Water conservancy pipeline construction butt joint device
By using structures such as electric push rods, slide chutes, clamping plates and elastic plates in water conservancy pipeline construction, the problem of unstable docking position is solved, high-precision and efficient pipeline docking is achieved, reducing leakage and adjustment time, and improving The quality of the docking and the service life of the equipment.
Patent Information
- Application Number
- CN202420737801.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-10
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-04-10
AI Technical Summary
The docking position during water conservancy pipeline construction is unstable, resulting in deviations and leakage problems. It is difficult for the existing technology to ensure the accuracy and stability of docking.
A water conservancy pipeline construction docking device is designed, adopting structures such as electric push rods, slide chutes, clamping plates and elastic plates to provide stable thrust and adaptive clamping, combining bristles and motors to clean the ends of the pipe to reduce deviation and leakage , and improve stability and service life through protective plates and elastic blocks.
It effectively improves the accuracy and stability of pipeline docking, reduces leakage and adjustment time, improves the speed and quality of docking, extends the service life of the pipeline, and reduces the cost of equipment replacement and cleaning.
Smart Images

Figure CN222038303U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of water conservancy construction, in particular to a water conservancy pipeline construction docking device. Background Art
[0002] Water conservancy pipelines are pipelines used to transport water resources. Water conservancy pipelines are used in many fields such as irrigation, drainage and water supply. Water conservancy pipelines are important engineering facilities for water resource management and utilization.
[0003] When water conservancy pipeline construction is docked, two pipes are installed and connected to enable water or other fluid media to flow smoothly in the pipes. There are many docking methods in water conservancy pipeline construction, including hot melt connection, pipe rubber ring connection and electric fusion connection. Among them, hot melt connection is to align and straighten the pipes when the water conservancy pipeline construction is docked, and the heating plate is placed between the docking to connect the pipes.
[0004] During the construction and docking of water conservancy pipelines, the docking position of the pipelines is easily unstable due to the difficulty in moving, which causes deviation of the pipelines during the docking process and causes inaccurate pipeline docking.
[0005] To this end, the utility model provides a water conservancy pipeline construction docking device. Utility Model Content
[0006] In order to make up for the deficiencies of the prior art, at least one technical problem raised in the background technology is solved.
[0007] The technical solution adopted by the utility model to solve its technical problems is as follows: a water conservancy pipeline construction docking device described in the utility model comprises a base; two first electric push rods are fixedly connected to the top of the base; the two first electric push rods are arranged oppositely; the output end of the first electric push rod is fixedly connected to the first fixing rod; multiple groups of first sliding grooves are arranged on the top of the base; a first sliding block is slidably connected to the middle of the first sliding groove; a docking block is fixedly connected to the top of the two first sliding blocks; a clamping plate is installed on the top of the docking block; two fixing holes are arranged on the top of the docking block; two bolts are threadedly connected to the top of the clamping plate; the two bolts are installed at the corresponding fixing hole positions; the ends of the two bolts are threadedly connected to the inside of the fixing hole; the side wall of the base is fixedly connected to two second fixing Rod; two second fixed rods are arranged opposite to each other; the end of the second fixed rod is fixedly connected with a support frame; the first electric push rod can effectively provide a stable thrust, effectively reduce the problem of unevenness caused by uneven force in pipeline docking, effectively reduce the deviation caused in the process of pipeline docking, effectively improve the accuracy of pipeline docking, and effectively fix the pipeline to effectively improve the stability of the pipeline in the docking process, effectively reduce the shaking or vibration of the pipeline in the docking process, which causes the displacement or deviation of the docking position, effectively reduce the increase in adjustment time caused by pipeline displacement, and effectively reduce the leakage problem caused by inaccurate pipeline docking, thereby effectively increasing the speed and accuracy of pipeline docking.
[0008] Preferably, a first spring is fixedly connected between the end of the slide rod and the top of the clamping plate; an elastic plate is fixedly connected to one end of the slide rod away from the first spring; the elastic plate can effectively adapt to the sizes of different pipes, can effectively clamp and fix pipes of different sizes, effectively reduce the use of different equipment for docking different pipes, effectively reduce the cost of equipment replacement, can effectively reduce the adjustment time for replacing different equipment, and can effectively increase the smoothness of pipe docking, effectively increase the stability and accuracy of the pipe docking process, and effectively improve the quality and efficiency of pipe docking.
[0009] Preferably, a third fixed rod is fixedly connected to the top of the base; a second electric push rod is fixedly connected to the top of the third fixed rod; a support rod is fixedly connected to the output end of the second electric push rod; two groups of bristles are fixedly connected to the middle of the support rod; the two groups of bristles are arranged opposite to each other; the bristles can effectively remove impurities and dirt accumulated on the end of the pipe, effectively increase the flatness and cleanliness of the pipe docking surface, effectively reduce leakage caused by dust and impurities on the docking surface after the pipes are docked, effectively reduce the problem of poor sealing caused by dust and impurities remaining in the sealing part, effectively increase the sealing performance of the pipe, effectively increase the safe and stable transmission of fluid or gas in the pipe, and can effectively reduce the problem of corrosion caused by the long-term presence of dust and impurities at the end of the pipe, thereby effectively increasing the service life of the pipe.
[0010] Preferably, a groove is provided on the top of the support rod; two connecting rods are fixedly connected to the top of the support rod; the two connecting rods are arranged opposite to each other; motors are fixedly connected to the ends of the two connecting rods; multiple groups of fan blades are fixedly connected to the output end of the motor; multiple groups of exhaust holes are provided in the middle of the support rod; dust impurities and tiny particles at the pipe docking end can be effectively removed by blowing air, the pipe docking surface can be free of dust and impurities, the residual moisture at the pipe docking end can be effectively dried, the moisture can be effectively and quickly removed to make the pipe docking surface dry, the tightness and stability of the pipe docking can be effectively increased, and the quality of the pipe docking can be effectively improved.
[0011] Preferably, a second spring is fixedly connected to the side wall of one of the docking blocks; an elastic block is fixedly connected to the end of the second spring; the second spring and the elastic block can effectively reduce the impact generated during the pipeline docking process, effectively reduce the impact on the pipeline, effectively reduce the wear of the wall surface of the pipeline end caused by the pipeline impact, effectively increase the stability of the pipeline docking process, effectively improve the accuracy and quality of the pipeline docking, effectively reduce the damage to the pipeline docking caused by the impact force, and effectively increase the service life of the pipeline.
[0012] Preferably, two second slide grooves are provided on the side wall of the base; a second slider is slidably connected to the middle of the two second slide grooves; protective plates are fixedly connected to the ends of the two second sliders; the protective plates can effectively isolate and protect the pipe docking part, effectively reduce the direct impact or extrusion of the pipe by external objects, effectively reduce the damage to the pipe, and can be easily installed and disassembled, making the pipe docking protection process simple and convenient, and can effectively reduce the damage and erosion to the equipment caused by harsh environment, and effectively reduce the aging and damage of the equipment caused by the environment.
[0013] The beneficial effects of the utility model are as follows:
[0014] 1. The utility model discloses a water conservancy pipeline construction docking device, which can effectively provide a stable thrust through the first electric push rod, effectively reduce the unevenness caused by uneven force in pipeline docking, effectively reduce the deviation caused in the process of pipeline docking, effectively improve the accuracy of pipeline docking, and effectively fix the pipeline to effectively improve the stability of the pipeline in the docking process, effectively reduce the displacement or deviation of the docking position caused by shaking or vibration of the pipeline in the docking process, effectively reduce the increase in adjustment time caused by pipeline displacement, and effectively reduce the leakage problem caused by inaccurate pipeline docking, thereby effectively increasing the speed and accuracy of pipeline docking.
[0015] 2. The water conservancy pipeline construction docking device described in the utility model can effectively adapt to the sizes of different pipelines through elastic plates, can effectively clamp and fix pipelines of different sizes, effectively reduce the use of different equipment for docking different pipelines, effectively reduce the cost of equipment replacement, can effectively reduce the adjustment time for replacing different equipment, and can effectively increase the smoothness of pipeline docking, effectively increase the stability and accuracy of pipeline docking, and effectively improve the quality and efficiency of pipeline docking. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] The utility model will be further described below in conjunction with the accompanying drawings.
[0017] Figure 1 It is a three-dimensional diagram of a water conservancy pipeline construction docking device in the utility model;
[0018] Figure 2 It is a structural schematic diagram of the docking block in the utility model;
[0019] Figure 3 It is a structural schematic diagram of the elastic plate in the utility model;
[0020] Figure 4 It is a structural schematic diagram of the support rod in the utility model;
[0021] Figure 5 It is a schematic diagram of the structure of the fan blade in the utility model;
[0022] In the figure: 1. base; 10. first electric push rod; 11. first fixed rod; 12. first slide groove; 13. first slider; 14. docking block; 15. clamping plate; 16. fixing hole; 17. bolt; 18. second fixed rod; 19. support frame; 2. slide rod; 21. first spring; 22. elastic plate; 3. third fixed rod; 31. second electric push rod; 32. support rod; 33. bristles; 4. groove; 41. connecting rod; 42. motor; 43. fan blade; 44. exhaust hole; 5. second spring; 51. elastic block; 6. second slide groove; 61. second slider; 62. protective plate; 7. rubber pad; 8. filter. DETAILED DESCRIPTION
[0023] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below in conjunction with specific implementation methods.
[0024] like Figures 1 to 4As shown, a water conservancy pipeline construction docking device described in an embodiment of the utility model comprises a base 1; two first electric push rods 10 are fixedly connected to the top of the base 1; the two first electric push rods 10 are arranged oppositely; a first fixing rod 11 is fixedly connected to the output end of the first electric push rod 10; a plurality of first slide grooves 12 are provided on the top of the base 1; a first slider 13 is slidably connected to the middle of the first slide groove 12; a docking block 14 is fixedly connected to the top of the two first sliders 13; a clamping plate 15 is installed on the top of the docking block 14; two fixing holes are provided on the top of the docking block 14 16; two bolts 17 are threadedly connected to the top of the clamping plate 15; the two bolts 17 are installed at the corresponding positions of the fixing holes 16; the ends of the two bolts 17 are threadedly connected inside the fixing holes 16; two second fixing rods 18 are fixedly connected to the side wall of the base 1; the two second fixing rods 18 are arranged oppositely; the ends of the second fixing rods 18 are fixedly connected to the support frame 19; when working, the two pipes are placed in the middle of the corresponding two docking blocks 14, and the middle of the pipe is placed in the middle of the support frame 19 for support, and then the bolts 1 on both sides of the clamping plate 15 are tightened. 7; Make the end of the bolt 17 rotate inside the fixing hole 16, fix the clamping plate 15 on the top of the docking block 14 through the bolt 17, clamp the pipeline in the docking block 14 through the clamping plate 15, and then open the first electric push rod 10 after powering on, so that the output end of the first electric push rod 10 moves, and the two first electric push rods 10 move to bring the docking block 14 closer, and the two fixed pipeline ends are docked by moving the docking block 14, and the first electric push rod 10 can effectively provide a stable thrust, effectively reduce the problem of unevenness caused by uneven force in pipeline docking, effectively reduce the deviation caused in the process of pipeline docking, and effectively improve the accuracy of pipeline docking. Effectively fixing the pipeline can effectively improve the stability of the pipeline during the docking process, effectively reduce the displacement or deviation of the docking position caused by shaking or vibration of the pipeline during the docking process, effectively reduce the increase in adjustment time caused by pipeline displacement, and effectively reduce the leakage problem caused by inaccurate pipeline docking, thereby effectively increasing the speed and accuracy of pipeline docking.
[0025] like Figures 1 to 3As shown, the top of the clamping plate 15 is slidably connected to the slide bar 2; a first spring 21 is fixedly connected between the end of the slide bar 2 and the top of the clamping plate 15; an elastic plate 22 is fixedly connected to the end of the slide bar 2 away from the first spring 21; during operation, when the pipeline is placed in the middle of the docking block 14, the clamping plate 15 is fixed to the pipeline by bolts 17, and when the clamping plate 15 moves toward the pipeline position, the top of the pipeline is first released by the elastic plate 22, and when the clamping plate 15 continues to apply pressure, the slide bar 2 slides in the middle of the clamping plate 15 through the elastic plate 22, and during the upward sliding process of the slide bar 2 During the process, the first spring 21 is elastically stretched. When the elastic plate 22 is fitted with the top of the pipeline, it is elastically bent by pressure and fits the surface of the pipeline. The elastic plate 22 can effectively adapt to the sizes of different pipelines, and can effectively clamp and fix pipelines of different sizes, effectively reduce the use of different equipment for docking different pipelines, effectively reduce the cost of equipment replacement, effectively reduce the adjustment time for replacing different equipment, and can effectively increase the smoothness of pipeline docking, effectively increase the stability and accuracy of pipeline docking, and effectively improve the quality and efficiency of pipeline docking.
[0026] like Figure 2 , Figure 4 , Figure 5 As shown, a third fixing rod 3 is fixedly connected to the top of the base 1; a second electric push rod 31 is fixedly connected to the top of the third fixing rod 3; a support rod 32 is fixedly connected to the output end of the second electric push rod 31; two groups of bristles 33 are fixedly connected to the middle of the support rod 32; the two groups of bristles 33 are arranged oppositely; during operation, when the pipeline is fixed inside the docking block 14, the second electric push rod 31 is energized and opened, the output end of the second electric push rod 31 is stretched and moved, and the support rod 32 is moved by the second electric push rod 31. At the same time, during the movement of the two groups of bristles 33, the two ends of the pipeline are cleaned by the bristles 33, and the impurities and dirt accumulated at the ends of the pipelines can be effectively removed by the bristles 33, and the flatness and cleanliness of the pipeline docking surface can be effectively increased, and the leakage caused by dust and impurities on the docking surface after the pipeline docking is effectively reduced, and the problem of poor sealing caused by dust and impurities remaining in the sealing part is effectively reduced, and the sealing performance of the pipeline is effectively increased, and the safe and stable transmission of fluid or gas in the pipeline is effectively increased, and the corrosion problem caused by the long-term presence of dust and impurities at the ends of the pipeline can be effectively reduced, thereby effectively increasing the service life of the pipeline.
[0027] like Figure 4 and Figure 5As shown, a groove 4 is provided on the top of the support rod 32; two connecting rods 41 are fixedly connected to the top of the support rod 32; the two connecting rods 41 are arranged oppositely; the ends of the two connecting rods 41 are fixedly connected to a motor 42; a plurality of fan blades 43 are fixedly connected to the output end of the motor 42; a plurality of exhaust holes 44 are provided in the middle of the support rod 32; when working, the motor 42 is turned on to make the output end of the motor 42 rotate, and the plurality of fan blades 43 are rotated by the motor 42, and the rotated fan blades 43 generate airflow to blow into the groove 4, and the airflow is discharged through the plurality of exhaust holes 44. When the support rod 32 moves, the airflow is discharged and blown to the end of the pipe, and the dust, impurities and tiny particles at the pipe docking end can be effectively removed by blowing, and the pipe docking surface can be free of dust and impurities, and the residual moisture at the pipe docking end can be effectively dried, and the moisture can be effectively and quickly removed to make the pipe docking surface dry, so as to effectively increase the tightness and stability of the pipe docking, and effectively improve the quality of the pipe docking.
[0028] like Figure 3 As shown, a second spring 5 is fixedly connected to the side wall of one of the docking blocks 14; an elastic block 51 is fixedly connected to the end of the second spring 5; during operation, when the two docking blocks 14 approach each other, the elastic block 51 contacts the surface of the other docking block 14, and when the two docking blocks 14 continue to approach each other, the second spring 5 elastically contracts, and the second spring 5 and the elastic block 51 can effectively reduce the impact generated during the pipeline docking process, effectively reduce the impact on the pipeline, effectively reduce the wear of the wall surface of the pipeline end caused by the pipeline impact, effectively increase the stability of the pipeline docking process, effectively improve the accuracy and quality of pipeline docking, effectively reduce the damage to the pipeline docking caused by the impact force, and effectively increase the service life of the pipeline.
[0029] like Figure 1 , Figure 2 , Figure 4 As shown, two second slide grooves 6 are provided on the side wall of the base 1; a second slider 61 is slidably connected in the middle of the two second slide grooves 6; a protective plate 62 is fixedly connected to the ends of the two second sliders 61; during operation, when the pipelines are docked, the two second sliders 61 are placed in the middle of one end of the second slide groove 6, and the protective plate 62 is slid inside the second slide groove 6 through the two second sliders 61, so that the protective plate 62 slides to the middle of the base 1 for protection, and the protective plate 62 can effectively isolate and protect the docking part of the pipeline, effectively reduce the pipeline from being directly hit or squeezed by external objects, effectively reduce the damage to the pipeline, and can be easily installed and disassembled, so that the pipeline docking protection process is simple and convenient, and can effectively reduce the damage and erosion caused to the equipment by the harsh environment, and effectively reduce the aging and damage of the equipment caused by the environment.
[0030] like Figure 1 , Figure 2 , Figure 3As shown, a rubber pad 7 is installed in the middle of the docking block 14; the rubber pad 7 is fixedly connected to the middle of the docking block 14; during operation, when the pipeline is placed inside the docking block 14, the docking block 14 is in contact with the pipeline surface through the rubber pad 7, and the friction between the pipeline and the docking block 14 can be effectively increased through the rubber pad 7, and the wear between the pipeline and the docking block 14 can be effectively reduced through the rubber pad 7, and the reduction in the matching accuracy between the pipeline and the docking block 14 caused by the wear can be effectively reduced, and the pipeline and the docking block 14 can be effectively made to fit tightly, and the problem of looseness of the pipeline can be effectively reduced, so that the pipeline can run stably.
[0031] like Figure 5 As shown, a filter screen 8 is installed in the middle of the exhaust hole 44; the filter screen 8 is fixedly connected to the middle of the exhaust hole 44; during operation, when the air flow is blowing, the dust and impurities inside the groove 4 are filtered through the filter screen 8, and the filter screen 8 can effectively reduce the dust and impurities in the air from entering the groove 4 and being discharged to the surface of the pipe, effectively reduce the dust and impurities accumulated in the groove 4 from being discharged, effectively reduce the dust and impurities discharged into the air to cause pollution to the working environment, can effectively reduce the diffusion of dust and impurities, and effectively improve the quality of the working environment.
[0032] During operation, the two pipes are placed in the middle of the two corresponding docking blocks 14, and the middle of the pipe is placed in the middle of the support frame 19 for support, and then the bolts 17 on both sides of the clamping plate 15 are screwed; the ends of the bolts 17 are rotated inside the fixing holes 16, and the clamping plate 15 is fixed to the top of the docking block 14 by the bolts 17, and the pipe is clamped and fixed in the docking block 14 by the clamping plate 15, and then the first electric push rod 10 is powered on and opened, so that the output end of the first electric push rod 10 moves, and the two first electric push rods 10 move to bring the docking block 14 closer, and the two fixed pipes The ends of the pipes are docked by moving the docking block 14. When the pipe is placed in the middle of the docking block 14, the clamping plate 15 is fixed to the pipe by the bolt 17. When the clamping plate 15 moves toward the pipe position, the top of the pipe is first released by the elastic plate 22. When the clamping plate 15 continues to apply pressure, the slide bar 2 slides in the middle of the clamping plate 15 through the elastic plate 22, and the first spring 21 is elastically stretched during the upward sliding of the slide bar 2. When the elastic plate 22 fits with the top of the pipe, it is elastically bent by pressure and fits with the surface of the pipe. When the pipe is fixed inside the docking block 14, When the second electric push rod 31 is powered on and turned on, the output end of the second electric push rod 31 is stretched and moved, and the support rod 32 is moved by the second electric push rod 31. At the same time, the two groups of bristles 33 are moved, and the two ends of the pipes are cleaned by the bristles 33. The motor 42 is turned on to rotate the output end of the motor 42. The motor 42 rotates the multiple groups of blades 43. The rotating blades 43 generate airflow to blow into the groove 4, and the airflow is discharged through the multiple groups of exhaust holes 44. When the support rod 32 moves, the airflow is discharged and blown to the end of the pipe. When the two docking blocks 14 are When approaching, the elastic block 51 contacts the surface of another docking block 14. When the two docking blocks 14 continue to approach, they are elastically contracted by the second spring 5. When the pipes are docked, the two second sliders 61 are placed in the middle of one end of the second slide groove 6, and the protective plate 62 is slid inside the second slide groove 6 through the two second sliders 61, so that the protective plate 62 slides to the middle of the base 1 for protection. When the pipe is placed inside the docking block 14, the rubber pad 7 makes the docking block 14 contact with the surface of the pipe. When the airflow is blowing, the dust and impurities inside the groove 4 are filtered through the filter 8.
[0033] The above shows and describes the basic principles, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only for explaining the principles of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection claimed by the utility model is defined by the attached claims and their equivalents.
Claims
1. A water conservancy pipeline construction docking device, comprising a base (1); characterized in that: Two first electric push rods (10) are fixedly connected to the top of the base (1); the two first electric push rods (10) are arranged opposite to each other; the output end of the first electric push rod (10) is fixedly connected to a first fixing rod (11); a plurality of first sliding grooves (12) are provided on the top of the base (1); a first sliding block (13) is slidably connected to the middle of the first sliding groove (12); a docking block (14) is fixedly connected to the top of the two first sliding blocks (13); a clamping plate (15) is installed on the top of the docking block (14); two fixing holes (16) are provided on the top of the docking block (14); two bolts (17) are threadedly connected to the top of the clamping plate (15); the two bolts (17) are installed at the positions corresponding to the fixing holes (16); the ends of the two bolts (17) are threadedly connected inside the fixing holes (16); two second fixing rods (18) are fixedly connected to the side wall of the base (1); the two second fixing rods (18) are arranged opposite to each other; and the ends of the second fixing rods (18) are fixedly connected to a support frame (19).
2. A water conservancy pipeline construction docking device according to claim 1, characterized in that: The top of the clamping plate (15) is slidably connected to a slide rod (2); a first spring (21) is fixedly connected between the end of the slide rod (2) and the top of the clamping plate (15); and an elastic plate (22) is fixedly connected to one end of the slide rod (2) away from the first spring (21).
3. A water conservancy pipeline construction docking device according to claim 2, characterized in that: A third fixing rod (3) is fixedly connected to the top of the base (1); a second electric push rod (31) is fixedly connected to the top of the third fixing rod (3); a support rod (32) is fixedly connected to the output end of the second electric push rod (31); two groups of bristles (33) are fixedly connected to the middle of the support rod (32); the two groups of bristles (33) are arranged opposite to each other.
4. A water conservancy pipeline construction docking device according to claim 3, characterized in that: A groove (4) is provided at the top of the support rod (32); two connecting rods (41) are fixedly connected to the top of the support rod (32); the two connecting rods (41) are arranged opposite to each other; motors (42) are fixedly connected to the ends of the two connecting rods (41); a plurality of fan blades (43) are fixedly connected to the output end of the motor (42); and a plurality of exhaust holes (44) are provided in the middle of the support rod (32).
5. A water conservancy pipeline construction docking device according to claim 4, characterized in that: A second spring (5) is fixedly connected to a side wall of one of the docking blocks (14); and an elastic block (51) is fixedly connected to an end of the second spring (5).
6. A water conservancy pipeline construction docking device according to claim 5, characterized in that: The side wall of the base (1) is provided with two second sliding grooves (6); the middle parts of the two second sliding grooves (6) are slidably connected with second sliding blocks (61); and the ends of the two second sliding blocks (61) are fixedly connected with protective plates (62).
7. A water conservancy pipeline construction docking device according to claim 6, characterized in that: A rubber pad (7) is installed in the middle of the docking block (14); the rubber pad (7) is fixedly connected to the middle of the docking block (14).
8. A water conservancy pipeline construction docking device according to claim 7, characterized in that: A filter screen (8) is installed in the middle of the exhaust hole (44); the filter screen (8) is fixedly connected to the middle of the exhaust hole (44).
Citation Information
Cited By
Raw material cutting equipment
CN120363291A