By introducing a suction device and a flue gas treatment device into the air duct system, the linkage control of the valve disc can achieve the treatment and emission of different gases, which solves the problem that the existing air duct system cannot quickly recover the heat energy of the exhaust gas and adapt to the treatment of different gases. , improves environmental performance and adaptability.
Patent Information
- Application Number
- CN202323605637.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-28
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2033-12-28
AI Technical Summary
The existing air duct system is not convenient for rapid recovery of heat energy in the exhaust gas produced by chemical equipment, and it is difficult to properly treat and discharge according to different types of gases, reducing the adaptability to different gas treatments and emissions.
A duct system for environmentally friendly equipment is designed, including the main air duct, equipment docking device, air separation conduit, flue gas treatment device and air exhaust device. By setting up the air exhaust device and the flue gas treatment device, the air duct system can be different according to the different The type of gas is treated and discharged differently, and the linkage between the first valve disc and the second valve disc is carried out to achieve centralized treatment and recovery of thermal energy and harmful substances in the gas.
It improves the environmental protection performance of the air duct system for gas treatment, reduces the cost of gas treatment, enhances the adaptability to different types of gas treatment, ensures that the gas treatment module does not idle, and improves the efficiency and stability of gas emissions.
Smart Images

Figure CN222026771U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of chemical environmental protection equipment, in particular to an air duct system used for environmental protection equipment. Background Art
[0002] The duct system of environmental protection equipment is a system used to process and transport gases. It is widely used in the field of chemical environmental protection. It is usually composed of a series of pipes, fans, valves, filters, etc., which are used to collect, transport, process and discharge various gases.
[0003] However, the existing air duct system is not convenient for quickly recovering the heat energy in the exhaust gas produced by chemical equipment. It is also not convenient for carrying out different treatment and discharge methods according to different types of gases, thereby reducing the adaptability of the air duct system to the treatment and discharge of different gases. Therefore, there is an urgent need for an air duct system for environmental protection equipment to solve the above problems. Utility Model Content
[0004] The purpose of the utility model is to provide an air duct system for environmental protection equipment to solve the problems raised in the above background technology.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solution: an air duct system for environmental protection equipment, comprising two sets of main air ducts for guiding air, the air collecting ends of the two sets of the main air ducts are provided with connecting elbows for turning and docking, and a bearing bracket for supporting is provided at the bottom of the output ends of the two sets of the main air ducts,
[0006] Equipment docking devices, wherein at least six groups of the equipment docking devices are provided, adjacent equipment docking devices are fixedly connected by fixing pipes, the equipment docking devices located at the innermost side are fixedly connected to the connecting elbow, and the equipment docking devices are used to dock with gas output equipment;
[0007] An air distribution conduit, the air distribution conduit being fixedly arranged on the lower end surface of the main air pipe near the supporting bracket;
[0008] A flue gas treatment device, wherein the flue gas treatment device is arranged at the output end of the gas distribution duct, an exhaust device for exhausting air is arranged at the output end of the flue gas treatment device, and an exhaust chimney for exhausting air is arranged at the output end of the exhaust device;
[0009] The flue gas treatment device includes a gas treatment module, a second air supply pipe is provided on one side of the upper part of the gas treatment module, and an exhaust pipe is provided on the other side of the upper part of the gas treatment module, a series closing device for opening and closing the pipeline is provided at the air inlet end of the second air supply pipe, and the series closing device and the exhaust pipe are connected through the first air supply pipe.
[0010] Preferably, the equipment docking device includes a teapot tee for gas distribution, a reducer for docking pipes is arranged along the axial direction of the teapot tee, and a second pipe compensator is arranged at the axial end of the reducer, a first pipe compensator for compensating pipes is arranged at the side end of the teapot tee, and a fixed elbow is arranged at the first pipe compensator away from the teapot tee, a docking pipe is arranged at the bottom of the fixed elbow, and a closing valve for closing the pipe is arranged near the middle of the inner end surface of the docking pipe, the closing valve can facilitate the staff to quickly open or close the docking pipe that needs to be opened and closed according to needs, and can improve the convenience of closed connection of the factory.
[0011] Preferably, the exhaust device includes a fixed frame for support, and two groups of belt drive modules are arranged on the inner end surface of the fixed frame, motors are arranged at the power input ends of the two groups of belt drive modules, and exhaust modules are arranged at the power output ends of the two groups of belt drive modules, square-to-round pipe joints are arranged at the top exhaust ends of the two groups of exhaust modules, and air collecting pipes are arranged on the upper end surfaces of the two groups of square-to-round pipe joints, and air supply pipes are arranged at the air inlet ends of the two groups of exhaust modules.
[0012] Preferably, the series closing device includes a three-way conduit for docking the pipeline, a first valve flap is arranged inside the axial gas transmission end of the three-way conduit, and a second valve flap is arranged at the center of the side of the three-way conduit, a diverter is arranged at the bottom end surface of the first valve flap, and a rocker is arranged at the side of the diverter, a swing arm is arranged at the bottom of the second valve flap, and the swing arm is hinged to the diverter through a connecting rod, and during transmission, when the first valve flap rotates, the connecting rod at the bottom of the first valve flap can be synchronously transmitted with the second valve flap through the swing arm, thereby facilitating the subsequent synchronous opening and closing of the first gas supply pipe and the second gas supply pipe, and achieving adaptability to processing different types of gases.
[0013] Preferably, the gas output end of the gas collecting pipe is through-connected with the interior of the exhaust chimney, and the output ends of the first gas supply pipe and the exhaust pipe are through-connected with the gas transmission pipe, which can effectively improve the efficiency and stability of subsequent gas discharge conduction.
[0014] Preferably, the three-way conduit is fixedly connected to the first air supply pipe at the second valve flap, and the second valve flap is used to open and close the air supply of the first air supply pipe. The three-way conduit is fixedly connected to the second air supply pipe at the first valve flap, and the first valve flap is used to open and close the air supply of the second air supply pipe. When in use, the linkage opening and closing of the first valve flap and the second valve flap can open and close the first air supply pipe and the second air supply pipe in series, so that the staff can choose a suitable emission method according to the emission of different types of gases, thereby improving the adaptability of the emission.
[0015] Compared with the prior art, the beneficial effects of the utility model are as follows:
[0016] 1. The utility model provides an exhaust device and a smoke treatment device, so that the air duct system can discharge different gases according to different gases through the linkage connection and closure of the first valve flap and the second valve flap, so as to perform different emission treatments on different types of gases, and then can centrally treat and recover various heat energy and harmful substances in the gas, thereby improving the environmental protection performance of the air duct system for gas treatment, and can also directly export the gas that meets the standards, prevent the gas treatment module from idling, reduce the cost of gas treatment, and also improve the adaptability of the equipment to different types of gas treatment. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a structural schematic diagram of the main body of the utility model;
[0018] Figure 2 It is a structural schematic diagram of the equipment docking device of the utility model;
[0019] Figure 3 It is a structural schematic diagram of the exhaust device of the utility model;
[0020] Figure 4 It is a structural schematic diagram of the flue gas treatment device of the utility model;
[0021] Figure 5 It is a structural schematic diagram of the serial closing device of the utility model.
[0022] In the figure: 1-connecting elbow, 2-equipment docking device, 3-fixed pipe, 4-exhaust chimney, 5-exhaust device, 6-smoke treatment device, 7-gas distribution duct, 8-carrying bracket, 9-main gas pipe, 21-45 degree teapot tee pipe, 22-reducing pipe, 23-first pipeline compensator, 24-fixed elbow, 25-docked pipeline, 26-closing valve, 27-second pipeline compensator, 51-gas collection pipeline, 52-square connection Circular pipe joint, 53-air supply pipe, 54-exhaust module, 55-belt drive module, 56-motor, 57-fixed frame, 61-first air supply pipe, 62-series closing device, 63-second air supply pipe, 64-gas treatment module, 65-exhaust pipe, 621-three-way conduit, 622-first valve flap, 623-direction changer, 624-rocker, 625-connecting rod, 626-swing arm, 627-second valve flap. DETAILED DESCRIPTION
[0023] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0024] See also Figure 1-5 The utility model provides an embodiment: an air duct system for environmental protection equipment, comprising two sets of main air ducts 9 for guiding air, the air collecting ends of the two sets of main air ducts 9 are provided with connecting elbows 1 for turning and docking, and the bottom of the output ends of the two sets of main air ducts 9 are provided with a supporting bracket 8 for support.
[0025] Equipment docking devices 2, at least six sets of equipment docking devices 2 are provided, adjacent equipment docking devices 2 are fixedly connected by fixed pipes 3, the innermost equipment docking device 2 is fixedly connected to the connecting elbow 1, and the equipment docking device 2 is used to dock with the gas output device;
[0026] The air distribution duct 7 is fixedly arranged on the lower end surface of the main air pipe 9 near the supporting bracket 8;
[0027] A flue gas treatment device 6, which is arranged at the output end of the gas distribution duct 7, and an exhaust device 5 for exhausting air is arranged at the output end of the flue gas treatment device 6, and an exhaust chimney 4 for exhausting air is arranged at the output end of the exhaust device 5;
[0028] like Figure 4As shown, the flue gas treatment device 6 includes a gas treatment module 64, a second air supply pipe 63 is provided on one side of the upper part of the gas treatment module 64, and an exhaust pipe 65 is provided on the other side of the upper part of the gas treatment module 64, a series closing device 62 for opening and closing the pipeline is provided at the air inlet end of the second air supply pipe 63, and the series closing device 62 and the exhaust pipe 65 are connected through the first air supply pipe 61.
[0029] like Figure 2 As shown, the equipment docking device 2 includes a 45-degree teapot tee 21 for gas distribution, a reducer 22 for docking the pipeline is arranged along the axial direction of the 45-degree teapot tee 21, and a second pipeline compensator 27 is arranged at the axial end of the reducer 22, a first pipeline compensator 23 for compensating the pipeline is arranged at the side end of the 45-degree teapot tee 21, and a fixed elbow 24 is arranged at the first pipeline compensator 23 away from the 45-degree teapot tee 21, a docking pipeline 25 is arranged at the bottom of the fixed elbow 24, and a closing valve 26 for closing the pipeline is arranged near the middle of the inner end surface of the docking pipeline 25, the closing valve 26 can facilitate the staff to quickly open or close the docking pipeline 25 that needs to be opened and closed according to needs, which can improve the convenience of closed connection to the factory.
[0030] like Figure 3 As shown, the exhaust device 5 includes a fixed frame 57 for support, and two groups of belt drive modules 55 are arranged on the inner end surface of the fixed frame 57, motors 56 are arranged at the power input ends of the two groups of belt drive modules 55, and exhaust modules 54 are arranged at the power output ends of the two groups of belt drive modules 55, square-to-circular pipe joints 52 are arranged at the top exhaust ends of the two groups of exhaust modules 54, and air collecting pipes 51 are arranged on the upper end surfaces of the two groups of square-to-circular pipe joints 52, and air supply pipes 53 are arranged at the air inlet ends of the two groups of exhaust modules 54.
[0031] like Figure 5 As shown, the serial closing device 62 includes a three-way conduit 621 for docking the pipeline, a first valve flap 622 is arranged inside the axial gas transmission end of the three-way conduit 621, and a second valve flap 627 is arranged at the side center of the three-way conduit 621, a diverter 623 is arranged at the bottom end surface of the first valve flap 622, and a rocker 624 is arranged at the side of the diverter 623, a swing arm 626 is arranged at the bottom of the second valve flap 627, and the swing arm 626 is hinged to the diverter 623 through a connecting rod 625. During transmission, when the first valve flap 622 rotates, the connecting rod 625 at the bottom of the first valve flap 622 can be synchronously driven with the second valve flap 627 through the swing arm 626, thereby facilitating the subsequent synchronous opening and closing of the first gas supply pipe 61 and the second gas supply pipe 63, and achieving adaptability to processing different types of gases.
[0032] The gas output end of the gas collecting pipe 51 is connected to the inside of the exhaust chimney 4, and the output ends of the first gas supply pipe 61 and the exhaust pipe 65 are connected to the gas delivery pipe 53, which can effectively improve the efficiency and stability of subsequent gas discharge conduction.
[0033] The three-way conduit 621 is fixedly connected to the first air supply pipe 61 at the second valve flap 627, and the second valve flap 627 is used to open and close the air supply of the first air supply pipe 61. The three-way conduit 621 is fixedly connected to the second air supply pipe 63 at the first valve flap 622, and the first valve flap 622 is used to open and close the air supply of the second air supply pipe 63. When in use, the linkage opening and closing of the first valve flap 622 and the second valve flap 627 can open and close the first air supply pipe 61 and the second air supply pipe 63 in series, so that the staff can choose the appropriate emission method according to the emission of different types of gases, thereby improving the adaptability of the emission.
[0034] Working principle: before use, the staff can dock the exhaust equipment inside the factory with the docking pipe 25, so as to facilitate the subsequent direct export of various gases produced by the equipment. The closing valve 26 inside the docking pipe 25 can be opened and closed according to the use status of the equipment. The gas exported by multiple sets of equipment docking devices 2 can be gathered inside the main air pipe 9 through the connecting elbow 1, so as to facilitate the subsequent rapid guidance of the gas. When processing the gas, the staff can start the motor 56 through the external control panel. At this time, the motor 56 can drive the belt drive module 55 to transmit, and then drive the exhaust module 54 to perform the exhaust operation, so that the exhaust pipe 65 or the first air supply pipe 61 connected to the gas transmission pipe 53 is in a negative pressure state, so that the gas inside the main air pipe 9 is extracted and guided through the gas distribution duct 7 and the supporting bracket 8;
[0035] When the gas contains high heat and harmful substances, the user can rotate the rocker 624 so that the rocker 624 can drive the first valve flap 622 to rotate inside the three-way conduit 621 through the direction changer 623, and the first valve flap 622 can open the gas conduction at the second gas supply pipe 63. At the same time, when the first valve flap 622 opens the second gas supply pipe 63, it can synchronously drive the swing arm 626 to swing through the connecting rod 625, thereby driving the second valve flap 627 to close the first gas supply pipe 61. At this time, the gas containing heat and dust can be introduced into the gas processing module 64 through the second gas supply pipe 63. The gas processing module 64 can absorb the heat in the gas and filter various dust and harmful substances. The treated gas is introduced into the gas transmission pipe 53 through the exhaust pipe 65. Then, the two sets of exhaust modules 54 can gather the gas and introduce it into the exhaust chimney 4 through the square-to-round pipe joint 52, and finally be discharged through the exhaust chimney 4.
[0036] When the factory gas does not require special treatment, such as the operation of the above-mentioned series sealing device 62, the staff can turn the rocker 624, and the rocker 624 can close the first valve flap 622 and simultaneously open the second valve flap 627, so that the gas can be directly introduced into the gas transmission pipe 53 through the first gas supply pipe 61, and then the exhaust module 54 can discharge the gas directly through the exhaust chimney 4 through the square-to-circular pipe joint 52 and the gas collecting pipe 51.
[0037] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. An air duct system for environmental protection equipment, comprising two sets of main air ducts (9) for guiding air, the air collecting ends of the two sets of main air ducts (9) are provided with connecting elbows (1) for turning and docking, and the bottoms of the output ends of the two sets of main air ducts (9) are provided with supporting brackets (8), characterized in that: Equipment docking devices (2), wherein at least six groups of the equipment docking devices (2) are provided, adjacent equipment docking devices (2) are fixedly connected via fixed pipes (3), the equipment docking devices (2) located at the innermost side are fixedly connected to the connecting elbow (1), and the equipment docking devices (2) are used to dock with gas output equipment; An air distribution duct (7), the air distribution duct (7) being fixedly arranged on the lower end surface of the main air pipe (9) close to the supporting bracket (8); A flue gas treatment device (6), the flue gas treatment device (6) being arranged at the output end of the gas distribution duct (7), the output end of the flue gas treatment device (6) being provided with an exhaust device (5) for exhausting air, and an exhaust chimney (4) for exhausting air being provided at the output end of the exhaust device (5); The flue gas treatment device (6) comprises a gas treatment module (64), a second gas supply pipe (63) is provided on one side of the upper portion of the gas treatment module (64), and an exhaust pipe (65) is provided on the other side of the upper portion of the gas treatment module (64), a series-connected closing device (62) for opening and closing the pipeline is provided at the air inlet end of the second gas supply pipe (63), and a first gas supply pipe (61) is provided between the series-connected closing device (62) and the exhaust pipe (65).
2. The air duct system for environmental protection equipment according to claim 1, characterized in that: The equipment docking device (2) comprises a 45-degree teapot tee (21) for gas distribution, a reducer (22) for docking a pipeline is arranged along the axial direction of the 45-degree teapot tee (21), and a second pipeline compensator (27) is arranged at the axial end of the reducer (22), a first pipeline compensator (23) for compensating the pipeline is arranged at the side end of the 45-degree teapot tee (21), and a fixed elbow (24) is arranged at the first pipeline compensator (23) away from the 45-degree teapot tee (21), a docking pipeline (25) is arranged at the bottom of the fixed elbow (24), and a closing valve (26) for closing the pipeline is arranged near the middle of the inner end surface of the docking pipeline (25).
3. The air duct system for environmental protection equipment according to claim 2, characterized in that: The exhaust device (5) comprises a fixed frame (57) for supporting, and two groups of belt drive modules (55) are arranged on the inner end surface of the fixed frame (57), motors (56) are arranged at the power input ends of the two groups of belt drive modules (55), and exhaust modules (54) are arranged at the power output ends of the two groups of belt drive modules (55), square-to-round pipe joints (52) are arranged at the top exhaust ends of the two groups of exhaust modules (54), and air collecting pipes (51) are arranged on the upper end surfaces of the two groups of square-to-round pipe joints (52), and air supply pipes (53) are arranged at the air inlet ends of the two groups of exhaust modules (54).
4. The air duct system for environmental protection equipment according to claim 3, characterized in that: The serial sealing device (62) comprises a three-way conduit (621) for connecting to a pipeline, a first valve flap (622) is arranged inside the axial gas transmission end of the three-way conduit (621), and a second valve flap (627) is arranged at the center of the side of the three-way conduit (621), a direction changer (623) is arranged at the bottom end surface of the first valve flap (622), and a rocker (624) is arranged on the side of the direction changer (623), a swing arm (626) is arranged at the bottom of the second valve flap (627), and the swing arm (626) is hinged to the direction changer (623) through a connecting rod (625).
5. The air duct system for environmental protection equipment according to claim 4, characterized in that: The gas output end of the gas collecting pipeline (51) is connected to the inside of the exhaust chimney (4), and the output ends of the first gas supply pipe (61) and the exhaust pipe (65) are connected to the gas delivery pipe (53).
6. The air duct system for environmental protection equipment according to claim 4, characterized in that: The three-way conduit (621) is fixedly connected to the first air supply pipe (61) at the second valve flap (627), and the second valve flap (627) is used to open and close the air supply of the first air supply pipe (61). The three-way conduit (621) is fixedly connected to the second air supply pipe (63) at the first valve flap (622), and the first valve flap (622) is used to open and close the air supply of the second air supply pipe (63).