles. The cyclone tube bundle includes a plurality of cyclone tubes stacked in series in the vertical direction, and a cyclone plate is arranged in the cyclone tube. The diameter-reducing section is in the shape of a cone that gradually expands downward, and the bottom of the chimney on the top of the tower is connected to the high-efficiency dust and mist removal device through the diameter-reducing section; The tower bottom slurry oxidation section includes a tower bottom liquid collecting trough connected to the inner wall of the tower body at the outer periphery of the bottom plate and an oxidation air distributor arranged above the tower bottom liquid collecting trough; a tower bottom slurry outlet is opened at the slope bottom of the tower bottom liquid collecting trough toward the outside of the tower body wall, and the tower bottom slurry outlet is connected to the quench nozzle and the absorption section nozzle through a circulating pump.
2. The integrated dust removal and desulfurization tower according to claim 1 is characterized in that: A dust collector overflow pipe is fixedly arranged through the bottom plate of the dust collector collecting tank, the bottom end of the dust collector overflow pipe passes through the wall of the tower body, an overflow liquid outlet is arranged, and the overflow liquid outlet is connected to the slurry oxidation section at the bottom of the tower.
3. The integrated dust removal and desulfurization tower according to claim 1 is characterized in that: In the first-stage spray quenching section, the flue gas inlet is connected to the tower wall of the first-stage spray quenching section, and the connection angle with the tower wall is 30° to 90°; the quenching nozzle is arranged on the tower wall of the first-stage spray quenching section and is connected to the tower wall at a certain angle, wherein some of the quenching nozzles are arranged on the upper and lower sides of the flue gas inlet and are arranged perpendicularly at 90° to the direction of the flue gas inlet, and some of the quenching nozzles are arranged on the left and right sides of the flue gas inlet and are arranged at an angle of 15° to 90° to the direction of the flue gas inlet.
4. The integrated dust removal and desulfurization tower according to claim 1 is characterized in that: In the secondary spray absorption section, 1 to 5 layers of absorption section spray are arranged, each layer of absorption section spray is arranged with 3 to 5 absorption section nozzles, and the absorption section nozzles of each layer are evenly arranged on the same plane; the absorption section nozzle connected to the inlet of the absorption section nozzle is connected to the tower wall of the secondary spray absorption section, and the absorption section nozzle is arranged downward in the horizontal direction, and the angle with the horizontal direction is 1° to 10°; the absorption section sprays of every two adjacent layers are staggered at a certain angle, and the angle of the absorption section sprays between every two layers is 10° to 50°.
5. The integrated dust removal and desulfurization tower according to claim 1 is characterized in that: In the three-stage spray multi-tube tube-in-tube dust collector, the lower part of the Venturi tube is fixed to the bottom plate of the dust collector collecting tank by welding or flange connection; a plurality of Venturi tubes are connected and fixed by rib plates; the lower end of each Venturi tube is connected to a guide vane segment, and a guide vane is arranged inside.
6. The integrated dust removal and desulfurization tower according to claim 1, characterized in that: The bottom plate of the dust collector liquid collecting tank is welded to the inner wall of the tower body at an angle of 10° to 30° with the horizontal direction; a liquid storage area is arranged at the bottom of the slope of the dust collector liquid collecting tank, the liquid storage height of the liquid storage area is 0.5 to 1.2 m, and the dust collector liquid collecting tank outlet is opened in the liquid storage area toward the outer side of the tower body wall; The three-stage spray pipe is connected downwardly to a plurality of spray nozzles, each of which corresponds to a venturi tube; the inlet of the three-stage spray pipe is provided with a plurality of three-stage spray pipe liquid inlets, which are located on the wall of the tower body and are connected to the outlet of the dust collector liquid collecting tank through a circulating pump; The number of the three-stage spray pipes is 1 to 50 and they are arranged at 0.5 to 1.5 m above the upper end of the venturi pipe.
7. The integrated dust removal and desulfurization tower according to claim 1, characterized in that: In the high-efficiency dust and mist removal device, each of the water spray flushing pipes is connected to a plurality of water spray hoses, and a plurality of flushing nozzles are arranged in each of the cyclone cylinders, and each of the flushing nozzles is connected to the water spray flushing pipe through the water spray hose; Each of the cyclone tube bundles is provided with 2 to 3 cyclone tubes, and each of the cyclone tubes is provided with 2 to 4 flushing nozzles; and the water spray flushing pipe is arranged at 0.5 to 1.2 m above the cyclone tube bundle.
8. The integrated dust removal and desulfurization tower according to claim 1, characterized in that: In the tower bottom slurry oxidation section, the bottom plate of the tower bottom sump is welded to the inner wall of the tower body at an angle of 15° to 60° with the horizontal direction; A tower bottom oxidation liquid reflux pipe is arranged above the bottom plate of the tower bottom liquid collecting tank. The oxidation liquid reflux pipe is arc-shaped and arranged along the wall of the tower body. A plurality of liquid outlet holes are opened on the tower bottom oxidation liquid reflux pipe at equal distances. The diameter of the liquid outlet holes is 50 to 200 mm, and the distance between adjacent liquid outlet holes is 0.56 to 1.2 m.
9. The integrated dust removal and desulfurization tower according to claim 1, characterized in that: The inlet of the oxidation air distributor is provided with a plurality of oxidation air inlets, which are located on the wall of the tower body and connected to an external oxidation fan; The oxidation air distributor comprises a plurality of oxidation air main pipes and a plurality of oxidation air branch pipes, wherein the oxidation air branch pipes are provided with a plurality of air outlet holes at equal distances, wherein the diameter of the air outlet holes is 50 to 150 mm, and the distance between adjacent air outlet holes is 0.5 to 800 mm; The distance between the oxidation air distributor and the tower bottom plate is 0.5 to 2.0 m, and the distance between the oxidation air distributor and the liquid level of the stored liquid is 5 to 10 m.
10. The integrated dust removal and desulfurization tower according to claim 1, characterized in that: A plurality of temperature detection instrument interfaces are arranged on the tower wall of the first-stage spray quenching section, and are arranged at the tower wall position directly opposite to the flue gas inlet. The connection angle between the temperature detection instrument interface and the tower wall is 90°. The temperature detection instrument interfaces are arranged up and down, and the distance between each interface is 0.5 to 2.0 m. Pressure detection instrument interfaces are arranged on the upper tower wall of the secondary spray absorption section, the upper tower wall of the tertiary spray multi-tube shell-and-tube dust collector, and the upper tower wall of the high-efficiency dust and mist remover, and a CEMS detection instrument interface is arranged on the lower tower wall of the tower top chimney; the above-mentioned instrument interfaces are all arranged upward in the horizontal direction, and the angle between the connection with the tower wall is 15° to 60°.