Municipal road prefabricated assembly type reinforced concrete inspection well
By designing a municipal road prefabricated reinforced concrete inspection well with adjustable connecting plates and docking and engaging devices, multiple sets of mold waste and complex installation problems are solved, and production efficiency and convenience are improved and costs are reduced.
Patent Information
- Application Number
- CN202323451750.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-18
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2033-12-18
AI Technical Summary
The existing municipal road inspection wells need to make multiple sets of molds at the pipe diameter change, resulting in waste of resources, low production efficiency, and complex installation.
A prefabricated reinforced concrete inspection well for municipal roads is designed, using adjustable connecting plates and docking and engaging devices, which can adapt to the connection ports of different pipe diameters, and crawling ladders and lifting rings are installed on the wellbore and manhole cover for easy installation. and transport.
The production of a single type of inspection well is achieved according to different pipe diameters, reducing mold adjustment and reproduction, improving production efficiency and installation convenience, and reducing production costs.
Smart Images

Figure CN222025098U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of prefabricated parts, in particular to a prefabricated assembled reinforced concrete inspection well for a municipal road. Background Art
[0002] Inspection wells are set up for the maintenance of urban underground infrastructure such as power supply, water supply, drainage, sewage, communications, cable TV, gas pipes, and street light lines. They are easy to install and are generally located at pipeline intersections, bends, places where pipe diameters or slopes change, and at certain intervals on straight pipe sections. They are convenient for regular inspection of ancillary structures. Especially when used at places where pipe diameters change, the inspection wells must be provided with access ports of different sizes. This also results in the need to make multiple sets of inspection well body molds to adapt to each change in pipe diameter, which is very resource-intensive. Utility Model Content
[0003] Therefore, in view of the above-mentioned problems, the utility model proposes a prefabricated and assembled reinforced concrete inspection well for municipal roads which saves more molds.
[0004] To achieve the above-mentioned purpose, the technical solution of the utility model is to provide a prefabricated and assembled reinforced concrete inspection well for a municipal road, comprising a well seat, a well shaft arranged on the well seat, a well cover arranged on the upper part of the well shaft, a wellhead cylinder arranged on the well cover, and a wellhead cylinder cover arranged on the wellhead cylinder, wherein a plurality of installation openings are provided on the well shaft, and a connecting plate for connecting a pipe is provided in the installation opening through a docking and clamping device, and a connecting opening for adapting to pipes of various diameters is provided on the connecting plate.
[0005] A further improvement is that the locking device includes: at least one first connecting hole opened in the connecting port, penetrating the connecting plate and matching the steel bar, a second connecting hole opened on the installing port and matching the first connecting hole, and steel bars inserted into the first connecting hole and the second connecting hole, and a docking device is also provided between the connecting plate and the installing port to facilitate alignment of the first connecting hole and the second connecting hole.
[0006] A further improvement is that the docking device includes: a groove opened on the mounting port, a first rubber layer arranged on the outer side of the connecting plate to facilitate its insertion into the mounting port, and a protrusion arranged on the first rubber layer and matching the groove for positioning the first connecting hole and the second connecting hole. The mounting port has a taper, and the connecting plate is matched with the mounting port so that the connecting plate will not rotate after being inserted into the mounting port and is easy to insert into the mounting port.
[0007] A further improvement is that a second rubber layer is provided inside the connection port to facilitate better insertion of the pipeline.
[0008] A further improvement is that the wellbore and the wellhead cylinder are both provided with climbing ladders for the convenience of workers to climb.
[0009] A further improvement is that the wellhead barrel is located on the well cover close to the inner wall of the wellbore for docking the climbing ladder to facilitate climbing.
[0010] A further improvement is that a docking device is provided between the manhole cover and the shaft to facilitate docking with the crawling ladder.
[0011] A further improvement is that the docking device includes: at least two frustoconical docking holes provided at the upper end of the shaft, and a frustoconical docking column provided at the bottom of the access cover for docking with the frustoconical docking holes.
[0012] A further improvement is that: the connecting plate is provided with a plurality of first lifting rings for easy transportation.
[0013] A further improvement is that a plurality of second lifting rings are provided on the wellhead cylinder and the wellbore for easy transportation.
[0014] The advantages and beneficial effects of the utility model are:
[0015] The structure is simple and easy to use. Connecting plates and connecting ports can be produced according to different pipe diameters, avoiding the problem that molds for producing inspection wells need to be adjusted or remade multiple times as the pipe diameter changes. The production efficiency of the inspection wells is improved and the production cost is reduced. A docking and locking device is provided between the connecting plate and the installation port, which is convenient for the construction party and the manufacturer to quickly install the connecting plate and complete the assembly of the inspection well. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 This is a front view schematic diagram of a prefabricated reinforced concrete inspection well for a municipal road according to the utility model;
[0017] Figure 2 This is a front and cross-sectional schematic diagram of a prefabricated reinforced concrete inspection well for a municipal road according to the utility model;
[0018] Figure 3 This is a top view schematic diagram of a prefabricated reinforced concrete inspection well connection plate for a municipal road according to the utility model;
[0019] In the figure: 1, well seat; 2, well shaft; 3, well cover; 4, wellhead cylinder; 5, wellhead cylinder cover; 6, installation port; 7, connecting plate; 8, connecting port; 9, first connecting hole; 10, second connecting hole; 11, steel bar; 12, groove; 13, first rubber layer; 14, protrusion; 15, second rubber layer; 16, climbing ladder; 17, frustum-conical docking hole; 18, frustum-conical docking column; 19, first lifting ring; 20, second lifting ring. DETAILED DESCRIPTION
[0020] The following is a further description of the specific implementation of the present invention in conjunction with the accompanying drawings and embodiments. The following embodiments are only used to more clearly illustrate the technical solution of the present invention, and cannot be used to limit the protection scope of the present invention.
[0021] like Figure 1-Figure 3 As shown, a prefabricated assembled reinforced concrete inspection well for a municipal road includes a well seat 1, a well shaft 2 arranged on the well seat 1, a well cover 3 arranged on the upper part of the well shaft 2, a wellhead barrel 4 arranged on the well cover 3, and a wellhead barrel cover arranged on the wellhead barrel 4, a plurality of installation openings 6 are opened on the well shaft 2, a connecting plate 7 for connecting a pipeline is arranged in the installation opening 6 through a docking and clamping device, and a connecting opening 8 for adapting to pipelines of various diameters is opened on the connecting plate 7.
[0022] In order to facilitate the locking of the connecting plate 7 to prevent it from moving, the locking device includes: at least one first connecting hole 9 opened in the connecting port 8, penetrating the connecting plate 7 and matching the steel bar 11, a second connecting hole 10 opened on the installation port 6 and matching the first connecting hole 9, and the steel bar 11 inserted into the first connecting hole 9 and the second connecting hole 10. A docking device is also provided between the connecting plate 7 and the installation port 6 to facilitate the alignment of the first connecting hole 9 and the second connecting hole 10.
[0023] In order to facilitate the alignment of the first connecting hole 9 and the second connecting hole 10 and enhance the connection stability of the connecting plate 7, the docking device includes: a groove 12 opened on the mounting port 6, a first rubber layer 13 arranged on the outer side of the connecting plate 7 for facilitating its insertion into the mounting port 6, and a protrusion 14 arranged on the first rubber layer 13 and matching the groove 12 for positioning the first connecting hole 9 and the second connecting hole 10. The mounting port 6 has a taper, and the connecting plate 7 matches the mounting port 6 so that the connecting plate 7 will not rotate after being inserted into the mounting port 6 and is easy to insert into the mounting port 6.
[0024] In order to leave a certain margin to facilitate the connection of the pipeline, a second rubber layer 15 is further provided on the inner side of the connecting port 8 for better insertion of the pipeline.
[0025] In order to facilitate the staff to go down the well for exploration, the wellbore 2 and the wellhead cylinder 4 are both provided with a climbing ladder 16 for the staff to climb conveniently.
[0026] In order to enable the climbing ladders 16 to dock with each other for easy climbing, the wellhead barrel 4 is located on the well cover 3 close to the inner wall of the wellbore 2 for enabling the climbing ladders 16 to dock with each other for easy climbing.
[0027] In order to facilitate the docking of the crawling ladder 16 after the manhole cover 3 is installed, a docking device is provided between the manhole cover 3 and the shaft 2, and the docking device includes: at least two frustoconical docking holes 17 provided at the upper end of the shaft 2, and a frustoconical docking column 18 provided at the bottom of the cover for docking with the frustoconical docking holes 17.
[0028] In order to facilitate transportation, a plurality of first lifting rings 19 are provided on the connecting plate 7 for easy transportation, and a plurality of second lifting rings 20 are provided on the wellhead barrel 4 and the wellbore 2 for easy transportation.
[0029] Working principle: During assembly, the user uses a crane to lift the connecting plate 7 and put it into the shaft 2. Then the staff aligns the groove 12 and the protrusion 14 and pushes the connection into the installation port 6. Then the steel bar 11 is inserted into the first connecting hole 9 and the second connecting hole 10. The assembly of the connecting plate 7 is completed. Then the frustum-shaped docking column 18 on the manhole cover 3 is aligned with the frustum-shaped docking hole 17 on the shaft 2 to complete the assembly of the inspection well.
[0030] The basic principles, main features and advantages of the utility model are shown and described above. Those skilled in the art should understand that the utility model is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which shall fall within the scope of the utility model to be protected. The scope of protection of the utility model shall be defined by the attached claims and their equivalents.
Claims
1. A prefabricated reinforced concrete inspection well for a municipal road, comprising a well seat, a well shaft arranged on the well seat, a well cover arranged on the upper part of the well shaft, a well head body arranged on the well cover, and a well head body cover arranged on the well head body, characterized in that: The wellbore is provided with a plurality of installation openings, and a connecting plate for connecting a pipeline is arranged in the installation opening through a docking and clamping device, and the connecting plate is provided with a connecting opening for adapting to pipelines of various diameters.
2. A prefabricated reinforced concrete inspection well for a municipal road according to claim 1, characterized in that: The locking device includes: at least one first connecting hole opened in the connecting port, penetrating the connecting plate and matching the steel bar, a second connecting hole opened on the installation port and matching the first connecting hole, and steel bars inserted into the first connecting hole and the second connecting hole. A docking device is also provided between the connecting plate and the installation port to facilitate alignment of the first connecting hole and the second connecting hole.
3. A prefabricated reinforced concrete inspection well for a municipal road according to claim 2, characterized in that: The docking device includes: a groove opened on the installation port, a first rubber layer arranged on the outer side of the connecting plate for facilitating its insertion into the installation port, and a protrusion arranged on the first rubber layer and matching with the groove for positioning the first connecting hole and the second connecting hole. The installation port has a taper, and the connecting plate is matched with the installation port so that the connecting plate will not rotate after being inserted into the installation port and is easy to insert into the installation port.
4. The prefabricated reinforced concrete inspection well for municipal roads according to claim 1 is characterized by: A second rubber layer is also provided inside the connection port to facilitate better insertion of the pipeline.
5. The prefabricated reinforced concrete inspection well for municipal roads according to claim 1 is characterized by: The wellbore and the wellhead cylinder are both provided with climbing ladders for the convenience of workers to climb.
6. A prefabricated reinforced concrete inspection well for a municipal road according to claim 5, characterized in that: The wellhead barrel is located on the well cover close to the inner wall of the wellbore and is used to allow the climbing ladder to dock and facilitate climbing.
7. A prefabricated reinforced concrete inspection well for a municipal road according to claim 6, characterized in that: A docking device is also provided between the manhole cover and the shaft to facilitate docking of the crawling ladder.
8. The prefabricated reinforced concrete inspection well for municipal roads according to claim 7 is characterized by: The docking device comprises: at least two truncated cone-shaped docking holes disposed at the upper end of the wellbore, and a truncated cone-shaped docking column disposed at the bottom of the well cover for docking with the truncated cone-shaped docking holes.
9. The prefabricated reinforced concrete inspection well for municipal roads according to claim 2, characterized in that: The connecting plate is provided with a plurality of first lifting rings for easy transportation.
10. The prefabricated reinforced concrete inspection well for municipal roads according to claim 1, characterized in that: The wellhead cylinder and the wellbore are both provided with a plurality of second lifting rings for easy transportation.
