Underground drainage device for coal mine
The design of anti-clogging components and placement components has solved the problem of filter clogging, enabling efficient operation of underground drainage devices in coal mines.
Patent Information
- Application Number
- CN202420575217.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-25
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-03-25
AI Technical Summary
In existing underground drainage systems for coal mines, the filter screens are prone to clogging, which reduces drainage efficiency and affects the use of the system.
A drainage device is designed that includes an anti-clogging component and a placement component. The anti-clogging component scrapes off impurities with a scraper, and the placement component is used to store impurities to prevent clogging.
It effectively prevents filter clogging, improves drainage efficiency, and ensures normal operation of the device.
Smart Images

Figure CN222033777U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of drainage devices, in particular to an underground drainage device for a coal mine. Background Art
[0002] my country's coal resources are mainly mined underground. During the mining process, a large amount of underground water, namely mine water, will inevitably be discharged. One of the sources of mine water is precipitation. If the accumulated water cannot be discharged to the surface in time, the production underground may be hindered and the safety underground cannot be guaranteed. In severe cases, it may cause flooding accidents, resulting in huge personal and property losses. Therefore, drainage equipment is indispensable in the mine operation process.
[0003] The existing Chinese utility model patent with reference announcement number CN214273728U discloses a drainage device for underground coal mines, including a water reservoir and a sewage storage tank arranged at the bottom of one side of the water reservoir, a filter assembly is fixedly provided on the top of the interior of the water reservoir, the filter assembly includes a filter screen, two support seats and two guide rods, the two support seats are respectively fixedly provided on the tops of the inner walls on both sides of the water reservoir, the tops of the two support seats are fixedly provided with guide rods, the two guide rods are both slidably connected to the filter screen, and the surfaces of the two guide rods are both sleeved with connecting springs. The beneficial effect of the utility model is that the coal slag or other impurities in the water can be filtered through the filter screen, when a certain amount of coal slag or impurities are accumulated on the surface of the filter screen, the connecting spring will be compressed, thereby causing the filter screen to move downward, and the coal slag or impurities on the surface of the filter screen will be discharged into the sewage storage tank through the sewage outlet, and the odor can be adsorbed by the activated carbon adsorption layer arranged inside the sewage storage tank.
[0004] Based on the search of the above patents and combined with the equipment in the prior art, it was found that drainage equipment is indispensable in the mine operation process. When using drainage equipment traditionally, the impurities inside the water source are filtered through a filter. Over time, the filter becomes clogged, resulting in reduced drainage efficiency and affecting the use of the overall device. When cleaning the filter, the impurities on the upper end cannot be collected, resulting in subsequent impurities clogging the discharge port. The existence of these problems affects the use of the device. Utility Model Content
[0005] 1. Technical issues to be resolved
[0006] In view of the deficiencies in the prior art, the utility model provides an underground drainage device for coal mines, which has the advantages of effectively preventing impurities inside the water source from being filtered through the filter when using traditional drainage equipment, causing the filter to be blocked over a long period of time, resulting in reduced drainage efficiency and affecting the use of the overall device, thereby solving the above-mentioned technical problems.
[0007] Technical Solution
[0008] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a coal mine underground drainage device, comprising an anti-blocking component, a filtering and extracting component for filtering and pumping water is installed inside the anti-blocking component, and a placement component for storing filtered impurities is installed on the right side of the outer end of the anti-blocking component;
[0009] The first filter plate is installed at the upper end of the anti-clogging component, and the upper end of the first filter plate is installed with a sliding groove, a driving rod is installed inside the sliding groove, and the upper end of the driving rod is connected with a connecting rod, and the lower end of the connecting rod is installed with a lifting rod, and the lower end of the lifting rod is installed with a scraper, which is convenient for scraping off impurities on the upper end of the first filter plate;
[0010] An anti-odor plate is installed at the upper end of the placement component, and a connecting port is installed at the upper end of the anti-odor plate, a mounting port is installed at the upper end of the connecting port, and a drop plate is installed at the lower end of the mounting port, and the drop plate blocks the upper end of the connecting port.
[0011] As a preferred technical solution of the utility model, an installation box is installed on the upper end of the anti-clogging component, and an input pipe is installed on the left side of the installation box, and a connecting port is installed on the right side of the installation box, and the input pipe is convenient for conveying water.
[0012] As the preferred technical solution of the utility model, a water tank is installed at the upper end of the filtering and extracting assembly, and a discharge outlet is installed on the right side of the water tank, a second filter plate is installed at the upper end of the water tank, and a buffer structure is installed at the lower end of the second filter plate, an extraction pipe is installed at the lower end of the buffer structure, and a water pump is installed at the upper end of the extraction pipe, and the extraction pipe is connected to the water pump for use, so as to facilitate the pumping of water.
[0013] As a preferred technical solution of the utility model, a storage box is installed on the upper end of the placement component, and a cleaning port is installed on the right side of the storage box, and the cleaning port is convenient for staff to open the storage box for cleaning.
[0014] As a preferred technical solution of the utility model, the filtering and extracting component is installed at the lower end of the first filter plate in the anti-clogging component, and the placing component is installed on the right side of the installation box in the anti-clogging component.
[0015] As a preferred technical solution of the utility model, the input pipe is an inclined structure, the first filter plate is parallel to the angle of the connecting port, and the scraper is an arc-shaped structure.
[0016] As a preferred technical solution of the utility model, the second filter plate is a downward inclined structure, the lower end of the second filter plate is connected to the discharge port, the buffer structure is composed of a buffer spring and a fixed plate, and the extraction pipe is inserted and connected to the water tank.
[0017] As a preferred technical solution of the utility model, the upper end of the deodorizing plate is activated carbon and bamboo charcoal, the connecting port is connected to the discharge port, and the mounting port is connected to the connecting port.
[0018] Compared with the prior art, the utility model provides a coal mine underground drainage device with the following beneficial effects:
[0019] 1. The utility model sets an anti-clogging component, in which a first filter plate is installed. The first filter plate preliminarily filters large impurities in the water, and a sliding groove is installed on the upper end. A driving rod is installed inside the sliding groove, and the connecting rod is connected by the driving rod, so that the device at the lower end can be driven to move, and a lifting rod is installed on the lower end. The scraper is driven to be lifted and lowered by the lifting rod, so that the scraper can be moved to the upper end of the first filter plate to scrape off impurities on the upper end of the first filter plate to prevent clogging at the upper end. This structure facilitates cleaning of the upper end of the first filter plate, which effectively prevents drainage equipment from being indispensable in the mine operation process. When traditional drainage equipment is used, impurities in the water source are filtered through a filter screen, which causes the filter screen to be blocked over a long period of time, resulting in reduced drainage efficiency and affecting the use of the overall device.
[0020] 2. The utility model arranges a placement component, in which a storage box is installed. The storage box is convenient for placing and storing impurities. A mounting port is installed at the upper end, through which the storage box is connected to the connecting port, so as to discharge impurities. An odor-proof plate is installed inside the storage box, so as to suppress the smell inside the storage box. A drop plate is installed at the upper end, through which the upper end of the connecting port is blocked. This structure is convenient for storing the scraped impurities, and effectively prevents the impurities at the upper end from being unable to be collected when cleaning the filter, resulting in subsequent impurities being blocked in the discharge port. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0022] Figure 2 This is a schematic diagram of the anti-blocking component of the utility model structure;
[0023] Figure 3 This is a schematic diagram of the structure filtering and extracting component of the utility model;
[0024] Figure 4 It is a schematic diagram of placing components of the structure of the utility model;
[0025] Among them: 1. Anti-clogging component; 101. Installation box; 102. Input pipe; 103. Connection port; 104. First filter plate; 105. Sliding groove; 106. Driving rod; 107. Connection rod; 108. Lifting rod; 109. Scraper; 2. Filter extraction component; 201. Water tank; 202. Discharge port; 203. Second filter plate; 204. Buffer structure; 205. Extraction pipe; 206. Water pump; 3. Placement component; 301. Storage box; 302. Cleaning port; 303. Deodorizing plate; 304. Connection port; 305. Installation port; 306. Drop plate. DETAILED DESCRIPTION
[0026] The following is a further detailed description of the implementation of the present invention in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but cannot be used to limit the scope of the present invention.
[0027] In the description of the present invention, unless otherwise specified, "multiple" means two or more; the terms "upper", "lower", "left", "right", "inner", "outer", "front end", "rear end", "head", "tail" and the like indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", "third" and the like are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.
[0028] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "connected" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0029] See also Figure 1 - Figure 4 In this embodiment, a coal mine underground drainage device includes: the upper end of the deodorizing plate 303 is activated carbon and bamboo charcoal, the connecting port 304 is connected to the discharge port 202, the installation port 305 is connected to the connecting port 103, the filtering and extracting component 2 is installed at the lower end of the first filter plate 104 in the anti-clogging component 1, and the placing component 3 is installed on the right side of the installation box 101 in the anti-clogging component 1.
[0030] Through the above structure; the anti-clogging component 1 is convenient for preliminary filtering of impurities in the water, and is convenient for processing impurities on the upper end of the first filter plate 104, the filtering and extraction component 2 is convenient for extracting the filtered water source, and the placement component 3 is convenient for placing and storing the processed impurities.
[0031] See also Figure 1 - Figure 4 An installation box 101 is installed at the upper end of the anti-clogging component 1, and an input pipe 102 is installed on the left side of the installation box 101, and a connecting port 103 is installed on the right side of the installation box 101. The input pipe 102 is an inclined structure, the first filter plate 104 is parallel to the angle of the connecting port 103, and the scraper 109 is an arc structure.
[0032] Through the above structure: by installing the installation box 101, it is convenient to install the internal structure, the input pipe 102 is convenient to transport the water source, the connecting port 103 is convenient to output impurities, the first filter plate 104 is convenient to preliminarily filter the impurities in the water, the sliding groove 105 is convenient to connect the internal driving rod 106, the driving rod 106 is connected to the connecting rod 107, the connecting rod 107 is driven to move, the connecting rod 107 is connected to the lifting rod 108, it is convenient to raise and lower the height of the scraper 109 at the lower end, and the scraper 109 is convenient to scrape off the impurities on the upper end of the first filter plate 104.
[0033] See also Figure 1 - Figure 4 A water tank 201 is installed at the upper end of the filtering and extracting component 2, and a discharge outlet 202 is installed on the right side of the water tank 201, a second filter plate 203 is installed at the upper end of the water tank 201, and a buffer structure 204 is installed at the lower end of the second filter plate 203, an extraction pipe 205 is installed at the lower end of the buffer structure 204, and a water pump 206 is installed at the upper end of the extraction pipe 205, the second filter plate 203 is a downward inclined structure, the lower end of the second filter plate 203 is connected to the discharge outlet 202, the buffer structure 204 is composed of a buffer spring and a fixed plate, and the extraction pipe 205 is inserted and connected to the water tank 201.
[0034] Through the above structure: the filtered water source is stored by installing the water tank 201, the discharge port 202 is convenient for discharging impurities, the second filter plate 203 is convenient for filtering impurities, the buffer structure 204 shakes the second filter plate 203 at the upper end, and the extraction pipe 205 is connected to the water pump 206 for use, so as to facilitate the pumping of the water source.
[0035] See also Figure 1 - Figure 4A storage box 301 is installed at the upper end of the placement component 3, and a cleaning port 302 is installed on the right side of the storage box 301. The upper end of the deodorizing plate 303 is activated carbon and bamboo charcoal. The connecting port 304 is connected to the discharge port 202, and the installation port 305 is connected to the connecting port 103.
[0036] Through the above structure: the storage box 301 is installed to facilitate the storage of impurities, the cleaning port 302 is convenient for the staff to open the storage box 301 for cleaning, the deodorizing plate 303 is convenient for the deodorizing treatment of impurities, the connecting port 304 is convenient for connection with the discharge port 202, the installation port 305 is connected with the connecting port 103 for use, and the drop plate 306 covers the upper end of the connecting port 304.
[0037] When in use, first, when using the device, connect the input pipe 102 to the drain outlet, and transport the water source to the installation box 101 through the input pipe 102. The first filter plate 104 is installed at the upper end of the installation box 101. The device in the water is preliminarily filtered through the first filter plate 104, and the filtered water source passes through the first filter plate 104 to reach the second filter plate 203 at the lower end, and the second filter plate 203 filters the impurities in the water. The filtered impurities pass through the second filter plate 203 and enter the water tank 201. At this time, start the water pump 206 at the upper end, and the water pump 206 drives the extraction pipe 205 to extract the water source inside the water tank 201. The filtered water source falls, and the device reaches the discharge port 202 through the inclined second filter plate 203, and the discharge The outlet 202 is connected to the connecting port 304 at the side end of the storage box 301, and the impurities are dropped into the storage box 301 through the connecting port 304. In order to prevent the first filter plate 104 from being blocked, an anti-blocking structure is installed at the upper end, and the driving rod 106 inside the sliding groove 105 is started through the terminal. The driving rod 106 is connected to the connecting rod 107, and the connecting rod 107 is driven to move. The lower end of the connecting rod 107 is installed with a lifting rod 108, and the scraper 109 at the lower end is driven to move by the lifting rod 108 to scrape off the impurities on the upper end of the first filter plate 104 at the lower end, and the scraped impurities fall to the installation port 305 through the connecting port 103 at the side end. The lower end of the installation port 305 is installed with a drop plate 306, so that the impurities fall into the storage box 301 through the drop plate 306.
[0038] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A coal mine underground drainage device, It is characterized in that The invention comprises an anti-clogging component (1), wherein a first filter plate (104) is installed at the upper end of the anti-clogging component (1), and a sliding groove (105) is installed at the upper end of the first filter plate (104), a driving rod (106) is installed inside the sliding groove (105), and the upper end of the driving rod (106) is connected to a connecting rod (107), a lifting rod (108) is installed at the lower end of the connecting rod (107), and a scraper (106) is installed at the lower end of the lifting rod (108). 109), a filtering and extracting component (2) is installed inside the anti-clogging component (1), a placement component (3) is connected and installed on the right side of the outer end of the anti-clogging component (1), an anti-odor plate (303) is installed on the upper end of the placement component (3), and a connecting port (304) is installed on the upper end of the anti-odor plate (303), a mounting port (305) is installed on the upper end of the connecting port (304), and a drop plate (306) is installed on the lower end of the mounting port (305).
2. A coal mine underground drainage device according to claim 1, It is characterized in that An installation box (101) is installed at the upper end of the anti-blocking component (1), an input pipe (102) is installed on the left side of the installation box (101), and a connection port (103) is installed on the right side of the installation box (101).
3. A coal mine underground drainage device according to claim 1, It is characterized in that A water tank (201) is installed at the upper end of the filtering and extracting component (2), and a discharge port (202) is installed on the right side of the water tank (201); a second filter plate (203) is installed at the upper end of the water tank (201), and a buffer structure (204) is installed at the lower end of the second filter plate (203); an extraction pipe (205) is installed at the lower end of the buffer structure (204), and a water pump (206) is installed at the upper end of the extraction pipe (205).
4. A coal mine underground drainage device according to claim 1, It is characterized in that A storage box (301) is installed at the upper end of the placement component (3), and a cleaning port (302) is installed on the right side of the storage box (301).
5. A coal mine underground drainage device according to claim 1, It is characterized in that The filtering and extracting component (2) is installed at the lower end of the first filter plate (104) in the anti-clogging component (1), and the placing component (3) is installed on the right side of the installation box (101) in the anti-clogging component (1).
6. A coal mine underground drainage device according to claim 2, It is characterized in that The input pipe (102) is an inclined structure, the first filter plate (104) is parallel to the connection port (103), and the scraper (109) is an arc-shaped structure.
7. A coal mine underground drainage device according to claim 3, It is characterized in that The second filter plate (203) is a downwardly inclined structure; the lower end of the second filter plate (203) is connected to the discharge port (202); the buffer structure (204) is composed of a buffer spring and a fixed plate; and the extraction pipe (205) is inserted and connected to the water tank (201).
8. A coal mine underground drainage device according to claim 4, It is characterized in that The upper end of the deodorizing plate (303) is filled with activated carbon and bamboo charcoal, the connecting port (304) is connected to the discharge port (202), and the mounting port (305) is connected to the connection port (103).