Ground crack protection structure of railway

By using protective plates and protective brazing structures in railway paving and combining with fill layers, the problem of ground crack expansion is solved and the stability and safety of the railway is improved.

CN222043747UActive Publication Date: 2024-11-22CCCC RAILWAY DESIGN & RES INST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420499882.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-14
Publication Date
2024-11-22
Estimated Expiration
2034-03-14

AI Technical Summary

Technical Problem

In the process of railway laying, the protection effect of ground cracks is poor after filling gravel, which can easily lead to the expansion of ground cracks and increase the risk of railway safety accidents.

Method used

The structure includes protective plates and protective brazing nails. The protective brazing nails are nailed into both sides of the formation, and the protective plates are welded and fixed with the brazing nails. The filling layer fills the ground cracks, forming an inverted trapezoidal protective pit and a multi-layer gravel rammed earth-covered soil structure.

Benefits of technology

It improves the protection effect of ground cracks, reduces the risk of further expansion, and ensures the stable use and safety of railways.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222043747U_ABST
    Figure CN222043747U_ABST
Patent Text Reader

Abstract

The utility model discloses a railway ground fissure protection structure, which comprises a ground layer, a protection plate and two groups of protection drill nails, the two groups of protection drill nails are respectively nailed into the ground layer, and the two groups of protection drill nails are symmetrically distributed on two sides of a ground fissure. The two ends of the protection plate are fixedly welded to the corresponding protection drill nails respectively, a protection pit is dug in the position, located at the ground fracture, of the stratum, and a filling layer is arranged in the protection pit. The protective drill nails and the protective plates are used for shielding, collecting and protecting the ground fissures of the stratum and are matched with the filling layer to fill the ground fissures, so that the protection effect on the ground fissures is improved, the risk that the ground fissures are further expanded is reduced, the use stability of a railway is guaranteed, and safety accidents are avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of railway facilities, in particular to a railway ground fissure protection structure. Background Art

[0002] Ground fissures generally refer to cracks on the ground, which mainly occur in fissures or faults in the strata. Ground fissures often appear in multi-level en-echelon combinations on the surface, and some can be connected into huge cracks.

[0003] At present, during the process of laying railways, if the stratum contains ground fissures, the ground fissures are usually filled with gravel before the railway is laid. However, simply filling the ground fissures with gravel has a poor protective effect, and the ground fissures are prone to further expansion, thus affecting the railway and even causing catastrophic accidents, which needs to be improved. Utility Model Content

[0004] In view of the deficiencies in the prior art, the purpose of the utility model is to provide a railway ground fissure protection structure that can improve the protection effect and reduce the risk of further expansion of the ground fissures, thereby ensuring the stable use of the railway and avoiding safety accidents.

[0005] The above-mentioned technical purpose of the utility model is achieved through the following technical scheme: a railway ground fissure protection structure, including a stratum, a protection plate and two groups of protection nails, the two groups of protection nails are respectively nailed into the stratum, and the two groups of protection nails are symmetrically distributed on both sides of the ground fissure, the two ends of the protection plate are respectively welded and fixed to the corresponding protection nails, the stratum is located at the position of the ground fissure with a protection pit, and a filling layer is arranged in the protection pit.

[0006] In a preferred example, the utility model can be further configured as follows: the cross section of the protective nail is in the shape of an I, and two side walls of the protective nail are respectively fixedly connected with a plurality of limiting bevel teeth.

[0007] In a preferred example, the utility model can be further configured as follows: a positioning column is fixedly connected to the top of each of the protective nails, a plurality of positioning holes are respectively opened at both ends of the protective plate, and the positioning column can be inserted into the corresponding positioning hole.

[0008] In a preferred example, the utility model can be further configured as follows: limiting drill nails are slidably penetrated through both ends of the protective plate, and the limiting drill nails are used to be driven into the stratum.

[0009] In a preferred example, the utility model can be further configured as follows: the bottom area of ​​the protection pit is larger than the top area thereof, and the protection pit is in an inverted trapezoidal structure.

[0010] In a preferred example, the utility model can be further configured as follows: the filling layer includes a crushed stone layer, a rammed earth layer and a covering soil layer arranged in sequence from bottom to top.

[0011] In a preferred example, the utility model can be further configured as follows: the crushed stone layer includes multiple layers of pebble layers and gap-filling crushed stone layers, and the pebble layers and the gap-filling crushed stone layers are alternately distributed.

[0012] In summary, the utility model has the following beneficial effects:

[0013] 1. The ground fissures in the strata are shielded and restrained by protective nails and protective plates, and the ground fissures are filled with filling layers to improve the protective effect of the ground fissures and reduce the risk of further expansion of the ground fissures, thereby ensuring the stability of railway use and avoiding safety accidents. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a schematic diagram of the overall structure of the embodiment;

[0015] Figure 2 Schematic diagram of the structure of the protective plate and the protective nail in the embodiment;

[0016] Figure 3 Schematic diagram of the structure of the filling layer in the embodiment.

[0017] Figure numerals: 1, stratum; 2, protective plate; 3, protective drill nail; 4, protective pit; 5, filling layer; 51, gravel layer; 511, pebble layer; 512, filling gravel layer; 52, rammed earth layer; 53, covering soil layer; 6, limiting oblique teeth; 7, positioning column; 8, positioning hole; 9, limiting drill nail. DETAILED DESCRIPTION

[0018] The utility model is further described in detail below in conjunction with the accompanying drawings.

[0019] Reference Figure 1 , Figure 2 A ground fissure protection structure for railways includes a stratum 1, a protection plate 2, and two groups of protection nails 3, and each group of protection nails 3 is provided with a plurality of nails. The two groups of protection nails 3 are respectively driven into the stratum 1, and the two groups of protection nails 3 are symmetrically distributed on both sides of the ground fissure, and the two ends of the protection plate 2 are respectively welded and fixed to the corresponding protection nails 3. At the same time, a protection pit 4 is dug at the position of the stratum 1 at the ground fissure, and a filling layer 5 is provided in the protection pit 4.

[0020] A protection pit 4 is excavated at the location of the ground fissure of the stratum 1, and then the protection pit 4 is filled with a filling layer 5, and then two groups of protection nails 3 are respectively nailed into the stratum 1, and then the protection plate 2 is placed on the stratum 1. At this time, the protection pit 4 is located below the protection plate 2, and the two ends of the protection plate 2 are respectively welded and fixed to the protection nails 3 to achieve protection of the ground fissure.

[0021] The ground fissures in the stratum 1 are shielded and constricted by the protective spikes 3 and the protective plates 2, and the ground fissures are filled in cooperation with the filling layer 5, thereby improving the protective effect on the ground fissures and reducing the risk of further expansion of the ground fissures, thereby ensuring the stability of railway use and avoiding safety accidents.

[0022] Reference Figure 1 , Figure 2 The cross section of the protective drill nail 3 is in an "I" shape to improve the structural strength of the protective drill nail 3. At the same time, the two side walls of the protective drill nail 3 are respectively fixedly connected with a plurality of limiting bevel teeth 6 to achieve the anti-retraction effect of the protective drill nail 3, thereby improving the connection stability between the protective drill nail 3 and the formation 1.

[0023] Reference Figure 1 , Figure 2 A positioning column 7 is fixedly connected to the top of each protective dowel pin 3, and a plurality of positioning holes 8 are respectively opened at both ends of the protective plate 2, and the positioning column 7 can be inserted into the corresponding positioning hole 8, thereby improving the connection stability between the protective plate 2 and the protective dowel pin 3.

[0024] Reference Figure 1 , Figure 2 , limiting dowel pins 9 are slidably penetrated at both ends of the protective plate 2, and the limiting dowel pins 9 are used to be nailed into the stratum 1, thereby improving the connection stability between the protective plate 2 and the stratum 1.

[0025] Reference Figure 1 , Figure 3 The bottom area of ​​the protection pit 4 is larger than the top area thereof, and the protection pit 4 is in an inverted trapezoidal structure to improve the structural strength of the filling layer 5. The filling layer 5 includes a crushed stone layer 51, a rammed earth layer 52 and a covering soil layer 53 arranged in sequence from bottom to top.

[0026] Reference Figure 3 The gravel layer 51 includes multiple pebble layers 511 and gap-filling gravel layers 512, and the pebble layers 511 and the gap-filling gravel layers 512 are alternately distributed. Pebbles are used as a filling skeleton, and the gaps between the pebbles are filled with the gap-filling gravel to improve the compactness of the gravel layer 51, thereby improving the structural stability.

[0027] The specific embodiments are merely explanations of the present invention and are not limitations of the present invention. After reading this specification, those skilled in the art may make modifications to the embodiments without any creative contribution as needed. However, as long as they are within the scope of the claims of the present invention, they are protected by the patent law.

Claims

1. A ground fissure protection structure for railways, comprising a stratum (1), characterized in that: It also comprises a protective plate (2) and two groups of protective nails (3), wherein the two groups of protective nails (3) are respectively nailed into the stratum (1), and the two groups of protective nails (3) are symmetrically distributed on both sides of the ground fissure, and the two ends of the protective plate (2) are respectively welded and fixed to the corresponding protective nails (3), and a protective pit (4) is dug at the position of the stratum (1) located at the ground fissure, and a filling layer (5) is arranged in the protective pit (4).

2. A railway ground fissure protection structure according to claim 1, characterized in that: The cross section of the protective dowel pin (3) is in the shape of an I, and two side walls of the protective dowel pin (3) are respectively fixedly connected with a plurality of position-limiting oblique teeth (6).

3. The railway ground fissure protection structure according to claim 1, characterized in that: The top of each protective spike (3) is fixedly connected with a positioning column (7), and a plurality of positioning holes (8) are respectively provided at both ends of the protective plate (2), and the positioning column (7) can be inserted into the corresponding positioning hole (8).

4. The railway ground fissure protection structure according to claim 1, characterized in that: Limiting nails (9) are slidably inserted through the two ends of the protective plate (2), and the limiting nails (9) are used to be nailed into the stratum (1).

5. The railway ground fissure protection structure according to claim 1, characterized in that: The bottom area of ​​the protection pit (4) is larger than the top area, and the protection pit (4) is in an inverted trapezoidal structure.

6. A railway ground fissure protection structure according to claim 5, characterized in that: The filling layer (5) comprises a crushed stone layer (51), a rammed earth layer (52) and a covering soil layer (53) which are arranged in sequence from bottom to top.

7. A railway ground fissure protection structure according to claim 6, characterized in that: The crushed stone layer (51) includes multiple layers of pebble layers (511) and gap-filling crushed stone layers (512), and the pebble layers (511) and the gap-filling crushed stone layers (512) are alternately distributed.