Composite lifting appliance and lifting equipment
By designing composite spreaders and integrating flat plates and bent state lifting components, the problem of multiple spreaders in the existing technology in the need of multiple splitters in multiple states is solved, and the efficient, low-cost and high-efficiency lifting of lifting equipment is achieved. Loading function.
Patent Information
- Application Number
- CN202420909215.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-28
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2034-04-28
AI Technical Summary
The design of the spreader in the prior art requires two pairs of spreaders to be loaded and unloaded, resulting in high costs, occupying the site, increasing working time and manual hooking workload, and reducing production efficiency.
A composite spreader is designed, including a first lifting assembly for lifting a flat plate state and a second lifting assembly in a bent state. The spreader beam is spaced apart in the length direction, the first lifting assembly is perpendicularly symmetrical with the second lifting assembly, and the first A preset distance is set between the lifting position and the second lifting position to realize the bias arrangement of the lifting tool and reduce interference.
The workpiece loading, bending and unloading lifting functions are integrated, saving the manufacturing and maintenance costs of spreaders, reducing replacement work time, and improving production efficiency.
Smart Images

Figure CN222042359U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of lifting equipment, and in particular, to a composite lifting device and lifting equipment. Background Art
[0002] In the field of mechanical manufacturing, hoists are one of the indispensable tools for handling raw materials, semi-finished products and finished products. In practical applications, it is often necessary to design and apply more non-standard hoists due to the characteristics of the hoisted workpieces, hoisting conditions and other restrictions.
[0003] Among them, the boom of the crane is welded by two steel cover plates, the upper and lower steel cover plates, which are generally leveled, cut, milled and bent to finally reach the shape and size on the drawing. In the existing manufacturing technology, the cover plate bending process is to bend the flat boom plate into a curved cover plate such as a groove, U-shape or polygon. Therefore, the steel plate in this process has two states: flat and curved. For the sake of safety and work efficiency, this process is generally equipped with two pairs of hangers: electromagnetic adsorption hanger and shoulder beam hanger. The electromagnetic adsorption hanger is used to lift the flat cover plate during loading, and the shoulder beam hanger is used to assist in adjusting the posture of the semi-finished product during the bending process and lifting the bent cover plate during unloading.
[0004] In the prior art, two sets of slings are required for loading and unloading the cover plate, which is costly and requires an additional dedicated storage area for the slings. Most importantly, replacing the slings will increase the operation time and the workload of manual hooking, reducing production efficiency. Utility Model Content
[0005] The purpose of the present application is to provide a composite sling and lifting equipment to solve the problem that the prior art uses two slings, which leads to increased costs, occupies space, increases operation time and manual hooking workload, and reduces production efficiency.
[0006] To achieve the above objectives, in a first aspect, the present application provides a composite sling, comprising:
[0007] A first lifting assembly is used to lift a workpiece in a flat plate state;
[0008] A second lifting assembly, used for lifting the workpiece in a bent state; and
[0009] A sling beam, used to be connected to a lifting device of a crane, wherein a plurality of the first lifting assemblies and a plurality of the second lifting assemblies are arranged on the sling beam at intervals along the length direction, and the plurality of the first lifting assemblies and the plurality of the second lifting assemblies are symmetrically distributed about a longitudinal center line of the sling beam perpendicular to the length direction;
[0010] Wherein, the first hoisting position of the first hoisting assembly and the second hoisting position of the second hoisting assembly are arranged at a preset distance in the width direction of the hanger beam.
[0011] As a further improvement of the above technical solution:
[0012] In a possible implementation, the first hoisting position of the first hoisting assembly is arranged below the hanger beam, and the second hoisting position of the second hoisting assembly is arranged on one side of the hanger beam.
[0013] In a possible implementation manner, the weight of the workpiece to be lifted is defined as G1, the overall weight of the composite sling is defined as G2, the lateral distance between the vertical projection position of the connection between the sling beam and the lifting device and the second lifting position is defined as A1, the lateral distance between the vertical projection position of the connection between the sling beam and the lifting device and the center of gravity of the composite sling is defined as A2, and the distance of the second lifting position from the center of gravity of the composite sling is defined as B;
[0014] Among them, B=A1+A2, and satisfies A1*G1≤A2*G2.
[0015] In a possible implementation manner, the second hanging assembly includes:
[0016] A hanging plate, arranged on the hanger beam;
[0017] a suspension rope connected to the suspension board; and
[0018] A steel plate clamp is arranged at the second lifting position of the second lifting assembly and is connected to one end of the lifting rope away from the hanging plate.
[0019] In a possible implementation, a locking bracket is further provided on the hanger beam corresponding to each of the second hanging components, and the locking bracket is used for detachably connecting with the steel plate clamp.
[0020] In a possible implementation, the hanging plate extends in a direction away from the hanger beam to form a cantilever portion, and the hanging rope is connected to the cantilever portion.
[0021] In a possible implementation, the hanging plate is located on the top of the hanger beam, and two ear seats are provided on a side of the hanging plate away from the hanger beam;
[0022] Wherein, a lifting ring is arranged above the sling beam, and each ear seat on the hanging plate is connected to the lifting ring through a connecting rope.
[0023] In a possible implementation, the first lifting assembly is an electromagnetic suction cup assembly or a vacuum suction cup assembly.
[0024] In a possible implementation manner, at least two support seats are further provided at the bottom of the hanger beam along the length direction.
[0025] To achieve the above-mentioned purpose, in a second aspect, the present application further provides a lifting device, including a crane and a composite lifting device provided according to the above-mentioned first aspect.
[0026] Compared with the prior art, the present invention has the following beneficial effects:
[0027] The present application provides a composite hoist and a hoisting device, wherein the composite hoist integrates a first hoisting component for hoisting a workpiece in a flat state and a second hoisting component for hoisting a workpiece in a bent state on the hoist beam, and there is a spacing between the first hoisting position of the first hoisting component and the second hoisting position of the second hoisting component in the width direction of the hoist beam, thereby, the first hoisting position and the second hoisting position do not overlap, and are offset settings. In this way, the first hoisting component and the second hoisting component can each perform their own functions without interfering with each other. In the bending process of the steel cover plate, the flat workpiece can first be sucked by the first hoisting component for loading, and the second hoisting component can be used to clamp the bent workpiece to assist in adjusting the posture during the bending process. When unloading, the second hoisting component can also be used to clamp the bent workpiece for unloading. Therefore, the composite hanger provided in the present application can be used for loading, auxiliary bending and unloading processes of workpieces. There is no need to configure two pairs of hangers, which saves the manufacturing and maintenance costs of the hangers. At the same time, there is no need to switch between the two pairs of hangers, which reduces the workload and improves production efficiency.
[0028] Other features and advantages of the present application will be described in detail in the subsequent detailed description. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] The accompanying drawings are used to provide a further understanding of the present application and constitute a part of the specification. Together with the following specific embodiments, they are used to explain the present application. It should be understood that the following drawings only show certain embodiments of the present application and should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work. In the drawings:
[0030] Figure 1 A schematic diagram of the three-dimensional structure of a composite hanger provided in an embodiment of the present application is shown;
[0031] Figure 2 Shows Figure 1 A front view of the composite spreader shown;
[0032] Figure 3 Shows Figure 1 A local enlarged schematic diagram of the middle A;
[0033] Figure 4 Shows Figure 1 A top view of the composite spreader is shown.
[0034] Description of reference numerals:
[0035] 100, sling beam; 110, locking bracket; 120, ear seat; 130, lifting ring; 140, connecting rope; 150, supporting seat;
[0036] 200, first hoisting assembly;
[0037] 300, second lifting assembly; 310, hanging plate; 311, cantilever portion; 312, lifting lug; 320, lifting rope; 330, steel plate clamp;
[0038] 400. Electrical control cabinet. DETAILED DESCRIPTION
[0039] The specific implementation of the embodiment of the present application is described in detail below in conjunction with the accompanying drawings. It should be understood that the specific implementation described here is only used to illustrate and explain the embodiment of the present application, and is not used to limit the embodiment of the present application.
[0040] The present application will be described in detail below with reference to the accompanying drawings and in conjunction with exemplary embodiments.
[0041] Example
[0042] This embodiment provides a composite hanger, which can realize loading and unloading of workpieces to be processed.
[0043] In order to more clearly describe the technical solution of the present application, in this embodiment, the upper and lower steel cover plates in the boom of a wheeled crane are used as an example. The upper and lower steel cover plates in the boom (hereinafter collectively referred to as cover plates) use steel plates of various specifications, large volume, and heavy weight, and the loading, bending, and unloading steps of the bending process all require the cooperation of the lifting device.
[0044] It should be noted that the cover plate is a boom plate in a flat state before bending. The boom plate in a flat state needs to be bent into a curved cover plate in a groove, U-shape or polygonal shape through the bending process. Since the shape of the cover plate changes before and after bending, different hoists are usually required for hoisting in the loading and unloading processes in the prior art. As a result, the existing operation method has the following technical problems:
[0045] 1. Equipped with two pairs of spreaders, the cost is relatively high;
[0046] 2. An additional dedicated site for hoisting equipment storage is required, which takes up resources;
[0047] 3. Two sets of hangers need to be replaced frequently in a bending process, which increases the operation time and the workload of manual hooking and reduces production efficiency.
[0048] See also Figure 1 and Figure 2 To solve the above problems, the composite sling provided in this embodiment includes a sling beam 100, a plurality of first sling assemblies 200 and a plurality of second sling assemblies 300. The sling beam 100 is used to connect with the lifting device of the crane; the plurality of first sling assemblies 200 and the plurality of second sling assemblies 300 are both arranged on the sling beam 100 and distributed along the length direction of the sling beam 100. The first sling position of the first sling assembly 200 and the second sling position of the second sling assembly 300 are arranged at a preset distance in the width direction of the sling beam 100.
[0049] Furthermore, the first hoisting assembly 200 and the second hoisting assembly 300 are symmetrically arranged about the longitudinal center line of the hoisting beam 100 perpendicular to the length direction to ensure the stability of the center of gravity during hoisting. Figure 2 As shown, the longitudinal center line is parallel to the paper surface and is a virtual line extending in the up-down direction.
[0050] There is a preset spacing between the first hoisting position of the first hoisting assembly 200 and the second hoisting position of the second hoisting assembly 300 in the width direction of the hanger beam, and the second hoisting assembly 300 and the first hoisting assembly 200 work independently without interfering with each other.
[0051] In some embodiments, when the second hoisting assembly 300 is working, the distance between the clamping end of the second hoisting assembly 300 and the bottom of the sling beam 100 is H1; when the first hoisting assembly 200 is working, the distance between the adsorption end of the first hoisting assembly 200 and the bottom of the sling beam 100 is H2, H1>H2. In this way, there is a certain height difference between the working positions of the second hoisting assembly 300 and the first hoisting assembly 200 in space, further reducing interference during the hoisting process.
[0052] Optionally, 0.05 m < H1-H2 < 0.2 m, so as to adapt to the lifting of large-volume steel plates with a width of ≤ 2.2 m, a length of ≤ 13 m, and a weight of ≤ 2 tons.
[0053] It should also be noted that the number of the first hoisting assembly 200 and the second hoisting assembly 300 can be designed according to the length and weight of the workpiece to be processed. In the drawings of this embodiment, 7 first hoisting assemblies 200 and two second hoisting assemblies 300 are illustrated. It should be understood that this embodiment is only an example and is not intended to limit the scope of protection of this application.
[0054] It can be understood that the composite hanger provided in this embodiment integrates a first hoisting assembly 200 for hoisting a workpiece in a flat state and a second hoisting assembly 300 for hoisting a workpiece in a bent state on the hanger beam 100, and there is a spacing between the first hoisting position of the first hoisting assembly 200 and the second hoisting position of the second hoisting assembly 300 in the width direction of the hanger beam, so that the first hoisting position and the second hoisting position do not overlap and are offset. In this way, it is convenient for the first hoisting assembly 200 and the second hoisting assembly 300 to perform their own functions respectively without interfering with each other. In the bending process of the steel cover plate (hereinafter referred to as the workpiece), the first hoisting assembly 200 can first be used to suck the workpiece in a flat state for loading, and the second hoisting assembly 300 can be used to clamp the workpiece in a bent state to assist in adjusting its posture during the bending process, and the second hoisting assembly 300 can also be used to clamp the workpiece in a bent state for unloading. Therefore, the composite hanger provided in the present application can be used for unloading, auxiliary bending and lifting of workpieces in the unloading process, and there is no need to separately configure two hangers, saving manufacturing costs. At the same time, there is no need to switch between the two hangers, which reduces the workload and improves production efficiency.
[0055] Please also read Figure 4 Furthermore, the first lifting position of the first lifting assembly 200 is arranged below the lifting beam 100, and the second lifting position of the second lifting assembly 300 is arranged on one side of the lifting beam 100. Thus, the second lifting assembly 300 forms an offset arrangement, so that the composite lifting device can realize the offset lifting of the workpiece to adapt to different processing procedures of the workpiece.
[0056] In some embodiments, the weight of the workpiece to be lifted is defined as G1, the overall weight of the composite sling is G2, the lateral distance from the vertical projection position of the connection between the sling beam 100 and the lifting device (that is, the vertical projection position of the lifting ring 130, the lifting ring 130 is described below) to the second lifting position is A1, the lateral distance from the vertical projection position of the connection between the sling beam 100 and the lifting device to the center of gravity of the composite sling is A2, and the distance of the second lifting position from the center of gravity of the composite sling is B; wherein, B=A1+A2, and satisfies A1*G1≤A2*G2.
[0057] In some embodiments, the minimum spacing L between adjacent second hanging assemblies 300 located on both sides of the longitudinal centerline of the hanger beam 100 perpendicular to the length direction defines the length of the workpiece as T, where T>L≥T-(1.2 meters to 1.4 meters).
[0058] In order to more clearly describe the technical solution of the present application, the composite spreader provided in this embodiment is described below, specifically as follows:
[0059] See also Figure 1 , Figure 2 and Figure 3 The second hoisting assembly 300 is a lifting clamp assembly. Specifically, each second hoisting assembly 300 includes a hanging plate 310, a hanging rope 320 and a steel plate clamp 330. The hanging plate 310 is arranged on the hanger beam 100. For example, the hanging plate 310 can be connected to the hanger beam 100 by bolt connection or welding connection. In this embodiment, welding connection is adopted to ensure the stability of the connection between the hanging plate 310 and the hanger beam 100.
[0060] The lifting rope 320 is connected to the hanging plate 310; the steel plate clamp 330 is arranged at the second lifting position of the second lifting assembly 300 and connected to the end of the lifting rope 320 away from the hanging plate 310. In this way, when the cover plate is lifted off the bending station by the second lifting assembly 300, the side of the workpiece is clamped by the steel plate clamp 330, and then the workpiece is lifted off.
[0061] It should be noted that only two symmetrical ones are selected to participate in the work among the plurality of second lifting assemblies 300. The unused second lifting assemblies 300 should have their lifting ropes 320 and steel plate clamps 330 removed or the steel plate clamps 330 locked on adjacent locking brackets 110 (described below).
[0062] Further, the hanging plate 310 is provided with a hanging ear 312 connected to the hanging rope 320. The arrangement of the hanging ear 312 facilitates the installation of the hanging rope 320. In this way, it is convenient to install the hanging rope 320 of different lengths to adapt to different hanging load conditions.
[0063] Optionally, the sling 320 is a steel wire rope, a sling chain or a sling. It should be understood that the length of the sling 320 can be adjusted according to the requirements of the sling workpiece.
[0064] In this embodiment, a locking bracket 110 is also provided on the hanger beam 100 corresponding to each second hoisting assembly 300. The locking bracket 110 is used to be detachably connected to the steel plate clamp 330 to lock and limit the steel plate clamp 330. In this way, when the first hoisting assembly 200 performs a hoisting operation, the steel plate clamp 330 is first installed on the locking bracket 110 to prevent the steel plate clamp 330 in a free state from shaking or contacting or rubbing with the steel plate to be hoisted, thereby interfering with the hoisting operation. Of course, in some embodiments, when the first hoisting assembly 200 performs a hoisting operation, the steel plate clamp 330 can also be installed on the hanging plate 310 of the adjacent second hoisting assembly 300.
[0065] Furthermore, the second hoisting assembly 300 may be arranged differently according to different hoisted workpieces. For example, the second hoisting assembly 300 may be arranged directly below the hoisting beam 100. In this embodiment, the second hoisting assembly 300 is arranged in an offset manner to facilitate the loading, posture adjustment and unloading of the cover plate.
[0066] Please also read Figure 4 Specifically, the hanging plate 310 extends in a direction away from the hanger beam 100 to form a cantilever portion 311 , and the hanging rope 320 is connected to the cantilever portion 311 .
[0067] In this embodiment, the hanging plate 310 is located at the top of the hanger beam 100, and two ear seats 120 are provided on the side of the hanging plate 310 away from the hanger beam 100. Among them, a lifting ring 130 is also arranged above the hanger beam 100, and each ear seat 120 on the hanging plate 310 is connected to the lifting ring 130 through a connecting rope 140. It can be understood that the lifting ring 130 can be easily connected to the crane. Each hanging plate 310 is arranged with two ear seats 120, so that the two hanging plates 310 have four ear seats 120, so that there are four connecting ropes 140 connected to the lifting ring 130, and the four connecting ropes 140 and the four ear seats 120 form a triangular pyramid structure, thereby ensuring the stability of the center of gravity of the entire composite hanger during the lifting process.
[0068] Furthermore, the first hanging assembly 200 is an electromagnetic suction cup assembly or a vacuum suction cup assembly, so as to be suitable for adsorbing the hanging plate 310 in a flat state.
[0069] The hanger beam 100 is also provided with an electric control cabinet 400, and a controller electrically connected to the first hanging assembly 200 is provided in the electric control cabinet 400. In this way, the controller controls the power-on adsorption and power-off release adsorption of the first hanging assembly 200. Optionally, the controller can be selected as a PLC, a single chip microcomputer or a relay group.
[0070] Furthermore, at least two support seats 150 are provided at the bottom of the hanger beam 100 along the length direction of the hanger beam 100. The support seats 150 can provide support for the hanger beam 100 when it is placed on the foundation to prevent the entire composite hanger from falling on the foundation.
[0071] This embodiment also provides a lifting device. The lifting device includes a crane and the composite lifting device provided according to the above embodiment. The composite lifting device is connected to the hook of the crane.
[0072] Optionally, the crane is a gantry crane or a crane.
[0073] Among them, the hoisting method of the hoisting equipment using the composite hoist is as follows:
[0074] S100: Fix the lifting ring 130 of the composite lifting device on the hook of the crane. Note that the composite lifting device has a direction when lifting, and the side where the second lifting assembly 300 is located needs to face the bending machine.
[0075] S200: Control the crane to control the composite hoist to rise to a certain height and move it above the boom plate in a flat state, and then control the composite hoist to descend to a preset height so that the adsorption end of the first hoisting component 200 contacts the surface of the boom plate.
[0076] S300: Control all first hoisting components 200 in contact with the arm of the hanging plate 310 to be firmly adsorbed, and then control the crane to smoothly transport the entire hanging arm plate to the bracket of the bending machine, and then release the adsorption of the first hoisting components 200.
[0077] S400: The bending machine starts working and the whole bending process of the boom plate begins. Note that the composite hoist may be required to assist the operation during the U-arm bending process. At this time, the steel plate clamp 330 in the second lifting assembly 300 is removed from the locking bracket 110 and clamped on the straight edge on the same side of the U-arm to assist manual adjustment of the U-arm posture.
[0078] S500: After completing the posture adjustment, use the second lifting assembly 300 of the composite lifting device to lift the workpiece away from the center of the lower mold of the bending machine, and then manually switch the steel plate clamp 330 of one of the second lifting assemblies 300 to the other side of the formed cover plate for clamping, and finally smoothly lift the formed cover plate away from the bending station.
[0079] Thus, the composite hanger provided in this embodiment has the following advantages:
[0080] (1) It can simultaneously meet the three functional requirements of loading the flat-plate boom plate in the bending process, assisting the loading during the bending process, and unloading the formed cover plate. The lifting is stable and reliable, thereby avoiding hard friction between steel plates and steel plates, and between steel plates and support racks, and reducing possible quality risks and safety risks.
[0081] (2) The composite sling integrates the first lifting assembly 200 and the second lifting assembly 300 on the sling beam 100, so that one sling integrates the functions of two slings, which can save the cost of one sling and reduce the site occupied by one sling.
[0082] (3) It can reduce the time and workload of replacing the hanger, adapt to the bending rhythm of different types of workpieces, and ensure the output capacity of the equipment.
[0083] In the description of the present application, it should be understood that the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one of the features. In the description of the present application, "plurality" means at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0084] In this application, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0085] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.
[0086] Although the embodiments of the present application have been shown and described above, it can be understood that the above embodiments are exemplary and cannot be understood as limitations on the present application. Ordinary technicians in the field can change, modify, replace and modify the above embodiments within the scope of the present application.
Claims
1. A composite sling, characterized in that: include: A first hoisting assembly (200) is used to hoist a workpiece in a flat plate state; A second lifting assembly (300) is used for lifting the workpiece in a bent state; and A sling beam (100) is used to be connected to a lifting device of a crane, wherein a plurality of the first lifting assemblies (200) and a plurality of the second lifting assemblies (300) are arranged on the sling beam (100) at intervals along the length direction, and the plurality of the first lifting assemblies (200) and the plurality of the second lifting assemblies (300) are symmetrically distributed about a longitudinal center line of the sling beam (100) perpendicular to the length direction; The first hoisting position of the first hoisting assembly (200) and the second hoisting position of the second hoisting assembly (300) are arranged at a preset distance in the width direction of the hanger beam (100).
2. The composite sling according to claim 1, characterized in that: The first hoisting position of the first hoisting assembly (200) is arranged below the hoisting beam (100), and the second hoisting position of the second hoisting assembly (300) is arranged on one side of the hoisting beam (100).
3. The composite sling according to claim 1 or 2, characterized in that: The weight of the workpiece to be lifted is defined as G1, the overall weight of the composite sling is defined as G2, the lateral distance between the vertical projection position of the connection between the sling beam (100) and the lifting device and the second lifting position is defined as A1, the lateral distance between the vertical projection position of the connection between the sling beam (100) and the lifting device and the center of gravity of the composite sling is defined as A2, and the distance of the second lifting position from the center of gravity of the composite sling is defined as B; Among them, B=A1+A2, and satisfies A1*G1≤A2*G2.
4. The composite sling according to claim 1, characterized in that: The second hanging assembly (300) comprises: A hanging plate (310) is arranged on the hanger beam (100); A hanging rope (320) connected to the hanging plate (310); and A steel plate clamp (330) is arranged at the second lifting position of the second lifting assembly (300) and is connected to one end of the lifting rope (320) away from the lifting plate (310).
5. The composite hanger according to claim 4, characterized in that: The hanger beam (100) is also provided with a locking bracket (110) corresponding to each of the second hanging components (300), and the locking bracket (110) is used for being detachably connected to the steel plate clamp (330).
6. The composite hanger according to claim 4, characterized in that: The hanging plate (310) extends in a direction away from the hanger beam (100) to form a cantilever portion (311), and the hanging rope (320) is connected to the cantilever portion (311).
7. The composite hanger according to claim 6, characterized in that: The hanging plate (310) is located at the top of the hanger beam (100), and two ear seats (120) are provided on a side of the hanging plate (310) away from the hanger beam (100); A lifting ring (130) is also arranged above the lifting device beam (100), and each ear seat (120) on the lifting plate (310) is connected to the lifting ring (130) via a connecting rope (140).
8. The composite hanger according to claim 1, characterized in that: The first lifting component (200) is an electromagnetic suction cup component or a vacuum suction cup component.
9. The composite sling according to claim 1, characterized in that: At least two support seats (150) are also provided at the bottom of the hanger beam (100) along the length direction.
10. A lifting device, characterized in that: It comprises a crane and a composite lifting device according to any one of claims 1-9.
Citation Information
Cited By
Self-adaptive conveying device for flat steel machining
CN121201996A