Pit digging equipment for building construction engineering

By using a combination of support plate, motor drive mechanism and limiting mechanism in the pit digging equipment for construction engineering, the problem of vertical digging caused by the deviation of the drilling machine angle is solved, the working efficiency and equipment stability are improved, and the The gadget is lost and the equipment is damaged.

CN222030422UActive Publication Date: 2024-11-22LIAOCHENG TIANZE CONSTR ENG CONSULTING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420344099.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-26
Publication Date
2024-11-22
Estimated Expiration
2034-02-26

AI Technical Summary

Technical Problem

During operation, traditional pit drilling machines cannot dig vertically downward due to angle deviation, which affects work efficiency, and gadgets are easily lost and affects the normal use of the equipment.

Method used

A kind of pit digging equipment for construction engineering is designed, using support plates, connecting rods, motor driving mechanisms and limiting mechanisms, adjust the angle through ground nails and moving rods, and use a level to determine whether the device is vertical, avoid angle deviation, and pass through springs and anti-collision blocks improve the stability and mobility of the equipment.

Benefits of technology

It effectively avoids the problem of unstable digging caused by angle deviation, improves work efficiency, reduces error judgment, prevents equipment damage, and improves the stability and operation convenience of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222030422U_ABST
    Figure CN222030422U_ABST
Patent Text Reader

Abstract

The utility model discloses digging equipment for building construction engineering, which relates to the technical field of planting digging and comprises a support plate, three connecting rods are fixedly arranged at the bottom of the support plate, a first shaft pin is fixedly sleeved in each connecting rod, a first U-shaped plate is movably sleeved on the rod wall of each first shaft pin, and a second U-shaped plate is movably sleeved on the rod wall of each first shaft pin. The bottom of each first U-shaped plate is fixedly connected with a first sleeve box, a moving rod is movably connected into each first sleeve box in a sleeved mode, a bolt is movably connected into each first sleeve box in a sleeved mode, a second U-shaped plate is fixedly arranged at one end of each moving rod, a second shaft pin is rotatably connected into each second U-shaped plate in a sleeved mode, and a second shaft pin is rotatably connected into each second shaft pin in a sleeved mode. The rod wall of each second shaft pin is fixedly sleeved with a ground nail. The angle of the device is adjusted through the moving rod, whether the device is in a vertical state or not is judged through the gradienter, follow-up operation caused by angle deviation is avoided, and work efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of planting pit digging, in particular to a pit digging device for a construction project. Background Art

[0002] A drilling machine is a mechanical equipment used for underground excavation. Traditional drilling machines generally do not have the function of avoiding the loss of smaller additional tools. Stones or hard objects on the ground may cause damage to the ground drill and other problems. The existing ground drill is usually fixed with a pin when replaced. Therefore, it is often necessary to fix it with some fasteners. The fasteners are small in size and easy to be lost, which affects the normal use of the planting and digging equipment.

[0003] After searching, a kind of tree planting and digging equipment for landscaping engineering construction with publication number CN220402321U has the function of avoiding the loss of smaller additional tools, saving the operation time of the staff, including a support seat, the inner wall of the bottom end of the support seat is provided with a motor, the output shaft of the motor is fixedly connected with a fixed tube, the inner wall of the fixed tube is fixedly connected with a guide tube, the outer wall of the guide tube is slidably connected with a connecting plate, the connecting plates are provided with two groups, the two groups of connecting plates are elastically connected by extrusion springs, the outer wall of the connecting plate is fixedly connected with a limiting block, the fixed tube is inserted with a ground drill, the inner wall of the ground drill is provided with a limiting groove, the outer wall of the support seat is fixedly connected with a square frame, and the inner wall of the bottom end of the square frame is elastically connected with a handle through a positioning spring.

[0004] The above technical solution has the following shortcomings:

[0005] The ground drill in the above technical solution cannot dig a hole vertically downward due to angle deviation during operation, and needs to be operated again, which affects work efficiency. Utility Model Content

[0006] In view of the problem that the above-mentioned existing ground drill cannot dig a hole vertically downward due to angle deviation during operation and needs to be operated again, the present utility model is proposed.

[0007] Therefore, the purpose of the utility model is to provide a pit digging equipment for construction engineering, which solves the problem that the ground drill cannot dig a pit vertically downward due to angle deviation during operation and needs to be operated again.

[0008] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0009] A pit digging equipment for construction engineering, comprising a support plate, wherein three connecting rods are fixedly connected to the bottom of the support plate, a first axle pin is fixedly sleeved inside each of the connecting rods, a first U-shaped plate is movably sleeved on the rod wall of each of the first axle pins, a first sleeve is fixedly connected to the bottom of each of the first U-shaped plates, a first opening is provided on the top of each of the first sleeves and a second opening is provided on one side, a moving rod is movably sleeved inside each of the first sleeves, a plurality of third openings are provided on the rod wall of each of the moving rods, a thread is provided inside each of the third openings, a bolt is movably sleeved inside each of the second openings, and each bolt matches the corresponding third opening , one end of each of the moving rods is fixedly connected to a second U-shaped plate, a second axle pin is rotatably sleeved inside each of the second U-shaped plates, a rod wall of each of the second axle pins is fixedly sleeved with a ground nail, the bottom end of the support plate is fixedly connected to a second box, a first motor is provided inside the second box, a ground drill is fixedly connected to the output end of the first motor, a driving mechanism is provided inside the second box, the first motor is transmission-connected to the driving mechanism, and limiting mechanisms are connected on both sides of the driving mechanism. The device is fixed by the ground nails, the moving rod is used to adjust the angle, and the level is used to judge whether the device is vertical, so as to avoid the ground drill being unable to dig vertically due to angle deviation.

[0010] Preferably, the driving mechanism includes a second motor, a screw rod and a slider, the second motor is fixedly arranged on the top of the support plate, the screw rod is vertically arranged inside the second casing and passes through the casing and is fixedly connected to the output end of the second motor, the two ends of the screw rod are rotatably connected to the corresponding support plate and the second casing respectively, the slider is threadedly connected to the screw rod, the first motor is fixedly connected to the top of the slider, one end of the ground drill is rotatably sleeved with the slider and fixedly connected to the output end of the first motor, the motor drives the screw rod to rotate, and the screw rod rotates and cooperates with the limit device to drive the slider to move to achieve the effect of moving the ground drill.

[0011] Preferably, the limiting mechanism includes two slide grooves and a slide rod, the two slide grooves are symmetrically arranged on both sides of the second box, the two slide rods are symmetrically arranged on both sides of the slider, the two slide rods are matched with the slide grooves, and the two slide rods move in the slide grooves and cooperate with the screw rod to drive the slider to move.

[0012] Preferably, two springs are fixedly connected to the bottom of the second box, and one end of the two springs is fixedly connected to an anti-collision block, so that the first motor can avoid direct collision with the second box when descending.

[0013] Furthermore, a level is fixedly provided on the top of the support plate, and the level can quickly determine whether the device is vertical.

[0014] Preferably, vertical rods are fixedly provided on both sides of the support plate, and one side of the two vertical rods is fixedly connected with a handle, through which the device can be conveniently carried.

[0015] In the above technical solution, the technical effects and advantages provided by the utility model are:

[0016] 1. In the utility model, the staff fixes the device by inserting ground nails into the soil, and then adjusts the angle of the device by adjusting three moving rods. When the device is adjusted to a vertical state, the first motor is turned on and the pit is dug through the driving mechanism and the limiting mechanism, which can avoid the angle deviation caused by direct digging to affect the digging angle and avoid reducing the work efficiency.

[0017] 2. According to the utility model, after the staff has adjusted the device, the level meter can be used to quickly determine whether the device is in a vertical state and whether to make subsequent adjustments, thereby avoiding errors caused by direct observation and improving work efficiency.

[0018] 3. The utility model can prevent the first motor from directly colliding with the second box by means of the anti-collision block, and can provide buffering during movement by means of the spring to prevent the device from being damaged due to long-term collision. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present utility model. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.

[0020] Figure 1 It is a structural schematic diagram of the utility model;

[0021] Figure 2 It is a rear view schematic diagram of the utility model;

[0022] Figure 3 For the utility model Figure 1 A magnified schematic diagram of part A.

[0023] Description of reference numerals:

[0024] 1. Support plate; 2. Connecting rod; 3. First axle pin; 4. First U-shaped plate; 5. First set of boxes; 6. Moving rod; 7. Bolt; 8. Second U-shaped plate; 9. Second axle pin; 10. Ground nail; 11. Second set of boxes; 12. First motor; 13. Ground drill; 14. Second motor; 15. Screw; 16. Slider; 17. Slide groove; 18. Slide rod; 19. Spring; 20. Anti-collision block; 21. Level; 22. Vertical rod; 23. Handle. DETAILED DESCRIPTION

[0025] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention will be further described in detail below in conjunction with the accompanying drawings.

[0026] The utility model embodiment discloses a pit digging device for building construction engineering.

[0027] The utility model provides Figure 1-3 The pit digging equipment for a construction project shown in the figure includes a support plate 1, three connecting rods 2 are fixedly connected to the bottom of the support plate 1, a first axle pin 3 is fixedly sleeved inside each connecting rod 2, a first U-shaped plate 4 is movably sleeved on the rod wall of each first axle pin 3, a first set box 5 is fixedly connected to the bottom of each first U-shaped plate 4, a first opening is provided on the top of each first set box 5 and a second opening is provided on one side, a moving rod 6 is movably sleeved inside each first set box 5, a plurality of third openings are provided on the rod wall of each moving rod 6, a thread is provided inside each third opening, a bolt 7 is movably sleeved inside each second opening, each bolt 7 matches with the corresponding third opening, and one end of each moving rod 6 A second U-shaped plate 8 is fixedly connected thereto, a second axle pin 9 is rotatably sleeved inside each second U-shaped plate 8, a ground nail 10 is fixedly sleeved on the rod wall of each second axle pin 9, a second set box 11 is fixedly connected to the bottom end of the support plate 1, a first motor 12 is arranged inside the second set box 11, a ground drill 13 is fixedly connected to the output end of the first motor 12, a driving mechanism is arranged inside the second set box 11, the first motor 12 is transmission-connected to the driving mechanism, and limiting mechanisms are connected to the two sides of the driving mechanism. The staff inserts the ground nail 10 into the soil and adjusts the angle by moving the three moving rods 6. When the angle is adjusted to the appropriate angle, it is fixed by bolts 7, which can avoid subsequent remedial operations caused by angle deviation and improve work efficiency.

[0028] In order to allow the drill 13 to move vertically, Figure 2 As shown, the driving mechanism includes a second motor 14, a screw rod 15 and a slider 16. The second motor 14 is fixedly arranged on the top of the support plate 1. The screw rod 15 is vertically arranged inside the second casing 11 and penetrates the casing and is fixedly connected to the output end of the second motor 14. The two ends of the screw rod 15 are rotatably connected to the corresponding support plate 1 and the second casing 11 respectively. The slider 16 is threadedly connected to the screw rod 15. The first motor 12 is fixedly connected to the top of the slider 16. One end of the earth drill 13 is rotatably sleeved with the slider 16 and fixedly connected to the output end of the first motor 12. When the second motor 14 is turned on, the second motor 14 drives the screw rod 15 to rotate. The screw rod 15 cooperates with the limiting mechanism to drive the slider 16 to move. The slider 16 moves to drive the earth drill 13 to dig a hole.

[0029] In order to prevent the earth drill 13 from rotating with the screw rod 15, Figure 2As shown, the limiting mechanism includes two slide grooves 17 and a slide rod 18. The two slide grooves 17 are symmetrically arranged on both sides of the second set box 11, and the two slide rods 18 are symmetrically arranged on both sides of the slider 16. The two slide rods 18 are matched with the slide grooves 17. The two slide rods 18 move in the slide grooves 17 following the slider 16. The slide rod 18 cooperates with the slider 16 to prevent the ground drill 13 from rotating with the screw rod 15 and being unable to move vertically.

[0030] In order to avoid the second motor 14 directly hitting the second housing 11, Figure 2 As shown, two springs 19 are fixedly connected to the bottom of the second box 11, and one end of the two springs 19 is fixedly connected to an anti-collision block 20. When the second motor 14 moves, it can avoid direct collision with the second box 11 to avoid damage.

[0031] In order to quickly determine whether the device is vertical, Figure 1-2 As shown, a level 21 is fixedly provided on the top of the support plate 1, and the level 21 can quickly determine whether the device is in a vertical state.

[0032] Finally, in order to facilitate the handling of the device, such as Figure 1-2 As shown, vertical rods 22 are fixedly provided on both sides of the support plate 1, and handles 23 are fixedly connected to one side of the two vertical rods 22, so that the device can be conveniently carried through the handles 23.

[0033] The above only describes some exemplary embodiments of the present invention by way of illustration. It is undoubted that those skilled in the art can modify the described embodiments in various ways without departing from the spirit and scope of the present invention. Therefore, the above drawings and descriptions are illustrative in nature and should not be construed as limiting the scope of protection of the claims of the present invention.

Claims

1. A pit digging device for a construction project, comprising a support plate (1), It is characterized in that The support plate (1) is fixedly connected to three connecting rods (2) at the bottom, each of the connecting rods (2) is fixedly sleeved with a first axle pin (3), the rod wall of each of the first axle pins (3) is movably sleeved with a first U-shaped plate (4), the bottom of each of the first U-shaped plates (4) is fixedly connected to a first sleeve box (5), the top of each of the first sleeve boxes (5) is provided with a first opening and one side is provided with a second opening, the interior of each of the first sleeve boxes (5) is movably sleeved with a moving rod (6), the rod wall of each of the moving rods (6) is provided with a plurality of third openings, each of the third openings is provided with a thread, each of the second openings is movably sleeved with a bolt (7), and each The bolts (7) are matched with the corresponding third openings, one end of each of the moving rods (6) is fixedly connected to a second U-shaped plate (8), a second shaft pin (9) is rotatably sleeved inside each of the second U-shaped plates (8), a ground nail (10) is fixedly sleeved on the rod wall of each of the second shaft pins (9), a second sleeve box (11) is fixedly connected to the bottom end of the support plate (1), a first motor (12) is provided inside the second sleeve box (11), an output end of the first motor (12) is fixedly connected to a ground drill (13), a driving mechanism is provided inside the second sleeve box (11), the first motor (12) is transmission-connected to the driving mechanism, and both sides of the driving mechanism are connected to limiting mechanisms.

2. A construction engineering pit digging equipment according to claim 1, It is characterized in that The driving mechanism comprises a second motor (14), a screw rod (15) and a slider (16); the second motor (14) is fixedly arranged on the top of the support plate (1); the screw rod (15) is vertically arranged inside the second casing (11) and penetrates the casing and is fixedly connected to the output end of the second motor (14); the two ends of the screw rod (15) are rotatably connected to the corresponding support plate (1) and the second casing (11), respectively; the slider (16) is threadedly connected to the screw rod (15); the first motor (12) is fixedly connected to the top of the slider (16); one end of the earth drill (13) is rotatably sleeved with the slider (16) and is fixedly connected to the output end of the first motor (12).

3. A construction engineering pit digging equipment according to claim 1, It is characterized in that The limiting mechanism comprises two slide grooves (17) and a slide rod (18), wherein the two slide grooves (17) are symmetrically arranged on both sides of the second housing (11), and the two slide rods (18) are symmetrically arranged on both sides of the slider (16), and the two slide rods (18) are matched with the slide grooves (17).

4. A construction engineering pit digging equipment according to claim 1, It is characterized in that Two springs (19) are fixedly connected to the bottom of the second casing (11), and one end of each of the two springs (19) is fixedly connected to an anti-collision block (20).

5. A construction engineering pit digging equipment according to claim 1, It is characterized in that A level (21) is fixedly provided on the top of the support plate (1).

6. A construction engineering pit digging equipment according to claim 1, It is characterized in that Vertical rods (22) are fixedly provided on both sides of the support plate (1), and a handle (23) is fixedly connected to one side of the two vertical rods (22).