Conical grouting arrangement structure of solid plugging body

By adopting a solid sealing cone-shaped grouting arrangement structure in water conservancy and hydropower projects, and using cone-shaped consolidation grouting holes and water-stopping copper sheets to form a closed grouting area, the problem of insufficient grouting quality of tunnel arch and sidewalls was solved, and grouting efficiency and project safety were improved.

CN222044099UActive Publication Date: 2024-11-22POWERCHINA HUADONG ENG CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420334345.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-22
Publication Date
2024-11-22
Estimated Expiration
2034-02-22

AI Technical Summary

Technical Problem

In water conservancy and hydropower projects, the grouting quality around the tunnel arch and sidewalls is difficult to guarantee, resulting in poor sealing effect and affecting the safety and stability of the project.

Method used

A solid sealing body with conical grouting arrangement structure is adopted. By opening conical consolidation grouting holes in the solid section of the sealing body and the surrounding rock of the tunnel, a circular consolidation ring is formed. Combined with water-stop copper sheets, a closed grouting area is formed, achieving effective consolidation and joint grouting.

Benefits of technology

It improved grouting efficiency and quality, enhanced the integrity and homogeneity of the rock mass surrounding the tunnel sidewalls and arch, reduced rock mass deformation and uneven settlement, and ensured the safety and stability of the project.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222044099U_ABST
    Figure CN222044099U_ABST
Patent Text Reader

Abstract

The utility model provides a solid plugging body conical grouting arrangement structure which is characterized in that a plugging body is arranged between a construction adit and a water delivery tunnel, and the plugging body comprises a plugging body hollow section adjacent to the construction adit and a plugging body solid section adjacent to the water delivery tunnel; a conical consolidation grouting hole is formed in the plugging body solid section and the surrounding rock around the tunnel together, the conical consolidation grouting hole is provided with a starting end on the side end face, adjacent to the plugging body hollow section, of the plugging body solid section, and the conical consolidation grouting hole obliquely penetrates through the plugging body solid section to be drilled into the surrounding rock. And the conical consolidation grouting holes form an annular grouting consolidation ring on the solid section of the plugging body and the surrounding rock around the tunnel. According to the utility model, the conical consolidation grouting hole is obliquely drilled into the surrounding rock to form an effective closed annular consolidation ring, so that the integrity and homogeneity of rock masses around the tunnel side wall and the top arch are improved, the deformation and differential settlement of the rock masses are reduced, and the plugging quality is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of water conservancy and hydropower engineering, in particular to a conical grouting arrangement structure of a solid plugging body. Background Art

[0002] In the construction of water conservancy and hydropower projects, the blocking of construction auxiliary channels is a late project in the construction of water diversion tunnel projects. It is of great significance to prevent hydraulic connections between caverns and protect the safety of cavern structures, ensuring the safety and stability of the project. In order to close the seepage channel and meet the leakage standards of the tunnel after water diversion and power generation, backfill grouting, joint grouting and consolidation grouting are required in the cross channel. The grouting quality is related to the safe operation of the tunnel. Under the traditional grouting arrangement structure, it is difficult to grout around the top arch and side walls of the tunnel and the grouting quality is difficult to guarantee.

[0003] Therefore, it is urgent to propose a conical grouting arrangement structure of a solid plugging body to effectively improve the efficiency and quality of grouting, achieve a good plugging effect, and improve the safety and stability of the project. Utility Model Content

[0004] The utility model aims to provide a conical grouting arrangement structure which solves the problems of difficult consolidation grouting of surrounding rocks and low grouting quality in sealing the top arch and side walls of a tunnel.

[0005] To this end, the utility model adopts the following technical solutions:

[0006] A conical grouting arrangement structure of a solid plugging body, wherein a plugging body is arranged between a construction branch tunnel and a water conveyance tunnel, wherein the plugging body comprises a hollow section of the plugging body adjacent to the construction branch tunnel and a solid section of the plugging body adjacent to the water conveyance tunnel; a conical consolidation grouting hole is jointly provided in the solid section of the plugging body and the surrounding rock around the tunnel, wherein a starting end of the conical consolidation grouting hole is arranged on the side end surface of the hollow section of the plugging body adjacent to the solid section of the plugging body, and the conical consolidation grouting hole obliquely penetrates the solid section of the plugging body and is drilled into the surrounding rock, so that the conical consolidation grouting hole forms an annular grouting consolidation ring on the solid section of the plugging body and the surrounding rock around the tunnel.

[0007] Furthermore, there are 12 conical consolidation grouting holes in the grouting consolidation ring.

[0008] Furthermore: a construction joint is provided between the hollow section of the plugging body and the solid section of the plugging body.

[0009] Furthermore: a water-stop copper sheet is arranged on the construction joint to form a closed irrigation area.

[0010] Furthermore, the conical consolidation grouting holes within the tunnel side wall can also form joint grouting holes for filling and sealing gaps and joints.

[0011] Compared with the prior art, the utility model has the following beneficial effects:

[0012] The utility model forms an effective closed annular consolidation ring by obliquely drilling a conical consolidation grouting hole into the surrounding rock, thereby improving the integrity and homogeneity of the rock mass around the tunnel side wall and the top arch, reducing rock mass deformation and uneven settlement, and improving the plugging quality. At the same time, the utility model can not only support consolidation grouting, but also complete joint grouting without increasing the number of additional holes, fill and plug the gaps and joints, ensure the effective transfer of stress, and effectively improve the grouting efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a plan view of the utility model;

[0014] Figure 2 It is a longitudinal sectional schematic diagram of the utility model;

[0015] Figure 3 It is a cross-sectional schematic diagram of the utility model.

[0016] The markings in the attached figure are: 1-conical consolidation grouting hole; 2-solid section of the sealing body; 3-hollow section of the sealing body; 4-construction joint; 5-water-stop copper sheet; 6-construction branch hole; 7-water diversion tunnel. DETAILED DESCRIPTION

[0017] The present invention is further described below in conjunction with the accompanying drawings and embodiments, but they are not intended to limit the present invention.

[0018] like Figure 1-3 As shown, a conical grouting arrangement structure of a solid plugging body is provided, wherein a plugging body is provided between a construction branch tunnel 6 and a water conveyance tunnel 7, wherein the plugging body comprises a hollow section 3 of the plugging body adjacent to the construction branch tunnel 6 and a solid section 2 of the plugging body adjacent to the water conveyance tunnel 7; a conical consolidation grouting hole 1 is jointly provided in the solid section 2 of the plugging body and the surrounding rock of the tunnel, wherein a starting end of the conical consolidation grouting hole 1 is provided at a side end surface of the hollow section 3 of the plugging body adjacent to the solid section 2 of the plugging body, and the conical consolidation grouting hole 1 obliquely penetrates the solid section 2 of the plugging body and is drilled into the surrounding rock, so that the conical consolidation grouting hole 1 forms an annular grouting consolidation ring on the solid section 2 of the plugging body and the surrounding rock of the tunnel, thereby promoting the slurry to penetrate into the surrounding rock of the side wall and the top arch of the tunnel through the conical consolidation grouting hole 1, thereby forming an effective consolidation ring, which has a good reinforcement effect on the surrounding rock, and effectively improves the efficiency and quality of grouting, as well as the safety and stability of the project.

[0019] In this embodiment, a construction joint 4 is provided between the hollow section 3 of the plugging body and the solid section 2 of the plugging body, and a water-stop copper sheet 5 is provided on the construction joint 4 to form a closed irrigation area. The water-stop copper sheet 5 can further achieve a waterproof effect to prevent water from penetrating from the joints and cracks.

[0020] In the present embodiment, each conical consolidation grouting hole 1 is drilled obliquely into the surrounding rock from the concrete surface of the solid section 2 of the sealing body, and the opening position is generally annular on the concrete surface of the solid section 2 of the sealing body, so that there are 12 conical consolidation grouting holes 1 in each ring of grouting consolidation circle, and the conical consolidation grouting holes 1 are arranged in a plum blossom shape, and the reverse extension lines of the axis of each conical consolidation grouting hole 1 intersect at one point, and this point is located on the axis of the sealed tunnel.

[0021] In this embodiment, the tapered consolidation grouting holes 1 within the tunnel side wall can also form joint grouting holes for filling and sealing gaps and joints to ensure effective transfer of stress and improve grouting efficiency.

[0022] See also Figure 1-3 When the conical grouting arrangement structure is used to perform grouting construction on the surrounding rock around the solid section 2 of the plugging body, the specific contents are as follows:

[0023] First, measurement and positioning are carried out on the concrete surface of the solid section 2 of the plugging body. The position and number of the conical consolidation grouting holes 1 are determined based on actual engineering needs. The hole positions are distributed in a ring shape, with the center of each ring coinciding, following the plum blossom arrangement principle.

[0024] Secondly, drilling is performed according to the determined hole position. Due to the limited operating space of the conical consolidation grouting hole 1, a small drilling rig is used for drilling. A hole is manually dug at the hole position before drilling. After the hole is dug, drilling is performed according to the designed inclination and azimuth to ensure that the conical consolidation grouting hole 1 is obliquely drilled from the concrete surface of the solid section 2 of the plugging body into the surrounding rock to reach the target position. The progress of drilling should not be too fast to prevent the drill head from heating up and affecting the strength of the concrete around the hole.

[0025] Finally, grouting is carried out, and the slurry penetrates into the surrounding rock through the drilled conical consolidation grouting hole 1 to form an effective closed annular consolidation ring, thereby improving the integrity and homogeneity of the rock mass around the tunnel side wall and the top arch, and reducing rock mass deformation and uneven settlement; at the same time, the conical consolidation grouting hole 1 within the side wall is also a joint grouting hole, and the joint grouting is achieved through the embedded pipe, combining the grouting material with the original concrete interface of the joint to undergo a curing reaction, thereby filling and sealing the gaps and joints.

[0026] The above embodiment is only a preferred technical solution of the present invention. Those skilled in the art should understand that the technical solutions or parameters in the embodiments can be modified or replaced without departing from the principle and essence of the present invention, and all should be included in the protection scope of the present invention.

Claims

1. A solid plugging body conical grouting arrangement structure, characterized in that: A plugging body is arranged between the construction branch hole (6) and the water conveyance tunnel (7), wherein the plugging body comprises a hollow plugging body section (3) adjacent to the construction branch hole (6) and a solid plugging body section (2) adjacent to the water conveyance tunnel (7); The solid section (2) of the sealing body and the surrounding rock of the tunnel are jointly provided with a conical consolidation grouting hole (1); the starting end of the conical consolidation grouting hole (1) is arranged on the side end surface of the hollow section (3) of the sealing body adjacent to the solid section (2) of the sealing body; the conical consolidation grouting hole (1) obliquely penetrates the solid section (2) of the sealing body and is drilled into the surrounding rock, so that the conical consolidation grouting hole (1) forms a circular grouting consolidation ring on the solid section (2) of the sealing body and the surrounding rock of the tunnel.

2. A conical grouting arrangement structure of a solid plugging body according to claim 1, characterized in that: There are 12 conical consolidation grouting holes (1) in the grouting consolidation ring.

3. A conical grouting arrangement structure of a solid plugging body according to claim 1, characterized in that: A construction joint (4) is provided between the hollow section (3) of the plugging body and the solid section (2) of the plugging body.

4. A conical grouting arrangement structure of a solid plugging body according to claim 3, characterized in that: A water-stop copper sheet (5) is provided on the construction joint (4) to form a closed irrigation area.

5. The solid plugging body conical grouting arrangement structure according to claim 1, characterized in that: The conical consolidation grouting holes (1) within the tunnel side wall can also form joint grouting holes for filling and sealing gaps and joints.