Old pavement widening structure

Through resonant gravel treatment and multi-layer structural design, the problem of cracks and insufficient load capacity of the old cement concrete pavement is solved after paving the widened section and asphalt concrete layer, and the stability and load capacity of the new pavement are improved. Extend road life and reduce maintenance costs.

CN222024813UActive Publication Date: 2024-11-19ROAD & BRIDGE INT CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323669805.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-29
Publication Date
2024-11-19
Estimated Expiration
2033-12-29

AI Technical Summary

Technical Problem

The old cement concrete pavement is prone to cracks and insufficient load capacity after directly paving the widened sections and asphalt concrete layers, which affects the overall performance of the road and driving safety.

Method used

Resonant gravel treatment of old pavement, and connecting the widened sections on the transverse end surfaces on it, laying hot asphalt gravel seals and asphalt concrete layers, including laying mortar masonry, concrete base and graded gravel layers from bottom to top , combined with hot asphalt gravel sealing layer and fine-grained asphalt concrete layer, enhance the compression, deformation and fatigue resistance of the pavement.

Benefits of technology

Through resonant gravel and multi-layer structural design, the stability and load capacity of the new pavement are improved, crack risk is reduced, road service life is extended, and maintenance costs are reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222024813U_ABST
    Figure CN222024813U_ABST
Patent Text Reader

Abstract

The old pavement widening structure comprises a resonance rubblization old pavement, a widening section which is connected with the transverse end face of the old pavement and is flush with the upper end face of the old pavement, and a hot asphalt gravel sealing layer and an asphalt concrete layer which are laid on the upper end faces of the old pavement and the widening section; the widening section comprises a grouted rubble layer, a concrete base layer and a graded broken stone layer which are sequentially laid from bottom to top. In the embodiment of the invention, the old cement concrete pavement is subjected to resonance rubblization and then is subjected to vibration compaction to form the old pavement, then the transverse end face of the old pavement is connected with the widening section, and finally the hot asphalt gravel sealing layer and the asphalt concrete layer are laid on the old pavement and the widening section. The purpose of widening the transverse end part after the old cement pavement is transformed into the asphalt pavement is achieved, so that the technical effects of upgrading the old roadbed pavement and ensuring the stability of the new pavement structure are achieved, and the technical problems of easiness in cracking, insufficient loading capacity and the like caused by directly paving a widening section and an asphalt concrete layer on the old cement concrete pavement are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of pavement engineering construction, and in particular, to an old pavement widening structure. Background Art

[0002] In the field of road construction, cement concrete pavement, commonly known as white pavement, was once the main choice for urban roads due to its high strength, long life, simple construction and low cost. However, with the rapid development of cities and the sharp increase in traffic volume, some disadvantages of cement concrete pavement have gradually emerged, including high noise, bumpy plate joints, poor driving comfort and long maintenance period, which has triggered an urgent need for its transformation.

[0003] Cement concrete pavement reconstruction has always been a challenging engineering task. Traditional reconstruction methods usually involve laying widening sections and asphalt concrete layers directly on the old pavement. However, these methods have a series of serious technical problems. First, directly covering the old cement pavement will lead to coordination problems between the new and old structures, prone to cracks and instability, thus affecting the overall performance and driving safety of the road. Second, the new structure may not be able to effectively adapt to the uneven settlement of the original roadbed, increasing the risk of pavement settlement and deformation, which in turn affects the bearing capacity of the pavement, increases maintenance costs and reduces the service life of the road. Summary of the invention

[0004] The main purpose of this application is to provide an old road widening structure to solve technical problems such as easy cracking and insufficient load capacity caused by directly paving widening sections and asphalt concrete layers on old cement concrete pavements.

[0005] In order to achieve the above objectives, according to one aspect of the present application, an old road surface widening structure is provided.

[0006] The old road surface widening structure according to the present application includes: a resonantly graveled old road surface, a widening section connected to the lateral end face of the old road surface and flush with the upper end face of the old road surface, and a hot asphalt gravel seal layer and an asphalt concrete layer laid on the old road surface and the upper end face of the widening section; wherein the widening section includes: a mortared stone layer, a concrete base layer and a graded gravel layer laid in sequence from bottom to top.

[0007] Furthermore, the old road surface includes: an old graded crushed stone functional layer, an old cement stabilized crushed stone subbase and an old concrete road surface resonance crushed stone layer which are vibrated and compacted in sequence from bottom to top.

[0008] Furthermore, the thickness of the old graded crushed stone functional layer is 15 cm; the thickness of the old cement stabilized crushed stone subbase is 18 cm; and the thickness of the resonance crushed stone layer of the old concrete pavement is 20 cm.

[0009] Furthermore, the particle size of the old graded crushed stone functional layer is less than 37.5 mm; the particle size of the old cement stabilized crushed stone subbase is less than 22.5 mm; and the particle size of the resonance crushed stone layer of the old concrete pavement is less than 7.5 mm.

[0010] Furthermore, the thickness of the mortar masonry layer is 25 cm, the thickness of the concrete base layer is 20 cm, and the thickness of the graded crushed stone layer is 8 cm.

[0011] Furthermore, a blind ditch is longitudinally opened in the mortar-stone layer, and the inner wall of the blind ditch is covered with anti-filter fabric.

[0012] Furthermore, a concrete hardened shoulder is paved at the lateral end of the widened section, and the concrete hardened shoulder includes: a concrete hardened layer laid on the concrete base and connected to the lateral ends of the graded crushed stone layer, the hot asphalt crushed stone seal layer and the asphalt concrete layer, and shoulder earthing connected to the lateral ends of the concrete base, the graded crushed stone layer and the concrete hardened layer; wherein the concrete hardened layer is flush with the upper end surface of the asphalt concrete layer.

[0013] Furthermore, the hot asphalt chip seal includes: sealing asphalt, and sealing stones that are spread synchronously after the sealing asphalt is sprayed.

[0014] Furthermore, the asphalt concrete layer includes: a lower layer of coarse-grained asphalt concrete formed by paving in one step and an upper layer of fine-grained asphalt concrete.

[0015] Furthermore, the lower layer of the coarse-grained asphalt concrete is coarse-grained asphalt concrete AC-20; and the upper layer of the fine-grained asphalt concrete is fine-grained SBS modified asphalt concrete AC-13C.

[0016] In the embodiment of the present application, the old cement concrete pavement is resonantly crushed and then vibrated to form an old pavement, and then a widened section is connected to the lateral end face of the old pavement, and finally a hot asphalt crushed stone seal layer and an asphalt concrete layer are laid on the old pavement and the widened section. The purpose of widening the lateral end after the old cement pavement is transformed into an asphalt pavement is achieved, thereby achieving the technical effect of upgrading the old roadbed and pavement and ensuring the stability of the new pavement structure, and further solving the technical problems such as easy cracks and insufficient load capacity caused by directly laying the widened section and the asphalt concrete layer on the old cement concrete pavement. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The drawings constituting a part of this application are used to provide a further understanding of this application, so that other features, purposes and advantages of this application become more obvious. The schematic embodiment drawings and their descriptions of this application are used to explain this application and do not constitute an improper limitation on this application. In the drawings:

[0018] Figure 1 It is a structural schematic diagram of the old road surface widening structure according to an embodiment of the present application.

[0019] Reference numerals

[0020] 1. Old road surface, 11. Old graded gravel functional layer, 12. Old cement-stabilized gravel subbase, 13. Old concrete road surface resonance gravel layer, 2. Widening section, 21. Mortared stone layer, 211. Blind ditch, 22. Concrete base, 23. Graded gravel layer, 3. Hot asphalt gravel seal layer, 4. Asphalt concrete layer, 41. Coarse-grained asphalt concrete lower layer, 42. Fine-grained asphalt concrete upper layer, 5. Concrete hardened shoulder, 51. Concrete hardened layer, 52. Shoulder earthing. DETAILED DESCRIPTION

[0021] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.

[0022] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present application described here. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0023] In this application, the terms "upper", "lower", "left", "right", "front", "back", "top", "bottom", "inner", "outer", "middle", "vertical", "horizontal", "lateral", "longitudinal" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings. These terms are mainly used to better describe the utility model and its embodiments, and are not used to limit the indicated devices, elements or components to have a specific orientation, or to be constructed and operated in a specific orientation.

[0024] In addition, some of the above terms may be used to express other meanings in addition to indicating orientation or positional relationship. For example, the term "on" may also be used to express a certain dependency or connection relationship in some cases. For those skilled in the art, the specific meanings of these terms in this utility model can be understood according to specific circumstances.

[0025] In addition, the terms "installed", "set", "provided with", "connected", "connected", and "socketed" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral structure; it can be a mechanical connection, or an electrical connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be an internal connection between two devices, elements, or components. For those of ordinary skill in the art, the specific meanings of the above terms in this utility model can be understood according to specific circumstances.

[0026] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0027] like Figure 1 As shown, the present application relates to an old road widening structure, comprising: an old road 1 subjected to resonance rubble treatment, a widening section 2 connected to the transverse end face of the old road 1 and flush with the upper end face of the old road 1, and a hot asphalt gravel seal layer 3 and an asphalt concrete layer 4 laid on the old road 1 and the upper end face of the widening section 2; wherein the widening section 2 comprises: a mortar masonry layer 21, a concrete base layer 22 and a graded gravel layer 23 laid in sequence from bottom to top. In the embodiment of the present application, the old cement concrete road surface is subjected to resonance rubble treatment and then vibrated and compacted to form the old road surface 1, and then the widening section 2 is connected to the transverse end face of the old road surface 1, and finally the hot asphalt gravel seal layer 3 and the asphalt concrete layer 4 are laid on the old road surface 1 and the widening section 2, so as to achieve the purpose of widening the transverse end of the old cement road surface after being transformed into an asphalt road surface, thereby achieving the technical effect of upgrading the old roadbed and road surface and ensuring the stability of the new road surface structure, thereby solving the technical problems such as easy cracking and insufficient load capacity caused by directly laying the widening section and the asphalt concrete layer on the old cement concrete road surface.

[0028] In this embodiment, the old road gravel layer 1 includes: an old graded gravel functional layer 11, an old cement stabilized gravel subbase 12 and an old concrete road resonant gravel layer 13 which are compacted sequentially from bottom to top; the old graded gravel functional layer 11 helps to provide uniform support and drainage functions, and improves the bearing capacity and compression resistance of the road surface; the old cement stabilized gravel subbase 12 enhances the overall stiffness of the old road gravel layer through the stabilizing effect of cement, and improves the road surface's deformation resistance; the old concrete road resonant gravel layer 13 can absorb part of the energy when the road surface is subjected to stress, slows down the vibration transmission, helps to reduce the impact on the upper road surface structure, and improves the road surface's fatigue resistance; through the above design, the old road surface is reused, and the compression resistance, deformation resistance, fatigue resistance and other properties of the reconstructed road surface are comprehensively improved, the road surface's service life is extended, and the maintenance cost is reduced.

[0029] Specifically, the thickness of the old graded crushed stone functional layer 11 is 15 cm; the thickness of the old cement-stabilized crushed stone subbase 12 is 18 cm; the thickness of the old concrete pavement resonance crushed stone layer 13 is 20 cm; the layered design of 15 cm, 18 cm and 20 cm helps to balance the functions of each layer, reasonably distribute the load, avoids the problems that may be caused by excessive or small thickness of each layer, makes the overall structure more balanced, and improves the compression resistance and durability of the pavement.

[0030] Specifically, the particle size of the old graded crushed stone functional layer 11 is less than 37.5 mm; the particle size of the old cement-stabilized crushed stone base layer 12 is less than 22.5 mm; the particle size of the old concrete pavement resonance crushed stone layer 13 is less than 7.5 mm; such a design helps to improve the bonding between layers, reduce the gaps between different layers, and enhance the compactness of the overall structure; reduce the stress difference between different layers, help reduce the occurrence of cracks and damage, and improve the overall stability of the pavement.

[0031] The widening section 2 of this embodiment includes: a mortar masonry layer 21, a concrete base layer 22 and a graded crushed stone layer 23 laid in sequence from bottom to top; the layered design of the mortar masonry layer 21, the concrete base layer 22 and the graded crushed stone layer 23 helps to reduce the formation of cracks and reduces the risk of reflective cracks, can effectively prevent cracks from propagating to the upper structure, and improve the durability of the road surface.

[0032] Specifically, the thickness of the mortar masonry layer 21 is 25 cm; the concrete base layer 22 is a C15 cement concrete road slab. As a concrete base layer, the C15 cement concrete road slab has high strength and bearing capacity, which helps to enhance the structural strength of the entire widening section, adapt to higher traffic loads, and reduce the risk of road deformation. The thickness of the concrete base layer 22 is 20 cm; the thickness of the graded crushed stone layer 23 is 8 cm. By designing different layers to be 25 cm, 20 cm, and 8 cm respectively, the load can be better shared and the stability of the overall structure can be improved.

[0033] Specifically, a blind ditch 211 is provided in the longitudinal direction of the mortar masonry layer 21, and the inner wall of the blind ditch 211 is covered with an anti-filter fabric. The provision of the blind ditch 211 is helpful for drainage, especially when there is a lot of water on the road surface, the longitudinal blind ditch 211 can collect and guide rainwater, reduce water accumulation, and prevent water from being retained under the road surface. In addition, the use of the anti-filter fabric helps prevent soil and particles from entering the blind ditch, reduces the scouring and erosion of the foundation material by the water flow, improves the drainage effect, and helps maintain the stability of the roadbed.

[0034] In this embodiment, a concrete hardened shoulder 5 is paved at the transverse end of the widening section 2, and the concrete hardened shoulder 5 includes: a concrete hardened layer 51 paved on the concrete base 22 and connected to the transverse ends of the graded crushed stone layer 23, the hot asphalt crushed stone seal layer 3 and the asphalt concrete layer 4, and a shoulder earthing 52 connected to the transverse ends of the concrete base 22, the graded crushed stone layer 23 and the concrete hardened layer 51; wherein the concrete hardened layer 51 is flush with the upper end surface of the asphalt concrete layer 4. The concrete hardened shoulder 5 is arranged on the side of the fill section, which helps to provide edge support and ensure the stability of the edge of the fill section, which plays an important role in preventing the collapse and deformation of the fill slope and helps to maintain the overall stability of the road.

[0035] Specifically, the concrete hardening layer 51 is made of C25 concrete, 16 cm thick and 50 cm long; C25 concrete has a high compressive strength, so the setting of the concrete hardening layer 51 effectively improves the overall strength of the lateral end of the concrete hardened shoulder 5, reduces the deformation and damage of the concrete hardened shoulder 5, and improves its bearing capacity; the shoulder soil 52 is 0.281m 3 / m, and its slope is 1:1.5. The setting of the shoulder earthwork 52 helps to prevent soil erosion and protect the base material at the edge of the fill section; the appropriate slope optimizes the discharge of water, reduces the retention of water in the shoulder earthwork 52, reduces the erosion and damage of the shoulder earthwork, thereby reducing maintenance costs and extending the service life of the concrete hardened shoulder 5.

[0036] In this embodiment, the hot asphalt chip seal layer 3 includes: sealing asphalt, and sealing stones that are spread synchronously after the sealing asphalt is sprayed. The sealing stones that are spread synchronously after the sealing asphalt is sprayed can make the sealing stones adhere better to the asphalt surface, improve the adhesion of the sealing stones, and enhance the tightness of the overall structure.

[0037] In this embodiment, the asphalt concrete layer 4 includes: a coarse-grained asphalt concrete lower layer 41 and a fine-grained asphalt concrete upper layer 42 formed by paving in one step.

[0038] Specifically, the coarse-grained asphalt concrete lower layer 41 is coarse-grained asphalt concrete AC-20, which has a high asphalt content and durability, and can provide better compression resistance and stability; the layer thickness of the coarse-grained asphalt concrete lower layer 41 is 6 cm, which not only ensures sufficient bearing capacity, but also helps to improve construction efficiency and reduce construction costs. The appropriate layer thickness can provide sufficient structural support without wasting materials. The use of the coarse-grained asphalt concrete lower layer 3 can reduce the stress of the road surface, slow down the generation of cracks, and increase the durability and crack resistance of the road surface.

[0039] Specifically, the fine-grained asphalt concrete upper layer 42 is fine-grained SBS modified asphalt concrete AC-13. SBS modified asphalt has good elasticity and durability, can maintain high flexibility under different climatic conditions, and improve the durability and crack resistance of the road surface. The thickness of the fine-grained asphalt concrete upper layer 42 is 3.5 cm. The thickness is reasonably designed to provide sufficient asphalt concrete layer support, improve construction efficiency, and reduce construction costs. The appropriate layer thickness can not only ensure the performance of the road surface, but also achieve economical construction. The design of the fine-grained asphalt concrete upper layer 42 enables the road surface to better adapt to traffic loads, slow down the deformation and damage of the surface layer, and help maintain the flatness and comfort of the road surface.

[0040] The construction steps of the structure are as follows:

[0041] Step S1: Performing resonance rubble treatment, using a crusher to perform rubble treatment on the old cement concrete pavement, crushing once with the crusher, and vibrating and compacting 2-3 times with a roller, to form a resonance rubble old pavement 1;

[0042] Step S2: connecting the widening section 2, laying a mortar stone layer 21, a concrete base layer 22 and a graded crushed stone layer 23 in sequence from bottom to top on the transverse section of the old road surface 1, and leaving a laying position for the concrete hardened layer 51 on the concrete base layer 22;

[0043] Step S3: laying a concrete hardening layer 51 and shoulder soil 52 at the transverse end of the widening section 2;

[0044] Step S4: construct a 1 cm thick hot asphalt chip seal layer 2 on the surface of the old road surface 1 and the widened section 2, and then lay an asphalt concrete layer 4 on the hot asphalt chip seal layer 2.

[0045] From the above description, it can be seen that the present application achieves the following technical effects: in the embodiment of the present application, the old cement concrete pavement is subjected to resonance crushing and then vibration compaction to form an old pavement 1, and then the widening section 2 is connected to the lateral end face of the old pavement 1, and finally a hot asphalt crushed stone seal layer 3 and an asphalt concrete layer 4 are laid on the old pavement 1 and the widening section 2, so as to achieve the purpose of widening the lateral end after the old cement pavement is transformed into an asphalt pavement, thereby achieving the technical effect of upgrading the old roadbed and pavement and ensuring the stability of the new pavement structure, and then solving the technical problems such as easy cracks and insufficient load capacity caused by directly laying the widening section and asphalt concrete layer on the old cement concrete pavement.

[0046] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims

1. An old road widening structure, characterized in that: include: A resonance-rubbled old road surface (1), a widening section (2) connected to the lateral end surface of the old road surface (1) and flush with the upper end surface of the old road surface (1), and a hot asphalt crushed stone seal layer (3) and an asphalt concrete layer (4) laid on the old road surface (1) and the upper end surface of the widening section (2); wherein the widening section (2) comprises: a mortared stone layer (21), a concrete base layer (22) and a graded crushed stone layer (23) laid in sequence from bottom to top.

2. The old road widening structure according to claim 1, characterized in that: The old road surface (1) comprises: an old graded crushed stone functional layer (11) that is vibrated and compacted in sequence from bottom to top, an old cement-stabilized crushed stone subbase (12), and an old concrete road surface resonance crushed stone layer (13).

3. The old road widening structure according to claim 2, characterized in that: The thickness of the old graded crushed stone functional layer (11) is 15 cm; the thickness of the old cement stabilized crushed stone subbase (12) is 18 cm; and the thickness of the old concrete pavement resonance crushed stone layer (13) is 20 cm.

4. The old road widening structure according to claim 2, characterized in that: The particle size of the old graded crushed stone functional layer (11) is less than 37.5 mm; the particle size of the old cement stabilized crushed stone subbase (12) is less than 22.5 mm; and the particle size of the old concrete pavement resonance crushed stone layer (13) is less than 7.5 mm.

5. The old road widening structure according to claim 1, characterized in that: The thickness of the mortar masonry layer (21) is 25 cm, the thickness of the concrete base layer (22) is 20 cm, and the thickness of the graded crushed stone layer (23) is 8 cm.

6. The old road widening structure according to claim 1, characterized in that: A blind ditch (211) is longitudinally provided inside the mortar-laid stone layer (21), and the inner wall of the blind ditch (211) is covered with a filter fabric.

7. The old road widening structure according to claim 1, characterized in that: A concrete hardened shoulder (5) is paved at the transverse end of the widening section (2), the concrete hardened shoulder (5) comprising: a concrete hardened layer (51) paved on a concrete base layer (22) and connected to the transverse ends of the graded crushed stone layer (23), the hot asphalt crushed stone seal layer (3) and the asphalt concrete layer (4), and a shoulder earthwork (52) connected to the transverse ends of the concrete base layer (22), the graded crushed stone layer (23) and the concrete hardened layer (51); wherein the concrete hardened layer (51) is flush with the upper end surface of the asphalt concrete layer (4).

8. The old road widening structure according to claim 1, characterized in that: The hot asphalt chip seal (3) comprises: sealing asphalt, and sealing stones which are spread synchronously after the sealing asphalt is sprayed.

9. The old road widening structure according to claim 1, characterized in that: The asphalt concrete layer (4) comprises: a coarse-grained asphalt concrete lower layer (41) and a fine-grained asphalt concrete upper layer (42) formed by paving in one step.

10. The old road widening structure according to claim 9, characterized in that: The coarse-grained asphalt concrete lower layer (41) is coarse-grained asphalt concrete AC-20; and the fine-grained asphalt concrete upper layer (42) is fine-grained SBS modified asphalt concrete AC-13C.