Single-column pier steel cover beam
Through the connection fit between the sleeve and the single-column pier and the mechanical limit, combined with the bonding fill layer and stiffening plate, the problem of insufficient overturning performance of the single-column pier bridge is solved, simplifying the construction process and improving efficiency and safety.
Patent Information
- Application Number
- CN202420133241.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-19
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2034-01-19
AI Technical Summary
The existing single-column pier bridges have insufficient safety performance in terms of overturn resistance. The construction process of traditional steel cover beams is complex and has high accuracy requirements, which affects construction efficiency and cost.
The sleeve is used to cooperate with the single-column piers to achieve positioning through the mechanical limits of the top plate and the sleeve and the gravity of the support itself, avoiding opening operations, and using bonded filling layers and stiffening plates to improve structural strength and simplify the construction process.
It reduces construction complexity and cost, improves anti-capsulation performance and construction efficiency, reduces positioning accuracy requirements, and achieves convenient reinforcement effects.
Smart Images

Figure CN222024879U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of single-column pier bridge reinforcement, in particular to a single-column pier steel cap beam. Background Art
[0002] Box girder structure is a common structural form, widely used in highway ramps, municipal elevated roads, and interchange hubs. In the early design of cast-in-place box girders, for cast-in-place box girders with smaller bridge deck widths, it was common to use single-column piers as the lower piers. Some bridges even have single-column piers installed continuously in the middle of the span. In the past, single-column pier bridges have experienced overturning and collapse accidents during use, and their safety performance needs to be improved. In view of this, relevant scholars began to study the overturning and collapse mechanism of such bridges. The study found that the factors affecting the anti-overturning performance of bridges are as follows: (1) lateral spacing of supports; (2) torsional span; and (3) horizontal curve radius of the bridge. For bridges that need to be reinforced for lateral anti-overturning, the horizontal curve radius of the bridge cannot be changed. The anti-overturning capacity can be improved by increasing the existing support spacing or reducing the torsional span. Usually, adding a cap beam and adding supports at the single-column pier can reduce the torsional span to achieve the effect of anti-overturning reinforcement.
[0003] There are two ways to add a cap beam at a single-column pier: concrete cap beam and steel cap beam. The concrete cap beam needs to be roughened and reinforced with steel bars on the original pier. To meet the force requirements, the newly added concrete cap beam usually needs to be prestressed to effectively combine the newly added cap beam with the original pier. In this way, the size of the concrete cap beam is often large. This reinforcement method cannot be used for bridge piers with limited building boundaries. From a construction perspective, the processes of reinforcing bars and prestressing are relatively cumbersome and the construction period is long, and the construction cost is high. Compared with the concrete cap beam, the steel cap beam can be prefabricated in the factory and can be butt-welded after being transported to the site. The entire construction process is relatively simple and fast. The traditional steel cap beam generally uses anchor bolts to combine the cap beam with the pier column. Before implanting the anchor bolts, the main reinforcement position must be detected with a detection instrument before the anchor bolt hole on the steel cap beam can be opened. This process requires refined construction. If the hole positions on the pier column and the steel cap beam cannot be aligned with the center, the holes need to be opened again. Therefore, this process requires high construction accuracy and is also a key process that affects the construction progress of the steel cap beam. Utility Model Content
[0004] The utility model provides a steel cap beam for a single-column pier, which is directly sleeved on the single-column pier through a sleeve and realizes vertical relative positioning of the support and the single-column pier through mechanical limiting of a top plate and the single-column pier and the weight of the support itself, and then the top plate and the sleeve are structurally reinforced. During the installation process, there is no need to drill holes in the single-column pier, the structure of the single-column pier is not damaged, the positioning requirement is relatively reduced, and the construction process is more convenient.
[0005] The utility model is realized by the following technical solutions:
[0006] A single-column pier steel cap beam, comprising:
[0007] A sleeve, wherein an adhesive filling layer is provided on the inner wall of the sleeve;
[0008] A top plate, the top plate is connected to one end of the sleeve, a newly added support seat is arranged on the top plate, a avoidance opening connected to the sleeve is arranged on the top plate, and a plurality of first stiffening plates are arranged on the edge of the avoidance opening on the top plate, wherein the avoidance opening is configured such that: along the axial direction of the sleeve, the projection range of the avoidance opening is included in the projection range of the inner hole of the sleeve;
[0009] A bottom plate, the bottom plate is connected to the outer wall of the sleeve and is arranged parallel to and spaced from the top plate;
[0010] A web plate, wherein the web plate is connected to the top plate and the bottom plate respectively, and a second stiffening plate is arranged on the web plate, and the second stiffening plate is connected to the top plate.
[0011] The single-column pier steel cap beam provided in the present application can make the support and the single-column pier be sleeved and matched through the sleeve. After the sleeve is sleeved on the single-column pier, the avoidance opening on the top plate can form an avoidance for the existing support seat on the single-column pier, and the top plate and the top surface of the single-column pier form a mechanical limit, so that the support as a whole will not slide down due to its own gravity; wherein, the first stiffening plate on the top plate located at the edge of the avoidance opening can strengthen the structural strength at the avoidance opening, which can greatly reduce the risk of structural deformation at the avoidance opening, and through the arrangement of the bottom plate, the web plate and the second stiffening plate, the structural strength of the top plate can be further improved to ensure that the overall supporting strength of the support meets the requirements; during the implementation process, there is no need to drill holes on the single-column pier, which avoids the positioning process corresponding to the hole position, and only the axial positioning of the sleeve and the single-column pier needs to be performed, the positioning requirements are relatively low, and the implementation is more convenient.
[0012] In some optional embodiments, the avoidance opening is configured as a circular hole coaxial with the sleeve, and the diameter of the circular hole is smaller than the inner diameter of the sleeve.
[0013] In some optional embodiments, the first stiffening plates are vertically connected to the top plate and are evenly distributed along the circumference of the avoidance opening.
[0014] In some optional embodiments, along the axial direction of the sleeve, the projection of the first stiffening plate and the projection of the sleeve have an overlapping area.
[0015] In some optional embodiments, a third stiffening plate is further connected between the top plate and the outer wall of the sleeve.
[0016] In some optional embodiments, the difference between the diameter of the avoidance opening and the inner diameter of the sleeve is greater than 4 cm.
[0017] In some optional embodiments, the difference between the diameter of the avoidance opening and the inner diameter of the sleeve is greater than 6 cm.
[0018] In some optional embodiments, the bonding filler layer is configured as a high-flow epoxy infusion filler layer.
[0019] In some optional embodiments, the high-fluidity epoxy perfusion filling layer is a pressurized perfusion filling layer.
[0020] In some optional embodiments, the thickness of the high-fluidity epoxy perfusion filling layer is 2 to 3 cm.
[0021] Compared with the prior art, the utility model has the following advantages and beneficial effects:
[0022] The utility model provides a single-column pier steel cap beam, which can make the support and the single-column pier be sleeved and matched through the sleeve. After the sleeve is sleeved on the single-column pier, the avoidance opening on the top plate can form an avoidance for the existing support seat on the single-column pier, and the top plate and the top surface of the single-column pier form a mechanical limit, so that the support as a whole will not slide down due to its own gravity; wherein, the first stiffening plate on the top plate located at the edge of the avoidance opening can strengthen the structural strength at the avoidance opening, which can greatly reduce the risk of structural deformation at the avoidance opening, and through the arrangement of the bottom plate, the web plate and the second stiffening plate, the structural strength of the top plate can be further improved, ensuring that the overall supporting strength of the support meets the requirements; during the implementation process, there is no need to drill holes on the single-column pier, thus avoiding the positioning process corresponding to the hole position, and only the axial positioning of the sleeve and the single-column pier needs to be performed, the positioning requirements are relatively low, and the implementation is more convenient. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to more clearly illustrate the technical solutions of the exemplary embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can be obtained based on these drawings without creative work.
[0024] Figure 1 A schematic diagram of a single-column pier steel cap beam structure provided by an embodiment of the utility model;
[0025] Figure 2 A schematic diagram of another single-column pier steel cap beam structure provided in an embodiment of the utility model.
[0026] Marks and corresponding parts names in the attached drawings:
[0027] 1-sleeve, 2-top plate, 3-bottom plate, 4-web plate, 5-first stiffening plate, 6-second stiffening plate, 7-third stiffening plate, 8-existing bearing seat, 9-newly added bearing seat, 10-single column pier, 11-circular cylinder. DETAILED DESCRIPTION
[0028] In order to make the purpose, technical solutions and advantages of the utility model more clearly understood, the utility model is further described in detail below in conjunction with embodiments and drawings. The schematic implementation manner of the utility model and its description are only used to explain the utility model and are not intended to limit the utility model.
[0029] In the following description, a large number of specific details are set forth in order to provide a thorough understanding of the present invention. However, it is apparent to those skilled in the art that these specific details are not necessary to implement the present invention. In other embodiments, in order to avoid confusing the present invention, well-known structures, circuits, materials or methods are not specifically described.
[0030] Throughout the specification, references to "one embodiment," "an embodiment," "an example," or "an example" mean that a particular feature, structure, or characteristic described in conjunction with the embodiment or example is included in at least one embodiment of the present invention. Therefore, the phrases "one embodiment," "an embodiment," "an example," or "an example" appearing in various places throughout the specification do not necessarily all refer to the same embodiment or example. In addition, particular features, structures, or characteristics may be combined in one or more embodiments or examples in any suitable combination and / or sub-combination. In addition, it will be appreciated by those of ordinary skill in the art that the figures provided herein are for illustrative purposes and that the figures are not necessarily drawn to scale. The term "and / or" as used herein includes any and all combinations of one or more of the associated listed items.
[0031] In the description of the present invention, the terms "front", "rear", "left", "right", "up", "down", "vertical", "horizontal", "high", "low", "inside", "outside", etc. indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction. Therefore, they should not be understood as limiting the scope of protection of the present invention.
[0032] like Figure 1 As shown, an embodiment of the utility model provides a single-column pier steel cap beam, including a sleeve 1, a top plate 2, a bottom plate 3 and a web 4.
[0033] The sleeve 1 is used to be sleeved on the single-column pier 10. The type of the sleeve 1 can be adaptively designed based on the cross-sectional shape of the single-column pier 10. For example, if the cross-sectional shape of the single-column pier 10 is circular, the type of the sleeve 1 is a cylinder. If the cross-sectional shape of the single-column pier 10 is square, the type of the sleeve 1 is a square cylinder. The following description is made by taking the sleeve 1 as a cylinder as an example. A bonding filling layer is provided on the inner wall of the sleeve 1. When the sleeve 1 is a cylinder, since the bonding filling layer is formed by filling, the shape of the bonding filling layer in three-dimensional space is also a cylinder. shape. In actual implementation, the inner diameter of the sleeve 1 is slightly larger than the outer diameter of the single-column pier 10. After the sleeve 1 is sleeved on the single-column pier 10, a filling gap is formed between the sleeve 1 and the single-column pier 10. A bonding filling layer is filled in the filling gap to bond the sleeve 1 to the single-column pier 10, thereby ensuring the position accuracy of the sleeve 1 in its radial direction. When filling the bonding filling layer, the coaxiality between the sleeve 1 and the single-column pier 10 should be ensured to make the thickness of the bonding filling layer uniform, thereby ensuring the bonding strength between the sleeve 1 and the single-column pier 10.
[0034] The top plate 2 is usually configured as a rectangular steel plate; one of the plate surfaces of the top plate 2 can be welded to the end surface of the sleeve 1 to ensure the connection strength between the sleeve 1 and the top plate 2, and a plurality of newly added support seats 9 can be configured on the other plate surface of the top plate 2, and the plurality of newly added support seats 9 are arranged at intervals along the length direction of the top plate 2, for example, a newly added support seat 9 is respectively provided at both ends of the length direction of the top plate 2; an avoidance opening is provided on the top plate 2 between the two newly added support seats 9, and the avoidance opening is connected to the inner hole of the sleeve 1, and the avoidance opening is used for arranging the sleeve 1, the existing support seat 8 on the single-column pier 10 is avoided during the support process, and a plurality of first stiffening plates 5 are arranged on the top plate 2 at the edge of the avoidance opening, wherein the avoidance opening is configured as follows: along the axial direction of the sleeve 1, the projection range of the avoidance opening is included in the projection range of the inner hole of the sleeve 1, so that after the sleeve 1 is sleeved on the single-column pier 10, the top plate 2 can form a mechanical limit with the end face of the single-column pier 10 (that is, the upper top face of the single-column pier 10), and the provision of the first stiffening plate 5 strengthens the strength of the edge structure of the avoidance opening, thereby reducing the risk of cracking of the top plate 2 from the avoidance opening during the support process.
[0035] The bottom plate 3 can be configured as a steel plate. In the radial direction of the sleeve 1, the length of the bottom plate 3 is smaller than the length of the top plate 2. The number of bottom plates 3 is configured as two and they are respectively located on both sides of the radial direction of the sleeve 1. The bottom plate 3 is welded to the outer wall of the sleeve 1, wherein the welding surface of the bottom plate 3 can be configured as an arc-shaped surface adapted to the outer wall of the sleeve 1 to ensure that the welding structure is uniform everywhere, thereby ensuring the connection stability between the bottom plate 3 and the sleeve 1. The bottom plate 3 and the top plate 2 are arranged parallel and spaced apart.
[0036] The web 4 can be configured as a steel plate, and the number of webs 4 is configured as at least two, each web 4 is connected between the top plate 2 and each bottom plate 3; a plurality of second stiffening plates 6 can be arranged on the web 4 by welding, and the second stiffening plates 6 are also welded to the top plate 2. In actual implementation, the number of webs 4 can be configured as four, and two webs 4 are connected to each bottom plate 3, and the two webs 4 can also be connected by a connecting steel plate to ensure the overall structural strength of the support, greatly reducing the risk of deformation during use.
[0037] When in use, the support as a whole can be divided into two parts along a radial direction of the sleeve 1, and the top plates 2 in the two parts are of equal length. The two parts are prefabricated and painted in the factory, and the thickness of the newly added support seat 9 is determined according to the relative position of the single-column pier 10 and the beam body, and cast on the top plate 2; the two prefabricated parts are transported to the construction site, the contact part between the steel cap beam and the pier column is roughened, and the steel-concrete joint surface is rust-proofed, and then the two parts are installed to form the sleeve 1 and the sleeve 1 is mounted on the single-column pier 10. A hanging basket or a bracket can be used, and the two parts can be temporarily connected by temporary construction measures to ensure that the gap between the two parts and the pier column is uniform, and the two parts are welded to form the support as a whole, and then the gap between the sleeve 1 and the single-column pier 10 is filled with a bonding filling layer to achieve bonding between the sleeve 1 and the single-column pier 10.
[0038] In some optional embodiments, the avoidance opening is configured as a circular hole coaxial with the sleeve 1, so that the avoidance opening has a relatively smooth edge structure, stress concentration is not likely to occur during the support process, and the risk of cracking of the avoidance opening can be reduced; the diameter of the circular hole is smaller than the inner diameter of the sleeve 1, so that after the sleeve 1 is sleeved on the single-column pier 10, the top plate 2 can form a mechanical limit with the top surface of the single-column pier 10.
[0039] In some optional embodiments, the first stiffening plates 5 are vertically connected to the top plate 2 and are evenly distributed along the circumference of the avoidance opening, so as to further enhance the structural strength of the edge of the avoidance opening, and the evenly distributed circumference of the first stiffening plates 5 can ensure uniform force, which can further reduce the risk of stress concentration.
[0040] In some optional embodiments, along the axial direction of the sleeve 1, the projection of the first stiffening plate 5 overlaps with the projection of the sleeve 1. This arrangement can further enhance the structural strength of the top plate 2 and reduce the risk of deformation at the welding point between the top plate 2 and the sleeve 1.
[0041] In some optional embodiments, a third stiffening plate 7 is further connected between the top plate 2 and the outer wall of the sleeve 1. The third stiffening plate 7 can further improve the connection strength between the top plate 2 and the sleeve 1, thereby further improving the overall support strength of the support. At the same time, the provision of the third stiffening plate 7 can also improve the structural strength of the top plate 2, and can greatly reduce the deformation risk of the top plate 2 in conjunction with the first stiffening plate 5.
[0042] In some optional embodiments, when the thickness of the bonding filling layer is generally set to 2 to 3 cm, its bonding strength and structural strength are sufficient, that is, the inner diameter of the sleeve 1 is 4 to 6 cm larger than the diameter of the single-column pier 10; when the inner diameter of the sleeve 1 is 4 cm larger than the diameter of the single-column pier 10, the difference between the diameter of the avoidance opening and the inner diameter of the sleeve 1 is greater than 4 cm to ensure that when the sleeve 1 is sleeved on the single-column pier 10, the top plate 2 can form a mechanical limit with the top of the single-column pier 10; when the inner diameter of the sleeve 1 is 6 cm larger than the diameter of the single-column pier 10, the difference between the diameter of the avoidance opening and the inner diameter of the sleeve 1 is greater than 6 cm to ensure that when the sleeve 1 is sleeved on the single-column pier 10, the top plate 2 can form a mechanical limit with the top of the single-column pier 10.
[0043] Preferably, the bonding filling layer is configured as a high-fluidity epoxy infusion filling layer. The filling material has the characteristics of high fluidity, excellent mechanical properties and high bonding ability.
[0044] Furthermore, the high-fluidity epoxy perfusion filling layer is a pressurized perfusion filling layer.
[0045] In some optional embodiments, such as Figure 2 As shown, a circular cylinder 11 can be derived from the top plate 2, and the avoidance opening is located on the circular cylinder 11. The diameter of the circular cylinder 11 can be equal to the diameter of the sleeve 1, so that the newly added base set on the top plate 2 can be lower than the top surface of the single-column pier 10, which is suitable for situations where the space between the top of the single-column pier 10 and the beam body is small or the cross slope of the beam body is large. Of course, for the convenience of manufacturing, the avoidance opening may not be set on the top plate 2, but one end of the sleeve 1 is sealed and the avoidance opening is set on the sealing surface of the sleeve 1, and the top plate 2 is connected to the outer wall of the sleeve 1. At this time, the first stiffening plate 5 is also located on the sleeve 1.
[0046] To sum up, the single-column pier steel cap beam provided in the embodiment of the present application can be cut into shape by steel plates and prefabricated by welding in the factory, and the quality can be guaranteed. Compared with the traditional support structure, there is no need to embed steel bars, tension prestress or implant anchor bolts, and no structural damage will be caused to the single-column pier 10. The construction process is relatively convenient, the construction efficiency is relatively improved, and the impact on traffic is small. At the same time, the position of the top plate 2 can also be determined according to the actual layout results, which can ensure that the newly added supports have sufficient placement space in different construction environments and has strong adaptability.
[0047] The specific implementation methods described above further illustrate the purpose, technical solutions and beneficial effects of the utility model in detail. It should be understood that the above description is only the specific implementation method of the utility model and is not used to limit the protection scope of the utility model. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the utility model should be included in the protection scope of the utility model.
Claims
1. A single-column pier steel cap beam, It is characterized in that include: A sleeve (1), wherein an adhesive filling layer is provided on the inner wall of the sleeve (1); A top plate (2), the top plate (2) being connected to one end of the sleeve (1), the top plate (2) being provided with a newly added support seat (9), the top plate (2) being provided with a relief opening communicating with the sleeve (1), the top plate (2) being provided with a plurality of first stiffening plates (5) at the edge of the relief opening, wherein the relief opening is configured such that: along the axial direction of the sleeve (1), the projection range of the relief opening is included in the projection range of the inner hole of the sleeve (1); A bottom plate (3), the bottom plate (3) being connected to the outer wall of the sleeve (1) and arranged in parallel and spaced relation with the top plate (2); A web plate (4), wherein the web plate (4) is connected to the top plate (2) and the bottom plate (3) respectively, and a second stiffening plate (6) is provided on the web plate (4), and the second stiffening plate (6) is connected to the top plate (2).
2. The single-column pier steel cap beam according to claim 1, It is characterized in that The avoidance opening is configured as a circular hole coaxial with the sleeve (1), and the diameter of the circular hole is smaller than the inner diameter of the sleeve (1).
3. The single-column pier steel cap beam according to claim 2, It is characterized in that The first stiffening plates (5) are vertically connected to the top plate (2) and are evenly distributed along the circumference of the avoidance opening.
4. The single-column pier steel cap beam according to claim 3, It is characterized in that Along the axial direction of the sleeve (1), the projection of the first stiffening plate (5) and the projection of the sleeve (1) have an overlapping area.
5. The single-column pier steel cap beam according to claim 1, It is characterized in that A third stiffening plate (7) is also connected between the top plate (2) and the outer wall of the sleeve (1).
6. The single-column pier steel cap beam according to claim 2, It is characterized in that The difference between the diameter of the avoidance opening and the inner diameter of the sleeve (1) is greater than 4 cm.
7. The single-column pier steel cap beam according to claim 6, It is characterized in that The difference between the diameter of the avoidance opening and the inner diameter of the sleeve (1) is greater than 6 cm.
8. The single-column pier steel cap beam according to claim 1, It is characterized in that The bonding filler layer is configured as a high-flow epoxy infusion filler layer.
9. The single-column pier steel cap beam according to claim 8, It is characterized in that The high-fluidity epoxy perfusion filling layer is a pressurized perfusion filling layer.
10. The single-column pier steel cap beam according to claim 8, It is characterized in that The thickness of the high-fluidity epoxy perfusion filling layer is 2 to 3 cm.
