Waste gas emission treatment equipment for water-based laminating adhesive reaction kettle
By introducing exhaust gas guide control components and purification components into the exhaust gas emission control equipment of the aqueous composite membrane glue reactor, automatic detection and repeated purification of waste gas is achieved, the problem of incomplete equipment aging and purification is solved, and the equipment efficiency and purification quality are improved. .
Patent Information
- Application Number
- CN202420663619.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-02
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-04-02
AI Technical Summary
The existing waste gas emission control equipment for water-based composite membrane glue reactors is not tested in time, resulting in equipment aging and incomplete purification, which affects the ecological environment and increases the workload of testing personnel and reduces equipment efficiency.
A device including exhaust gas guide control components and purification components is designed to realize automatic detection and repeated purification of exhaust gas through intake pipes, valves, detection control mechanisms and air pumps, and secondary purification is performed using filter chambers and activated carbon placement frames to ensure the waste gas. Thoroughly purify.
It realizes timely detection and thorough purification of waste gas, reduces the workload of inspection personnel, improves the purification efficiency and purification quality of the equipment, and extends the service life of the equipment.
Smart Images

Figure CN222034163U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of waste gas emission treatment, and more specifically, to waste gas emission treatment equipment for a water-based laminating adhesive reactor. Background Art
[0002] A water-based laminating adhesive reactor is a device used to produce water-based laminating adhesive. It is usually a closed container. The raw materials are reacted by heating, stirring and mixing to make water-based laminating adhesive. A large number of chemical reactions will occur in the reactor during the production process, and the chemical reactions will produce a large amount of waste gas. We need to treat the waste gas in the reactor to meet the emission standards before it can be discharged. Most of the existing reactor waste gas emission treatment equipment is directly purified by a purification mechanism, and the inspectors detect whether the gas meets the standards. If it meets the standards, it is directly discharged. Although this can achieve the effect of emission control, the equipment will age and be damaged after working for a long time. Because the waste gas detection is not timely, it may lead to the discharge of incompletely purified waste gas, which greatly affects the ecological environment, increases the workload of the inspectors, and reduces the working efficiency of the equipment. In order to solve the deficiencies of the existing technology, we propose a water-based laminating adhesive reactor waste gas emission treatment equipment. Utility Model Content
[0003] In order to overcome the above-mentioned defects of the prior art, the utility model provides a water-based laminating adhesive reactor waste gas emission treatment equipment to solve the problem that the equipment will be aged and damaged after working for a long time, and the waste gas is not discharged thoroughly due to untimely waste gas detection, which greatly affects the ecological environment, increases the workload of detection personnel, and reduces the working efficiency of the equipment.
[0004] In order to solve the above technical problems, the utility model provides the following technical solutions: a water-based laminating adhesive reactor exhaust gas emission treatment equipment, comprising a reactor body, a waste gas guide control component is arranged on one side of the reactor body, and a waste gas purification component is arranged on one side of the waste gas guide control component;
[0005] The exhaust gas guide control component includes an intake pipe opening, a first connecting pipe is arranged above one side of the intake pipe opening, a No. 1 valve is fixedly installed inside the first connecting pipe, a No. 2 valve is arranged below one side of the No. 1 valve, a detection control mechanism is fixedly installed on one side of the No. 2 valve, an air pump is fixedly installed on the outer surface of the rear side of the detection control mechanism, a second connecting pipe is fixedly installed on the outer surface of one end of the air pump, a No. 3 valve is fixedly installed inside the second connecting pipe, and an exhaust port is arranged on the outer surface of one side of the detection control mechanism.
[0006] Wherein, the outer surface of one end of the air inlet pipe opening is fixedly mounted on the outer surface of one side of the reactor body.
[0007] Among them, the exhaust gas purification component includes a filter bin, a filter net is fixedly installed on the inner cavity side of the filter bin, a purification barrel is arranged on one side of the filter bin, two grooves are symmetrically opened inside the purification barrel, the inner walls of the two grooves are slidably connected with fixing strips, and an activated carbon placement frame is fixedly installed between the two fixing strips.
[0008] Among them, the outer surface of the other end of the air inlet pipe port is fixedly installed on the outer surface of one side of the filter bin, one end of the first connecting pipe is fixedly installed on the upper outer surface of the filter bin, the other end of the first connecting pipe is fixedly installed on the outer surface of one side of the purification barrel, the other end of the No. 2 valve is fixedly installed on the lower outer surface of the purification barrel, and one end of the second connecting pipe is fixedly installed on the rear outer surface of the filter bin.
[0009] Wherein, the interiors of the filter bin and the purification barrel are both completely sealed.
[0010] The inner wall of the activated carbon placement frame is provided with activated carbon, and the outer surface of the activated carbon placement frame is evenly provided with a plurality of through holes.
[0011] Compared with the prior art, the beneficial effects of the utility model are:
[0012] The utility model provides an exhaust gas guiding control component, including an air intake pipe port, and the exhaust gas is generated from the reactor and passes through the exhaust pipe port through the first connecting pipe, and the No. 1 valve and the No. 2 valve are opened, so that the purified gas reaches the detection control mechanism. When the detection control mechanism detects that the gas meets the standard, the exhaust port is opened to discharge the qualified gas. When the detection control mechanism detects that the gas does not meet the standard, the air pump is started and the No. 3 valve is opened, so that the exhaust gas that does not meet the standard is re-purified from beginning to end until it is qualified before it can be discharged. By utilizing the above structure, the detection control mechanism and the air pump not only avoid the problem of untimely gas detection due to equipment aging, but also realize the thorough purification of the gas, reduce the workload of the detection personnel, and greatly improve the purification efficiency of the equipment.
[0013] The utility model provides an exhaust gas purification component, including a filter bin, and the exhaust gas enters the lower inner wall of the filter bin from the air inlet pipe port, and then passes through the filter screen to perform the first step of purification on the exhaust gas, and then the exhaust gas continues to move to the inner wall of the purification barrel, and activated carbon is previously arranged inside the activated carbon placement frame, and the exhaust gas is second-step purified by the activated carbon, and finally reaches the interior of the detection and control mechanism, and if the activated carbon needs to be replaced, it is only necessary to open the cover of the purification barrel and add the activated carbon to the inside of the activated carbon placement frame, and if the activated carbon placement frame needs to be cleaned, the cover is opened and the activated carbon placement frame is pulled so that the activated carbon placement frame can be slid on the inner wall of the purification barrel through the fixing bar and taken out for cleaning, and the above structure is utilized, and the secondary purification of the exhaust gas is realized through the filter bin and the purification barrel, thereby greatly improving the purification quality of the equipment, and the disassembly and cleaning of the device is facilitated by the arranged activated carbon placement frame. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0015] Figure 2 It is a schematic diagram of the overall internal structure of the utility model;
[0016] Figure 3 It is a schematic diagram of the overall rear view structure of the utility model;
[0017] Figure 4 It is a schematic diagram of the internal structure of the purification barrel of the utility model.
[0018] [reference numerals]
[0019] 1. Reactor body; 2. Waste gas guide control assembly; 3. Waste gas purification assembly; 21. Air inlet pipe port; 22. First connecting pipe; 23. Valve No. 1; 24. Valve No. 2; 25. Detection control mechanism; 26. Air pump; 27. Second connecting pipe; 28. Valve No. 3; 29. Exhaust port; 31. Filter chamber; 32. Filter net; 33. Purification barrel; 34. Fixing bar; 35. Activated carbon placement frame. DETAILED DESCRIPTION
[0020] In order to make the technical problems to be solved, technical solutions and advantages of the present invention more clear, a detailed description will be given below in conjunction with the accompanying drawings and specific embodiments.
[0021] As attached Figure 1 To Attachment Figure 4 The embodiment of the utility model provides a water-based laminating adhesive reactor waste gas emission treatment device, comprising a reactor body 1, a waste gas guide control component 2 is arranged on one side of the reactor body 1, and a waste gas purification component 3 is arranged on one side of the waste gas guide control component 2;
[0022] The exhaust gas guide control component 2 includes an intake pipe port 21, a first connecting pipe 22 is arranged above one side of the intake pipe port 21, a valve No. 1 is fixedly installed inside the first connecting pipe 22, a valve No. 2 is arranged below one side of the valve No. 1 23, a detection control mechanism 25 is fixedly installed on one side of the valve No. 2 24, an air pump 26 is fixedly installed on the outer surface of the rear side of the detection control mechanism 25, a second connecting pipe 27 is fixedly installed on the outer surface of one end of the air pump 26, a valve No. 3 is fixedly installed inside the second connecting pipe 27, and an exhaust port 29 is arranged on the outer surface of one side of the detection control mechanism 25.
[0023] The outer surface of one end of the air inlet pipe opening 21 is fixedly mounted on the outer surface of one side of the reactor body 1;
[0024] The waste gas generated from the reactor passes through the air inlet pipe port 21 and the first connecting pipe 22, and the No. 1 valve 23 and the No. 2 valve 24 are opened to allow the purified gas to reach the detection control mechanism 25. When the detection control mechanism 25 detects that the gas meets the standard, the exhaust port 29 is opened to discharge the qualified gas. When the detection control mechanism 25 detects that the gas does not meet the standard, the air pump 26 is started and the No. 3 valve 28 is opened, so that the waste gas that does not meet the standard is purified again from beginning to end until it is qualified before being discharged.
[0025] Among them, the exhaust gas purification component 3 includes a filter chamber 31, a filter net 32 is fixedly installed on the inner cavity side of the filter chamber 31, a purification barrel 33 is arranged on one side of the filter chamber 31, and two grooves are symmetrically opened inside the purification barrel 33. The inner walls of the two grooves are slidably connected with a fixing bar 34, and an activated carbon placement frame 35 is fixedly installed between the two fixing bars 34.
[0026] The other end outer surface of the air inlet pipe port 21 is fixedly mounted on the outer surface of one side of the filter bin 31, one end of the first connecting pipe 22 is fixedly mounted on the upper outer surface of the filter bin 31, the other end of the first connecting pipe 22 is fixedly mounted on the outer surface of one side of the purification barrel 33, the other end of the No. 2 valve 24 is fixedly mounted on the lower outer surface of the purification barrel 33, and one end of the second connecting pipe 27 is fixedly mounted on the rear outer surface of the filter bin 31;
[0027] The exhaust gas enters the lower inner wall of the filter bin 31 through the air inlet pipe port 21, and then passes through the filter net 32 for the first step of purification of the exhaust gas. Then the exhaust gas continues to move to the inner wall of the purification barrel 33, and the exhaust gas is purified in the second step by the activated carbon arranged inside the activated carbon placement frame 35, and finally reaches the interior of the detection and control mechanism 25. If the activated carbon needs to be replaced, it is only necessary to open the cover of the purification barrel 33 and add the activated carbon into the activated carbon placement frame 35. If the activated carbon placement frame 35 needs to be cleaned, open the cover and pull the activated carbon placement frame 35 so that the activated carbon placement frame 35 can slide on the inner wall of the purification barrel 33 through the fixing bar 34 and be taken out for cleaning.
[0028] The interiors of the filter bin 31 and the purification barrel 33 are both completely sealed.
[0029] The inner wall of the activated carbon placement frame 35 is provided with activated carbon, and the outer surface of the activated carbon placement frame 35 is evenly provided with a plurality of through holes.
[0030] The working process of the utility model is as follows:
[0031] First, the device is connected to the reactor body 1. When the reactor is working, the waste gas generated reaches the lower side of the filter bin 31 through the air inlet pipe port 21, and then the waste gas passes through the filter screen 32 to achieve the first step of purification of the waste gas. At this time, valve No. 1 23 and valve No. 2 24 are opened to allow the gas to pass through the first connecting pipe 22 to reach the inside of the purification barrel 33. Then the gas passes through the activated carbon arranged inside the activated carbon placement frame 35 to achieve the second step of purification of the gas. At this time, the gas reaches the inside of the detection and control mechanism 25. When the gas detected by the detection and control mechanism 25 meets the standard, the exhaust port 29 is opened to discharge the gas. If the detection and control mechanism 25 detects that the gas is unqualified, the air pump 26 will be opened at this time, and the No. 3 valve 28 will drive the gas inside the detection and control mechanism 25 to reach the inside of the filter bin 31 through the second connecting pipe 27 for re-purification. The exhaust port 29 can be opened to discharge qualified gas only after the detection and control mechanism 25 meets the standard, which greatly improves the working efficiency and purification quality of the waste gas emission treatment equipment and protects the ecological environment.
[0032] Finally, a few points should be explained: First, in the description of this application, it should be noted that, unless otherwise specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, which may refer to mechanical connection or electrical connection, or internal communication between two components, or direct connection. "upper", "lower", "left", "right", etc. are only used to indicate relative positional relationships. When the absolute position of the object being described changes, the relative positional relationship may change;
[0033] Secondly: In the drawings of the embodiments disclosed in the present utility model, only the structures related to the embodiments disclosed in the present utility model are involved, and other structures can refer to the general design. In the absence of conflict, the same embodiment and different embodiments of the present utility model can be combined with each other;
[0034] Finally: The above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present utility model should be included in the protection scope of the present utility model.
Claims
1. A water-based laminating adhesive reactor waste gas emission treatment device, comprising a reactor body (1), characterized in that: An exhaust gas guide control component (2) is disposed on one side of the reactor body (1), and an exhaust gas purification component (3) is disposed on one side of the exhaust gas guide control component (2); The exhaust gas guide control component (2) comprises an intake pipe opening (21), a first connecting pipe (22) is arranged above one side of the intake pipe opening (21), a No. 1 valve (23) is fixedly installed inside the first connecting pipe (22), a No. 2 valve (24) is arranged below one side of the No. 1 valve (23), a detection control mechanism (25) is fixedly installed on one side of the No. 2 valve (24), an air pump (26) is fixedly installed on the rear outer surface of the detection control mechanism (25), a second connecting pipe (27) is fixedly installed on the outer surface of one end of the air pump (26), a No. 3 valve (28) is fixedly installed inside the second connecting pipe (27), and an exhaust port (29) is arranged on the outer surface of one side of the detection control mechanism (25).
2. The exhaust gas emission treatment equipment for a water-based laminating adhesive reactor according to claim 1 is characterized in that: The outer surface of one end of the air inlet pipe opening (21) is fixedly mounted on the outer surface of one side of the reactor body (1).
3. The exhaust gas emission treatment equipment for a water-based laminating adhesive reactor according to claim 1 is characterized in that: The exhaust gas purification component (3) comprises a filter chamber (31), a filter screen (32) is fixedly installed on the inner cavity side of the filter chamber (31), a purification barrel (33) is arranged on one side of the filter chamber (31), two grooves are symmetrically provided inside the purification barrel (33), the inner walls of the two grooves are slidably connected with fixing bars (34), and an activated carbon placement frame (35) is fixedly installed between the two fixing bars (34).
4. The exhaust gas emission treatment equipment for a water-based laminating adhesive reactor according to claim 3 is characterized in that: The outer surface of the other end of the air inlet pipe port (21) is fixedly mounted on the outer surface of one side of the filter bin (31), one end of the first connecting pipe (22) is fixedly mounted on the upper outer surface of the filter bin (31), the other end of the first connecting pipe (22) is fixedly mounted on the outer surface of one side of the purification barrel (33), the other end of the No. 2 valve (24) is fixedly mounted on the lower outer surface of the purification barrel (33), and one end of the second connecting pipe (27) is fixedly mounted on the rear outer surface of the filter bin (31).
5. The exhaust gas emission treatment equipment for a water-based laminating adhesive reactor according to claim 3 is characterized in that: The interiors of the filtering bin (31) and the purification barrel (33) are both in a completely sealed state.
6. The exhaust gas emission treatment equipment for a water-based laminating adhesive reactor according to claim 3 is characterized in that: The inner wall of the activated carbon placement frame (35) is provided with activated carbon, and the outer surface of the activated carbon placement frame (35) is evenly provided with a plurality of through holes.