Novel supporting system for pipeline trench excavation in urban limited environment

By adopting a novel support system using planar steel formwork and internal support components in the restricted environment of urban areas, the problems of bulky, costly, complex, and low-safety trench support devices in existing technologies have been solved, achieving rapid, safe, and low-cost trench excavation support.

CN222044226UActive Publication Date: 2024-11-22CCCC THIRD HARBOR ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420563190.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-22
Publication Date
2024-11-22
Estimated Expiration
2034-03-22

AI Technical Summary

Technical Problem

Existing trench support devices are cumbersome, costly, complex, unsafe, and inefficient in urban restricted environments. They lack technological innovations specifically designed for urban restricted environments, leading to inconvenience in construction.

Method used

A new support system, including planar steel formwork and internal support components, is adopted. It is fixed with high-strength bolts and welded together. Combined with adjustable steel top supports and reinforcement components, it forms a stable support structure, which simplifies the operation process and improves safety.

Benefits of technology

It enables rapid, safe, and low-cost trench excavation and support in restricted urban environments, improving construction efficiency and safety while simplifying the operation process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222044226U_ABST
    Figure CN222044226U_ABST
Patent Text Reader

Abstract

The utility model relates to a novel supporting system for excavation of a pipeline groove in an urban limited environment, which comprises plane steel templates respectively arranged on two sides of the pipeline groove and an inner supporting component arranged on the upper side of the pipeline groove, and vertical steel pipes are arranged on the outer walls of the plane steel templates; the inner supporting assembly comprises a supporting steel pipe, adjustable steel jacking supports are connected to the two ends of the supporting steel pipe in an inserted mode, and double-spliced transverse steel pipes are arranged at the ends, away from the supporting steel pipe, of the adjustable steel jacking supports. The novel supporting system for pipeline trench excavation in the urban limited environment is easy to operate, good in stability, convenient and fast to install, low in use cost, high in use safety, beneficial to shortening the construction period, capable of improving the use efficiency, good in practicability and suitable for popularization and application. The problems that a traditional groove supporting device is cumbersome in operation, high in use cost, complex in operation, low in safety and low in efficiency, technical innovation for operation in the urban limited environment is lacked, and inconvenience is brought to construction are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of pipeline construction support, in particular to a new type of support system for pipeline trench excavation in a restricted urban environment. Background Art

[0002] In the old town pipeline reconstruction project, the roads are relatively narrow and the traffic volume is large. It is necessary to ensure the normal traffic of the existing roads. After comprehensively considering various factors such as economic cost, construction feasibility and road traffic demand, the open excavation trench support method is usually adopted for the construction of new pipelines. Trench support refers to the support, reinforcement and protection measures for the trench side walls and the surrounding environment to ensure the safety of underground structure construction and the surrounding environment of the trench. The trench needs to be supported during the pipeline construction process.

[0003] Due to the narrow roads, heavy traffic flow, complex underground pipelines in the construction area of ​​the old central urban area, the existing pipelines are in disrepair and the surrounding old buildings are dense, so there are many restrictive factors in trench excavation. The trench support device in the existing technology is cumbersome to operate, has high cost, complex operation, low safety and low efficiency, and lacks technical innovation for operations in restricted urban environments, which causes inconvenience to construction. Therefore, a new support system for pipeline trench excavation in restricted urban environments is proposed to solve the above problems. Utility Model Content

[0004] In view of the shortcomings of the existing technology, the utility model provides a new support system for pipeline trench excavation in restricted urban environments, which has the advantages of simple operation, good stability, and quick installation. It solves the problem that traditional trench support devices are cumbersome to operate, have high use costs, are complicated to operate, have low safety and efficiency, and lack technical innovations for operations in restricted urban environments, causing inconvenience to construction.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a new type of support system for pipeline trench excavation in a restricted urban environment, comprising a flat steel template respectively arranged on both sides of the pipeline trench and an inner support assembly arranged on the upper side of the pipeline trench, wherein a vertical steel pipe is arranged on the outer wall of the flat steel template;

[0006] The inner support component includes a supporting steel pipe, both ends of which are plugged with adjustable steel top supports, and the end of the adjustable steel top support away from the supporting steel pipe is provided with a double-jointed transverse steel pipe, and a reinforcement component is also provided on the outside of the supporting steel pipe.

[0007] Furthermore, the number of the flat steel formworks on both sides of the pipeline groove is four, and the four flat steel formworks are assembled into a group and reinforced as a whole formwork, and the number of the vertical steel pipes in each group of the whole formwork is four.

[0008] Furthermore, the adjacent planar steel formworks are fixed by high-strength bolts, and the vertical steel pipes are fixedly connected to the outer walls of the planar steel formworks by welding.

[0009] Furthermore, the number of the supporting steel pipes is set to four, and the double-jointed transverse steel pipe is composed of two steel pipes welded and fixed to each other, and the double-jointed transverse steel pipe is fixed to the vertical steel pipe by welding.

[0010] Furthermore, the reinforcement component includes a reinforcement bracket, and the upper and lower ends of the reinforcement bracket are fixedly connected with an arc-shaped support plate, and the number of the reinforcement brackets is set to four.

[0011] Furthermore, the inner wall of the arc-shaped support plate is matched with the outer wall of the support steel pipe, and the arc-shaped support plates at the upper and lower ends of the reinforcement bracket are connected to the support steel pipe.

[0012] Furthermore, the arc-shaped support plate is detachably connected to the outer wall of the support steel pipe by screws.

[0013] Compared with the prior art, the utility model provides a new support system for pipeline trench excavation in a restricted urban environment, which has the following beneficial effects:

[0014] 1. A new type of support system for pipeline trench excavation in a restricted environment in this urban area is to splice the flat steel formwork on the ground, measure the position, drive in three positioning bars, splice the flat steel formwork according to the position of the positioning bars, and use an oil pen to mark the bolt hole position. After marking, use a puncher to punch holes at the splicing of the flat steel formwork, install bolts, and tighten them. A horizontal ink line pops up at the specified position of a set of templates, and professional welding operators weld on the contact surface between the vertical steel pipe and the flat steel formwork. The assembled flat steel formwork is hoisted into the excavated trench by a crane, and the setting position of the internal support component is controlled by laying out the line. The operator controls the setting position according to the laying out position. Use a steel ruler to measure the spacing and mark it with a oil pen, then install the internal supports one by one according to the marked positions. Before installing the internal supports, check the screw diameter of the adjustable steel top support to ensure that the gap between the screw diameter and the supporting steel pipe is not greater than 3mm. In addition, mark the position of the maximum leakage length of each adjustable steel top support screw. During construction, the operator is required to ensure that the leakage length of the adjustable steel top support screw shall not exceed the marked position. In addition, after the installation is completed, use a torque wrench to check the torque value of the fasteners. When the trench construction is completed, pull out the combined steel formwork support and move the next section of the trench for support, forming a flow operation and efficient construction.

[0015] 2. The new support system for pipeline trench excavation in the restricted environment of the urban area is simple to operate, has good stability, is easy and quick to install, has low use cost, and is highly safe to use. It is conducive to shortening the construction period, improving the use efficiency, and has good practicality. It solves the problems of traditional trench support devices that are bulky to operate, high use cost, complex operation, low safety, low efficiency, and lack of technological innovation for operations in restricted environments in urban areas, which causes inconvenience to construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 This is a cross-sectional view of the structure of the utility model;

[0017] Figure 2 For this utility model Figure 1 A is a schematic diagram of the enlarged structure shown;

[0018] Figure 3 It is a structural side view of the flat steel formwork of the utility model.

[0019] In the figure: 1. Pipeline groove; 2. Flat steel formwork; 3. Vertical steel pipe; 4. Support steel pipe; 5. Adjustable steel top support; 6. Double-jointed horizontal steel pipe; 7. Reinforcement bracket; 8. Arc support plate. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0021] Embodiment 1:

[0022] See also Figure 1-3In the present embodiment, a new type of support system for pipeline trench excavation under a restricted urban environment includes a plane steel formwork 2 respectively arranged on both sides of the pipeline trench 1 and an internal support assembly arranged on the upper side of the pipeline trench 1. A vertical steel pipe 3 is arranged on the outer wall of the plane steel formwork 2. The number of plane steel formworks 2 on both sides of the pipeline trench 1 is four. The four plane steel formworks 2 are assembled and reinforced as a formwork as a whole. The number of vertical steel pipes 3 on each formwork as a whole is four. Adjacent plane steel formworks 2 are fixed to the plane steel formworks 2 by high-strength bolts. The vertical steel pipe 3 is fixedly connected to the outer wall of the plane steel formwork 2 by welding. The internal support assembly includes a supporting steel pipe 4. The number of supporting steel pipes 4 is set to four. Both ends of the supporting steel pipe 4 are plugged with adjustable steel top supports 5. The end of the adjustable steel top support 5 away from the supporting steel pipe 4 is provided with a double-jointed transverse steel pipe 6. The double-jointed transverse steel pipe 6 is composed of two steel pipes welded and fixed to each other. The double-jointed transverse steel pipe 6 is fixed to the vertical steel pipe 3 by welding.

[0023] Embodiment 2:

[0024] See also Figure 1 On the basis of the first embodiment, a reinforcement component is further provided on the outside of the supporting steel pipe 4, and the reinforcement component includes a reinforcement bracket 7, and the upper and lower ends of the reinforcement bracket 7 are fixedly connected with arc-shaped support plates 8. The number of reinforcement brackets 7 is set to four, and the inner wall of the arc-shaped support plate 8 is adapted to the outer wall of the supporting steel pipe 4. The arc-shaped support plates 8 at the upper and lower ends of the reinforcement bracket 7 are connected to the supporting steel pipe 4, and the arc-shaped support plates 8 are detachably connected to the outer wall of the supporting steel pipe 4 by screws. Through the cooperation of the arc-shaped support plates 8, the structure of the supporting steel pipe 4 can be reinforced, the stability of the structure is further enhanced, and the support effect is improved.

[0025] The working principle of the above embodiment is:

[0026] When the utility model is used, the plane steel template 2 is spliced ​​on the ground, the position is measured, three positioning ribs are driven in, the plane steel template 2 is spliced ​​according to the position of the positioning ribs, and the bolt hole position is marked with an oil pen. After the marking is completed, a punching machine is used to punch holes at the splicing of the plane steel template 2, bolts are installed and tightened, and a horizontal ink line is popped up at a specified position of a set of templates. Professional welding operators weld on the contact surface of the vertical steel pipe 3 and the plane steel template 2. The assembled plane steel template 2 is hoisted into the excavated trench by a crane, and the setting position of the inner support component is controlled by laying out. The operator uses a steel ruler to measure the position of the inner support component according to the laying out position. Measure the spacing and mark it with a paint pen, then install the internal supports one by one according to the marked positions. Before installing the internal supports, check the screw diameter of the adjustable steel top support 5 to ensure that the gap when the screw diameter is inserted into the supporting steel pipe 4 is not greater than 3mm. In addition, mark the position of the maximum leakage length of each adjustable steel top support 5 screw. During construction, the operator is required to ensure that the leakage length of the adjustable steel top support 5 screw shall not exceed the marked position. In addition, after the installation is completed, use a torque wrench to check the torque value of the fasteners. When the trench construction is completed, pull out the combined steel formwork support, move the next section of the trench for support, and form a flow operation.

[0027] The installation method, connection method or setting method disclosed in this embodiment are all common mechanical methods, and they can be implemented as long as they can achieve their beneficial effects.

[0028] It should be noted that in this article, the orientation or position relationship indicated is based on the orientation or position relationship shown in the drawings, which is only for the convenience of describing the present application and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation. Therefore, it should not be understood as a limitation on the present application.

[0029] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.

[0030] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A new type of support system for pipeline trench excavation in urban restricted environment, Features: It comprises a flat steel template (2) respectively arranged on both sides of the pipeline groove (1) and an inner support assembly arranged on the upper side of the pipeline groove (1), wherein a vertical steel pipe (3) is arranged on the outer wall of the flat steel template (2); The inner support assembly comprises a support steel pipe (4), both ends of the support steel pipe (4) are plugged with adjustable steel top supports (5), one end of the adjustable steel top support (5) away from the support steel pipe (4) is provided with a double-jointed transverse steel pipe (6), and a reinforcement assembly is also provided on the outer side of the support steel pipe (4).

2. According to claim 1, a new type of support system for pipeline trench excavation in a restricted urban environment, Features: The number of the flat steel formworks (2) on both sides of the pipeline groove (1) is four, and the four flat steel formworks (2) are assembled into a group and reinforced as a formwork as a whole. The number of the vertical steel pipes (3) in each group of the formwork as a whole is four.

3. According to claim 1, a new type of support system for pipeline trench excavation in a restricted urban environment, Features: Adjacent planar steel formworks (2) are fixed to each other via high-strength bolts, and the vertical steel pipes (3) are fixedly connected to the outer walls of the planar steel formworks (2) via welding.

4. According to claim 1, a new type of support system for pipeline trench excavation in a restricted urban environment, Features: The number of the supporting steel pipes (4) is set to four, and the double-jointed transverse steel pipe (6) is composed of two steel pipes that are welded and fixed to each other, and the double-jointed transverse steel pipe (6) is fixed to the vertical steel pipe (3) by welding.

5. According to claim 1, a new type of support system for pipeline trench excavation in a restricted urban environment, Features: The reinforcement assembly comprises a reinforcement bracket (7), the upper and lower ends of the reinforcement bracket (7) being fixedly connected to arc-shaped support plates (8), and the number of the reinforcement brackets (7) is set to four.

6. A new type of support system for pipeline trench excavation in a restricted urban environment according to claim 5, Features: The inner wall of the arc-shaped support plate (8) is matched with the outer wall of the support steel pipe (4), and the arc-shaped support plates (8) at the upper and lower ends of the reinforcement bracket (7) are both connected to the support steel pipe (4).

7. According to claim 5, a new type of support system for pipeline trench excavation in a restricted urban environment, Features: The arc-shaped support plate (8) is detachably connected to the outer wall of the support steel pipe (4) via screws.