Urban bridge approach road drainage system
By using permeable layers and vertical and horizontal drainage pipe networks on the urban bridge approach, it collects rainwater and is connected to the municipal drainage system, the problem of rainwater collection affecting driving safety is solved, and efficient drainage and low maintenance are achieved, avoiding vehicle crushing The risk of drainage grilles extends the service life of the system.
Patent Information
- Application Number
- CN202420189259.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-26
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2034-01-26
AI Technical Summary
The rainwater from the urban bridge approaches gathers and flows to the road during rainy days, which affects driving safety and comfort. Conventional drainage methods occupy large road widths, wheels crush the drainage grille, and frequent maintenance.
Using a permeable layer on the road surface and a vertical and horizontal drainage pipe network buried under the road surface, rainwater seeps into the drainage pipe through the permeable layer, the drainage pipe is connected to the municipal drainage system, and a water inlet port and water stop valve are installed for cleaning and maintenance to avoid direct vehicle Crush the drain pipe.
Effectively remove rainwater from the guideway, ensure driving safety and comfort, reduce maintenance frequency, and extend the life of the drainage system.
Smart Images

Figure CN222024877U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of road drainage, and in particular relates to a drainage system for an urban bridge approach. Background Art
[0002] When urban bridges cross obstacles, the bottom of the bridge often needs to ensure a high clear height, so the design elevation of the bridge will be raised relatively high. In order to smoothly connect the bridge with the urban roads at both ends, a long bridge approach is often required at both ends of the bridge. The slope of the bridge approach is generally large. When it rains, rainwater on the bridge approach will gather and flow to the foot of the approach slope and form a large convergent water flow. Under the action of the large slope, the flow rate of the water flow is relatively large. When the large water flow flows to the road at the foot of the slope at a large flow rate, it will seriously affect the driving safety and comfort of this section of urban road. Therefore, it is necessary to adopt a certain design solution to solve the drainage problem of the bridge approach.
[0003] Conventional drainage methods for urban bridge approach roads include: (1) setting a longitudinal drainage ditch on the approach road near the guardrail; (2) setting a transverse drainage ditch at the end of the approach road (i.e., at the toe of the slope).
[0004] Although conventional approach drainage methods can effectively collect and drain rainwater from the approach of urban bridges and prevent rainwater from spreading to urban roads, these drainage methods often use a dark ditch + drainage grille method. This method is often relatively large in size to ensure the stability of the ditch wall structure and occupies a wider road width. Whether longitudinal grooves are set on both sides or a transverse groove is set at the foot of the slope, the wheels of the vehicle are more likely to press on the drainage grille cover, causing the vehicle to jump and bump, seriously affecting the driving comfort. In addition, the speed of vehicles in the downhill direction is generally faster, and the drainage grilles, especially the grilles of the transverse drainage ditches, are easily deformed by the impact of cars and require frequent repairs and replacements. Utility Model Content
[0005] The utility model aims to overcome the existing technical defects and provide a drainage system for an urban bridge approach, which adopts a permeable layer on the road surface and a drainage pipe fully buried under the road surface structure to collect and discharge rainwater, which can effectively drain rainwater on the approach and ensure driving comfort, and the maintenance of the entire drainage system is relatively simple and has good durability.
[0006] In the first aspect, in order to solve the above-mentioned technical problems, the utility model provides an urban bridge approach drainage system, comprising a first drainage pipe buried on both sides of the bridge approach and extending along the length direction of the bridge approach, and a plurality of second drainage pipes buried at intervals in the bridge approach and extending along the width direction of the bridge approach, the two ends of the second drainage pipe are respectively connected to the first drainage pipes on both sides, the upper end surfaces of the first drainage pipe and the second drainage pipe are penetrated by a plurality of drainage holes, and the bridge approach is provided with a permeable layer at the position above the first drainage pipe and the second drainage pipe corresponding to the first drainage pipe and the second drainage pipe.
[0007] Furthermore, a drainage port is provided at one end of the first drainage pipe close to the toe of the bridge approach slope, and a water stop valve is provided at the drainage port.
[0008] Furthermore, a first water inlet port extending outwardly from the side of the bridge approach is provided at one end of the first drainage pipe close to the foot of the bridge approach slope, and a water stop valve is provided at the first water inlet port.
[0009] Furthermore, a second water inlet port extending outwardly from the side of the bridge approach is provided at one end of the first drainage pipe away from the bridge approach slope foot, and a water stop valve is provided at the second water inlet port.
[0010] Furthermore, the bridge approach is provided with an inverted trapezoidal water collecting trough at a position above the first drainage pipe and the second drainage pipe, and the permeable layer is filled in the water collecting trough.
[0011] Furthermore, a waterproof layer is provided on both side walls of the water collecting tank.
[0012] Furthermore, the bottom edge size of the water collection trough is the same as the size of the first drain pipe or the second drain pipe, and the top edge size of the water collection trough is larger than the size of the first drain pipe or the second drain pipe.
[0013] Furthermore, the cross-sections of the first drain pipe and the second drain pipe are both rectangular or circular.
[0014] Furthermore, the permeable layer is asphalt concrete.
[0015] Furthermore, the first drain pipe and the second drain pipe are both made of stainless steel.
[0016] Furthermore, the distance between two adjacent second drainage pipes is 8-10m.
[0017] The utility model has the following beneficial effects:
[0018] (1) The urban bridge approach drainage system of the utility model adopts a permeable layer on the road surface and a fully buried longitudinal and transverse drainage pipe network to collect and discharge rainwater, which can not only efficiently drain rainwater on the bridge approach to ensure the safety of driving on rainy days, but also ensure driving comfort because no drainage ditches or drainage holes are required on the surface of the entire approach section.
[0019] (2) Since the pores of the permeable layer are relatively large, there is a situation in which the pores are blocked by debris and dust during operation, resulting in low water permeability. Therefore, regular maintenance and cleaning are required. The urban bridge approach drainage system in the utility model fully considers the maintenance of the blockage during normal use. By designing the first water inlet port, the second water inlet port and the water stop valve arranged on the drainage pipe, when it is necessary to clean the pipe network, the water stop valve at the drainage port is closed, and the water stop valves at the first water inlet port and the second water inlet port are opened. Water is injected at the two ports to clean and maintain the drainage pipe network. The pressure of the injected water is used to make the water reversely osmotic through the drainage pipe network and discharged outward from the permeable layer, thereby discharging the dust and impurities blocking the permeable layer, and reversely osmoticating the debris and dust to achieve the purpose of cleaning and maintenance, ensuring that the permeable layer restores its permeability, thereby restoring the drainage efficiency of the drainage system, and making the drainage of the entire drainage system controllable and easy to maintain. At the same time, the water at the reverse osmosis point can also wash the approach road surface to wash away the dust and impurities that are reversely osmotic. After the maintenance is completed, the water stop valve at the drainage port is restored to the open state.
[0020] (3) The drainage pipes of the urban bridge approach drainage system in the utility model are all buried under the road surface, and a high-porosity permeable layer is arranged on it. The vehicle load will not directly act on the drainage pipes, which can avoid pressure damage to the drainage pipes. Therefore, the service life of the entire drainage system is long.
[0021] Additional aspects and advantages of the present invention will be partially given in the following description, which will become apparent from the following description or be understood through the practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] The drawings described herein are used to provide a further understanding of the present invention, constitute a part of the present application, and do not constitute an improper limitation of the present invention. In the drawings:
[0023] Figure 1 A schematic diagram of a drainage system for an urban bridge approach in an embodiment;
[0024] Figure 2 It is a schematic diagram of the urban bridge approach drainage system after removing the permeable layer in the embodiment;
[0025] Figure 3 for Figure 2 The enlarged schematic diagram of point A in the middle;
[0026] Figure 4 It is a partial cross-sectional schematic diagram of the urban bridge approach drainage system located at the first drainage pipe in the embodiment;
[0027] Figure 5 for Figure 4 Schematic diagram after removing the permeable layer;
[0028] Figure 6 It is a partial cross-sectional schematic diagram of the urban bridge approach drainage system located at the second drainage pipe in the embodiment. DETAILED DESCRIPTION
[0029] In order to more fully understand the technical content of the present invention, the present invention will be further introduced and explained in conjunction with the accompanying drawings and specific embodiments below; it should be noted that descriptions such as "first" and "second" in the text are used to distinguish different components, etc., and do not represent the order of precedence, nor do they limit the "first" and "second" to different types.
[0030] The technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all of the embodiments; based on the embodiments of the utility model, all other embodiments obtained by those skilled in the art without making creative work are within the scope of protection of the utility model.
[0031] Example
[0032] like Figures 1 to 6 As shown, the urban bridge approach drainage system shown in this embodiment includes a first drainage pipe 1 buried on both sides of the bridge approach 4 and extending along the length direction of the bridge approach 4, and a plurality of second drainage pipes 2 buried at intervals in the bridge approach 4 and extending along the width direction of the bridge approach 4. The two ends of the second drainage pipe 2 are respectively connected to the first drainage pipes 1 on both sides. The upper end surfaces of the first drainage pipe 1 and the second drainage pipe 2 are penetrated by a plurality of drainage holes 10 for rainwater on the bridge deck to enter the two drainage pipes through the drainage ports. The bridge approach is provided with a permeable layer 3 composed of a permeable material at the upper position corresponding to the first drainage pipe 1 and the second drainage pipe 2. The characteristic of the permeable layer 3 that can infiltrate water downward is utilized to allow rainwater on the bridge deck to infiltrate downward from the permeable layer into the drainage pipe.
[0033] In the above, the permeable layer on the road surface and the fully buried longitudinal and transverse drainage pipe network are used to collect and discharge rainwater, which can not only effectively drain the rainwater on the bridge approach to ensure the safety of driving on rainy days, but also ensure driving comfort because no drainage ditches or drainage holes are required on the surface of the entire approach section.
[0034] Preferably, a drainage port 7 is provided at one end of the first drainage pipe 1 near the toe of the bridge approach slope (i.e., the bottom of the slope), and the drainage port 7 is connected to the underground municipal drainage pipe system. When it rains, rainwater on the approach flows along the longitudinal and transverse slopes of the approach. When flowing through the permeable layer, the rainwater quickly seeps into the drainage pipe below through the permeable layer, and is collected in the first drainage pipes on both sides and discharged into the municipal drainage system through the drainage port, so that the rainwater on the bridge approach is quickly drained away without forming a large water flow at the starting point of the approach (i.e., the toe of the slope), and there is no need to set drainage ditches or drainage holes on the approach, thereby improving the driving comfort of the approach; a water stop valve 5 is also provided at the drainage port 11, and the water stop valve 5 is in a normally open state during normal use, so that the water in the access pipe is discharged into the municipal drainage system. When the bridge approach drainage system is maintained and cleaned, the water stop valve 5 needs to be closed.
[0035] In one embodiment, the end of the first drainage pipe 1 close to the bridge ramp slope foot is also provided with a first water inlet port 6 extending outwardly from the side of the bridge ramp 4, and the end of the first drainage pipe 1 away from the bridge ramp slope foot is provided with a second water inlet port 8 extending outwardly from the side of the bridge ramp 4, and a water stop valve 5 is provided at the first water inlet port 6 and the second water inlet port 8. When the urban bridge ramp drainage system is in normal use, the water stop valves 5 at the two water inlet ports are in a normally closed state; because the pores of the permeable layer are relatively large, there is a situation in which the pores are blocked by debris and dust during operation, resulting in low water permeability, and therefore regular maintenance and cleaning are required; the urban bridge ramp drainage system in the utility model fully considers the maintenance of the blockage during normal use, and by The first water inlet port, the second water inlet port and the stop valve design arranged on the top can close the stop valve 5 at the drainage port 7 when the pipeline network needs to be cleaned, open the stop valves at the first water inlet port and the second water inlet port, and inject water at the two ports to clean and maintain the drainage pipeline network. The pressure of the injected water is used to make the water reverse osmosis through the drainage pipeline network and be discharged outward from the permeable layer, so as to discharge the dust and impurities blocked in the permeable layer, and reversely infiltrate the debris and dust to achieve the purpose of cleaning and maintenance, ensure that the permeable layer recovers its permeability, thereby restoring the drainage efficiency of the drainage system, and making the drainage of the entire drainage system controllable and easy to maintain; at the same time, the water at the reverse osmosis point can also flush the approach road surface, flush out the dust and impurities reversely infiltrated, and after the maintenance is completed, restore the stop valve at the drainage port to be in the open state.
[0036] In this embodiment, in order to better collect rainwater, the bridge approach 4 is provided with an inverted trapezoidal water collection trough 41 at the upper position corresponding to the first drain pipe 1 and the second drain pipe 2, and the permeable layer 3 is filled in the water collection trough, so that the permeable layer 3 is also formed into an inverted trapezoidal structure with a larger top and a smaller bottom, thereby increasing the width range of the surface for collecting rainwater. In addition, the inverted trapezoidal structure can also reduce the impact of vehicle load on the drain pipe, and the surface of the permeable layer is flush with the surface of the bridge approach 4.
[0037] In this embodiment, a waterproof layer 9 is provided on both side walls of the sump to prevent rainwater from scouring the side walls of the sump; preferably, the waterproof layer can be formed by applying a waterproof coating, or can be a waterproof partition structure.
[0038] Preferably, the bottom edge size of the sump is the same as the size of the first drain pipe or the second drain pipe, and the top edge size of the sump is larger than the size of the first drain pipe or the second drain pipe; of course, the sizes of the first drain pipe and the second drain pipe may be the same or different, and preferably, the size of the second drain pipe is smaller than the size of the first drain pipe.
[0039] In one embodiment, the cross-sections of the first drain pipe 1 and the second drain pipe 2 are both rectangular or circular, preferably rectangular, to facilitate the arrangement of drainage holes and permeable layers.
[0040] In one embodiment, the permeable layer 3 is asphalt concrete with high porosity.
[0041] In one embodiment, the first drain pipe and the second drain pipe are both made of stainless steel.
[0042] In one embodiment, the distance between two adjacent second drainage pipes is 8-10m.
[0043] The construction steps of the urban bridge approach drainage system are as follows:
[0044] Step 1: Prefabricate the first and second drain pipes of designed dimensions in the factory, configure matching valves and port connection components, and inverted trapezoidal mold structure;
[0045] Step 2: During the road structure construction, bury two drainage pipes according to the designed position, connect the two drainage pipes in the longitudinal and transverse directions to form a water pipe network, compact and fix them, and temporarily fix the inverted trapezoidal mold on the drainage pipes;
[0046] Step 3: After completing the second step, continue to construct the pavement structure and carry out maintenance;
[0047] Step 4: After the pavement structure reaches the designed strength, take out the inverted trapezoidal mold and apply waterproof paint to the side wall of the inverted trapezoidal section to form a waterproof layer;
[0048] Step 5: After completing the waterproof treatment of the side wall of the inverted trapezoidal section, pour high-porosity asphalt concrete in the inverted trapezoidal section and maintain it;
[0049] Step 6: Install valves at each port of the drainage network system, connect the ports, and reserve ports for concealment and beautification.
[0050] Step 7: Check the drainage system by coordinating the valve switches, sprinkling water on the road surface and injecting pressurized water.
[0051] The technical solutions provided by the embodiments of the present invention are introduced in detail above. Specific examples are used in this article to illustrate the principles and implementation methods of the embodiments of the present invention. The description of the above embodiments is only applicable to help understand the principles of the embodiments of the present invention. At the same time, for those skilled in the art, according to the embodiments of the present invention, there will be changes in the specific implementation methods and application scopes. In summary, the content of this specification should not be understood as a limitation on the present invention.
Claims
1. An urban bridge approach drainage system, characterized in that: It includes a first drainage pipe buried on both sides of the bridge approach and extending along the length direction of the bridge approach, and a plurality of second drainage pipes buried at intervals in the bridge approach and extending along the width direction of the bridge approach. The two ends of the second drainage pipe are respectively connected to the first drainage pipes on both sides. The upper end surfaces of the first drainage pipe and the second drainage pipe are penetrated by a plurality of drainage holes. The bridge approach is provided with a permeable layer at the position above the first drainage pipe and the second drainage pipe.
2. The urban bridge approach drainage system according to claim 1, characterized in that: A drainage port is provided at one end of the first drainage pipe close to the foot of the bridge approach slope, and a water stop valve is provided at the drainage port.
3. The urban bridge approach drainage system according to claim 2, characterized in that: An end of the first drainage pipe close to the foot of the bridge approach slope is also provided with a first water inlet port extending outwardly from the side of the bridge approach, and a water stop valve is provided at the first water inlet port.
4. The urban bridge approach drainage system according to claim 3, characterized in that: An end of the first drainage pipe away from the bridge approach slope foot is provided with a second water inlet port extending outwardly from the side of the bridge approach, and a water stop valve is provided at the second water inlet port.
5. The urban bridge approach drainage system according to any one of claims 1 to 4, characterized in that: The bridge approach is provided with an inverted trapezoidal water collecting trough at a position above the first drainage pipe and the second drainage pipe, and the permeable layer is filled in the water collecting trough.
6. The urban bridge approach drainage system according to claim 5, characterized in that: Waterproof layers are arranged on the two side walls of the water collecting tank.
7. The urban bridge approach drainage system according to claim 6, characterized in that: The bottom edge size of the water collection trough is the same as the size of the first drain pipe or the second drain pipe, and the top edge size of the water collection trough is larger than the size of the first drain pipe or the second drain pipe.
8. The urban bridge approach drainage system according to claim 1, characterized in that: The cross sections of the first drain pipe and the second drain pipe are both rectangular or circular.
9. The urban bridge approach drainage system according to claim 1, characterized in that: The permeable layer is asphalt concrete.
10. The urban bridge approach drainage system according to claim 1, characterized in that: The distance between two adjacent second drainage pipes is 8-10m.